Neighborhood and Community Improvement Program Committee Meeting
Regular MeetingMonterey, CA · February 22, 2018
Minutes
MINUTES
NEIGHBORHOOD IMPROVEMENT PROGRAM COMMITTEE
Thursday, February 22, 2018
7:00 PM
COUNCIL CHAMBER, FEW MEMORIAL HALL OF RECORDS
580 PACIFIC STREET
MONTEREY, CALIFORNIA
NIP Alta Mesa Rick Heuer, Rep.
Representatives & Casanova-Oak Knolls Michael Brassfield, Alt.
Alternates Present: Deer Flats Dave Overton, Rep.
Del Monte Grove-Laguna Grande Merrily Alley, Rep., Kathleen Baker, Alt.
Fisherman Flats Tom Rowley, Rep., Sam Brand, Alt.
Glenwood Lee Whitney, Rep.
Monterey Vista Jean Rasch, Rep., Pat Venza, Alt.
New Monterey Sharon Dwight, Rep., Jonathan Hill, Alt.
Oak Grove Harlan Jencks, Rep., Luz Adam, Alt.
Old Town April Harrison, Rep.
Skyline Forest Dennis Duke, Rep.
Villa Del Monte Harry Mucha, Rep., Duane Peterson, Alt.
Staff Members Present: Jeff Krebs, Alyssa Huerta, Louie Marcuzzo
CALL TO ORDER
NIP Staff Coordinator, Jeff Krebs, called the meeting to order at 7:00 p.m.
ROLL CALL
Twelve (12) neighborhoods were represented with Aguajito Oaks absent. Mr. Sam Brand
(Fisherman Flats Alternate) was seated in the audience, leaving after Mr. Tom Rowley
(Representative for Fisherman Flats) arrived at 8:40 pm.
Kathryn Battiato participated in the meeting as the Alternate Del Monte Beach
Representative. After the meeting, it was confirmed that she had been nominated by her
neighborhood, but not yet appointed by City Council. As a result, all Del Monte Beach
votes were marked as absent.
APPROVAL OF MINUTES
1. January 25, 2018
Sharon Dwight requested a revision on page five (5), item number nine (9). She asked
that Dennis Duke’s last name be added to his seconding of the motion to appoint the NIP
Policies and Procedures Manual Subcommittee for 2018.
Harlan Jencks made a motion to approve the minutes as amended. Sharon Dwight
seconded the motion. The motion was approved by the ten representatives present
with Aguajito Oaks and Del Monte Beach absent, Tom Rowley not present at the
time of the vote, and Rick Heuer abstaining due to not being present at the January
meeting.
PUBLIC COMMENTS
Pat Venza, Alternate for Monterey Vista, discussed her neighborhood’s disapproval of 13
cell antennas planning to be placed in Monterey Vista. She believes Monterey Vista will
be the starting place for cell antennas and anticipates that it will spread throughout city.
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
Ms. Venza asked Committee members to go to their neighborhood presidents and have
letters sent to City staff to express their disapproval of the cell antennas.
She went on to discuss project submissions and suggested that if each neighborhood
had a top-priority project, then with a little coordination everyone could get their priority
project in the first round.
Seeing no more comments, Mr. Krebs closed public comments.
INFORMATIONAL REPORTS & STAFF COMMENTS
NIP INFORMATIONAL REPORTS
2. NIP Spokesperson Reports
Rick Heuer said he attended the February 6 City Council meeting. The agenda report
recommended six specific projects, however this was not followed by the Council;
instead, Council provided general guidance to NIP. He added that the feedback received
was in support of projects NIP seeks to continue to do. Mr. Heuer informed the
committee that another item discussed was the Private Bolio entrance and the cones
blocking left turns into the entrance. He said it may be time to work on improving the
appearance of the entrance, as it may be the entrance to the Presidio for an extended
period. Ms. Dwight said there is a solution, pending Council approval, for NIP to take the
Private Bolio entrance on as a project.
Ms. Dwight discussed her attendance at the Parks and Recreation Commission (PRC)
meeting where Mr. Krebs preliminarily reviewed the proposed NIP parks-related projects.
Ms. Dwight discussed how this meeting gave the PRC an idea of what NIP is looking to
do and the NIP meeting next month will open up for questions and suggestions.
Mr. Krebs added that the preliminary project review meeting gave the PRC a preview of
what is to come with the projects, allowing them more preparation time this year.
3. Receive Report on General and Departmental Overhead Costs to Conduct the NIP
Program, Fiscal Years 15/16 and 16/17 (Not a project under CEQA Article 20, Section
15378 and under General Rule Article 5, Section 15061).
Dennis Duke discussed the NIP Finance Committee meeting with Julie Porter, Finance
Director, and Carol Bouchard, Assistant Finance Director, to look over the allocations
and overhead.
Mr. Duke said fiscal year 2016-17 has not been completely resolved yet and the true-up
for 2015-16 is $33,920, based on the overall accounting. He asked that the Committee
be mindful of the allocation of City overhead. He added, based on total spending for
completing a project, NIP receives an allocation of City overhead, but to the extent that
people are directly working for NIP they are given 100% for the time that they worked for
NIP. He continued to say the longer NIP runs meetings or project-related items with
specific people other than Mr. Krebs, the more 100% dollars NIP is charged as opposed
to 1.82% dollars for City overhead based on NIP’s overall spending. He advised that this
is something to keep in mind relative to requesting staff resources and relative to how
long NIP runs its meetings.
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
2
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
Mr. Heuer asked if that includes the staff that come to voting night and Mr. Duke said
yes. Mr. Duke explained that in the last two years it has been 2,600 and 2,300 hours of
Mr. Krebs’ time, full-time, but there have also been 1,024 and 971 hours in the last two
years of additional 100% charge time, because staff worked 100% with NIP. Mr. Duke
reiterated that this is something to keep in mind as NIP holds its meetings.
Michael Brassfield asked if the City bills in the same manner when it is not an NIP
project. Mr. Krebs said Capital Improvement Projects (CIP) are just like NIP where they
have their own charge code and the Engineer’s time is charged to the project code. He
clarified the hours spent that are not charged to a project, for example when running
estimates, CIP people are charged back to their home base.
Mr. Heuer explained that the other overhead charge is what is charged to special funds.
He continued to say anything that is not general funds gets a portion of the overhead
billed back, so NIP is paying 1.82% of the overall overhead. Mr. Heuer and Mr. Brassfield
continued to discuss the billing process; billing of time and overhead piece.
David Overton asked for clarification of the true-up piece of the finances. Mr. Duke
explained that each year Finance takes the previous years’ overhead and uses that as
an estimate of what it is going to be, and after the year-end audit they do a calculation of
what the overhead actually is, so it is catching up with the overhead.
Ms. Dwight mentioned the actual cost of $429,432 for fiscal year 2015-16 and asked
what it is made up of, other than labor and if all of it is people. Mr. Krebs said it is in fact
just labor time because the particular projects pay for everything else.
Ms. Dwight discussed the variable costs of having a contractor doing the estimating as
opposed to in-house. Mr. Krebs said NIP has both; Whitson and in-house City engineers.
He explained that Whitson does not do all of the estimates, because they usually do not
do buildings and some other items, so the work is spread out across City Engineers,
Parks, etc.
Mr. Heuer said there are two different charges: one piece is directly related to what NIP
does (Mr. Krebs’s time, estimating time for projects, etc.) and the overhead piece. Mr.
Heuer expressed his discontent with the overhead piece, because the Planning
Commission isn’t charged overhead, whereas NIP is charged overhead because it is
viewed as a special fund.
Ms. Dwight said that over time she is seeing more charges to NIP overhead and asked
why NIP is the only committee that uses special tax funds to pay for a City committee.
She stated that NIP is a city commission and that the City needs to look at the overhead
charges. She added that the City calls NIP an enterprise fund and NIP is not.
Mr. Brassfield explained that one of the issues comes down to the fact that many of the
projects proposed to NIP are Citywide, submitted by City staff and yet NIP is charged
the overhead, which would be absorbed if it were a City project. Mr. Heuer clarified and
said NIP is not charged the overhead based off of projects; NIP is charged for estimating
time where, if it were a CIP, it would be coming out of the general fund. Mr. Brassfield
said it does not make sense to take from NIP to pay for the CIP items.
Mr. Duke clarified where the actual cost of $429,432 for fiscal year 2015-16 comes from
and said $268,572 (62.5%) is direct labor related to projects, Mr. Krebs’ time and other
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
3
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
staff time directly charged, $26,266 (6.1%) is outside professional services, such as
Whitson, and $134,594 (31.3%) is the overhead allocation, which is the 1.82% based on
how much money NIP spent during the year closing up projects. He added that the
overhead at $134,594 is a large percentage, but unless City Council changes this for
NIP, it’s how this will stay.
Ms. Dwight said it may be something to discuss with City Council after voting night. She
also mentioned that she spoke with the City engineer and told them another possibility to
encourage shorter meetings, as a means to create cost savings by paying for less staff
time, is to talk to department heads and tell them not to submit every single item on their
wish lists because the less citywide projects, the shorter the meetings. Ms Dwight
continued to say that this is the most transparent Financial Report NIP has had yet.
Mr. Heuer said beside the fact that it helped reduce the overall backlog, the smartest
thing NIP did was push to fund its own staff person, Mr. Krebs. Mr. Duke said Mr. Krebs
does a good job at minimizing the costs per project and is successful at finding funding
sources.
Mr. Krebs opened public comments. Seeing none, Mr. Krebs closed public comments.
PUBLIC APPEARANCE
4. Recommend City Council Approve Appropriation and Transfer of Supplemental Funds for
the DTM Park-Boat Structure Replacement (32n1420) (Not a project under CEQA Article
20, Section 15378 and under General Rule Article 5, Section 15061).
Mr. Krebs provided the Committee with an amended copy of the agenda report for this
item. He said there was an error in the CEQA determination, but it does not change the
intent and only cleans up his document.
Mr. Krebs explained that the Dennis the Menace Boat Structure was a project from fiscal
year 2013-14 and it previously received bids for the playground structure replacement in
2014, which were rejected. He stated the bids and equipment staff received for a boat
structure replacement in this budgeted range did not meet the City’s expectations for
creativity and imaginative play. He said an additional $21,500 was estimated at that time
to allow the requested items needed to broaden the options for a more life-like boat
structure. He added that staff put this project on hold until the walkway improvements
were constructed and since then staff has been working with playground equipment
suppliers for a replacement boat structure and anticipate additional cost to implement this
project. He explained that a supplemental appropriation and transfer of $56,000 from the
NIP contingency account is requested to implement this project.
Mr. Krebs handed over the discussion to Mr. Louie Marcuzzo, Parks Operations
Manager. Mr. Marcuzzo said Mr. Ruccello contacted him last month to ask about
submitting a project for a piece of play equipment at a cost of $60,000 for Dennis the
Menace Park, but Mr. Marcuzzo did not see any space for a new piece of equipment. He
reported that Parks currently has the new play structure for the back section of the park
and anticipates installation within the next month. He explained that the moon bridge,
another NIP funded project, is under construction and to be completed in the next couple
of weeks. He stated that when looking at the boat structure, the City wanted this to be
unique and Parks could not find anything within the originally estimated price range,
(shipping itself is around $10,000 for these structures), and so the ship was the best
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
4
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
item. He said if the boat flag is an issue it can be changed to a Dennis the Menace
character or a City of Monterey flag, etc.
Ms. Dwight, Mr. Brassfield and Mr. Heuer discussed the play structure design and
incorporating historical City elements into the design, including a fishing boat and flags.
Mr. Marcuzzo informed the Committee that it will be the same price for a fishing boat
design and he will get a new design to bring back to NIP. He added that it will be around
$110,000 total for everything; the product, installation, delivery. Mr. Krebs said the
estimate is at $112,000. Mr. Marcuzzo also confirmed the size of the structure,
approximately five feet tall and 18 feet long, and that the item is made in the United
States by the GameTime company.
Kathryn Battiato said she has a small child and, having visited many parks, she believes
that in terms of imagianitive play the pirate ship design will be preferred by children.
Mr. Krebs opened public comments.
Luz Adam, NIP Alternate for Oak Grove, asked if children will be able to walk inside. Mr.
Marcuzzo said yes.
Pat Venza said she understands what some Committee said about the Monterey fishing
town heritage in regards to the boat design, but believes children would much prefer the
large ship design presented by Mr. Marcuzzo. Ms. Venza recommended going out to the
public and finding out what design children would like.
Ms. Dwight said she would like to provide the $56,000 out of contingency and for Mr.
Marcuzzo to do the survey and find out what is wanted in the playground. Mr. Heuer said
the Committee would like to see the boat design for approval.
Seeing no more comments, Mr. Krebs closed public comments.
Sharon Dwight made a motion to allocate $56,000 from contingency for the Dennis
the Menace Park Boat Structure Replacement, and for Mr. Marcuzzo to come back
to the Committee with the new boat design. Dennis Duke seconded the motion.
The motion was approved by the eleven representatives present with Aguajito
Oaks and Del Monte Beach absent and Tom Rowley not present at the time of the
vote.
5. Request that the City Council direct the City Attorney to go to FPPC and ask for a
specific exemption for the NIP Committee.
Ms. Dwight said the FPPC changed the buffer rule from 300 to 500 feet, but they have
given NIP an exemption in the past. She added that procedurally what needs to be done
is to make a formal request to the City Council to direct the City Attorney to go to the
FPPC and ask if NIP may have the Committee exempt from the 500 foot rule.
Mr. Heuer said the NIP Committee is 100% advisory and makes no final determinations
at any time; everything NIP does is a recommendation to Council and they can say no to
anything from NIP.
Mr. Krebs asked NIP Spokesperson, Mr. Rick Heuer, if he would like a letter written for
him to sign and have sent to City Council. Mr. Heuer agreed to sign the letter for Council.
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
5
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
Sharon Dwight made a motion to send a letter to the City Council requesting they
direct the City Attorney to ask of the FPPC if NIP may have an exemption from the
500 foot rule. Dennis Duke seconded the motion. The motion was approved by the
eleven representatives present with Aguajito Oaks and Del Monte Beach absent
and Tom Rowley not present at the time of the vote.
6. Review the Preliminary Project Submittals for the NIP Fiscal Year 2018/19 Program (Not a
project under CEQA Article 20, Section 15378 and under General Rule Article 5, Section
15061).
Mr. Krebs began by saying that this was the preliminary review and on this night there was
no need to advocate for individual projects. He added that the Committee is only looking at
whether or not each project is a viable NIP project.
Neighborhood Project Name
Mesa Road at Fremont Crosswalk
AM-1
Project.
Del Monte Center/Alta Mesa Fencing Restoration and Path
Improvements
AM-2
Project – Mr. Heuer asked who owns the fence and Mr. Marcuzzo
said it is a City fence that leads to the greenbelt.
Don Dahvee Park Creek Path
Project – Mr. Heuer said NIP will need a determination from the City
Attorney on whether or not this may be done; lights and placing a
AM-3 path where one is not currently placed (deed restrictions). Mr.
Krebs said lights will not be allowed and he spoke with the applicant
and told her she needs to change the description. He added that
the applicant has reviewed the deed restrictions.
Alta Mesa Greenbelt Fuel Reduction
AM-4
Project.
Lagunita Mirada Restoration
Project – Ms. Dwight asked if this may be a capital project and Mr.
Krebs said he will check. Mr. Heuer asked if adding water plants
AM-5 impacts the purpose of the pond and Mr. Krebs said if it becomes
habitat it may not be able to be touched, which is a large concern.
Mr. Heuer said clarifying these aspects is critical before moving to
voting night.
Lagunita Mirada Park Security Lights
Project – Mr. Heuer said it is best to look at AM-6 and AM-7
AM-6 together because AM-7 is the path along this area. Ms. Dwight said
the parks close at dusk and NIP would need direction from Parks
and Recreation on this project.
Lagunita Mirada Park Path Lighting
Project – Mr. Heuer said it is best to look at AM-6 and AM-7
AM-7
together. Ms. Dwight said the parks close at dusk and NIP would
need direction from Parks and Recreation on this project.
West Side of Ramona Ave Storm Water Runoff Infiltration
COK-1
Project – capital project.
Mule Deer Way Drainage/Surface Repair
DF-1
Project.
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
6
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
Dunecrest Retaining Wall Repair
Project. Mr. Krebs did not view this as an eligible project for NIP
because when the City builds/improves items like retaining walls
instead of grading back into the property, then the property owner is
responsible for those improvements (driveway, sidewalk, retaining
wall, etc.) once the project is complete. Ms. Dwight said one thing
to do could be to set up a fund to repair and replace retaining walls
DMB-1
that the City built. Mr. Heuer said perhaps having a policy that
retaining walls built before a certain time, if they’re failing and were
completed as a result of NIP, should be deemed projects because
not everybody was informed of their responsibility of improvements
in the past. Ms. Dwight said this is a valid capital project and at this
juncture it is best to proceed with deeming this a project and letting
it go through the process.
Surf Way Entry and Roberts Ave Exit Fencing Replacement
DMB-2
Project.
Casa Verde at Del Monte Left Turn Signal
DMB-3
Project – capital project.
Beach Way Toilets
Project – capital project. Ms. Dwight said there have been some
DMB-4
concerns from persons in this neighborhood over a new structure;
she would like input from Parks and Recreation.
Spray Ave Tot Lot Resurfacing
DMB-5
Project.
Del Monte Grove Laguna Grande Update to 2001 Traffic
Calming Plan
Project – Ms. Dwight and Mr. Heuer asked to do a scope change on
DMG-1
this since the money has already been allocated for traffic calming
projects here in the past. Mr. Krebs said he will check the existing
scope to see what is needed.
Monterey Sports Center Accessible Pool Entrance Doors
DT-1
Project – changed to CW-18.
Monterey Sports Center Water Bottle Refilling Station
DT-2
Project – changed to CW-19.
Monterey Sports Center Gymnasium Modern Dividing Curtain
DT-3
Project – changed to CW-20.
Hartnell St/Carls Alley Curb Extension and Safety
DT-4 Improvements
Project.
Monterey Public Library Artistic Bicycle Rack
DT-5
Project – changed to CW-21.
Monterey Sports Center Natatorium Window Tint
DT-6
Project – changed to CW-22.
Monterey Sports Center Motorized Operable Windows
DT-7
Project – changed to CW-23.
Hartnell St/Carls Alley Curb Extension
DT - 8
Removed – duplicate of DT-4.
Spanish Plaza Art Installation
DT-9 Project – Ms. Dwight said NIP needs to check and see what the
policy documents say before doing too much on this project.
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
7
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
Monterey Public Library Newspaper Stand
Project – changed to CW-24. Mr. Heuer asked if publications will
move their newspapers into the newsstand and Mr. Krebs said they
did over at Griffin Plaza, while Mr. Marcuzzo added that they
followed suit on Alvarado Street as well. Mr. Brassfield said he
believes this is commercial and said NIP should check in with the
DT-10
City Attorney to see if they are allowed to spend City funds for a
business. Mr. Krebs said the City Attorney’s comment was that NIP
could not exclude any publications that are currently in place, so the
newsstand would need to include the same number of spaces as
there are now, and he added that he will check back with the City
Attorney on project eligibility.
Franklin Street Resurfacing
DT-11
Project.
Fisherman's Flats Greenbelt Fire Reduction
FF-1
Project.
Josselyn Canyon Road No U-Turn Safety Signs
FF-2
Removed – Referred to Traffic.
Via Isola and Josselyn Canyon Road Rehab Entry Walls
FF-3 Project – Ms. Dwight asked if the walls are on the right of way and
Mr. Krebs said he will check.
Inaccessible Fisherman's Flats Greenbelt Fuel Reduction
FF-4
Project.
Fisherman's Flats Park Drainage Improvement
FF-5
Removed – Parks pulled; crews have recently made improvements.
Iris Canyon Radar Sign
GW-1
Project.
Monterey High School Turf and Fence Installation
MV-1
Project – changed to CW-25.
City Storm Drain Outlet D03-E3 Reconstruction
MV-2
Project.
Via Paraiso Park Outdoor Fitness Spot
MV-3
Project – Ms. Dwight asked for Parks and Recreation to review.
Veterans Park Bike Path
MV-4
Project.
Monterey Vista Utility Undergrounding
Project – Mr. Krebs said, per the NIP policy and procedures manual
MV-5
for forming an assessment district, that a majority vote of property
owners is needed before proceeding on this.
Peter's Gate Retaining Wall Visual Improvement
MV-6
Project.
Via Paraiso Park Walkway Upgrade
Project – Mr. Krebs mentioned that this was a project from last year
MV-7 that was denied. Ms. Dwight said if the material of the walkway is
going to be changed, and Parks and Recreation did not like it last
year, then NIP should ask if there is any change.
San Bernabe Roadway Improvements
MV-8
Project.
Via Zaragosa Parking
MV-9
Removed – Referred to Traffic.
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
8
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
Via Zaragosa Radar Signs
Project – Mr. Krebs said he spoke with the applicant and changed
this from speed bumps to radar signs because the City policy does
not allow for speed bumps. Mr. Brassfield asked why the speed
bump policy is in place and Ms. Dwight said the Fire Department
MV-10
told City Council to restrict speed bumps because fire engines
cannot hit the bumps at speed with their engines. Mr. Brassfield
asked how to have this policy looked at again, and Mr. Krebs said
somebody would need to request this through the City’s website
and have it go through the process.
Mar Vista Drive 200 Block Street Resurfacing
MV-11
Project.
Monterey Vista Greenbelt Fuel Reduction
MV-12
Project.
Martin St. Retaining Wall
MV-13
Project.
Monterey Vista Fiber Optic Design and Engineering
Project – Mr. Krebs reiterated the assessment district requirement
for a majority support vote. Ms. Pat Venza, Alternate for Monterey
Vista, said this submission is for the design and engineering to see
how much this will cost, and this project will likely replace MV-5.
Ms. Dwight told Ms. Venza she needs to ask the neighborhood if
they are interested before coming back to them with a price, and
MV-14 70% support is needed because some support will fall off. Mr.
Heuer asked, in regards to fiber optics, who will use this and Ms.
Venza said companies who are not cabled in now could use it and
pay the City. Ms. Venza said she is hoping to find out from this
study how everything would possibly work; the general plan calls for
undergrounding. Mr. Heuer said since CW-13 is a citywide project
of this same design and engineering scope, it makes more sense to
do CW-13 first before looking at the individual neighborhoods.
San Bernabe S Curve Improvement
MV-15
Project.
Cuesta Vista Storm Drain extension
MV-16
Project.
David Av Open Space Acquisition
Project – Mr. Dwight said this is exactly the same project as last
NM-1 year’s submission that was approved by NIP but denied when it
went to Council, and this year she was told by members of Council
to submit it again because it will likely be approved.
Scholze Park Wall, Ph II
NM-2
Project.
Hilltop Park Center Roof Matching Funds
NM-3
Project.
680 Belden St. Sport Court and Field Expansion
NM-4
Project.
Scholze Park Center Parking Lot and Front Entrance ADA
NM-5 Upgrade
Project.
Oak 500 Widening
NM-6
Project.
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
9
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
Irving and Pine Northwest Corner ADA Curb Ramp
NM-7
Project.
Bruce Ariss Way Lighting Improvement
NM-8
Project.
Taylor Street 600 Block Walkway
NM-9
Project.
Cannery Row Public Restroom
Project – Mr. Heuer asked how water is handled when adding a
restroom in an area without water use and Mr. Krebs said water
NM-10
credits are needed and the City has some left over from the 735
Pacific remodel. Mr. Brassfield asked about design and Mr. Krebs
said it will adhere to the aesthetics in its area.
Alice 600 Drainage Improvements
NM-11
Project.
Sloat at 9th Street Walkway
OG-1 Removed – Mr. Krebs said this is already a current four-way stop
and it is an enforcement issue for the four-way stop.
Sloat at 5th Walkway
OG-2
Project.
Del Monte Crosswalk Light Timing
OG-3
Removed – to Traffic (ATP application for the entire intersection).
First Theatre Restoration
Project – changed to CW-26. Mr. Heuer asked who owns the
property and Mr. Krebs said it was the State Parks. Mr. Heuer
asked how this could be an NIP project because it is maintenance
on a building and he does not believe the state will allow the City to
OT-1 use it as a meeting place. Ms. Dwight asked if Mr. Krebs could
contact the applicant and ask if they would like to pursue a joint
project and Mr. Heuer reiterated that it needs to meet the standards
of third-party entities for shared space. Mr. Krebs said he would
follow up with the applicant. Mr. Tom Rowley said this is an ideal
project for matching funds.
Alvarado & Munras, Pacific & Jefferson, and Pacific & Madison
OT-2 Safety Bollard Installation
Project – changed to CW-27.
Old Town Accessible Park
Project – Mr. Krebs said this appears to be more of an MOU issue
and April Harrison said part of the issue is that the neighborhood
OT-3 does not have access to Larkin Park on weekends because it is
locked up. Mr. Krebs said he and Ms. Harrison will contact the
applicant to clarify what they would like to do about other park
areas in the neighborhood.
Old Town Undergrounding Survey of Support & Data Gathering
OT-4 Removed – Mr. Heuer said the project is a mailing and NIP cannot
fund mailing.
Veteran's Park/Veteran's Canyon Open Space Fuel Reduction
Project – Mr. Krebs combined with OT-6 to make it one large
greenbelt area as long as they go down all the way to the Madison
OT-5
Canyon area. Mr. Krebs asked Mr. Marcuzzo to speak with the City
Forrester about combining OT-5 and OT-6 into one big greenbelt
fuel reduction.
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
10
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
Old Town Greenbelt Fuel Reduction
Project – Mr. Krebs combined with OT-5 to make it one large
greenbelt area as long as they go down all the way to the Madison
OT-6
Canyon area. Mr. Krebs asked Mr. Marcuzzo to speak with the City
Forrester about combining OT-5 and OT-6 into one big greenbelt
fuel reduction.
Old Town Neighborhood Designation Signs
OT-7
Project.
Old Town Street Sign Replacement
Project – Ms. Dwight said she was also going to submit a similar
project for New Monterey. She called the sign maker, Jeff Glass,
and he told her because the City budgeted $50,000 last year and
another $50,000 this year that they have $100,000 and are working
OT-8
on sign replacement by zones. Mr. Heuer recommended for Mr.
Krebs to check if this may be funded prior to NIP proceeding as a
project. Mr. Krebs said this is a project and, with the money NIP put
in last year, Mr. Glass ordered more sign blanks and Mr. Krebs will
check on the status with him.
Skyline Forest Greenbelt Tree Removal
SF-1
Project.
Skyline Forest Greenbelt Fuel Reduction
SF-2
Project.
Skyline Drive at Chatswood Pl Landscaping of Island
SF-3
Project.
Greenwood Rise Island Landscaping
SF-4
Project.
Skyline Drive Radar Speed Signs
SF-5
Project.
Pinehill Way to Mar Vista Greenbelt Path Replacement
SF-6
Project.
Greenbelt Path Replacement Study
SF-7
Project.
Skyline Forest Drive and Highway 68 Bridge K-Rail
Improvement
SF-8
Project – Mr. Heuer asked who owns the bridge and Mr. Krebs said
it is a City bridge.
Casa Verde at Helvic/McNear/Portola Intersection
Reconstruction
VDM-1
Project – Mr. Krebs said the design study is complete and this is the
implementation of the design.
Peter Ferrante Playground Lighting
VDM-2
Project.
Peter Ferrante Playground Improvement
VDM-3
Project.
Monterey Fire Station 3 Parking Lot
VDM-4
Project – changed to CW-28.
Montecito Park Improvement Phase 3 with Supplemental
VDM-5 Funds to Complement CDBG
Project.
CW-1 Monarch butterfly restoration project
Project – Improvement description changed to “Reconstruct areas
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
11
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
within the City to provide areas for California narrow leaf milkweed,
the only food source for the monarchs.” Ms. Dwight said there is a
space at Hilltop Park Center that may be an ideal location for the
milkweed.
Colton Hall Preservation Repointing Project
CW-2
Project.
Citywide Utility Undergrounding
Project – Ms. Dwight said since Mr. Krebs is going to Council in
CW-3
March that he should ask if this is something the City would like to
pursue.
Lower Presidio Historic Park Stables Rebuild
CW-4
Project.
Monterey Youth Center Re-Design - Phase I
Project – Ms. Dwight said the applicant mentions both redesign and
a new building. Ms. Dwight spoke with Parks and Recreation about
CW-5
seeking a new building for this project rather than a redesign and
Mr. Krebs said he will contact the applicant to clarify their stance on
redesign or a new building.
Ryan Ranch RV Storage Lot Security Upgrade
Project – Mr. Krebs said as the description was in the submission it
cannot be a project because of the wifi element and so Mr. Krebs
CW-6
changed the improvement description to “upgrade security at the
RV lot,” and he will contact the applicant to discuss the change of
scope.
Veterans Memorial Park West Parking Lot Renovation
CW-7
Project.
Wharf I/Coast Guard Pier Rec Trail Widening
CW-8
Project.
Harbor Trail and Vista Trail Pedestrian Link
CW-9
Project.
Josselyn Canyon Rd. Area Greenbelt Fuel Reduction
CW-10
Project.
Citywide Emergency Warming Shelter
CW-11 Project – the study was previously funded by NIP and this is the
implementation.
Citywide Dog Park
CW-12
Project.
Citywide Fiber Optic Design and Engineering
CW-13 Project – Mr. Heuer asked that this go to Council to ask them if they
would like to pursue this.
Citywide Recycling Program and Infrastructure
Project – Mr. Krebs changed the improvement description to “Install
CW-14 recycling separation infrastructure; animal-proof cans similar to
Dennis the Menace park cans. Possible location at City corporation
yard or cemetery yard to separate recycling prior to disposal.”
Don Dahvee Park Disc Golf Course Signage
CW-15
Removed – Parks and Recreation.
Window By The Bay Bench
CW-16
Removed – Parks and Recreation.
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
12
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
Rec Trail Water Fountains
CW-17
Project.
7. Receive Report on the NIP Project Status Program (Not a project under CEQA Article 20,
Section 15378 and under General Rule Article 5, Section 15061).
Mr. Krebs began in October 2014 and had 127 projects on the books valued at $12.3
million. In fiscal year 2016, NIP added 42 projects at $3.6 million; in 2017, NIP added 50
projects at $2.8 million; and in 2018 NIP added 33 projects at $4 million. Since Mr. Krebs
began, he has had 252 total projects worth about $22.8 million.
Mr. Krebs currently has 143 projects and in the next six months can close out 72, which
is approximately $10 million worth of projects. Beginning in July 2018 he will have 71
projects at $9.2 million.
Merrily Alley asked if NIP Representatives are supposed to be signing closeout sheets.
Mr. Krebs said the last round of closeouts was in November and about 40 projects were
closed and the next round will be closing soon and will be coming around to NIP Reps.
Mr. Krebs opened public comments. Seeing none, Mr. Krebs closed public comments.
COMMITTEE MEMBER COMMENTS
Harry Mucha thanked Mr. Krebs and Mr. Marcuzzo for all of their help and said he is
looking forward to everyone working together.
April Harrison asked Mr. Krebs for clarification on whether Reps should be notifying the
applicants of projects that were removed. Mr. Krebs said he and Ms. Huerta would be
following up, but Reps assisting in this would be appreciated.
Sharon Dwight commented on the NIP Committee contact lists that were provided and
said it is helpful. She added that she was impressed by the minutes from the last
meeting. She discussed what a pleasure it is to serve on the Committee.
Dennis Duke explained that he added his cell phone number on the contact list and told
the Committee they may also give their phone numbers to Ms. Huerta so she may add
them to the contact list. He also appreciates everything Mr. Krebs has done to close out
projects.
Jean Rasch asked Mr. Krebs about the last meeting when the Committee discussed
asking the City Attorney whether they may take comments out of the project selection
night in order to shorten the length of the meeting. Mr. Krebs said he will be discussing
this with the City Attorney during Walk-in Wednesday.
Michael Brassfield complimented Sharon on her work with Parks and Recreation, being
there to answer questions and bringing the information back to the Committee; he
attributes some of the better questions and reactions from Parks and Recreation to
Sharon’s work.
Rick Heuer said it occurred to him after discussing the Monterey High School turf and
fence project that NIP helped fund their football field and it is failing and needs to be
replaced, but they are not coming to NIP for any of the money, instead paying for it out of
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
13
Neighborhood Improvement Program Committee Minutes Thursday, February 22, 2018
the existing school bond. He commended them for taking the lead on their new
improvements.
Lee Whitney thanked Mr. Krebs for everything he and his staff do and said NIP is really
progressing, which was evidenced by the report Mr. Krebs delivered about NIP project
status.
Dave Overton thanked Mr. Krebs and his staff and said he finds the project books they
created to be helpful to the Committee.
Harlan Jencks thanked Mr. Krebs and his staff.
Merrily Alley thanked the Committee for all of the projects in her neighborhood and said
her neighborhood is changed because the improvements to sidewalks, curbs and
gutters, and the traffic calming has all made it a wonderful place to live.
Tom Rowley said having the whole project book with the summary pages and original
submissions is very helpful because the Committee is able to view the descriptions as
the applicants intended. Mr. Rowley added that at their last meeting on February 20, City
Council approved their request to have the City Attorney go to the FPPC to get an
exception for conflict rules; he believes it passed on their consent agenda, so he hopes
that is good news for NIP to get some relief from the rule. He also informed the
Committee that the water management district is increasing their budget from $13 million
to $17 million, if anyone is wondering why they are paying higher rates.
NEXT MEETING
8. March 29, 2018 at 7:00 PM in Council Chambers.
ADJOURNMENT
Respectfully Submitted, Approved,
NIP Staff Coordinator
Neighborhood Improvement Program Committee Meeting Minutes
Thursday, February 22, 2018
14
Agenda
NIP Committee
Neighborhood Improvement Member listing at
http://monterey.org/nip
Program Committee Agenda
NIP Spokesperson
Rick Heuer
Sharon Dwight (Alternate)
Richard Ruccello (Alternate)
Council Chamber
Thursday, February 22, 2018 Pat Venza (Alternate)
Few Memorial Hall of Records
580 Pacific Street 7:00 PM NIP Staff Coordinator
Monterey, California Jeff Krebs
CALL TO ORDER
ROLL CALL
APPROVAL OF MINUTES
1. January 25, 2018
PUBLIC COMMENTS
INFORMATIONAL REPORTS & STAFF COMMENTS
NIP INFORMATIONAL REPORTS
2. NIP Spokesperson Reports
3. Receive Report on General and Departmental Overhead Costs to Conduct the NIP
Program, Fiscal Years 15/16 and 16/17 (Not a project under CEQA Article 20, Section
15378 and under General Rule Article 5, Section 15061).
PUBLIC APPEARANCE
4. Recommend City Council Approve Appropriation and Transfer of Supplemental Funds for
the DTM Park-Boat Structure Replacement (32n1420) (Not a project under CEQA Article
20, Section 15378 and under General Rule Article 5, Section 15061).
5. Request that the City Council direct the City Attorney to go to FPPC and ask for a specific
exemption for the NIP Committee
6. Review the Preliminary Project Submittals for the NIP Fiscal Year 2018/19 Program (Not a
project under CEQA Article 20, Section 15378 and under General Rule Article 5, Section
15061).
7. Receive Report on the NIP Project Status Program (Not a project under CEQA Article 20,
Section 15378 and under General Rule Article 5, Section 15061).
COMMITTEE MEMBER COMMENTS
NEXT MEETING
8. March 29, 2018 at 7:00 PM in Council Chambers.
ADJOURNMENT
Agenda packets may be reviewed by the public in the Engineering Office or on the web at
http://www.monterey.org beginning 72 hours prior to the date of the meeting.
Members of the public have the right to address the Committee on any Agenda items. The Staff
Coordinator will formally open the floor for public comment. However, if you wish to speak to items
during "Consent Agenda" or "Staff Informational Report," please advise the staff or the Coordinator
prior to the action on that item and you will be recognized. Notification, as much in advance as
possible, is appreciated.
Information distributed to the Committee at the meeting becomes part of the public record. A copy of
written material, pictures, etc. should be provided to the Secretary for this purpose. For more agenda
information, call the Engineering Office at 831-646-3921.
CITY OF MONTEREY'S 24-HOUR SUGGESTION HOTLINES:
Voicemail: 831-646-3799
FAX: 831-646-3793
Email: suggest@monterey.org
WebPage: http://www.monterey.org
The City of Monterey is committed to including the disabled in all of its services, programs
and activities. In compliance with the Americans with Disabilities Act, if you need special
assistance to participate in this meeting, please contact the City Clerk’s Office at (831) 646-
3935. Notification 30 hours prior to the meeting will enable the City to make reasonable
arrangements to ensure accessibility to this meeting [28 CFR 35.102-35.104 ADA Title
II]. Later requests will be accommodated to the extent feasible. For communication-related
assistance, dial 711 to use the California Relay Service (CRS) to speak to City offices. CRS
offers free text-to-speech, speech-to-speech, and Spanish-language services 24 hours a day, 7
days a week. If you require a hearing amplification device to attend a meeting, dial 711 to use
CRS to talk to the City Clerk's Office at (831) 646-3935 to coordinate use of a device.
UPCOMING MEETINGS AT CITY HALL
Feb 26 Museums and Cultural Arts Commission Meeting, Council Chamber - 4:00 pm
Feb 26 MCAC Meeting Cancellation Notice, Council Chamber - 4:00 pm
Feb 27 Planning Commission Meeting, Council Chamber - 4:00 pm
Feb 28 Library Board Meeting, Library Community Room - 5:00 PM
Feb 28 Council Study Session, Council Chamber - 4:00 PM
Mar 1 Zoning Administrator Meeting, Council Chamber - 4:00 pm
Mar 6 Council Regular Meeting, Council Chamber - 4:00 PM
Mar 7 Architectural Review Committee Meeting, Council Chamber - 4:00 pm
Mar 8 Historic Preservation Commission Meeting, Council Chamber - 4:00 pm
Mar 8 MP Regional Water Authority Meeting, TBD - 7:00 PM
Mar 9 Disabled Access Appeals Board Meeting, Council Chamber - 2:00 PM
NIP Committee Agenda
Thursday, February 22, 2018
2
Mar 13 Planning Commission Meeting, Council Chamber - 4:00 pm
Mar 15 Parks and Recreation Commission Meeting, Council Chamber - 7:00 PM
Mar 15 Zoning Administrator Meeting, Council Chamber - 4:00 pm
Mar 20 Council Regular Meeting, Council Chamber - 4:00 PM
Mar 21 Architectural Review Committee Meeting, Council Chamber - 4:00 pm
Mar 26 Museums and Cultural Arts Commission Meeting, Council Chamber - 4:00 pm
Mar 27 Planning Commission Meeting, Council Chamber - 4:00 pm
Mar 28 Library Board Meeting, Library Community Room - 5:00 PM
Mar 28 Council Study Session, Council Chamber - 4:00 PM