Inland / Wetlands & Water Courses Agency
Regular MeetingMiddletown, CT · August 3, 2022
Minutes
Chair Joseph Carta
Vice-Chair Ken McClellan
Members Fred Terrasi Trevor Davis
Inland Wetlands David Pritchard
Jammie Middleton
Jennifer Greenberg
Brian Gartner
And Alternates
Steven Skultety
Jack Pieper
Vacant
Paul Dyka
Watercourses Agency Vacant
Vacant
Vacant
Staff James Sipperly, Environmental Planner
MEETING MINUTES
Wednesday – August 3, 2022
Meeting held in person only, Municipal Building, Common Council Chambers
7:00 P.M.
Present: Ken McClellan
Joseph Carta
Paul Dyka
Jammie Middleton
Brian Gartner
Jennifer Greenberg
Kristen Rzasa (new member)
Absent: Fred Terrasi
Jack Pieper
Steven Skultety
Trevor Davis
Public: Seth Lenz, Assistant Chief Engineer; Bob Tedeski, Weston and Sampson; Domenick More,
Debbie More,117 Sachem Drive; Pat Benjamin, Bascom and Benjamin Engineering;
Dean Delvecchio; Kasia Lemoenski
Staff: James Sipperly, Environmental Planner
A. Call to Order
J. Carta, Chairman called the meeting to order at 7:03 pm and led the Pledge of Allegiance.
B. Public Hearing
1. Request to upgrade Red Road sewer pumping station which was originally constructed in
1969 at 90 Red Road. Applicant/Agent: Middletown Water and Sewer Department. 2022-7.
Seth Lenz, Assistant Chief Engineer, Water and Sewer Department described the project. The
current pump station is quite old and is in bad working order. The former design is not up to
current standards and in dire need of repairs and upgrades. There is a confined space as well.
S. Lenz stated that they have hired Weston and Sampson as consulting engineers to design the
project.
Bob Tedeski, P.E. from Weston and Sampson went into details about the project. The
wetlands were flagged on April 4, 2022 by Demian Sorretino. There will be a new concrete
slab, a new control panel, new bypass and new generator. All the work will be outside the
flagged wetlands area. Silt fence will be installed around the whole project area. There will be
Page 1 of 10
an above ground generator that will have a diesel underground double walled supply tank.
There will be interstitial monitoring device to detect any leakage. That monitoring system is
phone operated and on call workers will be immediately notified.
The new building will be shielded with arborvitaes and plantings.
J. Carta asked if any members of the public would like to speak.
Kasia Lemoenski, 6 Red Yellow Road spoke about saving the existing trees for shade. B.
Tedeski replied that one needs to be removed for sure and that it might be possible to save the
other 3 existing trees.
Staff read a letter from Bryna O’Sullivan requesting that another species of tree be panted
because arborvitaes are susceptible to be eaten by deer. Staff will look into this with the
project engineer.
Staff asked about the timing and phasing of the project. B. Tedeski responded that ordering the
materials have been tough. Once the materials have arrived the project will take approximately
one month to construct. The phasing would be, set up a bypass system, demo the existing
structure, construct the new system and then train the personnel to run the pump station.
Motion: To close the public comment period of the Public Hearing.
Moved by K. McClellan/seconded by J. Greenberg; approved unanimously.
J. Carta opened questions from commissioners.
J. Middleton questioned the concrete pad for the generator and the diesel tank. The potential
for a leak or spill is of concern. B. Tedeski stated that is slim because of the way the tank is
designed and monitored.
J. Sipperly asked about the service area of the pump station and S. Lenz responded that it
handles all off Red area and a good portion of the Yellow area plus some houses off of Laurel
Grove Road.
K. Rzasa asked about the 23 6’arborvitae trees and where they would be planted exactly. B.
Tedeski stated that they would not be in the wetland area but around the building for cover.
J. Carta asked about the time frame of the proposed work and staff responded that the
commission could stipulate when that work could be done during a dry time of year.
J. Sipperly asked if there will continue to be an external alarm that is visible to people passing
by. S. Lenz responded that there would be.
Motion: To close the Public Hearing. Moved by K. McClellan; seconded by P. Dyka approved
unanimously.
C. Old Business
1. Construction of a new septic system requiring the sewer force main to cross the
intermittent watercourse to the new septic system leaching fields at 488 Bow Lane .,
Applicant/Agent: Michael Kereks/Estate of Robert Kereks, 2022-5.
Page 2 of 10
P. Benjamin P.E. discussed the plans in detail. There is an existing culvert crossing where the
force main will be installed just below that area. The force main will be 42” below grade and
that there will be 110 sqft of temporary disturbance.
Motion:
IWWA APPPLCATION W 2022-5
Applicant/Agent Estate of Robert Kereks, C/O Michael Kereks, Exectutor
Draft Motion:
That the Inland Wetlands and Watercourses Agency (hereinafter, “Agency”), having
considered application 2022-5 with due regard to the criteria enumerated in Section 22a-41
of the Connecticut General Statutes and Section 8 of the Inland Wetlands & Watercourses
Regulations of the City of Middletown finds the following:
1. That the proposed activity is the construction of a new septic system due to the failure
of the existing septic system at the existing house.
2. That the sewer force main must be buried under the intermittent watercourse to the
new septic system leaching fields at the location where there is an existing culvert crossing.
That the force main will be buried at a depth of 42” below existing grade.
3. That the inlands wetlands and watercourses on the site were delineated by Eric
Davidson, Certified Soil Scientist on May 24, 2022 and are shown correctly on the plan
referenced below.
4. That based on subsurface soil tests, no other portion of the property can support a 3
bedroom septic system.
5. That the plans were approved by the Middletown Health Department on
July 11, 2022.
6. That there will be 110 sq. ft. of temporary intermittent watercourse disturbance while
installing the force main.
7. That the proposed work, as specified and conditioned below, is in conformance with
the purposes and provisions of said sections and furthermore, will not have a significant
adverse effect on the adjacent inland wetlands and watercourses.
Therefore, permit # W 2022-5 is granted, with conditions, to allow the following regulated
activities as depicted on the submitted plan entitled:
“Subsurface Sewage Disposal System Repair, Assessors Map 41, Lot 34, 488 Bow Lane,
prepared for Michael Kerkes, scale 1”=20’, dated 6-7-22, prepared by Bascom & Benjamin,
LLC”
This Permit is issued by the Agency subject to the following conditions and/or modifications
as follows:
1. If the authorized activity is not completed within five (5) years from the date of
approval by the Agency that is, on or before August 3, 2027 said activity shall cease and, if
not previously revoked or specifically extended, this Permit shall be null and void.
Page 3 of 10
2. The permittee shall notify the Wetlands Officer immediately upon the commencement
of work and upon its completion.
3. Prior to the commencement of any site work, the Permittees and/or their agent shall
properly install any and all sedimentation and erosion (S&E) control measures as depicted on
the site plans approved by the Agency. Changes to S&E controls may be made in order to
accommodate field conditions so long as they provide equal or greater protection against
S&E into the regulated wetlands and upland review area.
4. A copy of the plans approved by the Agency shall be kept at the job site for the
duration of construction activities as approved herein.
5. During construction, as represented to the Agency, no material shall be stockpiled
within the regulated area or in areas other than those depicted on the site plans approved by
the Agency.
6. The City reserves the right to inspect the site work area at any time from
commencement to conclusion of the property to ensure permit conditions and compliance
with the regulations is being met.
7. All sedimentation and erosion control devices shall remain in place until the end of
construction and the site is deemed stabilized by the City’s Wetlands Enforcement Officer or
other authorized agent of the Land Use Department. An inspection can be scheduled by
calling 860-638-4590.
8. All work, including all regulated activities conducted pursuant to this authorization,
shall be consistent with the terms and conditions of this Permit. Any structures, excavation,
fill, obstructions, encroachments, and/or regulated activities not specifically identified and
authorized herein shall constitute a violation of this Permit and may result in its modification,
suspension, or revocation. Upon initiation of the activities authorized herein, the Permittees
accept and agree to comply fully with all terms and conditions of this Permit.
9. No equipment or material including, without limitation, fill, construction materials
and/or debris, shall be deposited, placed, and/or stored in any regulated area, on or off site,
unless specifically authorized by this Permit.
10. The authorizations and activities set forth in this Permit are not transferable without
the written consent of the Agency or its Authorized Agent.
11. In evaluating this application, the Agency has relied on information provided by the
Permittees. If such information subsequently proves to be false, deceptive, incomplete
and/or inaccurate, this Permit may be modified, suspended, or revoked by the Agency.
12. If applicable, flagging associated with the wetland boundary shall remain until the
completion of construction activities and shall not be removed until all work is complete and
the site is stabilized.
13. The Permittee shall employ best management practices, consistent with the terms and
conditions of this Permit, to control stormwater discharge, to prevent erosion and sediment
migration beyond the work area(s), and to otherwise prevent pollution of inland wetlands
and watercourses. The Permittees shall immediately inform the City’s Inland Wetlands
Enforcement Officer of any problems related to activities in the regulated area, which have
been impacted during the course of, or caused by, the authorized work.
14. This Permit is subject to, and does not detract from, any present or future property
rights or other rights or powers of the State of Connecticut, and conveys no property rights in
real estate or material nor any exclusive privileges, and is further subject to any and all public
and private rights and to any federal, state, or local laws or regulations pertinent to the
property or activity affected hereby.
15. Nothing in these regulations shall obviate any requirement for the Permittee to obtain
any other assent, permit, or license required by law and/or regulation by the Government of
Page 4 of 10
the United States, the State of Connecticut, or any other political subdivisions thereof.
Obtaining such assents, permits, and/or licenses is solely the responsibility of the Permittee.
16. That any storage of fuel, oils and other chemicals on the site shall be stored in a
secondary container to prevent the possibilities of spills and/or leaks.
17. That the work will be done during a dry time of year which will be verified by staff prior
to the commencement of construction activities.
Moved by J. Greenberg; seconded by k. McClellan; approved unanimously
2. Construction of a single family home, septic system, well, driveway and associated land
clearing and grading on Shunpike Road (map/lot 49/0035). Applicant/Agent Dean Delvecchio
2022-6.
P. Benjamin P.E. described the project in detail. P. Benjamin stated there is no disturbance in
the wetlands only within a slight portion of the upland review area.
K. Rzasa questioned the amount of trees to be removed. P. Benjamin responded that there
will be about 20 trees removed that are between 6” – 10” in diameter.
Motion:
IWWA APPLICATION W 2022-6
Applicant/Agent Dean Delvecchio
Draft Motion:
That the Inland Wetlands and Watercourses Agency (hereinafter, “Agency”), having considered
application 2022-6 with due regard to the criteria enumerated in Section 22a-41 of the Connecticut
General Statutes and Section 8 of the Inland Wetlands & Watercourses Regulations of the City of
Middletown finds the following:
1. That the proposed activities are to construct a single family dwelling, well, septic and driveway
grading within the upland review area.
2. That there is no proposed disturbance to the inland wetlands and intermittent watercourse on
site.
3. That the inlands wetlands and watercourses on the site were delineated by Eric Davidson,
Certified Soil Scientist in May 2022 and are shown correctly on the plan referenced below.
4. That the proposed work, as specified and conditioned below, is in conformance with the
purposes and provisions of said sections and furthermore, will not have a significant adverse
effect on the adjacent inland wetlands and watercourses.
Therefore, permit # W 2022-6 is granted, with conditions, to allow the following regulated activities
as depicted on the submitted plan entitled:
“Subsurface Sewage Disposal, Tax assessors Map #49, lot 0035, East Side of Shunpike Road, prepared
for Dean Delvecchio, scale 1”=20’, dated 5-31-22, prepared by Bascom and Benjamin, LLC”
This Permit is issued by the Agency subject to the following conditions and/or modifications as
Page 5 of 10
follows:
1. If the authorized activity is not completed within five (5) years from the date of
approval by the Agency that is, on or before August 3, 2027 said activity shall cease
and, if not previously revoked or specifically extended, this Permit shall be null and
void.
2. The permittee shall notify the Wetlands Officer immediately upon the commencement
of work and upon its completion.
3. Prior to the commencement of any site work, the Permittees and/or their agent shall
properly install any and all sedimentation and erosion (S&E) control measures as
depicted on the site plans approved by the Agency. Changes to S&E controls may be
made in order to accommodate field conditions so long as they provide equal or
greater protection against S&E into the regulated wetlands and upland review area.
4. A copy of the plans approved by the Agency shall be kept at the job site for the
duration of construction activities as approved herein.
5. During construction, as represented to the Agency, no material shall be stockpiled
within the regulated area or in areas other than those depicted on the site plans
approved by the Agency.
6. The City reserves the right to inspect the site work area at any time from
commencement to conclusion of the property to ensure permit conditions and
compliance with the regulations is being met.
7. All sedimentation and erosion control devices shall remain in place until the end of
construction and the site is deemed stabilized by the City’s Wetlands Enforcement
Officer or other authorized agent of the Land Use Department. An inspection can be
scheduled by calling 860-638-4590.
8. All work, including all regulated activities conducted pursuant to this authorization,
shall be consistent with the terms and conditions of this Permit. Any structures,
excavation, fill, obstructions, encroachments, and/or regulated activities not
specifically identified and authorized herein shall constitute a violation of this Permit
and may result in its modification, suspension, or revocation. Upon initiation of the
activities authorized herein, the Permittees accept and agree to comply fully with all
terms and conditions of this Permit.
9. No equipment or material including, without limitation, fill, construction materials
and/or debris, shall be deposited, placed, and/or stored in any regulated area, on or
off site, unless specifically authorized by this Permit.
10. The authorizations and activities set forth in this Permit are not transferable without
the written consent of the Agency or its Authorized Agent.
11. In evaluating this application, the Agency has relied on information provided by the
Permittees. If such information subsequently proves to be false, deceptive, incomplete
and/or inaccurate, this Permit may be modified, suspended, or revoked by the Agency.
12. If applicable, flagging associated with the wetland boundary shall remain until the
completion of construction activities and shall not be removed until all work is
complete and the site is stabilized.
13. The Permittee shall employ best management practices, consistent with the terms and
conditions of this Permit, to control stormwater discharge, to prevent erosion and
sediment migration beyond the work area(s), and to otherwise prevent pollution of
inland wetlands and watercourses. The Permittees shall immediately inform the City’s
Inland Wetlands Enforcement Officer of any problems related to activities in the
Page 6 of 10
regulated area, which have been impacted during the course of, or caused by, the
authorized work.
14. This Permit is subject to, and does not detract from, any present or future property
rights or other rights or powers of the State of Connecticut, and conveys no property
rights in real estate or material nor any exclusive privileges, and is further subject to
any and all public and private rights and to any federal, state, or local laws or
regulations pertinent to the property or activity affected hereby.
15. Nothing in these regulations shall obviate any requirement for the Permittee to obtain
any other assent, permit, or license required by law and/or regulation by the
Government of the United States, the State of Connecticut, or any other political
subdivisions thereof. Obtaining such assents, permits, and/or licenses is solely the
responsibility of the Permittee.
16. That any storage of fuel, oils and other chemicals on the site shall be stored in a
secondary co to prevent the possibilities of spills and/or leaks.
Moved by K. McClellan; seconded by B. Gartner; approved unanimously.
Motion: to amend the agenda to add item D 1. To C3. Moved by K. McClellan; seconded by
B. Gartner; approved unanimously.
3. Maintenance removal of sediment in Bear Pond to be relocated to the North shore of
the pond at 117 Sachem Drive. Applicant/Agent: Dominick & Deborah More. 2022-8.
J. Sipperly stated that the Mores’ have responded to all of the Notice of Violations issues.
D. More presented his remediation plan and described how and when he will do the work.
When it is this dry this is the best time of year to do it. He will notify staff when he starts
the work which may take between 4-6 weeks to do.
Motion:
IWWA APPPLCATION W 2022-8
Applicant/Agent Dominick & Deborah More
Draft Motion:
That the Inland Wetlands and Watercourses Agency (hereinafter, “Agency”), having considered
application 2022-8 with due regard to the criteria enumerated in Section 22a-41 of the Connecticut
General Statutes and Section 8 of the Inland Wetlands & Watercourses Regulations of the City of
Middletown finds the following:
1. That the applicant has complied with all of the terms, questions and requests of the Notice of
Violation dated March 4, 2022 and it is therefore negated.
2. That this application is to conduct routine maintenance to remove sediment and soil removal
in “Bear Pond” as a result of several severe storm events.
3. That the inlands wetlands and watercourses on the site were delineated by William Jackson,
Certified Soil Scientist between May 11-18 and his report is included in the application materials.
4. That the wetland delineation is properly shown on a site plan prepared by Jackowiak Land
Surveying dated June 30, 2022.
Page 7 of 10
5. That the proposed work, as specified and conditioned below, is in conformance with the
purposes and provisions of said sections and furthermore, will not have a significant adverse
effect on the adjacent inland wetlands and watercourses.
Therefore, permit # W 2022-8 is granted, with conditions, to allow the following regulated activities
as depicted on the submitted plan entitled:
“Exhibit 1, received July 07, 2022, on base map – General Location Survey depicting Wetland limits as
delineated, prepared for Dominick & Deborah More, scale 1”=50’ dated June 30, 2022 prepared
Jackowiak Land Surveying”
This Permit is issued by the Agency subject to the following conditions and/or modifications as
follows:
1. If the authorized activity is not completed within five (5) years from the date of approval by
the Agency that is, on or before August 3, 2027 said activity shall cease and, if not previously
revoked or specifically extended, this Permit shall be null and void.
2. The permittee shall notify the Wetlands Officer immediately upon the commencement of work
and upon its completion.
3. Prior to the commencement of any site work, the Permittees and/or their agent shall properly
install any and all sedimentation and erosion (S&E) control measures as depicted on the site
plans approved by the Agency. Changes to S&E controls may be made in order to
accommodate field conditions so long as they provide equal or greater protection against S&E
into the regulated wetlands and upland review area.
4. A copy of the plans approved by the Agency shall be kept at the job site for the duration of
construction activities as approved herein.
5. During construction, as represented to the Agency, no material shall be stockpiled within the
regulated area or in areas other than those depicted on the site plans approved by the
Agency.
6. The City reserves the right to inspect the site work area at any time from commencement to
conclusion of the property to ensure permit conditions and compliance with the regulations is
being met.
7. All sedimentation and erosion control devices shall remain in place until the end of
construction and the site is deemed stabilized by the City’s Wetlands Enforcement Officer or
other authorized agent of the Land Use Department. An inspection can be scheduled by calling
860-638-4590.
8. All work, including all regulated activities conducted pursuant to this authorization, shall be
consistent with the terms and conditions of this Permit. Any structures, excavation, fill,
obstructions, encroachments, and/or regulated activities not specifically identified and
authorized herein shall constitute a violation of this Permit and may result in its modification,
suspension, or revocation. Upon initiation of the activities authorized herein, the Permittees
accept and agree to comply fully with all terms and conditions of this Permit.
9. No equipment or material including, without limitation, fill, construction materials and/or
debris, shall be deposited, placed, and/or stored in any regulated area, on or off site, unless
specifically authorized by this Permit.
10. The authorizations and activities set forth in this Permit are not transferable without the
written consent of the Agency or its Authorized Agent.
Page 8 of 10
11. In evaluating this application, the Agency has relied on information provided by the
Permittees. If such information subsequently proves to be false, deceptive, incomplete
and/or inaccurate, this Permit may be modified, suspended, or revoked by the Agency.
12. If applicable, flagging associated with the wetland boundary shall remain until the
completion of construction activities and shall not be removed until all work is
complete and the site is stabilized.
13. The Permittee shall employ best management practices, consistent with the terms and
conditions of this Permit, to control stormwater discharge, to prevent erosion and
sediment migration beyond the work area(s), and to otherwise prevent pollution of
inland wetlands and watercourses. The Permittees shall immediately inform the City’s
Inland Wetlands Enforcement Officer of any problems related to activities in the
regulated area, which have been impacted during the course of, or caused by, the
authorized work.
14. This Permit is subject to, and does not detract from, any present or future property
rights or other rights or powers of the State of Connecticut, and conveys no property
rights in real estate or material nor any exclusive privileges, and is further subject to
any and all public and private rights and to any federal, state, or local laws or
regulations pertinent to the property or activity affected hereby.
15. Nothing in these regulations shall obviate any requirement for the Permittee to obtain
any other assent, permit, or license required by law and/or regulation by the
Government of the United States, the State of Connecticut, or any other political
subdivisions thereof. Obtaining such assents, permits, and/or licenses is solely the
responsibility of the Permittee.
16. That any storage of fuel, oils and other chemicals on the site shall be stored in a
secondary container to prevent the possibilities of spills and/or leaks.
Moved by K. McClellan; seconded by B. Gartner; approved unanimously
D. New Business
1. Subdivision to create five residential building lots at 665 Ridgewood Road (map/lot:
10/0008). Applicant/Agent: Hubbard Properties, LLC 2022-9
Motion: To accept the application and schedule it for review at the next meeting on September
7, 2022. Moved by B. Gartner; seconded by K. Rzasa; approved unanimously.
2. Fill Wetlands for retail development at 550 Highland Avenue. Applicant/Agent: South
Main Investors, LLC. 2022-10
J. Sipperly stated that there is a small isolated pocket of wetland like soils in an existing
mowed lawn area. Filling is automatically a significant activity and requires a Public Hearing.
Motion; to accept the application and schedule a Public Hearing for the September 7, 2022
meeting. Moved by K. McClellan; seconded by P., Dyka approved unanimously.
Page 9 of 10
E . Agency Review
None
F. Reports of Officers and Committees
Staff reported that he has been conducting routine inspections with no issues to report.
G. Public Open forum
None
H. Minutes of July 6, 2022
The minutes were reviewed as received. Motion: to approve the minutes of July 6, 2022 as
received. Moved by K. McClellan; seconded by B. Gartner; approved unanimously with J.
Greenberg abstaining.
I. Communication and Bills
1. J. Sipperly received copies of a CT DEEP permits for treatment to several ponds in
Middletown for algae blooms. K. Mcclellan asked who follows up to ensure this is done and
done properly. Staff followed up with the manager Lisa Marikakis of The Pond and Lake
Connection and they send year end reports on their treatments.
J. Adjournment
Motion: To adjourn at 8:25 pm. Moved by K. McClellan; seconded by B. Gartner;
Approved unanimously.
Respectively Submitted,
James Sipperly, Secretary/Environmental Planner
Department of Land Use
Page 10 of 10
Agenda
Chair Joseph Carta
Vice-Chair Ken McClellan
Members Fred Terrasi Trevor Davis
Inland Wetlands David Pritchard
Jammie Middleton
Jennifer Greenberg
Brian Gartner
And Alternates
Steven Skultety
Jack Pieper
Vacant
Paul Dyka
Watercourses Agency Vacant
Vacant
Vacant
Staff James Sipperly, Environmental Planner
REGULAR MEETING
AGENDA
Wednesday, August 3, 2022
MEETING IN PERSON
MUNICIPAL BUILDING – COUNCIL CHAMBERS
7:00 P.M.
Meeting to be held in person. WEARING A MASK IS OPTIONAL
A. Call to Order
1. Pledge of Allegiance
1. Public Hearing
1. Request to upgrade Red Road sewer pumping station which was originally constructed
in 1969 at 90 Red Road. Applicant/Agent: Middletown Water & Sewer Department.
2022-7
2. Old Business
1 Construction of a new septic system requiring the sewer force main to cross the
intermittent watercourse to the new septic system leaching fields at 488 Bow Lane.
Applicant/Agent: Michael Kereks/Estate of Robert Kereks. 2022-5
2 Construction of a single family home, septic system, well, driveway, and associated
land clearing and grading on Shunpike Road (Map/Lot: 49/0035). Applicant/Agent:
Dean Delvecchio. 2022-6
D. New Business
1. Maintenance removal of sediment in Bear Pond to be relocated to the North shore of
the pond at 117 Sachem Drive. Applicant/Agent: Dominick & Deborah More. 2022-8
2. Subdivision to create five residential building lots at 665 Ridgewood Road (Map/Lot:
10-0008). Applicant/Agent: Hubbard Properties, LLC. 2022-9
3. Fill Wetlands for retail development at 550 Highland Avenue. 2022-10
E. Agency Review
None
F. Reports of Officers and Committees
G. Public Open Forum
H. Minutes – July 6, 2022
I. Communication and Bills
If you require special accommodations for any meeting, please call the ADA Coordinator at (860) 638-4540, (voice) or (860)
638-4812 (TDD/TTY), or the Town Clerk’s Office at (860) 638-4910 at least ten (10) days prior to the scheduled meeting.
J. Adjournment
Alternate Member Seating: Jack Pieper; Paul Dyka
If you require special accommodations for any meeting, please call the ADA Coordinator at (860) 638-4540, (voice) or (860)
638-4812 (TDD/TTY), or the Town Clerk’s Office at (860) 638-4910 at least ten (10) days prior to the scheduled meeting.
Get email alerts for Middletown
A daily email when new agendas and minutes are posted.