Water Pollution Control Authority
Regular MeetingMiddletown, CT · May 5, 2022
Minutes
AMENDED MINUTES
HYBRID/WEBEX REGULAR MEETING
WATER POLLUTION CONTROL AUTHORITY
May 5, 2022
PRESENT:
Director, Joseph Fazzino
Deputy Director, Donald Fisco
Chief Engineer, Brian Robillard
Vice Chairman, Scott Bishel
Councilmatic Representative, Philip J. Pessina
Councilmatic Representative, Eugene Nocera
Commissioner, Jack Pieper
Commissioner, Brian Gartner
Commissioner, David Bauer
I. Open Meeting (started at 7:20pm)
1. Public Hearing
No one from the public was present so the public portion of the meeting was
closed.
II. Reports, Minutes and Correspondence
1. Minutes of Regular Meeting of April 7, 2022
A motion was made by Commissioner Bauer and seconded by Commissioner
Gartner to approve the Minutes of Regular Meeting of April 7, 2022. Motion was
approved unanimously. Councilmatic Representative Pessina abstained.
2. Resignation Letter of John Giuliano, Commissioner
This letter was for informational purposes only.
III. Transfers/Fund Updates
1. Monthly Fund Balance Report Reports – April
The Monthly Fund Balance Report was for informational purpose only.
2. Collection/Delinquent Report
N/A
3. Consumption Report
The Consumption Report was for informational purposes only. Mr. Bauer noted
an error in the labeling of the fiscal year. This will be corrected.
IV. Old Business
1. Inflow/Infiltration, Basin #25, 26 & 27 – FYI
Director Fazzino stated that the Department started flow monitoring and manhole
inspections in sub-basins 25, 26 and 27. The work was split between two consultants;
Wright-Pierce and Prime AE.
Wright-Pierce is working in sub-basins 25 and 26. Sub-Basin 25 includes streets
between Warren Street and the Hunting Hill area and extends south to include the
Pameacha pond area. Sub-basins 26 includes streets south of Washington Street to South
Main Street and extends from the Wesleyan Campus on the west to DeKoven Drive on
the East. Prime AE is working in sub-basin 27 which includes areas between South Main
Street and Eastern Drive and from the Patnuade Pump Station to Mill Street.
The sub-basins all flow to the Patnaude Pump Station and were identified in
previous studies as having high infiltration and inflow. The consultants will be inspecting
manholes and conducting video inspection of the sewer mains to identify and leaks or
defects that contribute to I/I. Both consultants will prepare designs to address any defects
identified by the field inspections.
Director Fazzino went into further discussions about how the basins are tied into
the pump stations.
2
V. New Business
1. Resolution – Water Fund Loan
Director Fazzino stated that this resolution was for the Sewer Loan from the
Water Fund and repayment schedule. The Mattabassett Assessment and Sewer Fund
Contribution is why he is borrowing from the Water Fund to keep the rates down.
RESOLUTION
WHEREAS, the Sewer Department Fund Balance is being partially used to keep
the sewer rates low; and,
WHEREAS, the Sewer Department is proposing to borrow money from the Water
Fund Balance in order to keep a healthy fund balance.
NOW THEREFORE, BE IT RESOLVED BY THE COMMON COUNCIL OF
THE CITY OF MIDDLETOWN: that a loan of One Million Dollars ($1,000,000) from
the Water Fund Balance 5000-600000-30310-0000-00000-0000-000 to the Sewer Fund
Balance 2050-00000-30310-0000-00000-0000-000 is approved to cover the cost of the
Mattabassett yearly assessment; and
BE IT FURTHER RESOLVED THAT: the Sewer Department shall repay the
loan to the Water Fund Balance as revenue to the Sewer Fund Balance becomes
available; and
BE IT FURTHER RESOLVED THAT: the Sewer Department shall repay within
one (1) year, but no later than June 30, 2023.
A motion was made by Commissioner Bauer and seconded by Commissioner
Pieper to approve the resolution and recommend it to Common Council. Motion was
approved unanimously.
VI. Staff Reports
1. Durham Water - Update
Chief Engineer Robillard indicated that the contractor was working through some
communication issues between the new storage tank, pump station and meter building in
SCADA. The installation of the chlorine booster system began at the Long Hill Pump
Station. Other electrical work is also ongoing at the pump station. Chief Engineer
Robillard indicated that the contractor completed a leak test on the new storage tank. The
tank passed this test. The driveways for the new facilities are scheduled to be paved at
the end of this month.
3
2. Pameacha Project – Update
Director Fazzino stated that the Common Council approved a bid waiver for this
project. The Department is working with Finance to approve the purchase orders for
Ludlow Construction. This included creating a new budget line for the project. Pre- Pre-
Construction Meeting will take place on Friday to discuss submittals and discuss
potential start dates. Once the POs are in place, we preconstruction meeting will be held
with Public Works, Fire and Police.
VII. Executive Session-None
There was no Executive Session.
VIII. Adjournment
A motion was made by Councilmatic Representative Pessina and seconded by
Commissioner Bauer to adjourn the meeting. Motion was approved unanimously.
The meeting adjourned at 7:41p.m.
Respectfully submitted: ______________________________________
Brian Robillard
Chief Engineer, Water & Sewer Department
W.P.C.A.
4
Agenda
WPCA Staff
Vice Chairman Scott Bishel (2022) (2018) (2014) (2010) Director Joseph Fazzino
Councilmatic Representative Philip J. Pessina (2023) ((2019) Deputy Director Donald Fisco
Councilmatic Representative Eugene Nocera (2023) (2019) Chief Engineer Brian Robillard
Commissioner Jack Pieper (2024) (2020) (2016) (2012)
Commissioner Brian Gartner (2024) (2020)
Commissioner David Bauer (2024)
REGULAR MEETING AGENDA
WATER POLLUTION CONTROL AUTHORITY
HYBRID/WEBEX MEETING
THURSDAY, May 5, 2022 @ 7:00 p.m.
Special Note To The Public
TO LISTEN TO THE MEETING THROUGH AUDIO CONFERENCE:-
Audio Conference Phone Number 1-408-418-9388 and
WEBEX.Com / Event 2335 508 7122 Event Password: MIDDLETOWN
I. Open Meeting
1. Public Hearing
II. Reports, Minutes and Correspondence
1. Minutes of Regular Meeting of April 7, 2022 (enclosed)
2. Resignation Letter of John Giuliano, Commissioner (enclosed)
III. Transfers/Fund Updates
1. Monthly Fund Balance Report – April (enclosed)
2. Collection/Delinquent Report – N/A
3. Consumption Report (enclosed)
IV. Old Business
1. Inflow & Infiltration, Basin #25, 26 & 27 - FYI (enclosed maps)
V. New Business
1. Resolution – Water Fund Loan (enclosed)
VI. Staff Reports
1. Durham Water - Update
2. Pameacha Project-Update
VII. Executive Session
VIII. Adjournment
Get email alerts for Middletown