Miami Special Utility Authority (MSUA) Packets
Special MeetingMiami, OK · May 21, 2019
Agenda
Municipal Electric Systems of Oklahoma
Drake Rice Customer Service Award
The award was created to recognize individuals who best exemplify the qualities of a true
customer service professional. Those qualities are: consistent positive attitude towards customers
to assist them as needed; a positive and helpful attitude with coworkers to ensure a cooperative,
customer-focused work environment; and, a personal commitment to always giving his or her best
in every situation.
MSUA PURCHASE ORDERS PRESENTED
Tuesday, May 21, 2019
VENDOR DESCRIPTION
CUSTOMER SERVICE
PIONEER PRINTING DEPOSIT ONLY STAMP 19.95
19.95
ADMINISTRATIVE SERVICES
DAVIS WRIGHT TREMAINE PENSACOLA RELICENSING (PO#19-01353) 40,997.75
GOODELL, STRATTON RULE CURVE CHANGE (PO#19-01354) 988.00
GRDA PURCHASED POWER 4/1-4/30/19 621,334.76
663,320.51
METERING
ARROWHEAD OUTDOOR DIGITAL BOARD POSTING - METER READER 1 75.00
75.00
IT
CONTROL SCAN SPG PACKAGE - AIRPORT 34.95
UNITAS GLOBAL BACKUP SERVICES (PO#19-01389) 2,205.82
2,240.77
ELECTRIC
TYLER CLINE MILEAGE REIMBURSEMENT (PO#19-01392) 243.60
ACE HARDWARE TIME DELAY FUSE 44.97
ARROWHEAD OUTDOOR DIGITAL BOARD POSTING - LINEMAN 2 75.00
ARROWHEAD OUTDOOR DIGITAL BOARD POSTING - LINEMAN 75.00
COLE EQUIPMENT AUGER, BITS 71.00
GLOBAL RENTAL CARRIER DEVICE (PO#19-01320) 3,300.00
GLOBAL RENTAL DIGGER DERRICK (PO#19-01321) 3,300.00
LOCKE SUPPLY POCKET PARK SUPPLIES (PO#19-01319) 659.77
LOCKE SUPPLY POCKET PARK SUPPLIES 111.27
OLSSON SUB 1 UPGRADE (PO#19-01340) 35,708.55
OLSSON HWY 125 RELOCATE (PO#19-01342) 9,275.89
OLSSON PROCUREMENT SUB 2 (PO#19-01345) 15,197.21
OLSSON FEEDER RELAY (PO#19-01343) 6,929.99
74,992.25
ROW
ARVEST EQUIPMENT FINANCE LEASE PAYMENT MAY 786.01
FASTENAL SAFETY EYE WEAR 12.89
HAPPY COW FEEDS ROW CHEMICALS (PO#19-01132) 3,690.00
M&K OUTDOORS SHOP SUPPLIES 66.35
M&K OUTDOORS PULL ROPE/SPARK PLUGS 56.69
4,611.94
WATER PRODUCTION
ACCURATE ENVIRONMENTAL TOTAL COLIFORM TESTING 56.00
ACE HARDWARE CONCRETE 26.34
82.34
WATER DISTRIBUTION
ARVEST EQUIPMENT FINANCE LEASE PAYMENT -MAY 1,224.54
B&B AUTO BATTERY 285.72
B&L WATERWORKS METER BOX RISERS 378.60
KATNER MILLS OIL FILTER/OIL 14.42
1,903.28
POLLUTION CONTROL
ARVEST EQUIPMENT FINANCE LEASE PAYMENT - MAY 1512.65
OKLAHOMA NATURAL GAS GAS USAGE 3/29-5/2/19 23.11
PIKE PASS TOLL FEES 4/1-4/30/19 11.20
USA BLUEBOOK CONTROLLER, SENSOR (PO#19-01299) 2519.11
USA BLUEBOOK HIGH VOLTAGE SIGNS, LIFE PRESERVERS 388.83
4454.90
SOLID WASTE
AIRE MASTER DEODORIZER SERVICES 12.71
ARVEST EQUIPMENT LEASE PAYMENT - MAY 19 8822.47
KATNER MILLS OIL, FUEL, AIR FILTERS 129.31
KEMP STONE CRUSHER ROCK 389.89
MIAMI FIRE PROTECTION ANNUAL INSPECTIONS 385.00
MIAMI PEST & TERMITE REGULAR SERVICE 60.00
OKLAHOMA NATURAL GAS GAS USAGE 3/29-5/2/19 63.23
UNITED SCALE SERVICE SCALE CHECK TEST 195.00
US BANK LEASE PAYMENT - MAY 19 1724.50
WELCH STATE BANK LEASE PAYMENT - MAY 19 10653.36
WELCH STATE BANK LEASE PAYMENT - MAY 19 5818.67
28254.14
SALARIES & BENEFITS 5/13/19 128,621.76
FINAL REFUND CHECKS 5/10/19 1,807.16
TOTAL MSUA CLAIMS 910,384.00
THE MIAMI SPECIAL UTILITY AUTHORITY (MSUA) MET IN REGULAR SESSION MAY 07, 2019, IN THE MIAMI CIVIC CENTER
COUNCIL CHAMBERS AT 5:30 PM WITH THE FOLLOWING MEMBERS PRESENT:
Rudy Schultz, Chairman Dean Kruithof, Trust Manager (Absent)
Doug Weston, Trustee Ben Loring, Trust Attorney (Via Phone Conference)
Ryan Orcutt, Trustee Melissa Moore, City Clerk
Brian Forrester, Trustee (Absent)
Vicki Lewis, Trustee
The agenda for the meeting was posted in the main lobby and the north outside entryway of the Miami Civic Center at
3:55PM on May 06, 2019.
THE TRUST MAY DISCUSS, CONSIDER, AND VOTE ON ANY ITEM LISTED IN THIS AGENDA:
Call to Order
Chairman Schultz called the meeting to order at 5:31PM.
Invocation
Invocation by Pastor of Grace Church, Phil Shyers
Pledge of Allegiance
Trustee Lewis led the Pledge of Allegiance
Public Input and Unscheduled Personal Appearances
None.
CONSENT AGENDA By unanimous consent the public body may designate noncontroversial items to be considered in
one motion and one vote. The public body may add items from the regular agenda and approve. Posted agenda
items not added to the consent docket will be considered separately in their regular order. Staff recommends that
Item 6 through Item 8 be placed on the consent agenda.
Trustee Weston moved to transfer Item #6 (Approve Claims: $298,809.23) through Item #8 (Budget Amendments:
#19-77 MSUA - Electric (Receipting and Expending Oklahoma Department Of Transportation Reimbursement); #19-79
MSUA - Stormwater (Transfer for Merit Increases and Salary Study); #19-81 Stormwater - Stormwater (Transfer for
Merit Increases and Salary Study)) to the consent agenda and approve as presented. The motion was seconded by
Trustee Lewis. The Trust was polled with the following results.
Weston, Aye Lewis, Aye Orcutt, Aye Schultz, Aye Forrester, Absent
Chairman Schultz declared the motion carried.
Approve Claims: $298,809.23
Moved to consent agenda.
Approve Minutes: April 16, 2019 (Regular)
Moved to consent agenda.
Budget Amendments: #19-77 MSUA - Electric (Receipting and Expending Oklahoma Department Of Transportation
Reimbursement); #19-79 MSUA - Stormwater (Transfer for Merit Increases and Salary Study); #19-81 Stormwater -
Stormwater (Transfer for Merit Increases and Salary Study)
Moved to consent agenda.
MSUA Page 1 of 7 May 07, 2019
Accept or Reject Electric Utility Agreement With J-M Farms Pending Approval of Annexation Into the City of Miami
by the City Council
Tyler Cline explained this agreement allows the Miami Special Utility Authority to serve J-M Farms with electricity.
Trustee Orcutt made a motion to accept the electric utility agreement with J-M Farms pending approval of annexation
into the City of Miami by the City Council The motion was seconded by Trustee Lewis. The Trust was polled with the
following results:
Orcutt, Aye Lewis, Aye Weston, Aye Schultz, Aye Forrester, Absent
Chairman Schultz declared the motion carried.
Other New Business, if any, Which has Arisen Since the Posting of the Agenda and Could not Have Been Anticipated
Prior to the Time of Posting (25 O.S. § 311(9))
None.
Trustee Community Announcements
None.
Adjournment
Trustee Weston moved to adjourn the meeting. The motion was seconded by Chairman Schultz. The Trust was polled
with the following results:
Weston, Aye Schultz, Aye Lewis, Aye Orcutt, Aye Forrester, Absent
Chairman Schultz declared the meeting adjourned at 5:35PM.
___________________ _____________________ _______________________
Trustee Lewis Trustee Orcutt Trustee Weston
___________________ _____________________ ATTEST: ________________________
Trustee Schultz, Chairman Trustee Forrester Melissa Moore, City Clerk
MSUA PURCHASE ORDERS PRESENTED
Tuesday, May 7, 2019
VENDOR DESCRIPTION
INVENTORY
UTILITY SERVICE CO. 430 FT. 12" PVC PIPE 47,515.00
47,515.00
CUSTOMER SERVICE
CHAMBER OF COMMERCE EMPLOYEE BANQUET TICKETS 60.00
MIAMI AUTO SUPERCENTER 2007 SATURN REPAIRS 326.41
MSUA Page 2 of 7 May 07, 2019
OFFICIAL PAYMENTS BILL PAYMENTS 40.00
PIONEER PRINTING RECEIPT PAPER 13.10
439.51
ADMINISTRATIVE SERVICES
CHAMBER OF COMMERCE EMPLOYEE BANQUET TICKET - MA 15.00
OLSSON ENGINEERING SERVICES (PO#19-01330) 8,709.07
8,724.07
METERING
FUELMAN FUEL USAGE 4/15/19 39.99
MAIN STREET CAR WASH CAR WASH-TECHNICAL 2.99
42.98
IT
CABLEONE INTERNET SERVICES 35.02
CONVERGEONE SHAREPOINT PURCHASING CONTRACT 33.75
CONVERGEONE SHAREPOINT TRACKING (PO#19-01297) 880.00
TYLER TECHNOLOGIES UTILITY BILLING NOTIFICATION 386.30
TYLER TECHNOLOGIES TYLERTECH MAINTENANCE (PO#19-01304) 3,706.14
TYLER TECHNOLOGIES EXECUTIMEACCESS (PO#19-00078) 661.50
5,702.71
ELECTRIC
ACE HARDWARE SCRAPER, SAW BLADE, SAW, RULE TAPE 280.90
CDW- GOVERNMENT 27" LED MONITORS 337.56
COLE EQUIPMENT MINI SKID STEER RENTAL 160.00
FASTENAL MEDSPLIT L/W Z, BOLTS 97.33
FUELMAN FUEL USAGE 4/15/19 647.92
HACH COMPANY ANNUAL JOBCAL SERVICE (PO#19-01309) 178.33
LOCKE SUPPLY POCKET PARK LIGHTS (PO#19-01190) 8,424.00
MAIN STREET CAR WASH CAR WASH - ELECTRIC 37.09
O'REILLY CLEANER, OIL FILTER, COIL PLUG 47.48
PINKLEY SALES TRAFFIC SIGNAL PROCESSOR (PO#19-00618) 4,574.00
UNIVERSAL FIELD SERVICES ACQUISITION SERVICES (PO#19-01272) 2,334.00
WELCH STATE BANK LEASE PAYMENT - MAY 3,670.57
20,789.18
ROW
ACE HARDWARE SCRAPER, SAW, TAPE MEASURE, TREE FOOD, SOIL 102.77
B&B AUTO TRAILER WIRING CONNECTOR, BLADE 24.85
FUELMAN FUEL USAGE 4/15/19 5.58
M&D LUMBER TREATED WOOD 35.64
168.84
WATER PRODUCTION
ACCURATE ENVIRONMENTAL WATER SAMPLING, RADIOCHEMISTRY TEST 560.00
CDW-GOVERNMENT COMPUTERS (PO#19-01001) 1,288.80
DEQ PESTICIDES (PO#19-01315) 518.62
MSUA Page 3 of 7 May 07, 2019
HACH ANNUAL JOBCAL SERVICE (PO#19-01309) 178.33
KEITH SILER RETIREMENT PAYMENT (PO#19-01240) 250.00
MIAMI TROPHY RETIREMENT PLAQUE 38.80
OKLAHOMA NATURAL GAS GAS USAGE 3/14-4/12/19 69.06
PACTEC FILTER CLOTH (PO#19-01274) 2,813.12
5,716.73
WATER DISTRIBUTION
ARVEST LEASE PAYMENT - MAY 1,445.64
B&L WATERWORKS TAP SADDLE, BOLTS, NOZZLE, DRAIN, VALVE 1,771.52
FRIENDSHIP HOUSE RAGS 21.90
FUELMAN FUEL USAGE 4/15/19 243.45
KARNES PRO TIRE FLAT REPAIR 13.00
US BANK LEASE PAYMENT - MAY 1,724.50
5,220.01
POLLUTION CONTROL
AQUOINICS UV QUARTZ SLEEVES (PO#19-01318) 504.72
FUELMAN FUEL USAGE 4/15/19 276.45
HACH ANNUAL JOBCAL SERVICES (PO#19-01309) 178.35
KATNER MILLS AIR FILTER, O'RINGS, OIL FILTER, OIL 79.34
MIAMI INDUSTRIAL SUPPLY HOSE, SWIVEL, O'RING 70.77
OKLAHOMA TURNPIKE AUTHORITY TOLL FEES 3/1-3/31/19 11.20
USA BLUEBOOK LAB SUPPLIES 466.02
VERDER PUMP GEAR CASE (PO#19-01072) 13189.80
WALLIS LUBRICANT 5 GALLONS MOBILE OIL 301.71
15078.36
WW COLLECTION
FUELMAN FUEL USAGE 4/15/19 54.44
54.44
SOLID WASTE
ACTION GRAPHICS WINDOW ENVELOPES 78.00
AIRE-MASTER DEODORIZER SERVICES 25.42
ARVEST LEASE PAYMENT - MAY 8822.47
FUELMAN FUEL USAGE 4/15/19 1144.13
HACH ANNUAL JOBCAL SERVICE (PO#19-01309) 178.33
KATNER MILLS BACKUP LIGHT 11.99
MIAMI PEST & TERMITE CONTROL REG. EXTERMINATOR SERVICES 60.00
OKLAHOMA TURNPIKE AUTHORITY TOLL FEES 3/1-3/31/19 4.20
OTTAWA COUNTY DIST.#3 CLEAN UP ASSISTANCE (PO#19-01227) 2070.60
SOUTHERN TIRE MART STEER TIRE 453.05
YELLOWHOUSE MACHINERY AIR FILTERS 86.85
12935.04
COMMUNITY DEVELOPMENT
ADMIRAL EXPRESS PAPER 44.58
FUELMAN FUEL USAGE 4/15/19 35.64
MSUA Page 4 of 7 May 07, 2019
OTTAWA CO. ABSTRACT LEGAL DESCRIPTION 75.00
155.22
BANK OF OKLAHOMA LOCAL & BOND TRUSTEE FEES 500.00
SALARIES & BENEFITS 4/25/19 156,116.45
FINAL UTILITY REFUNDS 5,071.27
CREDIT CARD CHARGES 3/16-3/31/19 14,579.42
TOTAL MSUA CLAIMS 298,809.23
SPECIAL UTILITY AUTHORITY
May 7, 2019
MARCH 16, 2019 - MARCH 31, 2019
CUSTOMER SERVICE
PEREGRINE-POSTAGE $367.08
PEREGRINE-PRINTING $289.66
PEREGRINE-POSTAGE/PRINTING $307.24
PEREGRINE-POSTAGE $768.69
PEREGRINE-POSTAGE $604.11
PEREGRINE-POSTAGE/PRINTING $640.77
TOTAL $2,977.55
ADMINISTRATIVE SERVICES
QUILL-PAPER $119.95
QUILL-PAPER $119.95
STAND STEADY-STANDING DESKS $314.49
TOTAL $554.39
METERING
QUILL-PAPER $47.98
VISION METERING-METERS $2,200.00
CLEAN UNIFORM-RENTAL $16.35
CLEAN UNIFORM-RENTAL $32.70
TOTAL $2,297.03
INFORMATION TECHNOLOGY
CANON-COPIER CONTRACTS $4,356.29
AMAZON-NETWORK SWITCHES $74.96
WALMART-MONITOR $178.00
TOTAL $4,609.25
ELECTRIC
QUILL-PAPER $95.96
LOCKE-IMPACT $496.09
MSUA Page 5 of 7 May 07, 2019
FARWEST-TOOL HOLDER $331.45
B&B - MARINE M24-1000 $220.00
KEMPER-ALIGNMENT $45.00
TREASE-NITROGEN $47.99
FARWEST-BOOTS/D LOLLAR $345.00
CLEAN UNIFORM-RENTAL $99.29
FARWEST-BOOTS/B HARDAGE $328.66
CLEAN UNIFORM-RENTAL $99.29
PAYPAL-MESO CONFERENCE $425.00
TOTAL $2,533.73
RIGHT-OF-WAY
CLEAN UNIFORM-RENTAL $39.80
CLEAN UNIFORM-RENTAL $39.80
TOTAL $79.60
WATER PRODUCTION
LOCKE-CONTACT BLOCK/OPENER $41.85
TOTAL $41.85
WATER DISTRIBUTION
B&B-B&M OIL $158.00
CABLE ONE-INTERNET $89.79
TOTAL $247.79
POLLUTION CONTROL
QUILL-PAPER $23.99
ACE-PADLOCK AND KEYS $21.94
ACE-GATE KEYS $9.95
FASTENAL-NUTS/BOLTS $15.21
B&B-LABOR/WIRE/T-STAT $279.71
TOTAL $350.80
SOLID WASTE
LOCKE-RECEPTACLE/COVER PLATE $12.19
ACE-AIR COUPLER/MALE CONNECTOR $15.47
ACE-NIPPLES/COUPLER $18.47
TRACTOR SUPPLY-AIR COMPRESSOR $699.99
CLEAN UNIFORM-RENTAL $34.67
CLEAN UNIFORM-RENTAL $34.67
TOTAL $815.46
COMMUNITY DEVELOPMENT
QUILL-PAPER $47.98
TOTAL $47.98
STORMWATER
MSUA Page 6 of 7 May 07, 2019
QUILL-PAPER $23.99
TOTAL $23.99
GRAND TOTAL $14,579.42
MSUA Page 7 of 7 May 07, 2019
MSUA
ACTION/DECISION REQUEST
MSUA MEETING May 21, 2019
DATE:
AGENDA TITLE: Accept or Reject Olsson and Associates Work Order No.
18/19-7 for Progress Industrial Park Improvements and
Extension, and State Revolving Fund Loan Funding
Documents
BACKGROUND:
• Project Location: Progress Industrial Park
• Field Services Include:
• Collecting topographic survey data within the planned utility projects
limits, extending from Progress Industrial Park north to E 60 Rd., along
the west side of HWY 69A.
• Complete geotechnical drilling as required for Substation Foundation
design and railroad utility crossing permits.
• Anticipated services include 4 borings at a combined depth of
105’.
• Waterline Extension Design Services:
• Prepare detailed drawings and technical specifications for the proposed
construction work and for all equipment and materials required under the
contract. The documents will be prepared for construction by the Client.
The specifications shall not contain contracts, bid forms, bidding
instructions, General or Supplementary Conditions, or other documents
typically included when the project will be competitively bid.
• Assist Owner in completing construction permit application and forms for
submittal to ODEQ and BNSF for review.
• SRF Loan Funding Design Services
• Assist Client with OWRB, CWSRF and ODEQ/DWSRF loan application
engineering documents.
• Schedule for Olsson’s Services:
• Anticipated Start Date: Within 3 weeks of return of signed Work Order.
• Anticipated Completion Date: ODEQ Permit Submittal within 10 weeks
• Compensation:
• Client shall pay to Olsson for the performance of the Field Services
Scope fixed fee of Eighteen Thousand Six Hundred Dollars ($18,600).
• Olsson shall submit invoices monthly and payment is due within 45
calendar days of invoice date. Olsson’s Scope of Services will be
provided on an estimated time and expense basis $45,000.
• Total fees for this scope of work shall be $63,600.
• Funds will be paid out of Professional services.
STAFFS RECOMMENDATION:
• Vote to Approve
PRESENTER(S):
Tyler Cline
MASTER AGREEMENT WORK ORDER
NO. 18/19-7
This exhibit is hereby attached to and made a part of the Master Agreement for Professional
Services dated November 1, 2016 between City of Miami/ Miami Special Utility Authority
(MSUA) (“Client”) and Olsson Associates (“Olsson”) providing for professional services.
Olsson’s Scope of Services for the Agreement is as indicated below.
GENERAL
Olsson has acquainted itself with the information provided by Client relative to the project and
based upon such information offers to provide the services described below for the project.
Client warrants that it is either the legal owner of the property to be improved by this Project or
that Client is acting as the duly authorized agent of the legal owner of such property.
PROJECT DESCRIPTION AND LOCATION
Project will be located at: Progress Industrial Park & SRF Loan Funding
Project Description: Utility Improvements and Extension
SCOPE OF SERVICES
Olsson shall provide the following services (Scope of Services) to Client for the Project:
Field Services
1.1 Collect topographic survey data within the planned utility projects limits extending
from Progress Industrial Park north to E 60 Rd. along the west side of Hwy 69A.
The topographic survey for the utility improvements project will locate,
underground utilities as located by utility location services, ground elevation, and
surface features as required for utility construction. Utilities not marked during
the initial survey requiring additional trips shall be considered additional services.
1.2 Complete geotechnical drilling as required for Substation Foundation design and
railroad utility crossing permits. Anticipated services include 4 borings at a
combined depth of 105’.
Waterline Extension Design Services
1.1 A project initiation meeting will be conducted with all parties involved to refine
project scope, review the project site, identify specific goals, determine area to
be surveyed, establish schedule for completion, and establish channels of
communication.
1.2 Coordinate with Client’s representative for the project and Provide general
administrative services to manage and support the design of the project.
1.3 Prepare detailed drawings and technical specifications for the proposed
construction work and for all equipment and materials required under the
Page 1 of 4
contract. The documents will be prepared for construction by the Client. The
specifications shall not contain contracts, bid forms, bidding instructions, General
or Supplementary Conditions, or other documents typically included when the
project will be competitively bid.
1.4 Perform an “in-house” quality control review of drawings and specifications at 90
percent completion.
1.5 Provide owner with legal descriptions for waterline utility easements for recording
on City forms. Land acquisition services are not included as part of this work
order.
1.6 Provide digital sets of drawings and specifications to the Client for review at 90
percent. As part of the review of the submittal, meet with Client or Client’s
Designee to discuss their review comments and resolve any questions.
1.7 Present to the Client - Olsson shall present complete plans and specifications to
the Client or Client’s Designee for review and approval. Any comments shall be
incorporated into the final draft of the drawings.
1.8 Fire flow demand and documentation conforming with the requirements of
ODEQ shall be provided by the Owner. Owner shall provide available flow and
demand data for the proposed service area for current and future needs.
1.9 Assist Owner in completing construction permit application and forms for
submittal to ODEQ and BNSF for review.
SRF Loan Funding Design Services
1.10 Assist Client with OWRB CWSRF and ODEQ DWSRF loan application
engineering documents.
Should Client request work in addition to the Scope of Services listed above, Olsson shall
invoice Client for such additional services (Optional Additional Services) at the standard hourly
billing labor rate charged for those employees actually performing the work, plus reimbursable
expenses if any. Olsson shall not commence work on Optional Additional Services without
Client’s prior written approval.
Olsson agrees to provide all of its services in a timely, competent and professional manner, in
accordance with applicable standards of care, for projects of similar geographic location, quality
and scope.
Page 2 of 4
SCHEDULE FOR OLSSON’S SERVICES
Unless otherwise agreed, Olsson expects to perform its services under the Agreement as
follows:
Anticipated Start Date: Within 3 weeks of return of signed Work Order.
Anticipated Completion Date: ODEQ Permit Submittal within 10 Weeks.
Olsson will endeavor to start its services on the Anticipated Start Date and to complete its
services on the Anticipated Completion Date. However, the Anticipated Start Date, the
Anticipated Completion Date, and any milestone dates are approximate only, and Olsson
reserves the right to adjust its schedule and any or all of those dates at its sole discretion, for
any reason, including, but not limited to, delays caused by Client or delays caused by third
parties.
COMPENSATION
Client shall pay to Olsson for the performance of the Field Services Scope a fixed fee of
Eighteen Thousand Six Hundred Dollars ($18,600). Olsson’s reimbursable expenses for this
Project are included in the fixed fee. Olsson shall submit invoices on a monthly basis and
payment is due within 30 calendar days of invoice date.
Client shall pay to Olsson for the performance of the Waterline Extension and SRF Funding
Design Services Scope, the actual time of personnel performing such services, and all actual
reimbursable expenses in accordance with the Labor Rate Schedule and the Reimbursable
Expense Schedule attached to this Agreement. Olsson shall submit invoices on a monthly
basis and payment is due within 30 calendar days of invoice date. Olsson’s Scope of Services
will be provided on an estimated time and expense basis $45,000.
Total fees for this scope of work shall be $63,600.
TERMS AND CONDITIONS OF SERVICE
We have discussed with you the risks, rewards and benefits of the Project, the Scope of
Services, and our fees for such services and the Agreement represents the entire
understanding between Client and Olsson with respect to the Project. The Agreement may only
be modified in writing signed by both parties.
Client’s designated Project Representative shall be Tyler Cline, Utility Director.
If this Work Order satisfactorily sets forth your understanding of our agreement, please sign in
the space provided below. Retain a copy for your files and return an executed original to
Olsson. This proposal will be open for acceptance for a period of [maximum 30] days from the
date set forth above, unless changed by us in writing.
OLSSON, INC.
By _____________________________ By ________________________________
Clayton Cristy, Team Leader Shaun McConnaughey, Project Engineer
Page 3 of 4
By signing below, you acknowledge that you have full authority to bind Client to the terms of the
Agreement. If you accept this Work Order, please sign:
CITY OF MIAMI, OK/ MIAMI SPECIAL UTILITY AUTHORITY
By
Signature
Print Name Rudy Schultz
Title Mayor/ Chairman Dated:
Page 4 of 4
MSUA
ACTION/DECISION REQUEST
MSUA May 21, 2019
MEETING DATE:
AGENDA TITLE: Accept or Reject Olsson and Associates Work Order No.
18/19-9 for Substation #1 and Substation #2 Construction
Services
BACKGROUND:
This work order is for Construction administration for Substations #1 & #2. To include the
following listed below:
• Preconstruction Conference: Conduct preconstruction conference with
representatives from the Contractor, MSUA, affected utilities and other for the
purposes of initial project coordination and for reviewing the contract documents,
project requirements and construction schedule.
• Submittal reviews for the following contracts and equipment purchases shall be
included:
• 69-13.2 kV Substation Power Transformer Purchase
• Substation Control Building Purchases
• 15 kV Circuit Breaker Purchase
• 69-13.2 kV Substation Addition Construction
General Administration: Consult with City officials an act as City’s representative
•
and provide contract administration according to the required constraints of the
MSUA.
• Site visits to insure construction is being completed per plans and specifications
• Final Review: Conduct final construction review to determine if the project has
been completed in accordance with contract documents; and determine if
Contractor has fulfilled all obligations so that approval can be given for final
payment to Contractor.
• Design Services: Structure redesign for metering stand to meet GRDA
requirements for CT and PT.
• Funds for this work order will come from professional services and the current electric
bond
STAFFS RECOMMENDATION:
• Vote to Approve
PRESENTER(S):
Tyler Cline
MASTER AGREEMENT WORK ORDER
NO. 18/19-9
This exhibit is hereby attached to and made a part of the Master Agreement for Professional
Services dated November 1, 2016 between City of Miami/ Miami Special Utility Authority
(MSUA) (“Client”) and Olsson Associates (“Olsson”) providing for professional services.
Olsson’s Scope of Services for the Agreement is as indicated below.
GENERAL
Olsson has acquainted itself with the information provided by Client relative to the project and
based upon such information offers to provide the services described below for the project.
Client warrants that it is either the legal owner of the property to be improved by this Project or
that Client is acting as the duly authorized agent of the legal owner of such property.
PROJECT DESCRIPTION AND LOCATION
Project will be located at: Substation #2 & #1
Project Description: Substation Construction Services
SCOPE OF SERVICES
Olsson shall provide the following services (Scope of Services) to Client for the Project:
Construction Services
1. Provide construction period services including the following:
a. Preconstruction Conference: Conduct preconstruction conference with
representatives from the Contractor, MSUA, affected utilities and others
for the purposes of initial project coordination and for reviewing the
contract documents, project requirements, and construction schedule.
b. Submittal Review: Review Contractors’ and Suppliers’ material and
technical submittals for conformance with the specified requirements;
Review Contractors’ and Suppliers’ schedules, pay requests, O & M
manuals, and other correspondence and provide recommendations to the
City. Submittal reviews for the following contracts and equipment
purchases shall be included:
i. 69 – 13.2 kV Substation Power Transformer Purchase.
ii. Substation Control Building Purchase.
iii. 15 kV Circuit Breaker Purchase.
iv. 69 – 13.2 kV Substation Addition Construction.
c. General Administration: Consult with City officials and act as City’s
representative and provide contract administration, as delineated in the
Contract Documents for construction of Substations #1 and #2 and as
otherwise provided by applicable law.
Page 1 of 3
d. Site Visits: Visit the construction sites up to ten (10) occasions to
observe progress and quality of the work and to determine if it is
proceeding in accordance with contract documents. Accompany City
officials during reviews of construction of PROJECT. The amount of visits
may be altered as necessary, but may incur additional costs above and
beyond the not-to-exceed (NTE) cost associated with this Work Order.
e. Protective Device Settings: Develop protective device settings including
overcurrent, undervoltage, trip and close logic, healthy voltage and
source selection/transfer/restore logic, and alarm annunciation. Develop
voltage control (LTC) settings and switchboard meter settings. Set all
protective relays, controls, and voltage controls installed as part of the
Project.
f. Final Review: Conduct final construction review to determine if the
PROJECT has been completed in accordance with contract documents;
and determine if Contractor has fulfilled all obligations so that approval
can be given for final payment to Contractor.
g. Record Drawings: Prepare As-Constructed Drawings of the completed
work based on Contractor markup to the construction drawings.
2. Olsson will certify final payment for each formal contract when all closeout
requirements have been met.
Design Services
1. Structure redesign for metering stand to meet GRDA requirements for CT and PT.
Should Client request work in addition to the Scope of Services listed above, Olsson shall
invoice Client for such additional services (Optional Additional Services) at the standard hourly
billing labor rate charged for those employees actually performing the work, plus reimbursable
expenses if any. Olsson shall not commence work on Optional Additional Services without
Client’s prior written approval.
Olsson agrees to provide all of its services in a timely, competent and professional manner, in
accordance with applicable standards of care, for projects of similar geographic location, quality
and scope.
COMPENSATION
Client shall pay to Olsson for the performance of the Scope of Services, the actual time of
personnel performing such services, and all actual reimbursable expenses in accordance with
the Labor Rate Schedule and the Reimbursable Expense Schedule attached to this Agreement.
Olsson shall submit invoices on a monthly basis and payment is due within 30 calendar days of
invoice date.
If applicable: Olsson’s Scope of Services will be provided on a time and expense basis not to
exceed $60,000 for Substation #2, $40,000 for Substation #1 and $10,000 for Structure
Redesign.
Page 2 of 3
TERMS AND CONDITIONS OF SERVICE
We have discussed with you the risks, rewards and benefits of the Project, the Scope of
Services, and our fees for such services and the Agreement represents the entire
understanding between Client and Olsson with respect to the Project. The Agreement may only
be modified in writing signed by both parties.
Client’s designated Project Representative shall be Tyler Cline, Utility Director.
If this Work Order satisfactorily sets forth your understanding of our agreement, please sign in
the space provided below. Retain a copy for your files and return an executed original to
Olsson. This proposal will be open for acceptance for a period of [maximum 30] days from the
date set forth above, unless changed by us in writing.
OLSSON, INC.
By _____________________________ By ________________________________
Clayton Cristy, Team Leader Shaun McConnaughey, Project Engineer
By signing below, you acknowledge that you have full authority to bind Client to the terms of the
Agreement. If you accept this Work Order, please sign:
CITY OF MIAMI, OK/ MIAMI SPECIAL UTILITY AUTHORITY
By
Signature
Print Name Rudy Schultz
Title Mayor/ Chairman Dated:
Page 3 of 3
MANAGER’S STAFF REPORT
-1-
POLLUTION CONTROL
SOUTH WASTE WATER TREATMENT PLANT
MONTH: April YEAR: 2019
1) PLANT OPERATIONS All Sampling Test Results during the month that were reported on the Discharge Monitoring
Report to DEQ were within our permit Limits. No Violations reported.
Amount in Million Gallons (MG) of Daily Max Treated for the Daily Min Treated for the
80.96 4.305 1.864
Treated Wastewater Month Month
2) HAULED LAND DATE: 040919 NET WET LBS.: 500000 NET DRY LBS.: 85000
APPLIED SLUDGE
3) SEPTIC RECEIVING GALLONS
GALLON GALLON PER
S THIS BILLED S THIS BILLED CONTRAC BILLED
COMPANY MONTH REVENUE YEAR REVENUE T REVENUE
Jus t in Time 0 $0.00 0 $0.00 7550 $755.00
Septics R Us 0 $0.00 0 $0.00 206525 $20,652.50
All America n 4750 $475.00 15500 $1,550.00 59000 $5,900.00
Rickey's Septic Service 0 $0.00 0 $0.00 0 $0.00
Jumpin Ja cks 0 $0.00 0 $0.00 7550 $755.00
TOTALS 4750 $475.00 15500 $1,550.00 280625 $28,062.50
4) PROJECTS/MAINTENANCE 45 Plant maintenance work orders were completed during the month that includes
some of the following:
Exercise and Inspect Comminutor Grinder Unit CM1102,
Greased Bearings Sludge Press Conveyor Unit CON501
Change Oil Sludge Press Conveyor Unit CON501,
Change Filters UV Inlet Air Damper and Headworks Intake Filters
Check Belt Tension Digester Sludge Pump P502
5) EQUIPMENT FAILURES Issues and Developments
UV Units A new 14-inch Valve was installed on UV Unit Number Three to replace the old Valve
that had frozen up. The Plant had to be shut down to do this Project. Once this was
complete we started up the Unit and checked for leaks. The Unit is now back online
and working properly.
TODD MURPHREE POLLUTION CONTROL MANAGER
MANAGER’S STAFF REPORT
-2-
POLLUTION CONTROL
SOUTH WASTE WATER TREATMENT PLANT
MONTH: April YEAR: 2019
UV Units A failed Light Indicator was replaced on UV Unit Number 3. The U-Vector that
controls the Light Panel was adjusted for proper Intensity.
6) OTHER Issues and Developments
Safety Program Validate, Review and or Revise the Safety Check List
Validate, Review and or Revise the Safety Lock Out Tag Out (LOTO)
Ran the entire grounds Safety Checklist.
Safety Program Flush Water Valves in Emergency Eye Wash and Decontamination Showers
Safety Program Check and Repair Emergency Lighting and Exit Lights. Checked and repaired all Smoke
Alarms in the Sludge Building.
Plant Tour A Plant Tour was given to the Youth Leadership Group. We had 13 kids that came and
Toured the Plant.
7) PRETREATMENT Issues and Developments
MSGP Permit WWTP Monthly Inspection and Site Evaluation was completed.
Biomonitoring Quarterly Biomonitoring DMRs for February through April were Electronically Reported
to the Department of Environmental Quality.
TODD MURPHREE POLLUTION CONTROL MANAGER
SOLID WASTE MONTHLY REPORT 2019- APRIL
MAY 21, 2019
APRIL FISCAL YTD YTD TONNAGE APRIL YTD TIPPING
TONNAGE TONNAGE LAST FISCAL TIPPING FISCAL YTD FEES LAST
MATERIAL TOTALS TOTALS YEAR FEES TIPPING FEES FISCAL YEAR LANDFILLS
Yardwaste 129.73 2001.12 1376.93 N/A N/A N/A City Landfill
Residential Waste - C/D 1645.22 13718.32 15465.11 $50,641.75 $405,480.91 $373,889.99 WCA
C/D 0 15.51 15.84 $0.00 $406.20 $367.80 B-3
TOTALS 1774.95 15734.95 16857.88 $50,641.75 $405,887.11 $374,257.79
MAINTENANCE REVENUE RECEIVED
APRIL 2018 YTD
APRIL FISCAL YTD APRIL FISCAL YTD Revenue
2003 $1,568.86 $37,587.03 Transfer Station Tipping Fees $43,206.19 $419,189.22 $418,765.62
Res. & Comm. Fees $176,418.80 $1,735,925.11 $1,702,010.86
TOTALS $1,783.99 $37,587.03 TOTALS $219,624.99 $2,155,114.33 $2,120,776.48
FREE DISPOSAL SATURDAY METAL SALES COMPOST SALES
MONTH LOADS TONNAGE MONTH TOTALS MONTH TOTALS
APRIL 127 31.12 APRIL $0.00 APRIL $96.00
TOTAL TOTAL
FISCAL YEAR FISCAL YEAR TOTALS FISCAL YEAR TOTALS
LOADS TONNAGE
2016-2017 1631 414.52 2016-2017 $2,835.35 2016-2017 $757.00
2017-2018 1525 369.35 2017-2018 $5,900.40 2017-2018 $1,176.00
FISCAL YTD 1372 308.13 FISCAL YTD $3,213.40 FISCAL YTD $640.00
Get email alerts for Miami