Neighborhood and Community Improvement Program Committee Meeting
Regular MeetingMonterey, CA · July 29, 2019
Minutes
MINUTES
NEIGHBORHOOD AND COMMUNITY IMPROVEMENT PROGRAM COMMITTEE
CITY OF MONTEREY
MONDAY, JULY 29, 2019
6:00 PM
COUNCIL CHAMBER, FEW MEMORIAL HALL OF RECORDS
580 PACIFIC STREET
MONTEREY, CALIFORNIA
NCIP Alta Mesa Rick Heuer, Rep.
Representatives & Casanova-Oak Knoll Richard Ruccello, Rep., Scott Dent, Alt.
Alternates Deer Flats Dave Overton, Rep.
Present: Del Monte Beach Jayme Fields, Rep.
Del Monte Grove-Laguna Grande Merrily Alley, Rep., Kathleen Baker, Alt.
Downtown William Curt Tipton, Rep., Bella Lofaso, Alt.
Fisherman Flats Tom Rowley, Rep.
Glenwood Lee Whitney, Rep.
Monterey Vista Jean Rasch, Rep., Hans Jannasch, Alt., Bruce
Zanetta, Alt.
New Monterey Sharon Dwight, Rep., Jonathan Hill, Alt.,
Old Town Sue Ricketson, Alt.
Skyline Forest Dennis Duke, Rep., Richard Moore, Alt.
Villa Del Monte Duane Peterson, Rep.
NCIP Aguajito Oaks Olivia Morgan, Rep.
Representatives & Alta Mesa Marilyn Fox, Alt.
Alternates Del Monte Beach Kathryn Battiato, Alt.
Absent: Fisherman Flats Sam Brand, Alt., Marilyn Maxner, Alt.
New Monterey Joanne Garden, Alt.
Oak Grove Harlan Jencks, Rep., Luz Adam, Alt.
Old Town April Harrison, Rep.
Villa Del Monte Shaun Berry, Alt., Tammy Jennings, Alt.
City Staff Present: Jeff Krebs, NCIP Staff Coordinator
Steve Wittry, Public Works Director
Alyssa Huerta, Administrative Assistant II
Louie Marcuzzo, Park Operations Manager
Scott Connolly, Cemetery Coordinator
Javier Hernandez, Engineering Assistant
CALL TO ORDER
Mr. Krebs called the meeting to order at 6:00 p.m.
ROLL CALL
Ms. Huerta called the roll with thirteen (13) neighborhoods represented and Aguajito
Oaks and Oak Grove absent.
PUBLIC COMMENTS
Mike Brassfield thanked the committee for their work.
INFORMATIONAL REPORTS & STAFF COMMENTS
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
1. Verify NCIP Committee Participants Have Attended or Viewed all Five NCIP Project
Review Meetings (Not a project under CEQA Article 20, Section 15378 and under
General Rule Article 5, Section 15061)
Action: Mr. Krebs verified that all present NCIP Committee participants attended or
viewed all five NCIP project review meetings.
2. Explain the Voting Process (Continued from May 15, 2019 meeting) (Not a project under
CEQA Article 20, Section 15378 and under General Rule Article 5, Section 15061)
Action: Mr. Krebs explained the voting process.
3. NCIP Financial Report (Continued from May 15, 2019 meeting) (Not a project under
CEQA Article 20, Section 15378 and under General Rule Article 5, Section 15061)
Jayme Fields introduced a motion to add $300,000 to the NCIP Opportunity Buying
Fund. The motion was seconded by Richard Ruccello.
The motion carried by the following vote:
AYES: 9 COMMITTEE MEMBERS: Fields, Duke, Rasch, Whitney,
Ruccello, Overton, Alley, Rowley,
Ricketson
NOES: 4 COMMITTEE MEMBERS: Peterson, Dwight, Heuer, Tipton
ABSENT: 0 COMMITTEE MEMBERS:
ABSTAIN: 0 COMMITTEE MEMBERS:
RECUSED: 0 COMMITTEE MEMBERS:
NCIP INFORMATIONAL REPORTS
4. NCIP Spokesperson Reports (Continued from May 15, 2019 meeting) (Not a project
under CEQA Article 20, Section 15378 and under General Rule Article 5, Section 15061)
Action: Rick Heuer reported on Council direction of NCIP voting process from the
July 16 Council meeting.
PUBLIC APPEARANCE
2. Voting Process for FY 2019-20 NCIP Program (Public Comments and Select Projects by
Voting - Continued from May 15, 2019 meeting) (Not a project under CEQA Article 20,
Section 15378 and under General Rule Article 5, Section 15061)
Action: Mr. Krebs detailed five (5) conflict projects: DMG-6, CW-46, AM- 1, CW-37,
DMG-5
Action: Mr. Krebs discussed the changes to project costs since the May 2 NCIP
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
2
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
meeting.
Barbara Lang spoke in support of CW-48.
Mike Denby spoke in support of CW-19A and CW-19B.
Robert Yoha spoke in support of COK-2.
City of Monterey Fire Chief, Gaudenz Panholzer, spoke in support of CW-41, CW-44 and
CW-47.
Pat Venza spoke in support of CW-31.
Ray Meyers spoke in support of CW-31.
Suzanne Grimes spoke in support of CW-31.
Bob Tachibana spoke in support of MV-4.
Bruce Zanetta spoke in support of CW-31.
Hans Jannasch spoke in support of CW-31, MV-4, MV-7, CW-21 and CW-28.
Tammy Jennings spoke in support of CW-17.
Mike Brassfield spoke in support of COK-2, CW-44 and CW-32.
Scott Dent spoke in support of CW-8, CW-10 and COK-1.
Jason Wachs spoke in support of CW-19.
Kelly Violini spoke in support of COK-4.
Jeannie Ferrara spoke in support of CW-31.
Action: Mr. Krebs opened voting for the five (5) conflict projects:
DMG-6 (Merrily Alley left the room while the reaming Committee members
discussed and voted)
CW-46 (Curt Tipton left the room while the reaming Committee members (Bella
Lofaso representing DT) discussed and voted)
AM- 1 (Rick Heuer left the room while the reaming Committee members
discussed and voted)
CW-37 (Rick Heuer left the room while the reaming Committee members
discussed and voted)
DMG-5 (Merrily Alley left the room while the reaming Committee members
discussed and voted)
Duane Peterson listed his neighborhood priorities: VDM-6, VDM-1, VDM-3. He spoke in
support of CW-17.
Jayme Fields listed her neighborhood priorities: DMB-4, DMB-6, DMB-3, DMB-1, DMB5,
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
3
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
DMB-7, DMB-8. She clarified the similarities and differences between DMB-1 and DMB-
3.
Sharon Dwight listed her neighborhood priorities: NM-4, NM-9, CW-9, NM-5, NM-1, CW-
1. She described her voting approach for this year’s process.
Dennis Duke listed his neighborhood priorities: CW-47, SF-2, SF-3, SF-1. He spoke in
support of CW-44 and CW-41.
Jean Rasch listed her neighborhood priorities: CW-47, CW-31, MV-4, MV-3, CW-21, CW-
28, CW-17.
Lee Whitney noted that her neighborhood does not have any projects this year. She
spoke in support of CW-47, CW-44 and all traffic calming projects for all neighborhoods.
Richard Ruccello listed his neighborhood priorities: COK-1, COK-2, COK-4. He spoke in
support of COK-1, COK-2, CW-44 and CW-47. He described his voting approach for this
year’s process.
Rick Heuer listed his neighborhood priorities: CW-47, AM-4. He said he will also support
each neighborhood’s top priorities. He spoke in support of CW-17, CW-44 and CW-12.
Dave Overton noted that his neighborhood only has one project for this year and so his
priority was DF-1. He spoke in support of CW-47, CW-17, CW-12.
Merrily Alley said she was going to pass on listing her priorities.
Tom Rowley listed his neighborhood priorities: CW-47, CW-45, COK-1, FF-1, CW-1, CW-
44 and CW-15.
Curt Tipton listed his neighborhood priorities: DT-9, DT-10A, CW-13, DT-2, CW-4, DT-6.
He spoke in support of DT-10A.
Sue Ricketson noted that her neighborhood has no projects this year. She spoke in
support of CW-47, CW-31 and anything that touches Veterans Park, such as CW-43,
CW-28 and CW-26.
The attachments to the minutes (NCIP Voted Project List and Summary) was not sent out
with the distributed draft minutes as part of the agenda packet for the October 24, 2019
meeting to approve the minutes. The minutes have been amended to include the
attachments, as the voted projects list is referenced in Rick Heuer’s motion below.
Rick Heuer introduced a motion to approve the voted projects list down to and
including the four cut-off projects, with an audit of duplicates and review of the
funding by Mr. Krebs. The motion was seconded by Dennis Duke.
The motion carried by the following vote:
AYES: 13 COMMITTEE MEMBERS: Fields, Duke, Rasch, Whitney,
Ruccello, Overton, Alley, Rowley,
Ricketson, Peterson, Dwight, Heuer,
Tipton
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
4
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
NOES: 0 COMMITTEE MEMBERS:
ABSENT: 0 COMMITTEE MEMBERS:
ABSTAIN: 0 COMMITTEE MEMBERS:
RECUSED: 0 COMMITTEE MEMBERS:
COMMITTEE MEMBER COMMENTS
Duane Peterson said thank you.
Jayme Fields said she appreciated how fast the process was this year.
Sharon Dwight said she would like the Committee to schedule a follow-up meeting to
discuss voting and the Grand Jury report.
Dennis Duke said nothing is constant but change.
Jean Rasch had no comment.
Lee Whitney said she enjoyed the quick process.
Richard Ruccello said he liked the voting cards and that this voting night came out similar
to the past but there was a time savings and state law was met.
Rick Heuer said tonight went better than expected, but in the future he would like to
spend more time on speaking about projects before voting begins. He said his response
to the Grand Jury will be published and he requested that Mr. Krebs send it out to the
Committee. Mr. Krebs said he will go through the Assistant City Manager regarding the
response.
Dave Overton thanked the Committee, public and staff.
Merrily Alley said she feels strongly that the Committee should meet to speak and talk
about the changes and agreed there should be a meeting about the Grand Jury.
Tom Rowley said he was sorry that two neighborhoods were not able to participate this
year.
Curt Tipton said he agreed to a follow up meeting and to also discuss the grand jury
report.
Sue Ricketson had no comment.
NEXT MEETING
Special meeting to be scheduled as needed.
ADJOURNMENT
Mr. Krebs adjourned the meeting at 9:20 p.m.
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
5
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
Respectfully Submitted, Approved,
NCIP Staff Coordinator
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
6
NCIP Voting Night - July 29, 2019 - Summary
Dollars
NCIP Funding (including ending
balance) $4,141,420
Base allocation (roll forward) $96,322
Total Funding Available $4,237,742
Opportunity Buying $300,000
Remaining Balance $3,937,742
POINTS PROJECT PROJECT NAME
CW-47
(formerly AM-
3, FF-4, SF-4, Combined Greenbelt Fuel Reduction and Tree
130 SF-5) Removal Projects $280,000
126 COK-1 COK Tree Study $15,000 $295,000
125 MV-4 El Caminito Del Norte Streetlight $4,000 $299,000
123 VDM-6 Montecito Park Improvements, Ph 4 $80,000 $379,000
118 CW-17 Accessible Beach Mats $41,000 $420,000
114 FF-1 Fisherman Flats Park Improvements $8,100 $428,100
111 COK-2 COK Park Improvements $77,000 $505,100
110 AM-4 Don Dahvee Creek Path, Construction Ph I $195,000 $700,100
110 CW-44 Emergency Operations Center Upgrade $71,000 $771,100
109 NM-4 Oak St 500 Block Widening phase 1 $346,000 $1,117,100
108 DT-9 Simoneau Plaza/Trader Joe's RRFB $94,000 $1,211,100
Laguna Grande Pk Vball Court Turf
105 DMG-5 Replacement $84,000 $1,295,100
103 CW-15 Colton Hall Repointing, Ph II $158,000 $1,453,100
102 DF-1 Deer Forest/Elk Run Retaining Wall $116,000 $1,569,100
100 CW-5 Citywide Dog Amenities $25,000 $1,594,100
Spray Ave Tot Lot Resurfacing. Duplicate
DMB-1 funding approval. Recommend funding DMB -
99 (2018 Cut-Off) 3 $54,000 $1,648,100
95 MV-1 Mar Vista Drive Radar Sign $11,000 $1,659,100
95 SF-2 Skyline Forest Dr/HoL. Hwy K-Rail $17,000 $1,676,100
Laguna Grande Pk Playground Equipment
92 DMG-6 Replacement $140,000 $1,816,100
CW-48
(formerly MV-
91 2) Pickleball 6-Court Feasibility Study $4,500 $1,820,600
VDM-1
90 (2018 Cut-Off) Montecito Park Improvements, Ph 3 $230,000 $2,050,600
90 CW-27 Citywide Restroom Study $30,000 $2,080,600
90 CW-28 Vets Pk Bball Court, Ph II $54,000 $2,134,600
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
89 CW-26 Vets Pk West Parking Lot Renovation $52,000 $2,186,600
Pearl/Figueroa Street Intersection
88 DT-10A Improvements $158,000 $2,344,600
88 CW-13 Library Parking Lot Streetlight $4,500 $2,349,100
87 COK-4 Fairground Road/Airport Road Lighting $27,000 $2,376,100
86 DT-2 Monterey Beach Shower Station $47,000 $2,423,100
84 NM-9 David Spencer Curb Extensions Design $187,000 $2,610,100
84 CW-8 Bike Repair Stations $10,000 $2,620,100
Vets Pk Bocce Ball Court Surface
84 CW-43 Improvement $5,000 $2,625,100
CW-45
83 (formerly FF-2) Josselyn Cyn Radar Speed Signs $30,000 $2,655,100
CW-1
82 (2018 Cut-Off) Ryan Ranch RV Storage Lot Security $40,000 $2,695,100
82 CW-32 Downtown Portland Loos $250,000 $2,945,100
81 CW-41 Downtown Safety Bollard Installation $80,000 $3,025,100
CW-21
79 (2018 Cut-Off) Vets Park Bike Path Segment 4 $183,000 $3,208,100
78 DMB-6 DMB Rec Trail Signage $3,500 $3,211,600
78 CW-10 Rec Trail Water Bottle Refill Stations $31,000 $3,242,600
77 CW-31 Conduit Installation Pilot Project $250,000 $3,492,600
Spray Ave Tot Lot Resurface and Exercise
74 DMB-3 Equipment $73,000 $3,565,600
74 MV-3 Dry Creek Road Storm Drain Grate Upgrade $35,000 $3,600,600
72 MV-7 Mar Vista Traffic Calming, Ph 1 $238,000 $3,838,600
72 MV-12 Via Paraiso Pk Bball Ct Upgrade $111,000 $3,949,600
71 DMB-4 Del Monte Beach/Tide Ave Security Camera $13,000 $3,962,600
71 NM-5 Prescott 1740 Sidewalk $49,000 $4,011,600
70 VDM-3 Ramona Ave Highway Screening $28,000 $4,039,600
69 SF-3 Hwy 1, 68 to Viejo Bike Path Upgrade Repair $190,000 $4,229,600
Fremont/Munras Corridor Traffic Signal
68 CW-25 Adaptive System $100,000 $4,329,600
67 CW-16 380 Alvarado Path of History Map Mural $5,200 $4,334,800
Monterey History Milestones Plaques
66 CW-30 Extension $7,500 $4,342,300
62 DT-3 Franklin and Figueroa Trash Receptacle $5,100 $4,347,400
62 NM-1 Lily 900 Block Street widening $180,000 $4,527,400
56 CW-22 Youth Center Park Play Equipment Upgrade $147,000 $4,674,400
54 SR-1 Parcel B Sewer and Fire Access Road $230,000 $4,904,400
54 CW-19B Rec Trail Pedestrian Lane $45,000 $4,949,400
Downtown and Wharf Trash/Recycle
53 DT-6 Enclosures $25,000 $4,974,400
53 VDM-5 Ferrante Park Playground Expansion, Ph I $292,000 $5,266,400
53 CW-12 Sports Center Water Slide $196,000 $5,462,400
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
8
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
52 VDM-2 Ramona Ave Traffic Calming $32,000 $5,494,400
51 DMB-5 DMB Retaining Wall Repair $36,000 $5,530,400
51 CW-9 CW Aquatic Center Feasibility Study $40,000 $5,570,400
51 CW-19A Rec Trail Bike and Ped Lanes $167,000 $5,737,400
51 CW-49 Park Playground Boulders Study $2,500 $5,739,900
50 AM-1 Mesa Rd at Fremont St Crosswalk $115,000 $5,854,900
50 NM-7 Cannery Row Public Restroom Construction $285,000 $6,139,900
50 CW-39 SR 68 Scenic Hwy Signs $4,000 $6,143,900
48 SF-1 Skyline Dr/Chatswood Pl Median $27,000 $6,170,900
47 CW-11 Sports Center Kids Zone Window Tinting $10,500 $6,181,400
Scholze Pk Walkway and ADA Accessible
46 NM-8 Outdoor Fitness Area Station, Ph III $143,000 $6,324,400
Window on the Bay Dunes Fence and Signage
45 CW-4 Repair $82,000 $6,406,400
44 DMB-7 Beach Way/Surf Way Traffic Calming $26,000 $6,432,400
44 MV-9 Via del Pinar Realignment at Via del Rey $112,000 $6,544,400
44 CW-24 El Estero Pk Par Course Upgrade $135,000 $6,679,400
43 VDM-4 Del Robles Ave Streetlights $79,000 $6,758,400
43 CW-2 Aguajito Rd Sidewalk $324,000 $7,082,400
43 CW-6 Sollecito Ballpark Lighting $260,000 $7,342,400
43 CW-20 Shoreline Pk Bball Court Flex Surfacing $145,000 $7,487,400
Cortes/Pearl Street Intersection
42 DT-10B Improvements $71,000 $7,558,400
42 CW-7 DTM Train Play Equipment $309,000 $7,867,400
Rec Trail, Camino El Estero to Casa Verde Rec
39 CW-36 Trail Repair $238,000 $8,105,400
38 AM-5 Alta Mesa/El Dorado RRFB $126,000 $8,231,400
37 CW-40 Pearl St Southside Walking Access $108,000 $8,339,400
36 DT-5 Harbor Parking Lot EV Charging Station $58,000 $8,397,400
Sloat Monument landscaping and sidewalk
35 CW-38A path between lower Harbor trail and Museum $320,000 $8,717,400
Mervine Renovation pathway from Sloat
33 CW-38B Monument $204,000 $8,921,400
27 CW-18 Sports Center Parklet $115,000 $9,036,400
26 MV-8 Mar Vista/Soledad Ped Improvement, Ph I $720,000 $9,756,400
23 NM-6 Rec Trail Water Tank Mural $46,000 $9,802,400
21 CW-3 Citywide Multi-lingual Signage $45,000 $9,847,400
18 CW-14 Historic Monterey Gateways $191,000 $10,038,400
16 CW-35 Cemetery Columbarium Flooring Replacement $41,000 $10,079,400
14 CW-46 Jack's Park Infield Turf $428,000 $10,507,400
13 DMB-8 DMB Dunes Play Area $161,000 $10,668,400
9 CW-37 Fremont Street Sidewalk Construction $1,400,000 $12,068,400
$12,068,400
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
9
City of Monterey
NCIP Voted Project List
7/29/2019
VDM DMB NM SF MV GW COK AM DF DMG FF DT OT
total Neighbor -
Project Name Estimate
points hood
CW-47 Combined Greenbelt Fuel Reduction
(formerly and Tree Removal Projects
130 $280,000
AM-3, FF-4,
SF-4, SF-5) 10 10 10 10 10 10 10 10 10 10 10 10 10
126 COK-1 COK Tree Study $15,000 10 10 10 9 10 7 10 10 10 10 10 10 10
125 MV-4 El Caminito Del Norte Streetlight $4,000 10 10 8 9 10 9 10 10 10 10 10 9 10
123 VDM-6 Montecito Park Improvements, Ph 4 $80,000 10 10 10 7 8 8 10 10 10 10 10 10 10
118 CW-17 Accessible Beach Mats $41,000 10 8 10 8 8 8 10 10 10 9 10 8 9
114 FF-1 Fisherman Flats Park Improvements $8,100 10 10 9 8 7 4 10 10 8 8 10 10 10
111 COK-2 COK Park Improvements $77,000 9 7 10 8 8 9 10 10 10 8 6 8 8
Don Dahvee Creek Path,
110 AM-4 Construction Ph I $195,000
10 9 8 7 9 7 10 10 10 4 7 9 10
Emergency Operations Center
110 CW-44 Upgrade $71,000 10 6 10 10 4 10 10 10 10 0 10 10 10
109 NM-4 Oak St 500 Block Widening phase 1 $346,000 9 10 10 6 10 7 5 10 9 10 10 10 3
108 DT-9 Simoneau Plaza/Trader Joe's RRFB $94,000 10 9 10 6 9 8 10 10 8 7 1 10 10
Laguna Grande Pk Vball Court Turf
105 DMG-5 Replacement $84,000
10 9 9 9 8 7 8 10 10 7 10 8
103 CW-15 Colton Hall Repointing, Ph II $158,000 10 4 10 7 6 9 10 5 10 8 10 7 7
102 DF-1 Deer Forest/Elk Run Retaining Wall $116,000 5 7 10 7 9 6 8 10 10 7 7 10 6
100 CW-5 Citywide Dog Amenities $25,000 7 10 10 5 5 8 5 6 10 4 10 10 10
DMB-1 Spray Ave Tot Lot Resurfacing.
99 (2018 Cut- Duplicate funding approval. $54,000
Off) Recommend funding DMB - 3 7 9 10 6 7 8 8 4 9 9 7 7 8
95 MV-1 Mar Vista Drive Radar Sign $11,000 7 4 7 7 10 9 10 10 5 1 10 5 10
95 SF-2 Skyline Forest Dr/HoL. Hwy K-Rail $17,000 9 9 0 9 10 7 8 8 10 0 9 8 8
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
Laguna Grande Pk Playground
92 DMG-6 Equipment Replacement $140,000
9 4 10 7 7 7 10 8 8 6 8 8
CW-48 Pickleball 6-Court Feasibility Study
91 (formerly $4,500
MV-2) 7 10 10 9 5 5 4 10 10 0 1 10 10
VDM-1 Montecito Park Improvements, Ph 3
90 (2018 Cut- $230,000
Off) 8 6 0 5 8 8 9 10 8 7 10 8 3
90 CW-27 Citywide Restroom Study $30,000 8 10 10 6 7 8 9 0 10 0 10 7 5
90 CW-28 Vets Pk Bball Court, Ph II $54,000 7 7 5 6 10 9 7 6 10 5 0 8 10
Vets Pk West Parking Lot Renovation
89 CW-26 $52,000
7 7 10 5 7 8 8 0 10 0 9 8 10
Pearl/Figueroa Street Intersection
88 DT-10A Improvements $158,000
9 3 9 6 7 8 10 9 5 4 5 9 4
88 CW-13 Library Parking Lot Streetlight $4,500 9 3 0 8 4 6 9 10 9 0 10 10 10
Fairground Road/Airport Road
87 COK-4 Lighting $27,000
8 6 10 7 6 7 10 6 8 10 2 7 0
86 DT-2 Monterey Beach Shower Station $47,000 8 8 10 6 7 4 10 0 9 5 4 8 7
David Spencer Curb Extensions
84 NM-9 Design $187,000
8 9 10 6 9 6 4 8 8 8 0 2 6
84 CW-8 Bike Repair Stations $10,000 5 7 10 8 9 5 10 0 7 0 7 8 8
Vets Pk Bocce Ball Court Surface
84 CW-43 Improvement $5,000
9 9 7 7 3 8 9 3 5 6 1 7 10
CW-45
83 (formerly
FF-2) Josselyn Cyn Radar Speed Signs $30,000 9 2 10 7 4 8 10 0 3 8 10 8 4
CW-1 Ryan Ranch RV Storage Lot Security
82 (2018 Cut- $40,000
Off) 8 4 10 7 4 4 10 0 10 2 10 8 5
82 CW-32 Downtown Portland Loos $250,000 9 2 0 8 4 8 10 9 10 0 6 8 8
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
11
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
Downtown Safety Bollard
81 CW-41 Installation $80,000
10 8 1 10 3 2 9 8 10 0 5 7 8
CW-21 Vets Park Bike Path Segment 4
79 (2018 Cut- $183,000
Off) 8 6 6 7 9 8 3 0 5 8 3 6 10
78 DMB-6 DMB Rec Trail Signage $3,500 9 10 5 7 8 4 2 9 8 0 0 8 8
Rec Trail Water Bottle Refill Stations
78 CW-10 $31,000
7 5 1 5 10 5 10 0 9 4 5 7 10
77 CW-31 Conduit Installation Pilot Project $250,000 7 9 0 10 10 8 4 0 10 0 1 8 10
Spray Ave Tot Lot Resurface and
74 DMB-3 Exercise Equipment $73,000
8 10 0 6 7 7 8 4 10 7 1 6 0
Dry Creek Road Storm Drain Grate
74 MV-3 Upgrade $35,000
8 3 1 5 10 9 10 6 10 2 0 4 6
72 MV-7 Mar Vista Traffic Calming, Ph 1 $238,000 7 0 10 4 7 9 6 4 5 8 0 7 5
72 MV-12 Via Paraiso Pk Bball Ct Upgrade $111,000 9 7 2 5 10 9 9 0 6 4 3 5 3
Del Monte Beach/Tide Ave Security
71 DMB-4 Camera $13,000
10 10 0 5 3 4 0 10 10 0 9 10 0
71 NM-5 Prescott 1740 Sidewalk $49,000 7 8 10 3 7 8 4 0 9 5 2 4 4
70 VDM-3 Ramona Ave Highway Screening $28,000 5 4 10 5 7 3 3 6 9 4 0 6 8
Hwy 1, 68 to Viejo Bike Path
69 SF-3 Upgrade Repair $190,000
8 9 10 7 8 8 0 3 1 5 1 5 4
Fremont/Munras Corridor Traffic
68 CW-25 Signal Adaptive System $100,000
7 1 10 6 3 8 6 0 8 6 3 8 2
380 Alvarado Path of History Map
67 CW-16 Mural $5,200
7 8 5 7 6 5 10 0 2 0 0 7 10
Monterey History Milestones
66 CW-30 Plaques Extension $7,500
8 5 9 7 5 5 4 0 1 0 8 4 10
Franklin and Figueroa Trash
62 DT-3 Receptacle $5,100
5 0 10 7 5 5 10 0 5 0 1 4 10
62 NM-1 Lily 900 Block Street widening $180,000 6 4 10 4 5 7 6 0 7 5 3 5 0
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
12
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
Youth Center Park Play Equipment
56 CW-22 Upgrade $147,000
8 0 8 5 5 7 8 0 6 0 0 5 4
Parcel B Sewer and Fire Access Road
54 SR-1 $230,000
10 0 4 3 5 8 5 0 5 0 9 5 0
54 CW-19B Rec Trail Pedestrian Lane $45,000 5 4 2 8 5 8 0 2 8 0 0 5 7
Downtown and Wharf Trash/Recycle
53 DT-6 Enclosures $25,000
7 3 1 6 4 7 0 0 2 0 3 10 10
Ferrante Park Playground Expansion,
53 VDM-5 Ph I $292,000
10 0 0 6 4 5 9 5 3 2 2 4 3
53 CW-12 Sports Center Water Slide $196,000 8 1 3 6 5 4 5 10 1 1 0 6 3
52 VDM-2 Ramona Ave Traffic Calming $32,000 9 0 0 6 5 8 7 0 3 5 3 6 0
51 DMB-5 DMB Retaining Wall Repair $36,000 3 5 10 3 5 6 8 0 4 2 0 5 0
51 CW-9 CW Aquatic Center Feasibility Study $40,000 5 8 10 7 0 3 0 0 7 0 10 1 0
51 CW-19A Rec Trail Bike and Ped Lanes $167,000 4 9 0 7 3 8 0 2 9 0 0 2 7
51 CW-49 Park Playground Boulders Study $2,500 5 0 0 6 0 0 0 10 7 7 3 10 3
50 AM-1 Mesa Rd at Fremont St Crosswalk $115,000 9 0 0 4 3 8 8 5 4 2 7 0
Cannery Row Public Restroom
50 NM-7 Construction $285,000
7 4 0 4 7 9 0 0 3 4 10 2 0
50 CW-39 SR 68 Scenic Hwy Signs $4,000 2 0 9 5 4 4 8 0 2 0 10 6 0
48 SF-1 Skyline Dr/Chatswood Pl Median $27,000 9 2 0 5 5 4 0 0 8 0 7 5 3
Sports Center Kids Zone Window
47 CW-11 Tinting $10,500
4 0 10 5 6 4 5 0 7 0 0 6 0
Scholze Pk Walkway and ADA
46 NM-8 Accessible Outdoor Fitness Area, Ph $143,000
III 3 1 2 6 6 6 6 0 2 2 0 8 4
Window on the Bay Dunes Fence
45 CW-4 $82,000
and Signage Repair 3 1 7 5 3 5 10 0 0 0 0 9 2
44 DMB-7 Beach Way/Surf Way Traffic Calming $26,000 3 4 10 3 3 7 3 0 0 5 4 2 0
Via del Pinar Realignment at Via del
44 MV-9 $112,000
Rey 4 8 1 4 6 6 0 0 1 3 0 4 7
44 CW-24 El Estero Pk Par Course Upgrade $135,000 3 1 5 5 4 7 7 0 0 0 0 4 8
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
13
Neighborhood and Community Improvement Program Committee Minutes Monday, July 29, 2019
43 VDM-4 Del Robles Ave Streetlights $79,000 7 0 0 4 2 5 4 0 4 3 5 7 2
43 CW-2 Aguajito Rd Sidewalk $324,000 4 7 9 5 2 5 0 0 9 0 0 2 0
43 CW-6 Sollecito Ballpark Lighting $260,000 3 3 10 6 3 7 0 0 1 0 2 4 4
Shoreline Pk Bball Court Flex
43 CW-20 $145,000
Surfacing 5 0 0 5 3 6 8 0 3 0 4 9 0
Cortes/Pearl Street Intersection
42 DT-10B $71,000
Improvements 3 1 1 6 7 7 5 0 5 3 0 0 4
42 CW-7 DTM Train Play Equipment $309,000 4 0 4 0 10 6 0 0 1 0 5 8 4
Rec Trail, Camino El Estero to Casa
39 CW-36 $238,000
Verde Rec Trail Repair 7 0 0 7 2 8 0 0 1 0 0 7 7
38 AM-5 Alta Mesa/El Dorado RRFB $126,000 10 0 0 5 5 7 0 0 0 3 0 8 0
37 CW-40 Pearl St Southside Walking Access $108,000 1 0 0 7 0 6 7 0 1 5 0 5 5
Harbor Parking Lot EV Charging
36 DT-5 $58,000
Station 2 7 0 7 4 6 4 0 0 0 0 1 5
Sloat Monument landscaping and
35 CW-38A sidewalk path between lower $320,000
Harbor trail and Museum 5 3 0 3 2 6 0 0 1 0 0 7 8
Mervine Renovation pathway from
33 CW-38B $204,000
Sloat Monument 4 3 0 5 2 6 0 0 1 0 0 7 5
27 CW-18 Sports Center Parklet $115,000 4 0 0 6 0 5 0 0 3 0 0 5 4
Mar Vista/Soledad Ped
26 MV-8 $720,000
Improvement, Ph I 4 0 0 4 6 9 0 0 0 1 0 2 0
23 NM-6 Rec Trail Water Tank Mural $46,000 3 0 0 5 7 2 0 0 1 5 0 0 0
21 CW-3 Citywide Multi-lingual Signage $45,000 2 0 0 5 1 3 3 0 1 0 0 3 3
18 CW-14 Historic Monterey Gateways $191,000 2 0 3 6 2 3 0 0 0 0 0 2 0
Cemetery Columbarium Flooring
16 CW-35 $41,000
Replacement 3 1 0 0 0 4 3 0 0 1 0 1 3
14 CW-46 Jack's Park Infield Turf $428,000 2 0 0 2 2 4 0 0 0 1 0 3 0
13 DMB-8 DMB Dunes Play Area $161,000 2 0 0 4 1 4 0 0 0 0 0 2 0
Fremont Street Sidewalk
9 CW-37 $1,400,000
Construction 5 0 0 0 0 4 0 0 0 0 0 0
$ 12,068,400
Neighborhood Improvement Program Committee Meeting Minutes
Monday, July 29, 2019
14
Agenda
NIP Committee
REVISED Member listing at
http://www.monterey.org/en-
Neighborhood Improvement
us/cityhall/boardscommissions/
Program Committee Agenda nipcommittee.aspx
Neighborhood Improvement NIP Spokesperson
Program Committee Meeting Rick Heuer
Sharon Dwight (Alternate)
Monday, July 29, 2019 Richard Ruccello (Alternate)
Council Chamber
580 Pacific Street 6:00 PM NIP Staff Coordinator
Monterey, California
Jeff Krebs
CALL TO ORDER
ROLL CALL
PUBLIC COMMENTS
PUBLIC COMMENTS. At this time, the public may speak for a maximum of one to three
minutes on any subject which is within the jurisdiction of the Monterey Neighborhood
Improvement Program Committee and which is not on the agenda. Any person or group
desiring to bring an item to the attention of the Neighborhood Improvement Program
Committee may do so during Public Comments or by addressing a letter of explanation
to: NIP Coordinator, Public Works, Engineering Division, City Hall, Monterey CA 93940.
INFORMATIONAL REPORTS & STAFF COMMENTS
INFORMATIONAL REPORTS & STAFF COMMENTS supply the Committee with written
or oral information that they may wish to take action by placing the item on a future
agenda.
1. Verify NIP Committee Participants Have Attended or Viewed all Five NIP Project
Review Meetings (Not a project under CEQA Article 20, Section 15378 and under
General Rule Article 5, Section 15061)
2. Explain the Voting Process (Continued from May 15, 2019 meeting) (Not a project
under CEQA Article 20, Section 15378 and under General Rule Article 5, Section
15061)
3. NIP Financial Report (Continued from May 15, 2019 meeting) (Not a project under
CEQA Article 20, Section 15378 and under General Rule Article 5, Section 15061)
NIP INFORMATIONAL REPORTS
NIP INFORMATIONAL REPORTS allow NIP Committee members to supply information
on past projects, activities, or announcements to the Committee and to request
clarification or direction regarding the item.
4. NIP Spokesperson Reports (Continued from May 15, 2019 meeting) (Not a project
under CEQA Article 20, Section 15378 and under General Rule Article 5, Section
15061)
PUBLIC APPEARANCE
PUBLIC APPEARANCE items are reports on action or informational issues that might
stimulate public discussion, but that do not require formal noticing. You are welcome to
offer your comments after being recognized by the NIP Staff Coordinator. The
Coordinator may limit the time allocated to each speaker.
5. Voting Process for FY 2019-20 NIP Program (Public Comments and Select
Projects by Voting - Continued from May 15, 2019 meeting) (Not a project under
CEQA Article 20, Section 15378 and under General Rule Article 5, Section 15061)
COMMITTEE MEMBER COMMENTS
COMMITTEE MEMBERS may ask a question for clarification, make a brief
announcement or make a brief report on his or her activities. In addition, a Committee
member may provide a referral to staff or other resources for factual information, request
staff to report back to the body at a subsequent meeting concerning any NIP matter, or
direct staff to place a request to agendize a matter of business on a future agenda. (G.C.
54954.2)
NEXT MEETING
Special meeting to be scheduled as needed.
ADJOURNMENT
Agenda packets may be reviewed by the public in the Engineering Office or on the web at
http://www.monterey.org beginning 72 hours prior to the date of the meeting.
Members of the public have the right to address the Committee on any Agenda items. The Staff
Coordinator will formally open the floor for public comment. However, if you wish to speak to items
during "Consent Agenda" or "Staff Informational Report," please advise the staff or the
Coordinator prior to the action on that item and you will be recognized. Notification, as much in
advance as possible, is appreciated.
Information distributed to the Committee at the meeting becomes part of the public record. A copy
of written material, pictures, etc. should be provided to the Secretary for this purpose. For more
agenda information, call the Engineering Office at 831-646-3921.
CITY OF MONTEREY'S 24-HOUR SUGGESTION HOTLINES:
Voicemail: 831-646-3799
FAX: 831-646-3793
Email: suggest@monterey.org
WebPage: http://www.monterey.org
The City of Monterey is committed to including the disabled in all of its services, programs
and activities. In compliance with the Americans with Disabilities Act, if you need special
assistance to participate in this meeting, please contact the City Clerk’s Office at (831) 646-
3935. Notification 30 hours prior to the meeting will enable the City to make reasonable
arrangements to ensure accessibility to this meeting [28 CFR 35.102-35.104 ADA Title
II]. Later requests will be accommodated to the extent feasible. For communication-related
assistance, dial 711 to use the California Relay Service (CRS) to speak to City offices. CRS
offers free text-to-speech, speech-to-speech, and Spanish-language services 24 hours a day, 7
days a week. If you require a hearing amplification device to attend a meeting, dial 711 to use
CRS to talk to the City Clerk's Office at (831) 646-3935 to coordinate use of a device.