Muyni
← Back to Miami

Miami Special Utility Authority (MSUA) Packets

Special Meeting

Miami, OK · September 3, 2019

Agenda

Agenda

MSUA PURCHASE ORDERS PRESENTED Tuesday, September 3, 2019 (JUNE 30) VENDOR DESCRIPTION INVENTORY BRENNTAG CHLORINE CYLINDER 1,191.00 UTILITY SUPPLY TAP SLEEVE, WEDGE VALVE (PO#19-01434) 29,064.00 PIPE, TEES, HYD. EXT.PIPE, LID, SADDLE (PO#19- UTILITY SUPPLY 01443) 13,523.21 UTILITY SUPPLY TAP SLEEVE, VALVE ASSEMBLY (PO#19-01433) 2,448.00 46,226.21 ELECTRIC FENCING SOLUTIONS OPC FENCE EXTENSION (PO#19-01506) 10,000.00 PINKLEY SALES SIGNAL BATTERY BACKUP (PO#19-01322) 10,296.00 20,296.00 WATER DISTRIBUTION INSTALL SHORT & LONG TAP SERVICES (PO#19- CRAFTON PUMP SERVICE 01600) 23,050.00 23,050.00 WASTE WATER COLLECTION FENCING SOLUTIONS OPC FENCE EXTENSION (PO#19-01506) 10,000.00 10000.00 TOTAL MSUA CLAIMS 99572.21 MSUA PURCHASE ORDERS PRESENTED Tuesday, September 3, 2019 VENDOR DESCRIPTION INVENTORY ANIXTER INSULATED CAPS (PO#20-00196) 798.00 798.00 ADMINISTRATIVE SERVICES ADMIRAL EXPRESS STAPLER 34.05 DAVIS WRIGHT TREMAINE PENSACOLA RELICENSING (PO#20-00222) 59,258.98 JILL FITZGIBBON 20 YEAR SERVICE AWARD 75.00 OLSSON ENGINEERING SERVICES (PO#20-00162) 10,148.92 PIONEER PRINTING CALCULATOR RIBBONS 17.85 69,534.80 METERING FUELMAN FUEL USAGE 8/12-8/19/19 200.12 200.12 IT CDW GOVERNMENT ANTI VIRUS SOFTWARE (PO#20-00167) 14,105.70 CDW GOVERNMENT WEB FILTER LICENSE (PO#20-00186) 1,397.84 CDW GOVERNMENT OPTIPLEX 3060 (PO#20-00213) 2,156.70 TYLER TECHNOLOGIES EXECUTIME MONTHLY ACCESS FEE(PO#20-00007) 661.50 18,321.74 ELECTRIC ACTION COMMUNICATIONS KENWOOD RADIOS (PO#20-00234) 1,506.20 ARVEST DIGGER TRUCK LEASE PAYMENT 9/19 8,307.43 B&B AUTO GAUGE, LIGHTS 83.08 FUELMAN FUEL USAGE 8/12-8/19/19 499.75 JASON WALDON 10 YEAR SERVICE AWARD 25.00 OLSSON SUBSTATION 1 UPGRADE (PO#20-00220) 1,274.93 O'REILLY PLUGS, FLUSH, OIL, FILTERS 106.32 PINKLEY MICRO SWITCH 27.06 UNIVERSAL FIELD SERVICES UTILITY RELOCATION SH 125 1,292.50 VANCE FORD LINE, DRYER, RESTRICTOR 89.53 WELCH STATE BANK LEASE PAYMENT 3,670.57 16,882.37 ROW FASTENAL WEDGE ANCHORS 120.37 FUELMAN FUEL USAGE 8/12-8/19/19 125.46 MAIN STREET CAR WASH CAR WASH - ELECTRIC 10.14 255.97 WATER PRODUCTION INTEGRIS HEALTHCARE SERVICES (PO#20-00252) 450.00 JOPLIN SUPPLY COIL STARTER (PO#20-00192) 4,374.91 OKLAHOMA NATURAL GAS GAS USAGE 7/13-8/10/19 45.25 4,870.16 WATER DISTRIBUTION DITCH WITCH SOLENOID BORING MACHINE (PO#20-00203) 803.40 FASTENAL SAW BLADE, LASER 123.96 FUELMAN FUEL USAGE 8/12-8/19/19 387.12 INTEGRIS HEALTHCARE SERVICES (PO#20-00252) 450.00 OLSSON STREETSCAPE ENGINEER (PO#20-00216) 985.14 CENTRAL AVE. WATER REPLACEMENT (PO#20- OLSSON 00215) 2,907.78 5,657.40 POLLUTION CONTROL FUELMAN FUEL USAGE 8/12-8/19/19 108.09 HAWKINS POLYMER DRUMS (PO#20-00242) 2487.24 HAYNES SCADA SOFTWARE (PO#20-00080) 5294.93 MIAMI MACHINE SHOP WELD FITTINGS 130.00 PACE ANALYTICAL AMMONIA TESTING 75.00 8095.26 WASTE WATER COLLECTION FUELMAN FUEL USAGE 8/12-8/19/19 282.09 282.09 SOLID WASTE ADMIRAL EXPRESS PAPER, PENCILS, LEAD, PAPER CLIPS 128.50 AIRE-MASTER DEODORIZER SERVICES 12.71 FUELMAN FUEL USAGE 8/12-8/19/19 2059.28 KATNER MILLS BACKUP ALARM 46.49 MIAMI INDUSTRIAL SUPPLY FITTING,HYDRAULIC HOSE 266.06 O'REILLY WIPER BLADES,BATTERY,CLAMPS,SEALED BEAM 224.88 SOUTHERN TIRE MART TRASH TRUCK DRIVE TIRES 453.05 YELLOWHOUSE MACHINERY CUTTING EDGES (PO#20-00178) 923.60 4114.57 COMMUNITY DEVELOPMENT FUELMAN FUEL USAGE 8/12 35.21 35.21 STORMWATER NEO CONCRETE 7TH &K.NW CONCRETE 243.38 NEO CONCRETE 7TH &K.NW CONCRETE 177.00 SCURLOCK CONCRETE STORM PIPE (20-0118) 787.50 1207.88 OWRB SEMI ANNUAL PAYMENTS 151,656.15 FINAL UTILITY REFUNDS 2,264.52 SALARIES & BENEFITS - 8/18/19 152,474.38 TOTAL MSUA CLAIMS 436,650.62 THE MIAMI SPECIAL UTILITY AUTHORITY (MSUA) MET IN REGULAR SESSION AUGUST 20, 2019, IN THE MIAMI CIVIC CENTER COUNCIL CHAMBERS AT 5:30 PM WITH THE FOLLOWING MEMBERS PRESENT: Rudy Schultz, Chairman Dean Kruithof, Trust Manager Doug Weston, Trustee Ben Loring, Trust Attorney Ryan Orcutt, Trustee Melissa Moore, City Clerk Brian Forrester, Trustee (Absent) Vicki Lewis, Trustee The agenda for the meeting was posted in the main lobby and the north outside entryway of the Miami Civic Center at 4:20PM on August 19, 2019. THE TRUST MAY DISCUSS, CONSIDER, AND VOTE ON ANY ITEM LISTED IN THIS AGENDA: Call to Order Chairman Schultz called the meeting to order at 5:31PM. Invocation Invocation by Director of Norse Campus Ministries, Steve Whitesell Pledge of Allegiance Chairman Schultz led the Pledge of Allegiance Public Input and Unscheduled Personal Appearances None. CONSENT AGENDA By unanimous consent the public body may designate noncontroversial items to be considered in one motion and one vote. The public body may add items from the regular agenda and approve. Posted agenda items not added to the consent docket will be considered separately in their regular order. Staff recommends that Item 6 through Item 7 be placed on the consent agenda. Trustee Lewis moved to transfer Item #6 (Approve Claims: $1,374,426.82) through Item #7 (Approve Minutes: August 06, 2019 (Regular)) to the consent agenda and approve as presented. The motion was seconded by Trustee Weston. The Trust was polled with the following results. Lewis, Aye Weston, Aye Orcutt, Aye Schultz, Aye Forrester, Absent Chairman Schultz declared the motion carried. Approve Claims: $1,374,426.82 Moved to consent agenda. Approve Minutes: August 06, 2019 (Regular) Moved to consent agenda. Other New Business, if any, Which has Arisen Since the Posting of the Agenda and Could not Have Been Anticipated Prior to the Time of Posting (25 O.S. § 311(9)) None. Staff Reports (Written report included in packet, if available staff is present for questions) None. MSUA Page 1 of 7 August 20, 2019 Trustee Community Announcements None. Adjournment Trustee Weston moved to adjourn the meeting. The motion was seconded by Trustee Orcutt. The Trust was polled with the following results: Weston, Aye Orcutt, Aye Lewis, Aye Schultz, Aye Forrester, Absent Chairman Schultz declared the meeting adjourned at 5:33PM. ___________________ _____________________ _______________________ Trustee Lewis Trustee Orcutt Trustee Weston ___________________ _____________________ ATTEST: ________________________ Trustee Schultz, Chairman Trustee Forrester Melissa Moore, City Clerk MSUA PURCHASE ORDERS PRESENTED Tuesday, AUGUST 20, 2019 (JUNE 30) VENDOR DESCRIPTION INVENTORY BALDWIN POLE & PILING CO CLASS 2 & 3 POLES (PO#19-00873) 22,575.00 B&L WATERWORKS ASSORTED CLAMPS (PO#19-01688) 1,270.10 B&L WATERWORKS ASSORTED GLAND PACKS (PO#19-01293) 4,450.44 B&L WATERWORKS 12" MJ GATEWAY VALVE (PO#19-01294) 5,828.55 STUART IRBY INVENTORY 497.00 UTILITY SUPPLY WATER METERS (PO#19-01214) 2,080.94 CLAMPS, NUTS, PIPE, CAPS, CHLORINE, TEES, BUSHINGS, UTILITY SUPPLY TEES (PO#19-01441) 13,052.96 UTILITY SUPPLY INVENTORY ITEMS (PO#19-01442) 28,889.71 UTILITY SUPPLY TAP VALVE SLEEVES (PO#19-01443) 1,680.00 80,324.70 ELECTRIC ARKANSAS ELECTRIC 15 KV JACKETS 26,613.72 FIVE STAR RANCH & HOME FILTER, OIL 22.33 JOPLIN GLOBE INVITATION TO BID 139.81 LOCKE SUPPLY HK ELECTRIC SUPPLIES FOR SPLASH PAD 650.26 MISACO DEPARTMENT SHIRTS (PO#19-01556) 1,165.00 OLSSON WO#17.18.9 SUBSTATION #1 UPGRADE 913.96 OLSSON SUBSTATION CONSTRUCTION 14,121.02 PINKLEY SALES NEMA CONTROLLER (PO#19-01453) 5,348.00 48,974.10 MSUA Page 2 of 7 August 20, 2019 WATER DISTRIBUTION B&L WATERWORKS HYDRANT EXTENSION (PO#19-01557) 861.92 FERGUSON WATERWORKS 6" POLY PIPE PO#(19-01288) 14,286.32 OLSSON CENTRAL AVE. WATER REPLACEMENT (PO#19-01686) 2,977.52 OLSSON JM FARMS UTILITY EXTENSION 4,997.62 OLSSON WO#17.18.6 MAIN STREET STREETSCAPE 1,747.91 UTILITY SUPPLY FIRE HYDRANT EXT. (PO#19-01459) 925.83 WILLIAM THOMAS PROFESSIONAL SERVICES 2,000.00 27,797.12 POLLUTION CONTROL HAYNES FAIRBANKS PUMP (PO#19-01325) 36937.78 36937.78 TOTAL MSUA CLAIMS 194,033.70 MSUA PURCHASE ORDERS PRESENTED Tuesday, AUGUST 20, 2019 VENDOR DESCRIPTION ADMINISTRATIVE SERVICES APTUS&C MEMBERSHIP RENEWAL - JF, BT, MA 385.00 FUELMAN FUEL USAGE 7/22/19 41.05 GOODELL, STRATTON, EDMONDS RULE CURVE CHANGE (PO#20-00148) 6,827.50 GRDA PURCHASED POWER 7/1-7/31/19 952,857.60 MESO/OMUSA ANNUAL DUES 7,243.00 MIAMI NEWS RECORD PUBLIC NOTICE 25.80 OTA TOLL FEES 7/1-7/31/19 16.21 967,396.16 METERING FUELMAN FUEL USAGE 7/22-8/5/19 325.18 325.18 IT CDW GOVERNMENT MALWARE FIREWALL RENEWAL (PO#20-00124) 3,700.00 CONTROL SCAN SPG PACKAGE - AIRPORT 34.95 SPARKLIGHT INTERNET SERVICES 17.19 TANGENT VDI SUPPORT (PO#20-00187) 5,397.00 UNITAS GLOBAL BACKUP SERVICES (PO#20-00173) 2,331.73 11,480.87 ELECTRIC ARROWHEAD OUTDOOR JOB POSTINGS 150.00 FUELMAN FUEL USAGE 7/22-8/5/19 1,006.37 GLOBAL RENTAL MOBILE UTILITY EQUIPMENT RENTAL (PO#20-00191) 6,600.00 MSUA Page 3 of 7 August 20, 2019 JOPLIN GLOBE LINEMAN POSTING 347.52 MESO/OMUSA JT&S DUES PO#(20-001450) 1,251.75 MIAMI NEWS RECORD SUBSTATION EXPANSION 201.42 MIAMI NEWS RECORD SUBSTATION ADDITION 185.28 9,742.34 ROW FUELMAN FUEL USAGE 7/22-8/5/19 233.79 233.79 WATER PRODUCTION ACCURATE ENVIRONMENTAL WATER SAMPLING 318.00 FUELMAN FUEL USAGE 7/22-8/5/19 34.65 LOCKE SUPPLY TIME DELAY FUSE 133.38 486.03 WATER DISTRIBUTION ACE HARDWARE LOCK,CONCRETE, PAINT 81.09 ARVEST LEASE PAYMENT AUG. 19 1,224.54 B&L WATERWORKS METER BOX, LID, COUPLING, TUBING, GASKETS 733.85 CENTRAL POWER ON SITE MOBILE SERVICE 235.88 FUELMAN FUEL USAGE 7/22-8/5/19 850.55 MIAMI INDUSTRIAL QUICK CONNECT COUPLINGS 42.31 MIAMI INDUSTRIAL HYDRAULIC HOSE 123.66 OTA TOLL FEES 7/1-7/31/19 9.60 O'REILLY MOTOR OIL, FILTER 28.24 US BANK LEASE PAYMENT AUG. 19 1,724.50 UTILITY SUPPLY POLY ADAPTER 462.00 UTILITY SUPPLY 8" ALPHA GATE VALVE (20-00068) 822.23 6,338.45 POLLUTION CONTROL ARVEST LEASE PAYMENT AUG. 19 1512.65 FUELMAN FUEL USAGE 7/22-8/5/19 114.82 HAYNES DIAGNOSTIC TESTING 280.10 JOPLIN GLOBE POLLUTION CONTROL TECH AD 261.59 ODEQ PERMIT (PO#20-00189) 557.56 OTA TOLL FEES 7/1-7/31/19 19.20 O'REILLY FILTER, MOTOR OIL 157.86 PACE ANALYTICAL AMMONIA TESTING 25.00 USA BLUEBOOK SIEMENS PROBE (20-00137) 1229.95 4158.73 WASTE WATER COLLECTION FUELMAN FUEL USAGE 7/22-8/5/19 143.37 OKLAHOMA NATURAL GAS GAS USAGE 7/2-7/30/19 23.08 166.45 SOLID WASTE AIRE MASTER DEODORIZER SERVICES 12.71 MSUA Page 4 of 7 August 20, 2019 ARVEST LEASE PAYMENT JULY 19 15567.38 FUELMAN FUEL USAGE 7/22-8/5/19 3760.78 MIAMI INDUSTRIAL HYDRAULIC HOSE 49.03 MIAMI PEST CONTROL REGULAR SERVICES 60.00 NANA'S EZ CLEAN WASH TOKENS 250.00 OKLAHOMA NATURAL GAS GAS USAGE 6/28-7/30/19 39.61 SCHAFFER CART LID AXEL AND LID 54.15 SOUTHERN TIRE MART DRIVE TIRE 455.55 WELCH STATE BANK LEASE PAYMENT AUG. 19 5818.67 WELCH STATE BANK LEASE PAYMENT AUG. 19 10653.36 YELLOWHAOUSE PARTS SALES 75.19 36796.43 COMMUNITY DEVELOPMENT FUELMAN FUEL USAGE 7/22-8/5/19 58.47 58.47 STORMWATER COLLINS CONSTRUCTION INLET, BASIN REPLACEMENT (PO#20-00143) 2250.00 SCURLOCK INDUSTRIES INTAKE CONCRETE COVER 495.00 2745.00 BANK OF OKLAHOMA BOND TRUSTEE FUND 79.45 LOCAL TRUSTEE FUND 79.45 FINAL UTILITY REFUNDS 1,733.51 SALARIES & BENEFITS 7/18/19 127,618.73 MSUA CREDIT CARDS 7/1-7/15/19 10,954.08 TOTAL MSUA CLAIMS 1,180,393.12 SPECIAL UTILITY AUTHORITY August 20, 2019 JULY 1, 2019 - JULY 15, 2019 CUSTOMER SERVICE WALMART-OFFICE SUPPLIES $9.38 WALMART-BANKER BOXES $91.29 TOTAL $100.67 METERING KARNES-FLAT REPAIR #134 $13.00 ELC SECURITY-DEMAND SEALS $452.50 VERIZON-METERING $40.01 TOTAL $505.51 INFORMATION TECHNOLOGY MSUA Page 5 of 7 August 20, 2019 VERIZON-IT & COUNCIL $240.06 BOLT-PHONE SERVICE $6,456.44 TOTAL $6,696.50 ELECTRIC DEPARTMENT WALMART-NOTEBOOKS $25.11 ACE-POSTAGE $240.39 VERIZON-ELECTRIC $80.02 VERIZON-ROW $80.02 AMAZON-PRIME MEMBERSHIP $119.00 TOTAL $544.54 RIGHT-OF-WAY TSC-GASKET/CNL NOZZLE $142.96 TOTAL $142.96 WATER DISTRIBUTION OPTICSPLANET-KNIVES $125.70 YELLOWHOUSE-KEYS/WHEEL $315.22 USPS-STAMP $0.55 VERIZON-WATER $64.98 DEQ-WTR/SWER CERT/S BARNES $92.00 TOTAL $598.45 POLLUTION CONTROL LOCKE-ALUM FLASHING $5.70 LOWES-VENT PIPE FLASHING $17.66 BO'S-TIRE REPAIR $15.00 ACE-ROOFCOAT $14.99 TOTAL $53.35 WASTEWATER COLLECTION SUPER PRODUCTS-VAC REPAIR PART $1,532.02 TOTAL $1,532.02 SOLID WASTE BO'S TIRE-G4 TIRE REPAIR $50.00 BO'S TIRE-TIRE REPAIR 6210 $50.00 YELLOWHOUSE-V BELT #6318 $48.19 HYSPECO-CYLINDER REPAIR 5238 $450.00 ACE-LAWNMOWER OIL $4.98 ACE-LAWN MOWER FUEL FILTER $9.99 OREILLY-OIL ABSORBENT $51.96 ACE-WINDOW CEMENT $14.97 TOTAL $680.09 STORMWATER MSUA Page 6 of 7 August 20, 2019 TRACTOR-SUV FIELD TOTE $99.99 TOTAL $99.99 GRAND TOTAL $10,954.08 MSUA Page 7 of 7 August 20, 2019 MIAMI SPECIAL UTILITY AUTHORITY ACTION/DECISION REQUEST MSUA MEETING September 3rd, 2019 DATE: AGENDA TITLE: Accept or Reject bid #C19-37A in the Amount of $ 1,126,700 to Capital Electric Line Builders for 13.2 kV Substation Expansion for Substation #1; Approve Contract Contingent Upon the Submission of Required Contract Documents, and Approve City Manager or his Designee to Sign Notice to Proceed BACKGROUND: The Miami Special Utility Authority put out for bid substation #1 and substation #2 for reconstruction. Bids were opened on 8/29/2019. They are listed below: Sub: #1 CDL ElectriComm B and L Capital Electric Re-Con Electric Electric Line Builders Company $1,204,379.10 $1,425,000.00 $1,201,970.91 $1,126,700.00 $1,254,601.27 Olsson’s opinion of cost the work was $1,157,493. STAFFS RECOMMENDATION: Staff recommends award bid to Capital Electric Line Builders for substation construction PRESENTER(S): Tyler Cline Shaun McConnaughey August 29, 2019 Tyler Cline Director of Public Utilities Miami Special Utility Authority 403 D Street SE Miami, OK 74534 Re: Contract Award Recommendation Substation 1 and 2 Construction Miami, Oklahoma – 2019 Miami Contract Numbers C19-37A and C19-38A Tyler Cline: Bids for the subject projects were opened at the Miami City Offices at 2:00 pm on Tuesday, August 29, 2019. Five bids were received for Substation #1 and four bids for Substation #2 as shown on the Council Background Agenda. These two bids are summarized below: Bidder Contract Number Bid Price Capital Electric C19-37 $ 1,126,700.00 B&L Electric C19-37 $ 1,201,970.91 CDL Electric. C19-37 $ 1,204.379.10 Re-Con Company C19-37 $ 1,254,601.27 ElectriComm C19-37 $ 1,425,000.00 Capital Electric C19-38 $ 1,856,000.00 CDL Electric C19-38 $ 1,952,330.41 B&L Electric C19-38 $ 2,261,953.06 Re-Con Company C19-38 $ 2,518,771.06 Our opinions of cost, presented to the MSUA at the January 2019 meeting, was $1,157,493 for C19-37A and $1,999,216 for C19-38A. Upon receiving these results, Olsson reviewed the bid packages from each bidder. After review, the bids from Capital Electric Line Builders followed the constraints of the Bid Specifications and Bid Award requirements set forth in the complete bid packages. Olsson has had positive experience with Capital Electric Line Builders and their subsequent sub-contractors on past projects. Olsson formally recommends the award of C19-37A and C19-38A to Capital Electric Line Builders. Sincerely, Rustin S. Hartman, P.E. AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) This AGREEMENT is by and between (“Owner”) and (“Contractor”) Owner and Contractor hereby agree as follows: ARTICLE 1 – WORK 1.01 Project Description The work is briefly described as follows: Furnish all labor, services, supervision and tools necessary for the following: 1. Construct 69 – 13.2 kV substation addition including steel structures, bus work, circuit switchers, disconnect switches, isolation switches, vault, foundations, fence, grounding, rock surfacing and all other components necessary for a complete installation. 2. Make HV, LV, control wire, and grounding connections to one (1) Owner-furnished 15//28 MVA 69 – 13.2 kV power transformer. 3. Install Owner-furnished outdoor 15 kV circuit breakers (5 each). 4. Install LV AC power and DC control wiring from circuit breakers, power transformers, and instrument transformers to relay panel termination cabinet supplied with Owner- furnished pre-fabricated control building. Install LV AC power from lighting and other yard equipment to control building AC system. 5. Install four (4) underground feeder exits with 3 – 500 kCM Copper URD cables. Feeder exit construction also includes directional boring, riser pole construction, and all cable terminations. 6. Other construction as specified in the bidding documents. 7. Removals and other miscellaneous work as shown on the Drawings. ARTICLE 2 – ENGINEER 2.01 Design The Project has been designed by Olsson, Garrett L. Klein, P.E., Project Manager, 601 “P” Street, Suite 200, Lincoln, NE 68508, (402) 458-5641. 2.02 Engineer The Owner has retained Olsson who is hereinafter called Engineer. The scope of Engineer’s authority as representative is limited to the giving of professional advice and the rendering of professional recommendations to Owner in accordance with, and as described in the Contract Documents. EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1 of 6 ARTICLE 3 – CONTRACT TIMES 3.01 Contract Times: Dates The Owner requires that certain construction precede delivery of Owner-furnished equipment as follows: A. Work to be completed before _______________; 1. Installation of power transformer foundation. B. Work to be completed before ______________: 1. Site work and installation of control building foundation. Bidder has agreed that the above critical work will be complete according to the times indicated. 3.02 Bidder agrees that the balance of the Work will be substantially complete on or before ____________________, and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before ____________________. 3.03 Liquidated Damages 1. The contract provides for assessment of liquidated damages $200.00 for each working day required to finish the work after the above-established contract completion date. ARTICLE 4 – CONTRACT PRICE 4.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents the amounts that follow, subject to adjustment under the Contract: Total Base Bid - Lump Sum, Including $25,000.00 Contingency Allowance: _______________________________________________________($_____________) (Write-Out-in-Words) (Figures) All specific cash allowances are included in the above price in accordance with Paragraph 13.02 of the General Conditions. ARTICLE 5 – PAYMENT PROCEDURES 5.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed as provided in the General Conditions. 5.02 Progress Payments; Retainage A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment on a monthly basis during performance of the Work as provided in Paragraph 5.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 of 6 Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract. 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract a. 90 percent of Work completed (with the balance being retainage); and b. 90 percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage). B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts set off by the Owner pursuant to Paragraph 15.01.E of the General Conditions. 5.03 Final Payment A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06. ARTICLE 6 – INTEREST 6.01 All amounts not paid when due as provided in Article 15 of the General Conditions shall bear interest at the maximum legal rate. ARTICLE 7 – CONTRACTOR’S REPRESENTATIONS 7.01 In order to induce Owner to enter into this Contract, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents, and any data and reference items identified in the Contract Documents. B. Contractor has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work. D. Reports of explorations and tests of subsurface conditions at or adjacent to the Site and drawings of physical conditions relating to existing surface or subsurface structures at the Site are limited to those identified in the Supplementary Conditions. E. Site-related reports and drawings are limited to those identified in the Supplementary Conditions. F. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3 of 6 H. Contractor has given Owner and Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. J. Contractor’s entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 8 – CONTRACT DOCUMENTS 8.01 Contents A. The Contract Documents consist of the following: 1. This Agreement (pages C-520-1 to C-520-6, inclusive). 2. Performance bond (pages C-610-1 to C-610-3, inclusive). 3. Statutory Bond. 4. Maintenance Bond. 5. Contract Affidavit. 6. General Conditions (pages C-700-1 to C-700-65, inclusive). 7. Supplementary Conditions (pages C800-1 to C800-15, inclusive). 8. Specifications as listed in the table of contents of the Project Manual. 9. Drawings consisting of 27 sheets with each sheet bearing the following general title: a. 13.2 kV Substation Expansion, Substation No. 1. 10. Appendices to these specifications. 11. Addenda (numbers ___ to ___, inclusive). 12. Exhibits to this Agreement (enumerated as follows): a. Contractor’s Bid (pages C-410-1 to C-410-5, inclusive). 13. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto: a. Notice to Proceed. b. Work Change Directives. c. Change Orders. B. The documents listed in Paragraph 8.01.A are attached to this Agreement (except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 8. D. The Contract Documents may only be amended, modified, or supplemented as provided in the General Conditions. EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4 of 6 ARTICLE 9 – MISCELLANEOUS 9.01 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. 9.02 Assignment of Contract A. Unless expressly agreed to elsewhere in the Contract, no assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, money that may become due and money that is due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.03 Successors and Assigns A. Owner and Contractor each binds itself, its successors, assigns, and legal representatives to the other party hereto, its successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 9.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 9.05 Contractor’s Certifications A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 9.05: 1. “Corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process or in the Contract execution; 2. “Fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non- competitive levels, or (c) to deprive Owner of the benefits of free and open competition; 3. “Collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and 4. “Coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5 of 6 9.06 Other Provisions A. Owner stipulates that if the General Conditions that are made a part of this Contract are based on EJCDC® C-700, Standard General Conditions for the Construction Contract, published by the Engineers Joint Contract Documents Committee®, and if Owner is the party that has furnished said General Conditions, then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, through a process such as highlighting or “track changes” (redline/strikeout), or in the Supplementary Conditions. IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. This Agreement will be effective on ___________________________, 2019 (which is the Effective Date of the Contract). OWNER: CONTRACTOR: By: By: Title: Title: (If Contractor is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.) Attest: Attest: Title: Title: Address for giving notices: Address for giving notices: License No.: (where applicable) F:\2016\2001-2500\016-2300-A\80-Current\Specs\Substation Construction Spec 6_25_19\Sub 1 Revised 6-26-19\C-520 Agreement Stipulated Price 062619.Doc EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6 of 6 Documentation of Authority to Sign Complete Section A or B, as applicable: Section A. I ___________________________ certify that I am the Secretary of the corporation named as Contractor herein; that ________________________ who signed this contract on behalf of the Contractor was then (Title) of said corporation; that said contract was duly signed for and on behalf of the said corporation by authority of its governing body and is within the scope of its corporate powers. IN WITNESS WHEREOF, I have hereunto affixed my hand and the seal of said corporation this day _____ of ________________, ________. (Corporate Seal) _____________________________ Corporate Secretary Section B. We hereby certify that the undersigned are the sole owners of the company named as Contractor herein; and hereby attest that , who signed this Agreement on behalf of said Contractor, is authorized to legally bind the Contractor to the obligations of this Agreement. By ___________________________ ______________________________ NOTARIZATION STATE OF OKLAHOMA COUNTY OF ____________________ The foregoing was acknowledged before me this _______ day of , , by . _____________________________ Notary Public DAS-1 MIAMI SPECIAL UTILITY AUTHORITY ACTION/DECISION REQUEST MSUA MEETING September 3rd, 2019 DATE: AGENDA TITLE: Accept or Reject bid #C19-38A in the Amount of $ 1,856,000 to Capital Electric Line Builders for 13.2 kV Substation Expansion for Substation #2; Approve Contract Contingent Upon the Submission of Required Contract Documents, and Approve City Manager or his Designee to Sign Notice to Proceed BACKGROUND: The Miami Special Utility Authority put out for bid substation #1 and substation #2 for reconstruction. Bids were opened on 8/29/2019. Substation #2 is listed below: Sub: #2 CDL ElectriComm B and L Capital Electric Re-Con Electric Electric Line Builders Company $ 1,952,330.41 N/A $ 2,261,953.06 $ 1,856,000 $ 2,409,599.86 Olsson’s opinion of cost for the work was $ 1,999,216. STAFFS RECOMMENDATION: Staff recommends award bid to Capital Electric Line Builders for substation construction PRESENTER(S): Tyler Cline Shaun McConnaughey August 29, 2019 Tyler Cline Director of Public Utilities Miami Special Utility Authority 403 D Street SE Miami, OK 74534 Re: Contract Award Recommendation Substation 1 and 2 Construction Miami, Oklahoma – 2019 Miami Contract Numbers C19-37A and C19-38A Tyler Cline: Bids for the subject projects were opened at the Miami City Offices at 2:00 pm on Tuesday, August 29, 2019. Five bids were received for Substation #1 and four bids for Substation #2 as shown on the Council Background Agenda. These two bids are summarized below: Bidder Contract Number Bid Price Capital Electric C19-37 $ 1,126,700.00 B&L Electric C19-37 $ 1,201,970.91 CDL Electric. C19-37 $ 1,204.379.10 Re-Con Company C19-37 $ 1,254,601.27 ElectriComm C19-37 $ 1,425,000.00 Capital Electric C19-38 $ 1,856,000.00 CDL Electric C19-38 $ 1,952,330.41 B&L Electric C19-38 $ 2,261,953.06 Re-Con Company C19-38 $ 2,518,771.06 Our opinions of cost, presented to the MSUA at the January 2019 meeting, was $1,157,493 for C19-37A and $1,999,216 for C19-38A. Upon receiving these results, Olsson reviewed the bid packages from each bidder. After review, the bids from Capital Electric Line Builders followed the constraints of the Bid Specifications and Bid Award requirements set forth in the complete bid packages. Olsson has had positive experience with Capital Electric Line Builders and their subsequent sub-contractors on past projects. Olsson formally recommends the award of C19-37A and C19-38A to Capital Electric Line Builders. Sincerely, Rustin S. Hartman, P.E. AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) This AGREEMENT is by and between (“Owner”) and (“Contractor”) Owner and Contractor hereby agree as follows: ARTICLE 1 – WORK 1.01 Project Description The work is briefly described as follows: Furnish all labor, services, supervision and tools necessary for the following: 1. Construct 69 – 13.2 kV substation addition including steel structures, bus work, circuit switchers, disconnect switches, isolation switches, vault, foundations, fence, grounding, rock surfacing and all other components necessary for a complete installation. 2. Make HV, LV, control wire, and grounding connections to two (2) Owner-furnished 15//28 MVA 69 – 13.2 kV power transformers. 3. Install Owner-furnished outdoor 15 kV circuit breakers (14 each). 4. Install LV AC power and DC control wiring from circuit breakers, power transformers, and instrument transformers to relay panel termination cabinet supplied with Owner- furnished pre-fabricated control building. Install LV AC power from lighting and other yard equipment to control building AC system. 5. Install six (6) underground feeder exits with 3 – 750 kCM Copper URD cables. Feeder exit construction also includes directional boring, riser pole construction, and all cable terminations. 6. Other construction as specified in the bidding documents. 7. Removals and other miscellaneous work as shown on the Drawings. ARTICLE 2 – ENGINEER 2.01 Design The Project has been designed by Olsson, Garrett L. Klein, P.E., Project Manager, 601 “P” Street, Suite 200, Lincoln, NE 68508, (402) 458-5641. 2.02 Engineer The Owner has retained Olsson who is hereinafter called Engineer. The scope of Engineer’s authority as representative is limited to the giving of professional advice and the rendering of professional recommendations to Owner in accordance with, and as described in the Contract Documents. EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1 of 6 ARTICLE 3 – CONTRACT TIMES 3.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 3.02 Contract Times: Dates A. Bidder agrees that the following work will be completed in accordance with the date(s)/schedule noted: 1. Work to be completed before ________________________; a. Installation of two (2) power transformer foundations. 2. Work to be completed before ________________________: a. Site wok and installation of control building foundation. B. Bidder agrees that the balance of the Work will be substantially complete on or before ____________________, and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before ____________________. 3.03 Liquidated Damages 1. The contract provides for assessment of liquidated damages $200.00 for each working day required to finish the work after the above-established contract completion date. ARTICLE 4 – CONTRACT PRICE 4.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents the amounts that follow, subject to adjustment under the Contract: Total Base Bid - Lump Sum, Including $25,000.00 Contingency Allowance: _______________________________________________________($_____________) (Write-Out-in-Words) (Figures) All specific cash allowances are included in the above price in accordance with Paragraph 13.02 of the General Conditions. ARTICLE 5 – PAYMENT PROCEDURES 5.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed as provided in the General Conditions. 5.02 Progress Payments; Retainage A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment on a monthly basis during performance of the Work as provided in Paragraph 5.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 of 6 Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract. 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract a. 90 percent of Work completed (with the balance being retainage); and b. 90 percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage). B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts set off by the Owner pursuant to Paragraph 15.01.E of the General Conditions. 5.03 Final Payment A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06. ARTICLE 6 – INTEREST 6.01 All amounts not paid when due as provided in Article 15 of the General Conditions shall bear interest at the maximum legal rate. ARTICLE 7 – CONTRACTOR’S REPRESENTATIONS 7.01 In order to induce Owner to enter into this Contract, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents, and any data and reference items identified in the Contract Documents. B. Contractor has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work. D. Reports of explorations and tests of subsurface conditions at or adjacent to the Site and drawings of physical conditions relating to existing surface or subsurface structures at the Site are limited to those identified in the Supplementary Conditions. E. Site-related reports and drawings are limited to those identified in the Supplementary Conditions. F. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3 of 6 H. Contractor has given Owner and Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. J. Contractor’s entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 8 – CONTRACT DOCUMENTS 8.01 Contents A. The Contract Documents consist of the following: 1. This Agreement (pages C-520-1 to C-520-6, inclusive). 2. Performance bond (pages C-610-1 to C-610-3, inclusive). 3. Statutory Bond. 4. Maintenance Bond. 5. Contract Affidavit. 6. General Conditions (pages C-700-1 to C-700-65, inclusive). 7. Supplementary Conditions (pages C800-1 to C800-14, inclusive). 8. Specifications as listed in the table of contents of the Project Manual. 9. Drawings consisting of 27 sheets with each sheet bearing the following general title: a. 69-13.2 kV Substation Addition, Substation No. 2. 10. Appendices to these specifications. 11. Addenda (numbers ___ to ___, inclusive). 12. Exhibits to this Agreement (enumerated as follows): a. Contractor’s Bid (pages C-410-1 to C-410-5, inclusive). 13. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto: a. Notice to Proceed. b. Work Change Directives. c. Change Orders. B. The documents listed in Paragraph 8.01.A are attached to this Agreement (except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 8. D. The Contract Documents may only be amended, modified, or supplemented as provided in the General Conditions. EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4 of 6 ARTICLE 9 – MISCELLANEOUS 9.01 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. 9.02 Assignment of Contract A. Unless expressly agreed to elsewhere in the Contract, no assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, money that may become due and money that is due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.03 Successors and Assigns A. Owner and Contractor each binds itself, its successors, assigns, and legal representatives to the other party hereto, its successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 9.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 9.05 Contractor’s Certifications A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 9.05: 1. “Corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process or in the Contract execution; 2. “Fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non- competitive levels, or (c) to deprive Owner of the benefits of free and open competition; 3. “Collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and 4. “Coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5 of 6 9.06 Other Provisions A. Owner stipulates that if the General Conditions that are made a part of this Contract are based on EJCDC® C-700, Standard General Conditions for the Construction Contract, published by the Engineers Joint Contract Documents Committee®, and if Owner is the party that has furnished said General Conditions, then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, through a process such as highlighting or “track changes” (redline/strikeout), or in the Supplementary Conditions. IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. This Agreement will be effective on ___________________________, 2019 (which is the Effective Date of the Contract). OWNER: CONTRACTOR: By: By: Title: Title: (If Contractor is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.) Attest: Attest: Title: Title: Address for giving notices: Address for giving notices: License No.: (where applicable) F:\2016\2001-2500\016-2300\40-Design\Specs\Substation Construction - Sub 2\C-520 Agreement Stipulated Price 062719.Doc EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6 of 6 Documentation of Authority to Sign Complete Section A or B, as applicable: Section A. I ___________________________ certify that I am the Secretary of the corporation named as Contractor herein; that ________________________ who signed this contract on behalf of the Contractor was then (Title) of said corporation; that said contract was duly signed for and on behalf of the said corporation by authority of its governing body and is within the scope of its corporate powers. IN WITNESS WHEREOF, I have hereunto affixed my hand and the seal of said corporation this day _____ of ________________, ________. (Corporate Seal) _____________________________ Corporate Secretary Section B. We hereby certify that the undersigned are the sole owners of the company named as Contractor herein; and hereby attest that , who signed this Agreement on behalf of said Contractor, is authorized to legally bind the Contractor to the obligations of this Agreement. By ___________________________ ______________________________ NOTARIZATION STATE OF OKLAHOMA COUNTY OF ____________________ The foregoing was acknowledged before me this _______ day of , , by . _____________________________ Notary Public DAS-1

Get email alerts for Miami

A daily email when new agendas and minutes are posted.

Report an issue with this meeting