Architectural Review Board (ARB)
Regular MeetingMission Hills, KS · April 14, 2020
Agenda
ARCHITECTURAL REVIEW BOARD AGENDA
April 14, 2020
3:00 p.m.
Pre-meeting to begin at 2:30 p.m.
#1 CONSENT AGENDA
A. Kevin & Janell Caponecchi – 6012 Mission Drive Copper cap on outdoor fireplace
#2 Will & Olivia Lynn Synthetic shake shingle on roof
2301 W 63rd Street Continued from March 31st ARB mtg
#3 Nick & Clare Blasi Changes to previously approved project
6640 Indian Lane Continued from March 31st ARB mtg
#4 James McGinness & Nancy Lombardino * Outdoor fireplace
5400 State Line Road Continued from December 17th ARB mtg
#5 Kirk & Stesha Black Two additions, patio, and pergola at rear of home
6548 Sagamore Road Continued from March 17th ARB mtg
#6 Robert & Angela Evangelidis Replace and extend driveway
3300 W 68th Street
#7 Sean & Christina Hogan Generators and landscape plan
6616 Wenonga Terrace
#8 Brad & Blair Jackson Modify previously approved fence
3517 W 64th Street
#9 Thomas & Ellen Cray Patio with fire pit in rear yard
6621 Belinder Avenue
#10 William & Natalie Busch * Additions, renovation, patio/terrace with
5601 High Drive outdoor fireplace
#11 Scott & Ashley Fillmore Fire pit and outdoor kitchen
7030 Belinder Avenue
* Variance required
The Mission Hills Board of Zoning Appeals (BZA) provides that the BZA shall determine whether or not an ARB decision was
reasonable based upon the evidence presented to the ARB and the record of the ARB proceedings. Testimony at the BZA
hearing will be limited to a discussion of the evidence presented to the ARB. No new evidence will be considered.
#1 Consent Agenda
A. Kevin & Janell Caponecchi 6012 Mission Drive
Mr. and Mrs. Caponecchi are returning to the ARB with changes to their previously approved
project.
Summary of Property:
• Character Area: Countryside Estates
• Location of Common Green Space: Front
• Any Special Frontages: Creekside
Summary of Project:
At a previous meeting, the Coponecchis were approved for an outdoor fireplace. They are
returning to the ARB to add an 18-inch tall copper shroud at the top of the fireplace.
Ordinance Compliance:
There are no conflicts between the proposed project and the City of Mission Hills Code of
Ordinances.
Design Guideline Review:
There are no conflicts between the proposed project and the City of Mission Hills Design
Guidelines.
April 14, 2020
#2 Will & Olivia Lynn 2301 West 63rd Street
The Lynns are returning to the ARB with changes to their previously approved project. They are
proposing a faux shake roof.
This project was continued at the March 31st meeting so the ARB could visit the site and see a
mockup installation.
Summary of Property:
• Character Area: Neighborhood Estates
• Location of Common Green Space: Front
• Any Special Frontages: None
Summary of Project:
The Lynns are currently in the process of a whole house remodel. When originally reviewed,
the ARB approved the change from an existing cedar shake roof to a composition tile roof. The
Lynns are now proposing a synthetic shake shingle.
Ordinance Compliance:
There are no conflicts between the proposed project and the City of Mission Hills Code of
Ordinances.
Design Guideline Review:
Section 2.7.1 B on page 94 of the Design Guidelines provides specific recommendations related
to roofing. This section recommends that roofing materials be consistent with the architectural
style of the home, but does not specifically mention faux materials. The ARB has approved
some, but not all, synthetic roofing materials in the past. The proposed shingle has not been
reviewed previously.
April 14, 2020
#3 Nick & Clare Blasi 6640 Indian Lane
The Blasis are returning to the ARB with changes to their previously approved project.
This project was continued at the March 31st ARB meeting due to technical difficulties and the
owner proposing additional changes that were not previously noticed.
Summary of Property:
• Character Area: Neighborhood Estates
• Location of Common Green Space: Front & Side
• Any Special Frontages: Intersection Green
Summary of Project:
The layout of the retaining walls at the rear of the house are being modified. At the rear of the
house, the wall that boarders the neighboring property is being extended to the north almost to
the north property line. The wall tapers down from south to north. It follows the grade of the
neighboring property. On the Blasi side of the wall, the wall tapers from approximately 4 feet
tall, down to 1 foot tall at the north end. The wall material has not changed. A new utility yard
has been added at the rear of the garage. Two A/C units and a generator will be partially
enclosed with stone wall. New Changes: 1) small overhead door on the rear of the home
will be removed and will be filled in with stucco; 2) roof material will be a Grand Manor
composition shingle in pearl black color; and 3) remove stone screen wall at rear of
mechanical units.
The muntin pattern for all windows have been changed to a more traditional layout in lieu of
the “horizontals only” that was previously submitted. The Blasis are also proposing to change
the stone band that wraps the house from cut stone, to cast stone with a foam infill. The top of
the main chimney has been modified to allow for a second flew.
At the front elevation, the front entry surround will change from stucco to all stone. The roof
over the porch will be changed to composite shingles to match the main roof. To accomplish
this, the pitch must be increased slightly. With the roof change, the height of the window that is
centered over the front entry has been decreased. The secondary entrance door near the
garage is being changed to a full glass door with muntins to match the windows. The sill height
of the adjacent window is being increased while the head height remains unchanged. The front
wing that includes the front door originally included windows on both sides. These windows
have been omitted. Two windows at the front of the left side wing are moving to be more
equally spaced in the elevation. At the right side elevation, a railing has been added to the wall
that separates the rear yard from the basement access.
At the rear elevation, two large windows at the back of the garage are being omitted. These
windows are in the same area as the previously mentioned utility yard. Stone wainscoting is
being added for a portion of the rear elevation first floor. The flat roof area over a rear porch is
being converted into a roof deck. An iron railing has been added. Additionally, a pair of
casement windows are being converted into a pair of doors. This area of the rear elevation
makes a U shape. One of the side windows is being changed to a single door. On the opposite
interior elevation, the sill height of a window is being increased while the head height remains
April 14, 2020
unchanged. In this view you can see where two of the windows in the front wing were omitted.
At the left side of the house, the only changes visible are those general items previously
mentioned and the omitted windows at the side of the front wing.
Ordinance Compliance:
Code Section 5-138 forbids walls located within platted setback areas except for retaining walls.
Both the south and driveway walls are located within platted setbacks and must meet the
requirements of 5-103.84 to be allowed. (Previously approved, no changes proposed)
There are no conflicts between the proposed project and the City of Mission Hills Code of
Ordinances.
Design Guideline Review:
Section 2.7.1 A on pages 92 of the Design Guidelines provides recommendations for exterior
wall materials. While this section accepts the use of cast stone for trim and accent materials,
this is a departure from the natural cut stone previously approved.
Lot Information
Zoning: R-1(E1)/LS-6
Lot Area: 44,360 SF
Lot Width: 200.0’
Ordinance Allowable/Required Proposed
Maximum Height 35’ 32.2’
Minimum Front Yard: 65’ (Platted) 65.2’
Minimum Side Yard (Left): 40’ (Platted) 41.3’
Minimum Side Yard (Right): 20’ 28.7’
Minimum Combined Side Yards:
50’ 70.0’
(25% of Mean Lot Width)
Minimum Rear Yard:
30.0’ (At closest point) 45.3’
(20% of Mean Lot Depth)
Greenspace: Not Calculated
Address Lot Area Lot Coverage Ordinance Limit % max used
6640 Indian Lane 44,360 3,686 8,985 41.03%
6630 Indian Lane 38,391 4,106 8,126 50.53%
6635 Indian Lane 55,360 3,394 10,480 32.39%
3600 W 67th Street 35,127 6,142 7,639 80.40%
6632 Wenonga Road 40,902 4,196 8,492 49.41%
Average 50.75%
50% Increase 76.12%
6640 Indian Lane 44,360 6,737 8,985 74.98%
Allowable Lot Coverage as 6,840 98.49%
reduced by 150% Rule
April 14, 2020
#4 James McGinness & Nancy Lombardino * 5400 State Line Road
The property owners are proposing a new outdoor fireplace on an existing patio.
This project was continued at the December 17th ARB meeting, at the owner’s request. The
ARB required that the fireplace be relocated to a location that does not require a variance. No
new drawings have been submitted.
Summary of Property:
• Character Area: Neighborhood Estates
• Location of Common Green Space: Front
• Any Special Frontages: None
Summary of Project:
The proposed fireplace is constructed with stone and brick and stands 12 feet tall at its highest
point.
Ordinance Compliance:
The project is in violation of Code Section 5-120 C which requires accessory structures be
located a minimum of 10 feet from the side property line. The fireplace is proposed at 4 feet
from the property line. A variance of 6 feet is required.
Design Guideline Review:
There are no conflicts between the proposed project and the City of Mission Hills Design
Guidelines.
* A variance is required.
April 14, 2020
#5 Kirk & Stesha Black 6548 Sagamore Road
The Blacks are proposing two new rear wing additions, a patio and pergola at the rear of their
home.
The Blacks were continued at the March 17th meeting so the drawings could be revised to
lessen the height of the rear addition.
Summary of Property:
• Character Area: Suburban
• Location of Common Green Space: Front
• Any Special Frontages: None
Summary of Project:
The new addition is located at the north end of the rear elevation. All of the proposed materials,
detailing and fenestration matches the existing house. A new fireplace is proposed at the side
of the new wing. The wing features a second floor dormer that is set back to the conditional
building area.
As part of the project, a smaller 2-story addition is proposed at the opposite side of the rear
elevation. This addition extends 4 feet from the rear of the house. Like the larger addition, all
materials and detailing matches the main house.
The new patio and pergola are located between the two wings and extend only slightly further
into the rear yard. The patio will have stone paving, and the pergola aligns with the second floor
plate line.
Ordinance Compliance:
There are no conflicts between the proposed project and the City of Mission Hills Code of
Ordinances.
Design Guideline Review:
There are no conflicts between the proposed project and the City of Mission Hills Design
Guidelines.
April 14, 2020
#6 Robert & Angela Evangelidis 3300 W 68th Street
The Evangelidises are proposing to replace their existing driveway and add a small extension
near the house.
Summary of Property:
• Character Area: Neighborhood Estates
• Location of Common Green Space: Front
• Any Special Frontages: None
Summary of Project:
The new driveway will be concrete with brick paver borders. An existing curb along the left
(west) side of the drive will be rebuilt and reduced from 7 inches tall to 5 inches tall. How the
curb and brick border will work together has not yet been resolved.
The new extension is near the house. At 43.94 feet from the street, the width of the driveway
will be extended by 10 feet. Since the drive has an existing curve near the garage, the
extension near the house will only be 4.67 feet wide.
Ordinance Compliance:
There are no conflicts between the proposed project and the City of Mission Hills Code of
Ordinances.
Design Guideline Review:
There are no conflicts between the proposed project and the City of Mission Hills Design
Guidelines.
April 14, 2020
#7 Sean & Christina Hogan 6616 Wenonga Terrace
The Hogans are returning to the ARB with changes to their previously approved project. They
were originally approved for a new pool house in their rear yard. They are returning to add
generators at the side of the new pool house. A landscape plan has also been provided for
ARB review.
Summary of Property:
• Character Area: Neighborhood Estates
• Location of Common Green Space: Front
• Any Special Frontages: None
Summary of Project:
The proposed generators are located at the southwest side of the pool house. Sheet LS-312
shows the location of one unit approximately 10.5 feet from the side property line. The second
unit is closer to pool house. Sheet LS-112 indicates extensive landscaping around the
generators and along the southwest side of the property. This sheet also shows a cobblestone
walkway connecting the pool deck to the existing circle driveway.
Ordinance Compliance:
There are no conflicts between the proposed project and the City of Mission Hills Code of
Ordinances.
Design Guideline Review:
There are no conflicts between the proposed project and the City of Mission Hills Design
Guidelines.
Lot Information
Zoning: R-1(20)/LS-4
Lot Area: 26,897 SF
Ordinance Allowable/Required by
Proposed
Ord
Detached Accessory Building
24’ 16.7’
Maximum Height
Detached Accessory Building Minimum
10’ 19.1’
Side Yard:
Detached Accessory Building Minimum
10’ 51.9’
Rear Yard:
Lot Coverage: 4,618 SF (72.8% of
6,346 SF
Max)
Existing Lot LC by
Address Lot Area % max used
Coverage Ordinance
April 14, 2020
6616 Wenonga Ter 26,897 3,447 6,346 54.32%
6626 Wenonga Ter 26,848 2,892 6,338 45.63%
6620 Wenonga Ter 38,302 5,801 8,113 71.50%
6610 Wenonga Ter 28,188 5,199 6,556 79.30%
6600 Wenonga Ter 41,601 3,283 8,592 38.21%
6551 Wenonga Rd 25,249 3,428 6,073 56.45%
6549 Wenonga Rd 35,390 3,724 7,679 48.49%
6601 Wenonga Rd 32,377 2,415 7,219 33.45%
Average 53.42%
50% Increase 80.13%
6616 Wenonga Ter 26,897 3,447 6,346
Recommended Lot Coverage
5,085
Limit as reduced by 150% Rule
PROPOSED 4,618 90.82%
April 14, 2020
#8 Brad & Blair Jackson 3517 West 64th Street
The Jacksons are returning to the ARB to propose modifications to their existing fence.
Summary of Property:
• Character Area: Neighborhood Estates
• Location of Common Green Space: Front
• Any Special Frontages: None
Summary of Project:
The Jackson’s existing metal fence does not meet the current code requirements for pool
enclosures. They are proposing to add an expanded metal mesh to the fence to close off the
space between the pickets. The attached photo shows the mesh over a small part of the fence,
but in reality it will cover the center portion of the fence as shown on attachment 4.
Ordinance Compliance:
The swimming pool is an existing non-conforming structure that will not be modified as part of
this project.
There are no conflicts between the proposed project and the City of Mission Hills Code of
Ordinances.
Design Guideline Review:
There are no conflicts between the proposed project and the City of Mission Hills Design
Guidelines.
April 14, 2020
#9 Thomas & Ellen Cray 6621 Belinder Avenue
The Crays are proposing a new patio with a fire pit in their rear yard.
Outdoor fireplaces are substantial construction matters as defined by Code section 5-103.75
and was noticed as such.
Summary of Property:
• Character Area: Neighborhood Estates
• Location of Common Green Space: Front
• Any Special Frontages: None
Summary of Project:
The new patio is located at the center of the rear façade. The patio extends into the rear yard.
A low seat wall, approximately 20 inches tall, encloses the rear of the patio. Both the patio and
the walls will be constructed of brick. The wall will be capped with stone. Light fixtures are
proposed at the wall pilasters. The proposed fire pit is located in an alcove formed by the rear
seat wall. The fire pit will be the same approximate height as the seat wall.
Ordinance Compliance:
There are no conflicts between the proposed project and the City of Mission Hills Code of
Ordinances.
Design Guideline Review:
There are no conflicts between the proposed project and the City of Mission Hills Design
Guidelines.
April 14, 2020
#10 William & Natalie Busch * 5601 High Drive
The Busches are proposing two significant addition/renovations that include a new patio/terrace
with an outdoor fireplace.
Outdoor fireplaces are substantial construction matters as defined by Code Section 5-103.75
and was noticed as such.
Summary of Property:
• Character Area: Neighborhood Estates
• Location of Common Green Space: Front
• Any Special Frontages: Intersection Green
Summary of Project:
At the front of the house, an existing timber front porch roof will be removed and not replaced.
The existing masonry will be repaired and a new light fixture added over the front door.
At the south side of the house, a new addition will replace the existing garage. The existing
garage will be removed in its entirety and a new garage added. The new garage will be all brick
to match the existing garage, and like the existing garage, the new will have a flat roof. An
existing second floor porch, over the garage, will be reconstructed over the new garage, but
now it will be fully enclosed with siding, and fenestration to match the existing house.
At the north side of the northeast corner of the house, an existing 1-story wing with a low
pitched roof is being demolished, and a new slightly larger wing added in its place. The new
wing will have siding, detailing, and fenestration to match the existing house. The new addition
will include a pitched roof to match the main house.
At the rear of the house, a new terraced patio is proposed. A new outdoor fireplace is proposed
at the rearmost terrace. A large portion of the patio protrudes into the minimum rear yard. This
is acceptable as long as the height of walls and railings follows the rule for fences limiting them
to a maximum of 7 feet. That condition has been met.
As part of the project, the Busches are proposing to widen their driveway. The new extension is
near the main house. An existing stone screen wall will be reconstructed at the west side of the
new driveway extension. The proposed driveway and the wall are both located in the side yard.
Ordinance Compliance:
The project is in violation of Code Section 5-120.B that requires all homes in the LS-4 Lot Size
Category have a minimum side yard setback, no less than 15% the width of the property. A
variance of 12.3 feet is required.
Design Guideline Review:
There are no conflicts between the proposed project and the City of Mission Hills Design
Guidelines.
* A variance is required
April 14, 2020
Lot Information
Zoning: R-1(25)/LS-4
Lot Area: 29,653 SF
Lot Width: 227’
Ordinance Allowable/Required by Ord Proposed
Maximum Height: 35’ No Change
Minimum Front Yard: No Change
Minimum Side Yard (Left): 34’ 55’
Minimum Side Yard (Right): 34’ 21.7’
Minimum Rear Yard: (30%) 36’’ 36.9’
Minimum Greenspace: 65% 68.2%
Existing Lot
Address Lot Area LC by Ordinance % max used
Coverage
5601 High Dr 29,653 2,905 6,791 42.78%
2031 W 56th St 17,020 1,627 4,617 35.24%
5600 Pembroke Ln 19,901 3,032 5,147 58.91%
5620 Pembroke Ln 23,718 2,341 5,815 40.26%
Average 44.30%
50% Increase 66.44%
5601 High Drive 29,653 Proposed = 2,995 6,791 44.10%
Recommended Lot Coverage as reduced by 150% Rule 4,511 66.39%
April 14, 2020
#11 Scott & Ashley Fillmore 7030 Belinder Ave
The Fillmores are proposing a new fire pit and outdoor kitchen on their previously approved
patio.
Outdoor fireplaces are substantial construction matters as defined by Code Section 5-103.75
and was noticed as such.
Summary of Property:
• Character Area: Suburban
• Location of Common Green Space: Front
• Any Special Frontages: None
Summary of Project:
The new fire pit is located in the corner of the patio adjacent to an existing seat wall. The fire pit
will be approximately 22 inches tall and constructed to match the seat wall.
The outdoor kitchen consists of an L-shaped island with a drop-in grill. The construction of the
kitchen is similar to the previously approved walls.
Ordinance Compliance:
There are no conflicts between the proposed project and the City of Mission Hills Code of
Ordinances.
Design Guideline Review:
There are no conflicts between the proposed project and the City of Mission Hills Design
Guidelines.
April 14, 2020