Board of Public Works & Safety
Regular MeetingMichigan City, IN · August 11, 2015
Minutes
SPECIAL MEETING – August 11, 2015
The Board of Public Works and Safety of the City of Michigan City, Indiana, met in a
SPECIAL SESSION on Monday morning, August 11, 2015 at the hour of 11:00 a.m., in the
Council Chambers, in the City Hall Building, located at 100 East Michigan Boulevard,
Michigan City Indiana – a regular meeting room of this Board.
The meeting was called to order by President Steve Janus, who presided.
Noted present: Steve Janus, Michael Palmer and Virginia Keating (3). Absent: (0).
A QUORUM WAS NOTED PRESENT.
Also noted in attendance:
Amber Lapaich, Corporate Counsel
Charles “Spike” Peller, City Engineer
Jim Micheals, Assistant Superintendent of Collection, M.C. Sanitary District
Arber Hiniaj, Engineer, M.C. Sanitary District
Craig Phillips, City Planner
Kim Sliwa, Deputy City Clerk
Change Order Request by City Engineer
Spike Peller, City Engineer believed the board had a packet that shows the Change Order
and maybe the summary on page 4 of 5 where the original contract cost was $1,069,601.00.
Change Order 1 was about $24,000.00. Change Order 2 which is this, there is a deduction
from the original work because they were able to save a little money by doing things a little
different. With the additions to Change Order 2, the total contract cost including 1 and 2 is
$1,263,000.00+ dollars. This is about an 18% increase in the original contract price. Mr.
Peller added there is enough money in the Streets and Alleys account even if the Council
takes back 20% of the original $2,000,000.00 that they appropriated. He knows there has
been some talk about this. However, there would still be enough money for this Change
Order. Also, there is some fairly detailed accounts of this Change Order and things like in
the first part of the contract. This is just an estimate of the cost for the work to be done.
Mr. Peller thinks the best way to do this is at the end of the work or contract he will bring
before the board a File Change Order which will, when all quantities are tallied. This is
based on tons of asphalt and square feet of sidewalk, things like that. They will not know
the exact number until it is done. They will of course keep it under 20%. President Janus
asked Mr. Peller if he was asking for a Change Order of $169,000 at this time and Mr.
Peller agreed. That is the sum total of the Change Order. From the original contract they
were able to save $223,000.00. The additions to the new work that they want to do is
close to $400,000.00 and when you add that up and subtract that is what the net Change
Order is. But this concludes all the work that they want to do, and it will be all done this
year. Vice-President Palmer asked if this included the Fire Training Paving and Mr. Peller
said it did not include it because they are working with the Sanitary District to get the
property transferred and at the next board meeting it maybe be done. Mr. Peller has put
together a description and they may transfer that to the City at which case then there will not
be a need to have all these agreements and Memorandums of Understandings.
Special Meeting – August 11, 2015 Page 2
Vice-President Palmer made the motion to approve the additional Change Order in the
amount of $169,000.00. The motion was seconded by Virginia Keating and carried as
follows: AYES: MEMBERS Janus, Palmer and Keating (3). NAYS: None (0). Motion
carries.
SOLICITATION OF BIDS
Brad Minnick, Primera Engineers, came to the meeting today to see what questions the board
might have regarding the plans or project in general. Craig Phillips stated for the benefit of
two of the members, asked if the board wanted them to go through the whole project or just
give highlights at this point? The plans have been drawn based on the comments received
from the workshop. If there any specific question the board has about the project that they
can address, it is basically South of Hwy 12 is largely signage and restriping. The addition of
a bike lanes on Pine Street only. Parking on both sides of both Pine Street and Washington
Street. North of Hwy 12 is more a substantial project, this consist of creating an actual
intersection at Franklin and where Pine St and Washington St. currently intersect with
Franklin, creating an actual intersection at 2nd St., and removal of the median north of 2nd St.
The colored sheets that were sent separately, those represent the staging or the phases of
traffic flow, so it will not result in full street closures.
Mr. Minnick stated MOT is an acronym for the maintenance of traffic. The Stage 1 and most
critical portion of the project is north of US 12 at the intersection of Franklin and 2nd St. As
the board can see from the red hashing in the Stage 1 drawing, the part would be quadrant
off and built from 2nd St. through the medians that are just south of the bridge. That has to
be built first, that comes into play when the traffic flip occurs later in the staging. In Stage 1
all the removals and purposed curves would be built at 2nd and Franklin. Then install all the
signs and signal throughout the project. Mostly from 11th St. down to 2nd St. and bag them
so they would be covered until ready. Traffic flow would be counter clock wise one way
which is consistent with the current traffic flow. Going to the next page, Stage 2 push all the
traffic on Pine St. and Washington St. inside, that would be the west side of Pine St. and
east side of Washington St., then work on the outside lanes for pavement marking, removal,
striping and so forth. Then similarly the traffic would continue to flow in a counter clock wise
direction, one way. Finally in Stage 3 push all traffic to the outside being the east side of
Pine St and the west side of Washington St. At the end of Stage 3 open it all up to traffic
with the intention of this being built all this fall, then in the spring there would be construction
at curbs of Washington St. and 2nd St. and also at 2nd St. and Pine St. This would be to
straighten out the curbs a little bit.
President Janus asked if it was stated that they would have to purchase some area on the
curb. Mr. Phillips stated there would have to be some negotiation with property owners in
order for the possibility of the intersection of 2nd St. and Pine St. to occur. The second
intersection at 2nd St. and Washington St. can occur today. This will only happen if they are
successfully able to negotiation those terms with the three property owners. Mr. Phillips also
wanted to clarify Washington St. is intended to be a one lane in each direction with a center
turn lane down the center and parking on both sides from 11th St. to Michigan Blvd. Pine St.
is shown as one lane in each direction with bike lanes in both direction and parking on both
sides. Then 9th St. would be one lane in each direction with a center turn lane in the section
between Washington St. and Pine St. Then to the west of Washington St. would be two way
from Washington St. all the way through Chicago St. with parking on both sides. The reason
for bike lanes on Pine St. is as a City subscribe to a Complete Streets model whenever we
do major traffic work, we have to provide for all modes of transportation. Keeping that in
mind, Mr. Phillips works with partners at the South Shore and NICTD. Having a bike lane
Special Meeting – August 11, 2015 Page 3
going to and from our train station is a very good planning method. There has been some
concerns that the bike lanes dead end at 11th St., they don’t dead end at 11th St., they dead
end at a train station. That is critical, and thinks we should whole heartedly support that.
They don’t feel the bike lanes are appropriate for Washington St. but they do fit on Pine St.
Mr. Phillips also reinstated that Washington St. would be one lane each direction with a
center turning lane for its entire length, Washington St. would be intended for carrying the
majority of the heavy traffic within the downtown area as a result of this project. To the north
of Hwy 12 there would be the same type of configuration on Pine St. up to where it curves
into 2nd St. and Franklin St. Franklin St. and Washington St. all the way through would have
that center turn lane to lead you in and out of Washington Park. This is for the purpose of
being able to have enough traffic flow and perhaps being able to reverse traffic flow for
events.
Virginia Keating asked when the target completion date was. Mr. Minnick would have an
intermediate completion date for the traffic flip late fall, probably November 15. Then the final
completion date would be in the spring early summer and that would hinge on negotiations
with the property owners at 2nd St. and Pine St.
President Janus stated the actually switch to two way will occur prior to the curbing on the
last two blocks of Washington St. are taken out? There will not be room for a turn lane
then. Mr. Phillips stated that traffic flow would not be reversed until that intersection is done.
However, that is intended to happen this fall if possible. President Janus reminded them the
curve at 9th St and 10th St. on Washington St., the curbs come out into Washington St. Mr.
Minnick stated they were not going to do anything with the curb. President Janus stated with
the curbs sticking out he didn’t think there was room for a turning lane. Mr. Phillips said
there are bump outs to protect the parking, there is no need to change those. There are
three lanes south of 9th St., there is adequate room to do, and there is currently parking on
both side. Vice-President Palmer stated there are only two lanes in right now, they cannot
get three lanes, that it skinny’s down and you have to merge over to one of the two lanes,
starting at 9th St. Mr. Phillips responded the flow of traffic that would be Franklin St to 9th St.
to Washington St. in terms of flow of traffic for the center turn lanes. The parking on both
sides would remain the same south of 9th St. and is one lane in each direction. In order for
us to accommodate what the board is asking for, they would have to lose the parking in front
of those business on that section between 9th St. and 11th St. That is also a pretty
substantial increase to the cost of the project. They intended for this project to be done
south of Hwy 12 within existing curves. President Janus said there would be a backup at 11th
St. More discussion ensued over this matter between Mr. Phillips and President Janus.
President Janus stated if you take the curbs out at 9th St. and 10th St. and you would have
the same width, but Mr. Phillips reminded them that you have to take out bump outs out at
all three of those intersections, which is a pretty costly project.
Spike Peller, City Engineer his thinking is to do it like they have planned and if there is a big
problem, they can change it. But he does not see a point in changing this plan right now
and adding the cost when it may not be necessary. Mr. Phillips added that traffic will be able
to turn onto 9th St., there will be a center turn lane available on 9th St. between Franklin St.
and Washington St. and then there is two lanes in each direction on Franklin St. south of 9th
St. More discussion ensued between the board and Mr. Phillips about traffic issues. Mr.
Phillips stated the board was suggesting an addition of a center turn lane in that area south
of 9th St. Maybe not a center turn lane but two lanes going one direction? President Janus
stated that change just might do it. Mr. Phillips stated that would mean talking to all the
property owners and redesigning the project to take out all the bump outs.
Special Meeting – August 11, 2015 Page 4
Mr. Minnick spoke stating one potential alternative at that intersection would be to change the
signal head and have a left turn arrow and holding up the northbound traffic, so it would be a
delayed signal. He asked if that was a concern at other streets or was this one just because
of the South Shore. President Janus stated no other intersections were a concern. Mr.
Phillips added that they can always come back and modify this as a second phase of the
project if they find it is not working. It would take some more work and some pretty heavy
engineering to make that work, similar to the engineering work that had to be done north of
Hwy 12. Mr. Minnick stated that was the nice thing about this project and being able to hold
over into the spring, they could monitor traffic flow after the switch and make adjustments still
under this contract. It something is not fit or needed at a certain intersection whether it be
due to development, they can come back and modify it under this contract. President Janus
mentioned that Mr. Minnick still had to talk to the Post Office and someone else, what was
that about? Mr. Minnick stated on Washington St. south of Hwy 12 the Post Office has their
drop boxes on the east side of the road. With respect to the conversation with Commerce
Square group, that was just bringing them up to speed of where the project is at and that
there would be two phases.
Mr. Phillips spoke that there was another possible suggestion for perhaps in the medium
term, that could be help with the concerns at 11th St. Tim Haas with Haas and Associates
they are a sub consultant to Primera Engineering on this project. In the future if there is a
need for a change, they are to add a dedicated left turn lane, there is a possibility to
eliminate parking along the eastside of Washington St. This is adjacent to what use to be
the Boyd E. Phelps building. They do have a dedicated parking lot that does go with that
building so the parking lane there is not as critical as in some of the other areas where there
are houses that do not have any other place to park.
Vice-President Palmer asked when the Bike Lanes were brought up on Pine St. and there
were no traffic counts or get any accident reports, Mr. Phillips stated they do have basic
traffic counts. Vice-President Palmer stated that they are putting traffic down to one lane on
Pine St. which is really heavy especially on weekends, the concern was if they could do
away with the two bike lanes and put in a center lane that could be utilized both ways? The
board was not sure where the stop signs were going or if any were going to be added to
some of the busy intersections. Mr. Phillips recommend against this, he thinks we have to
provide for all modes of transportation when the city does city projects. And with the fact
that the train station is there the city needs to do what they can to support traffic coming
from the train station using all modes of traffic that are available. Mr. Phillips added that
there is a rule of thumb in regards to the number of cars per day that a lane can handle.
Pine St. was far under this number. There is definitely not a need for two or three lanes on
Pine St. going in one direction based on this information. There will be a stop sign added at
Pine St. and 6th St. Mr. Minnick added there are going to be changes to these stop signs.
First they are going to go with LED stop signs so it will flashing red perimeter, this will help
alert traffic to the altered pattern. Other cities have used this with great success. Stop Sign
changes along Pine Street will be the following: 10th St. there are currently no stop signs
northbound so they would be added in the northbound southbound directions, there are
currently only stop signs in the east/west direction. 9th St. there is a stop sign already on
the northbound so there would be an added one for the southbound. 8th St. has a signal.
7th St. has stop signs east/west and no stop signs on the north/south. 6th St. would be a
purposed 4 way stop. 5th St. again northbound existing and southbound would be an add.
4th St. northbound existing and southbound would be an add. Then the signal at Hwy 12.
Then on Washington St. of course the signal at 11th St., no stop signs at 11th St. They are
currently on the east/west on 10th St. 9th St. thru 4th St. all would have stop signs because
they are introducing left turn lanes at each intersection. 8th St. and Hwy 12 have a traffic
Special Meeting – August 11, 2015 Page 5
signal. The benefit of having this project carry over into the spring is if a stop sign is not
installed in the fall and it comes to be needed in the spring, it can be added. And just the
opposite, if they are installed in the fall and they find out that traffic is bottle neck they can
take the stop sign out. Mr. Minnick mentioned again all intersection on Washington St. that
do not have a traffic signal will become 4 way stops. This is because of the left turn lane.
PUBLIC COMMENT
Larry Silvestri, 314 Kenwood Place and is a member of the Michigan City Redevelopment
Commission. They has studied the details for a long time and Mr. Silvestri cannot see any
major problem. Other studies has come up with the same solution, that these streets need
to be two way. There was not one study that said leave it as it is.
Further discussion ensued between the board and Mr. Phillip about authorizing two way
conversion project and to be on the Board of Public Works and Safety agenda for August 17.
2015.
Virginia Keating made a motion to advertise for bids on the Two Way Conversion Project.
The motion was seconded by Vice-President Palmer and carries as follows: AYES:
MEMBERS Janus, Palmer and Keating (3). NAYS: (0). Motion Carries.
ADJOURNMENT
President Janus inquired whether there was anything else to be considered by the Board at
this time and, there being none, declared the meeting ADJOURNED (approximately 11:30
a.m.). Virginia Keating made the motion to adjourn. The motion was seconded by Vice-
President Palmer and carried as follows: AYES: MEMBERS Janus, Palmer and Keating
(3). NAYS: None (0). Motion carries.
_________________________________________
Gale A. Neulieb, City Clerk
Agenda
AGENDA
BOARD OF PUBLIC WORKS & SAFETY - SPECIAL MEETING
Tuesday, August 11, 2015
Meeting to be held at 11:00 a.m., local time,
in the Common Council Chambers, City Hall Building
CHANGE ORDER Charles Peller, City Engineer – 2015 Streets and Sidewalk
REQUEST Contract, Rieth-Reiley
SOLICITATION OF Craig Phillips, City Planner request approval to solicit bids for the
BIDS Two Way Street Conversion” project
ADJOURNMENT
____________________________
Gale Neulieb, City Clerk
Please contact the Clerk’s Office at 219-873-1410 if you require information regarding building accessibility or
reasonable accommodations. Office hours are Monday – Friday from 8:00 a.m. to 4:30 p.m.
Page 1
Agenda August 11, 2015
Posted August 10, 2015
Get email alerts for Michigan City
A daily email when new agendas and minutes are posted.