Planning Commission Meeting
Regular MeetingMonterey, CA · March 15, 2018
Minutes
MINUTES
PLANNING COMMISSION
Thursday, March 15, 2018
6:00 p.m.
SPECIAL MEETING
FEW MEMORIAL HALL OF RECORDS
COUNCIL CHAMBERS, 580 PACIFIC STREET
MONTEREY, CALIFORNIA
Commissioners Present: Millich, Dawson, Brassfield, Ezekiel, Fletcher, Latasa, Reed
Commissioners Absent: None
Staff Members Present: Community Development Director Cole, Housing and
Community Development Manager Caraker, Senior Associate
Planner Bennett, City Attorney Davi, Recording Secretary
Leinen
CALL TO ORDER
Chair Millich called the meeting to order at 6:01 p.m.
PUBLIC COMMENTS
Nina Beety spoke about the 13 personal wireless service (PWS) applications submitted and
said the proposed facilities would point to the west, benefitting Pebble Beach. She also said
Congress Bill 4986 must be opposed.
Judy Karas, Monterey resident, said a meeting regarding safe agriculture and safe schools is
being held and that she hopes that those concerned with PWS applications will also give
attention to the safety of those who work in the fields.
PUBLIC HEARING
1. Deny Use Permit UP-17-0339 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 1006 Madison Street; Applicant Lawrence Beer for ExteNet Systems, Inc.;
Owner City of Monterey; Zoning Designation R-1-6; Exempt from CEQA Requirements
(Article 19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
2. Deny Use Permit UP-17-0332 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 81 Via Encina; Applicant Lawrence Beer for ExteNet Systems, Inc.; Owner
City of Monterey; Zoning Designation R-1-8; Exempt from CEQA Requirements (Article
19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
3. Deny Use Permit UP-17-0334 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 231 Via Del Rey; Applicant Lawrence Beer for ExteNet Systems, Inc.; Owner
City of Monterey; Zoning Designation R-1-8; Exempt from CEQA Requirements (Article
19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
Planning Commission Minutes Thursday, March 15, 2018
Chair Millich said Pat Venza of the Monterey Vista Neighborhood Association (MVNA) would be
allowed to speak for 10 minutes at the beginning of Public Comment.
4. Approve Use Permit UP-17-0335 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 277 Mar Vista Drive and 7 Cuesta Vista Drive; Applicant Lawrence Beer for
ExteNet Systems, Inc.; Owner City of Monterey; Zoning Designation R-1-20; Exempt
from CEQA Requirements (Article 19, Section 15303, Class 3)
ACTION: Adopted a resolution denying Use Permit UP-17-0335 for a new PWS facility to
be attached to an existing utility pole located in the City of Monterey’s public
right-of-way with amendments to the findings and deletion of all Conditions of
Approval.
Staff Presentation/Commissioner Questions
Todd Bennett presented the Agenda Report and answered Commissioners’ questions.
Chair Millich called for a five minute recess at 6:19 pm. Chair Millich reconvened the meeting
at 6:22 p.m.
Mr. Bennett said the applicant, ExteNet, submitted a letter the day of the meeting which has
been provided to the Commissioners and interested members of the public.
Christine Davi introduced Lee Afflerbach of CTC Technology & Energy and Tripp May of
Telecom Law Firm.
Mr. Afflerbach said he was tasked with determining whether the information provided by the
applicant regarding coverage gaps is correct. He said his measurements confirmed that the
information provided is correct, and that there is coverage in the area but it does not meet 4G
coverage or signal level to provide signal into buildings.
In response to Commissioner Ezekiel’s question, Mr. Afflerbach confirmed that the applicant
proposes to add 1900 and 2100 megahertz and he detailed the locations of the three 700
megahertz macro sites. He also said he did not look at the construction of these existing
antennas and the possibility of them providing additional coverage as he was only tasked to
measure existing performance. In response to Commissioner Ezekiel’s question regarding the
target capacity for the proposed location, Mr. Afflerbach said he had no target as his job was to
measure what the existing signal level is.
In response to Vice Chair Dawson’s question regarding whether the proposed sites are
supposed to be 5G LTE, Mr. Afflerbach said there is a general move away from the macro
sites to the small sites which are going to be the backbone of 5G technology. In response to
Vice Chair Dawson’s question about expected coverage, Mr. Afflerbach said this depends on
what the waves have to penetrate, such as buildings and foliage, but generally speaking
higher frequencies provide about half the distance of a 700 megahertz site. In response to
Vice Chair Dawson’s question regarding measurement of signal from a moving vehicle, Mr.
Afflerbach said the reason this was done is to be able to provide a graph of the coverage area.
In response to Vice Chair’s question regarding capacity versus coverage, Mr. Afflerbach said
that although an LTE site may have sufficient signal level it could still be lacking in capacity.
Mr. Bennett and Mr. May answered Commissioners’ questions regarding the shot clock,
capacity versus coverage, and the 9th Circuit Courts. In response to Vice Chair Dawson’s
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
2
Planning Commission Minutes Thursday, March 15, 2018
question regarding whether the law takes into consideration a coverage gap or a capacity gap,
Mr. May said the bedrock judicial case established a significant gap test in 2005 when the
issue at hand was coverage, but subsequent 9th Circuit Court decisions have not readdressed
significant gap. He said lower California Courts have addressed the issue taking into
consideration a lack of in building coverage or a lack of capacity in general. Mr. May also
confirmed that it is the applicant’s responsibility to confirm that a coverage gap exists. He said
he believes, based on the CTC report, that a Court would find that there is a gap, however
there are still other factors to consider like whether the project is the least intrusive means. In
response to Commissioner Ezekiel’s question, Mr. May confirmed that under City Code, co-
location of facilities is preferable.
In response to Commissioner Latasa’s question regarding coverage versus capacity, Mr. May
said the Planning Commission’s determination about whether or not a gap exists is not
dispositive in the same way their determination about conformity with the municipal code
would be upon judicial review, so it does not do any harm for staff to make a determination.
He also said if the Planning Commission makes contrary findings that the project does not
comply with the local code, then the Limited Exception Findings would be triggered and
findings about existence of a gap and whether the facility is the least intrusive would have to
be made.
In response to Commissioner Reed’s question, Mr. May said for this application, the issue of a
gap in coverage was not mentioned because staff determined all of the basic findings could be
met so limited exception findings were not needed. Mr. May also confirmed that coverage is
irrelevant for this application as the application cannot be denied based on coverage.
In response to Commissioner Latasa’s questions regarding undergrounding of utilities and
individuals having their own wired systems, Mr. May said the Public Utilities Code allows
telephone companies the right to put their services in the public right-of-way.
In response to Vice Chair Dawson’s question regarding California Public Utilities Code General
Order 95 (GO 95) and co-location of side-mounted antennas, Mr. May said co-location would
be unlikely due to GO 95 and the poles being unable to support the additional utilities.
In response to Commissioner Fletcher’s question about ownership of the utility pole, Mr.
Bennett said the Northern California Joint Pole Association owns the pole and ExteNet is a
member of that association. He also said prior to installation, the pole would need to be
evaluated to confirm it is structurally sound. Mr. May said a Joint Pole Association member
submits an application to all interested parties and if no objections are received within 45 days
permission is granted. Mr. Bennett said to his knowledge this permission has not yet been
granted for the proposed pole.
In response to Commissioner Ezekiel’s question regarding vaulting of equipment, Mr. Bennett
said staff recommends on-pole equipment over vaulting for this location due to the site’s
foliage, the significant slope, and the aesthetic impacts of the three retaining walls that would
be needed.
In response to Commissioner Brassfield’s question regarding co-location in residential areas,
Mr. Bennett said commercial and industrial zones are preferred over residential, unless the
applicant indicates that there are no suitable commercially or industrially zoned properties
within the area, in which case residential can be considered.
In response to Commissioner Fletcher’s question regarding accuracy of the assessments of
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
3
Planning Commission Minutes Thursday, March 15, 2018
the proposed pole, Mr. May said the engineers make assumptions on tolerance based on
calculations of known factors.
In response to Commissioner Ezekiel’s question about view impacts, Mr. Bennett said the
nearest residence to the proposed site is approximately 65 feet away. Mr. Bennett said the
Wireless Ordinance is intended to require mitigation for these types of facilities, but does not
require that facilities are not visible from adjacent residences.
In response to Commissioner Reed’s question regarding a 12 foot radius from the proposed
site, Mr. May said the antenna does not have the right to use the air space above adjacent
private property that the owner is using and that the antenna cannot prevent development of
other properties. In response to Commissioner Reed’s question regarding the Wireless
Ordinance, Mr. May said the Ordinance was written with all types of facilities in mind. He said
the City can deny applications in residential areas if there are findings that the facilities will
incommode the public’s use of the right of way or if there are alternative locations or designs
that would be more compatible with the Ordinance.
In response to Commissioner Ezekiel’s question regarding macro towers, Mr. Afflerbach said
macro towers have limitations in the 700 megahertz and that investigating use of macro towers
was not a part of the applicant’s scope. Mr. May said the City cannot dictate technological
choices or require applicants to use properties they cannot gain access to.
In response to Commissioner Brassfield’s question, Mr. Afflerbach confirmed that the
proposed project uses the smallest model currently available to accomplish the goal and said
the proposal from an engineering standpoint is a sound approach. In response to
Commissioner Brassfield’s question regarding future modifications to the project if approved,
Mr. Bennett said unless upgrades or modifications reach a certain threshold the review would
be ministerial. In response to Commissioner Brassfield’s question regarding review of 5G
facilities in the future, Mr. May said local government has the right to review facilities to ensure
they meet necessary criteria, such as size, structural soundness, and pole height.
In response to Commissioner Reed’s question, Mr. May confirmed that the applicant has
withdrawn the 12 other PWS applications and would therefore have to submit new applications
if they desired to proceed with those 12 locations.
In response to Commissioner Latasa’s question regarding the letter submitted by ExteNet, Mr.
Bennett said the letter states that an extensive evaluation occurred showing that the proposed
site is the preferred location and City staff concurs. Mr. May said the letter is part of the record
and the Commission should weigh it with other items as part of the record.
In response to Commissioner Ezekiel’s question regarding undergrounding required
equipment in vaults, Mr. Bennett said this is an alternative that ExteNet has stated would
require fans, an exhaust vent, and the addressing of flooding issues. In regards to
Commissioner Ezekiel’s concern regarding fire risks in the area, Mr. May said the application
process is what is used to vet alternatives, such as underground vaulting, and that if this is the
Commission’s desire it can be considered.
In response to Chair Millich’s question, Mr. Afflerbach said implementation of only one PWS
site would only cover roughly 1/12 of the desired service area and would not make a material
impact.
Chair Millich adjourned the meeting for a recess at 8:04 p.m. Chair Millich reconvened the
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
4
Planning Commission Minutes Thursday, March 15, 2018
meeting at 8:15 p.m.
Applicant
Joe Camicia, ExteNet Systems Inc., gave a background of ExteNet Systems Inc. and said
representatives are present to answer questions. Mr. Camicia described the proposed project
and showed a photo simulation. He said ExteNet is agreeable to a Condition of Approval to
determine whether an equipment shroud would be feasible. Mr. Camicia explained site
selection and alternative analyses, describing why some locations would not work or were less
desirable, along with the City’s design preferences. He also described ancillary equipment
options and explained why the project is necessary.
Bill Hammett, Licensed Professional Engineer of Hammett & Edison, Inc., described his firm’s
expertise and said staff is correct in saying the issue of compliance with health standards is
preempted by the FFC. He also said if the project were to be built as proposed it would meet
FCC standards. Mr. Hammett said the proposed project would not generate any noise from
fans or cooling fins, but that vaults do create noise due to air entering the vault for cooling.
Mr. Camicia spoke about structural integrity and said all installations are designed by
registered civil engineers and require review by the City’s engineers. He also spoke about the
benefit of PWS facilities for emergencies and public safety matters, such as 911 calls, natural
disasters, personal emergencies, and for use by first responders. Mr. Camicia requested that
the Planning Commission approve the project as proposed.
In response to Commissioner Ezekiel’s questions, Mr. Camicia said ExteNet is still evaluating
vaulting factors and that ExteNet did not take any photos from the residence at 277 Mar Vista
Drive since it is private property. In response to Commissioner Reed’s question about the
number of households the proposed PWS facility would cover, Mr. Camicia said there is not a
specific number and it is more a question of capacity, coverage, and network performance. He
said the facility would offload demand from other facilities nearby and ease up the whole
network.
In response to Commissioner Reed’s question regarding the proposed facilities being oriented
towards Pebble Beach, ExteNet Design Engineer Greg Seth said small cell facilities would not
have the signal strength to reach Pebble Beach and that the small cells are pointed in that
direction as to not interfere with line of sight across the bay.
In response to Commissioner Ezekiel’s question regarding evidence that macrosites are at
capacity, Mr. Camicia said the evidence exists but he is unsure if it has been provided to the
City.
In response to Commissioner Fletcher’s question, Mr. Camicia said the 12 other applications
were withdrawn because ExteNet wanted to continue the projects to a date in the future and
that staff’s recommendations were based on incomplete information. Mr. Camicia said
ExteNet hopes to have the necessary data in the future to resubmit the projects. In response
to Chair Millich’s question, Mr. Camicia said the other two projects that staff recommended for
approval were withdrawn because the Mar Vista site provided a great deal of vegetation for
screening and was the least likely for vaulting, which is not preferred by ExteNet or
recommended by City staff. In response to Commissioner Reed’s question, Mr. Camicia said
ExteNet has made the decision to go forward with the proposed project because there is an
existing problem with network performance in the neighborhood and a good user experience is
needed for all customers.
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
5
Planning Commission Minutes Thursday, March 15, 2018
In response to Commissioner Brassfield’s questions regarding lights on the proposed PWS
facility, Mr. Camicia confirmed there will be no lights. In response to his question regarding the
proposed meter for the project, Mr. Camicia said PG&E determines the type of meter installed.
Wendy Mueller of PG&E said that power to the proposed facility can be turned off by
emergency personnel or technical support staff. In response to Commissioner Brassfield’s
question about vandalism, Mr. Camicia said the equipment would be locked and mounted out
of reach of the general public. In response to further questions by Commissioner Brassfield,
Mr. Camicia said the proposed location for the project is Verizon’s desired location and that the
benefit of the proposed PWS facility would be the offloading of other cellular sites.
In response to Commissioner Latasa’s question, Mr. Camicia said if the project included a
vault it would still include an antenna and only the RRUs and diplexers would be housed inside
the vault. In response to Commissioner Latasa’s question regarding the letter submitted by
Extenet, Mr. Camicia said it contains more thorough documentation of the alternatives that
have been discussed at length with staff already.
In response to Commissioner Ezekiel’s question, Mr. Hammett said the pole generates about
200 watts of output from the equipment to the antenna and the only equipment generating heat
are the RRUs, which each generate about 750 watts. Mr. Camicia said the site can be shut off
remotely or on-site.
Public Comments
Pat Venza, Monterey Vista Neighborhood Association (MVNA) representative said the
Association represents over 1200 residents and the proposed PWS facilities are a highly
contested issue among residents. She said she does not agree with ExteNet or City staff’s
report and expressed concern with inconsistencies in the report and flawed data. Ms. Venza
said a PWS facility would affect everyone in the neighborhood with regards to property values,
health of the forest, and views and that PWS facilities should only be allowed in commercial
and industrial areas. Ms. Venza said there is an unmet legal requirement for a significant gap
in coverage and asked the Planning Commission to deny the application, saying she hopes
ExteNet does not return in the future. She also questioned why only one application remains
when the neighborhood was previously told all 13 were necessary.
Mike Pekin spoke against the proposed PWS facility and said the 700 emails received are
proof that there is no coverage gap. He said he is proud of the Planning Commissioners and
residents. He asked for a better proposal from ExteNet if they return to Monterey in the future.
Susan Nine, Peter’s Gate resident, spoke in opposition to the proposed PWS facility and said
as a Verizon customer she has never had any trouble with coverage inside or outside her
home. Ms. Nine expressed concern regarding the residential location of the proposed project,
staff’s conclusion that the project complies with City Code, the lack of reference to a service
coverage gap in staff’s report or resolution, the CTC test data, and a denied PRA request
made to Ms. Davi for the original CTC report.
Jeff Galfin, El Caminito Del Norte resident, spoke in opposition to the proposed PWS facility
and expressed concern with things previously found safe turning out to be unsafe, such as
lead, asbestos, and Agent Orange. He asked the Commission to do the right thing and deny
the project.
Tony Tolner, Monterey Vista neighborhood resident, spoke in opposition to the proposed PWS
facility and said the Commission’s job is to advocate for the community, which is made of
homes and families. He asked the Commissioners to vote with their conscience and deny the
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
6
Planning Commission Minutes Thursday, March 15, 2018
application.
Gina Jett, Monterey Vista Drive resident, spoke in opposition to the proposed PWS facility and
said there are no coverage gaps in the neighborhood and that the PWS Ordinance is being
violated due to the applicant not submitting a collocation report, not considering commercial
areas, and proposing the project in a residential area.
Kathy Little, Soledad Drive resident, spoke in opposition to the proposed PWS facility and said
the existing utility poles are unattractive and visual aesthetics are important in a natural,
beautiful space like the Monterey Vista neighborhood. Ms. Little presented a life-sized model
of a utility pole to show its unattractiveness.
Sandra Collingwood, Fountain Avenue resident, spoke in opposition to the proposed PWS
facility and expressed concern regarding inconsistencies between what she was told at the
Verizon store about coverage in the Monterey Vista neighborhood and what has been said by
ExteNet at this meeting.
Robert Yoha, Euclid Avenue resident, spoke in opposition to the proposed PWS facility and
said due to health concerns, his doctors have told him to stay away from high voltage and cell
towers. Mr. Yoha said there is no scientific basis that there is a lack of coverage.
Nancy Soule, Old Town neighborhood resident, spoke in opposition to the proposed PWS
facility and spoke about FCC regulations and the unreliability of using them to judge health
effects due to the age of the regulations. Ms. Soule said there would be an increased risk of
wildfires with installation of more facilities and that it would also delay or prevent the
undergrounding of utilities.
Lois Hansen, Monte Vista neighborhood resident, spoke in opposition to the proposed PWS
facility and asked how there would be room for collocation on the proposed utility pole in a
concealed or camouflaged manner. Ms. Hansen said there is no coverage gap and that the
project should be denied as it does not comply with the PWS Ordinance and the General Plan
goals.
A person not identifying himself spoke in opposition to the proposed PWS facility and said
approving it would go against the natural beauty of the area and impact those in the area who
regularly look up at the trees. He also said approval would require maintenance of trees and
branches near the facility.
Nancy Selfridge, Monterey Vista neighborhood resident, spoke in opposition to the proposed
PWS facility and said over 700 pages of input was received from the community regarding the
project. She said undergrounding of utilities should be explored further and the Planning
Commission should stand up for the residents by denying the project.
Vicky Williams, Martin Street resident, said the City’s Wireless Ordinance states that a
compact, top-mounted radome is preferred over arms or appendages so the City has erred in
recommending approval of the project. Ms. Williams also said the project is not compatible
with the neighborhood.
Maureen Bianchini, Monterey Vista neighborhood resident, spoke in opposition to the
proposed PWS facility saying she likes the trees, treasures the neighborhood, and has
concerns with the structure of telephone poles in her front yard. She asked the Planning
Commission to deny the application.
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
7
Planning Commission Minutes Thursday, March 15, 2018
Kristen Dotterrer spoke in opposition to the proposed PWS facility and said there is excellent
service in the Monterey Vista neighborhood. Ms. Dotterrer said the Verizon store confirmed to
her the quality of service and data. She said the project should be denied since there is no
significant gap in coverage, shown by the postcards received by the City from residents, tests
done by Verizon customers and the report.
Ray Meyers, Monterey Vista neighborhood resident, spoke in opposition to the proposed PWS
facility and said the engineer’s calculations were incorrect due to an error in the models used
for calculations. He said omnidirectional and directional antennas are different and the error is
critical, making the report invalid.
Luke Martin, Monterey resident, spoke in opposition to the proposed PWS facility and said
health hazards and health risks are being imposed upon residents. He said he is very
opposed to the method the applicant is using of withdrawing the other 12 applications because
they are not ready.
John Adamo, Monterey Vista neighborhood resident, spoke in opposition to the proposed
PWS facility and said Verizon currently has great coverage, and expressed concern with
precedent setting. He also expressed concern with fire risks and said the City does not take
wild fires seriously.
Catherine Adamo, Monterey resident, spoke in opposition to the proposed PWS facility and
said the Monterey Vista neighborhood has perfect coverage. Ms. Adamo expressed concern
with precedent setting, wild fire risk in relation to telecom equipment, uninformed CPUC
regulators and PG&E staff, dry trees, and the neighborhood being in a high fire risk zone.
Danielle Gregorio, Monterey resident, spoke in opposition to the proposed PWS facility and
read from news articles detailing the link between pole-mounted equipment and wildfires. Ms.
Gregorio expressed concern with fire danger in the Monterey Vista Neighborhood due to
deteriorated utility poles, the weight of existing equipment, additional weight of new equipment,
microwave equipment intensifying fire and making it more difficult to fight, and the protruding
profile of the equipment acting like a sail in the wind. She also said residents should be not
forced to live with this threat.
Chip Dorey, Monterey resident, spoke in opposition to the proposed PWS facility and said he
has good Verizon coverage in the area. He also said small cell facilities emit high frequency
radiation and that PG&E Smart Meters are high voltage, potential ignition sources. Mr. Dorey
said Smart Meters should not be placed on poles near traffic as pole collisions are not
uncommon. He also said if the equipment’s cooling feature malfunctions or is damaged, the
utility pole could catch on fire. Mr. Dorey said PWS facility fires spread rapidly and the
antenna would act as a torch once the fire reaches it.
Charisse Carlile, Monterey resident, spoke in opposition to the proposed PWS facility and said
she has good Verizon coverage in the area. She spoke about additional stress on utility poles
increasing fire danger, massive Pine trees above the proposed antenna, the difficulty of
fighting electrical fires, narrow streets making it difficult for fire trucks to maneuver, and the fact
that the residents of Cuesta Vista Drive have only one way to exit through Mar Vista Drive and
in the event of a fire would have no evacuation route.
Whitney Willis, Monterey resident, spoke in opposition to the proposed PWS facility and
explained the website mystreetmychoice.com. She also spoke of a study regarding cell towers
causing brain impacts and said she has no issues with her Verizon coverage and that a safer
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
8
Planning Commission Minutes Thursday, March 15, 2018
option should be chosen.
Javier Rodriguez spoke in opposition to the proposed PWS facility saying his neighbor has
three children and one of the proposed PWS sites is in front of their house. He expressed
concern with health risks.
Michelle Oldman, Cuesta Vista Drive resident, spoke in opposition to the proposed PWS
facility, said there is no coverage gap, and spoke of her experience with cell towers in southern
California. Ms. Oldman said approval of the proposed project will affect real estate and cause
devaluation of property values.
Steve Wilson, Toda Vista Drive resident, spoke in opposition to the proposed PWS facility and
said he does not agree with the finding that the facility will not be detrimental to public health,
safety and welfare as it is proposed to be installed below the house of a person with
electromagnetic frequency (EMF) sensitivity. Mr. Wilson said he is concerned about wildfires
and that PWS facilities should not be allowed in residential districts.
Esther McKay, Toda Vista Drive resident, spoke in opposition to the proposed PWS facility and
said the proposal is not in compliance with the Wireless Ordinance and General Plan. Ms.
McKay said approval of the project would have damaging effects to property owners and
would have to be disclosed under State law.
Hal McKay, Toda Vista Drive resident, spoke in opposition to the proposed PWS facility and
said his bedroom is 42 feet away from the proposed project. Mr. McKay said he is a retired
firefighter and is 90 percent disabled and does not know how the PWS facility would affect him
and his quality of life.
Elizabeth Murray, Peters Gate resident, spoke in opposition to the proposed PWS facility and
said as an artist her life revolves around aesthetics and beauty, so she does not want the
project to be approved. She said she does not want to have to worry about fire risks, health
risks, and a decline in home values.
Jenny Padowan, Mar Vista Drive resident, spoke in opposition to the proposed PWS facility
and said it would be aimed into her window. She also said in the event of a fire, both her
home and her neighbor’s home would burn. She suggested fiber optics instead of PWS
facilities.
Bruce Zanetta, Monterey Vista neighborhood resident, spoke in opposition to the proposed
PWS facility and said additional capacity is not necessary because wired or wireless internet is
available inside people’s homes. He also said the site was chosen for the screening of the
trees, but Pine trees are flammable.
Hebard Olsen spoke in opposition to the proposed PWS facility and suggested placing larger
towers on the top of the hill instead of in the neighborhood. He said he has cancer and would
be affected by PWS facilities. Mr. Olsen said the City is being run by a corporation and asked
if utility poles with PWS facilities would be able to withstand 85 mph winds.
James Smith, Bartolomea Way resident, spoke in opposition to the proposed PWS facility and
said approval of one PWS facility will open the door for others. He said he is offended by
staff’s findings that there would be no impacts to health, safety or welfare and said all the data
is from the Federal Government and based on lobbyists.
Jean Rasch, Monterey Vista neighborhood resident, spoke in opposition to the proposed PWS
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
9
Planning Commission Minutes Thursday, March 15, 2018
facility and said the proposed project is not in conformance with the height requirement as the
project would total 27 feet in height. She said wireless poles with PWS facilities added to the
top should not be given the exception that poles are given.
Barbara Jacobowsky spoke in opposition to the proposed PWS facility and expressed concern
with health issues, the environment, safety of birds and animals, and with her property being
targeted since her daughter is a strong opponent of cell towers. Ms. Jacobowsky also said
she has excellent coverage and has never had a problem.
Nina Beety, Mar Vista Drive resident, spoke in opposition to the proposed PWS facility and
expressed concern with non-compliance with standards, false photo simulations of the project,
removal of vegetation required to install the PWS facility, incorrectness of staff’s report, a lack
of screening for the proposed facility, staff’s CEQA determination, precedent setting, non-
compliance with the City’s zoning code, the proposed PWS facility being within a 12 foot radius
of her property, and eminent domain. Ms. Beety said due to her EMS disability, approval of
the project would take her whole home away from her and she sees it as retaliation.
Steven Lucas spoke in opposition to the proposed PWS facility and said the FCC standard
about exposure refers to where the radiation is occurring, not the radiation source, and that
this radiation has an effect on metal on and inside the body. Mr. Lucas said the science is
clear and the Planning Commission does not have the authority to approve something that is
not in compliance.
Bill Clancy, Monterey Vista neighborhood resident, spoke in opposition to the proposed PWS
facility said it would be ineffective in an emergency because emergency calls require electricity
and it does not have a power source.
Chair Millich gave the applicants an opportunity for rebuttal.
Mr. Hammett said it is Congress who restricts the City to apply nothing stricter than the FCC’s
requirements and that the FCC updates their standards with the continual research that
occurs. Mr. Hammett spoke about wireless facilities in other countries and also IEEE
standards. He also confirmed that the findings of his study were based on the correct type of
antenna.
Mr. Camicia said regarding concerns expressed over structural integrity, that the pole chosen
will be fully evaluated by licensed structural engineers and City staff. He also said the
proposal meets all City guidelines and asked the Planning Commission to approve the project.
Commissioner Comments
Commissioner Reed thanked the neighborhood for their participation and thanked ExteNet for
their courtesy to the neighborhood. He said because the applicant now proposes one PWS
site instead of 13, the analysis in staffs report is probably incorrect. He also said based on one
site, as opposed to 13 sites, the commercial district is now the best location for the one
proposed PWS facility, since it is no longer part of a system of several facilities.
Commissioner Reed said the analysis for the one site needs to take in consideration other
locations. He also said the proposed tower will ease service for other towers, so the proposed
tower no longer needs to be in this location and can be on a commercial site. Commissioner
Reed said if the finding is made that there are other sites that can be used for this one
particular location, this means that the Commission needs to make a determination on gap
coverage. Mr. May confirmed that the Planning Commission’s finding has to contradict one of
the first three requirements for the general use permits or the three for the PWS permits.
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
10
Planning Commission Minutes Thursday, March 15, 2018
Chair Millich said there may not be sufficient evidence to make an informed decision and
asked Mr. May if there is a way to deny the permit because of this. Mr. May said the Planning
Commission could evaluate the evidence in the record and make a determination with findings
to deny the application.
In response to Commissioner Latasa’s question, Mr. May confirmed that one finding by the
Planning Commission is adequate to sustain the finding of substantial evidence.
Commissioner Ezekiel said the citizens of Monterey have made an admirable effort and he
said he applauds the work ExteNet has done with City Staff. Commissioner Ezekiel said there
are major issues with the application, including a flawed description of aesthetics, visibility of
the proposed PWS facility from the residence at 277 Mar Vista Drive, a lack of evidence of a
coverage gap versus a capacity gap, and a lack of data and facts. He also said all proposed
applications should utilize underground vaults, which can contain fire, and should have an
auto-off switch. Commissioner Ezekiel said he supports denial of the project.
Commissioner Brassfield said he would have liked a representative of Verizon to be present to
answer the Commissioners’ and public’s questions. He also said residents have spoke of their
concerns about health, safety, and welfare, but the Planning Commission is not allowed to
consider this. Commissioner Brassfield said Monterey prides itself on being an environmental
city and California’s first capital, and he objects to putting the proposed apparatus on the pole.
Commissioner Brassfield said he agrees with Commissioner Reed on the reasons why the
Planning Commission can deny the project, referencing City Code.
Commissioner Latasa said findings can be made for denial, with the most obvious finding
being the aesthetic impacts and annoyance to the public, especially for residents of 277 Mar
Vista Drive. Commissioner Latasa said findings could also be based on the proposal not being
the least intrusive option and the lack of a coverage gap.
Commissioner Fletcher said he has not been convinced of a significant coverage gap. He also
said Planning Commissioners are tasked with overseeing thoughtful and orderly development
in the City, and that piecing the applications together one at a time is unsettling to him.
Commissioner Fletcher said he cannot support the application.
Vice Chair Dawson said there is a perceived capacity gap because Verizon to wants move
forward with virtual fiber and 5G. He also said if one PWS facility is allowed to be installed
there would be others to come from various cellular companies. Vice Chair Dawson said
multiple towers all over the City is unacceptable and the approval of a PWS facility on one pole
will lead to facilities on other poles.
Chair Millich called for a recess at 11:05 p.m. Chair Millich reconvened the meeting at 11:43
p.m.
Mr. May said that he and staff have modified the draft resolution to make it conform to the
Commissioners’ discussion. The Commission reviewed the proposed changes to the draft
resolution and confirmed its accuracy. Commissioner Reed made a motion to adopt a
resolution denying Use Permit UP-17-0335 for a new PWS facility to be attached to an existing
utility pole located in the City of Monterey’s public right-of-way with amendments to the
findings as follows and deletion of all Conditions of Approval:
FINDINGS:
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
11
Planning Commission Minutes Thursday, March 15, 2018
1. The proposed use is in accord with the objectives of Monterey City Code Chapter 38 and
the purposes of the zone.
Chapter 38 generally provides that the zoning ordinance is intended to protect and
promote the public health, safety and general welfare, and to implement the policies in
the General Plan. An evaluation under Zoning Ordinance Section 38-112.4 is an
appropriate means to evaluate compliance with Chapter 38 and the General Plan
because Section 38-112.4 regulates PWS facilities in a manner consistent with the
objectives and purposes in both Chapter 38 and the General Plan. As more fully
discussed below, subject to conditions, the proposed PWS facility complies does not
comply with all the applicable provisions in Zoning Ordinance Section 38-112.4, and
therefore the proposed PWS facility is not in accord with the objectives and purposes
in Chapter 38 and the General Plan.
2. The proposed use and the proposed conditions under which it would be operated or
maintained will be consistent with the General Plan; will not be detrimental to the public
health, safety, or welfare of persons residing or working in or adjacent to the neighborhood
of such use; and will not be detrimental to properties or improvements in the vicinity or to
the general welfare of the city.
This finding is divided into three separate findings: whether the proposed use (1) is
consistent with the General Plan; (2) will be detrimental to public health, safety or
welfare; and (3) will be detrimental to properties or improvements in the vicinity or to
the general welfare.
First, subject to conditions, the proposed PWS facility is not consistent with the
General Plan because it complies does not comply with all applicable design and
development standards. The Land Use Element classifies the proposed site location as
residential and the Monterey City Code provides that PWS Facilities are a major utility
subject to a use permit in all residential zones. An evaluation under Zoning Ordinance
Section 38-112.4 is an appropriate means to evaluate compliance with the General
Plan because Section 38-112.4 regulates PWS facilities in a manner consistent with
the objectives and purposes in the General Plan. As more fully discussed below, the
proposed PWS facility complies does not comply with the applicable provisions in
Zoning Ordinance Section 38-112.4 (subject to conditions), and therefore the proposed
PWS facility is not in accord with the objectives and purposes in the General Plan.
Second, the PWS facility is not detrimental to the public health, safety or welfare
because it would be installed, maintained and operated in compliance with all
applicable public health and safety regulations, which includes without limitation all
building codes, electrical codes, pole attachment regulations and regulations for
exposure to RF emissions. The design involves installations on an existing pole, which
would reduce new obstructions in the public rights-of-way that could impede access or
create hazards for pedestrians, persons protected under the federal Americans with
Disabilities Act, bicyclists or motorists. The application included a report prepared by
Hammett & Edison, Inc., Consulting Engineers, that determined the proposed facility
will comply with the prevailing FCC standards for limiting public exposure to radio
frequency energy. Signage would be installed to notify utility workers and others who
might attempt to climb the pole about potential exposure to RF emissions, and would
include a toll-free number connected to an operator who can power-down the
transmitters. A disconnect switch would also be installed on the pole. (1) not be
equipped with automatic fire detection or shutdown systems, (2) be installed on
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
12
Planning Commission Minutes Thursday, March 15, 2018
a pole that is potentially structurally unsound, and (3) surrounded by dry trees
that pose a fire danger.
Third, the proposed PWS facility will not be detrimental to properties or improvements
in the vicinity or general welfare of the city because the record does not contain site
and context-specific evidence to suggest that the proposed PWS facility would
negatively impact the value of specific adjacent properties or improvements. Rather,
the record contains evidence that opponents to the project believe that PWS facilities
per se have a negative impact residential property values. Generalized grievances do
not amount to substantial evidence. Moreover, the proposed PWS facility will not be
detrimental to properties or improvements because the use is consistent with the
underlying utility support structure given that a general function of utility poles in the
public rights-of-way is to support communications network infrastructure.
3. The proposed use will comply with any specific condition required for that use.
The proposed PWS facility complies does not comply with any specific condition
required for the use because, subject to conditions, the facility is not compliant with the
applicable provisions in the Zoning Ordinance.
4. The facility is not detrimental to the public health, safety and welfare.
The proposed PWS facility will not be detrimental to the public health, safety or welfare
because it would be installed, maintained and operated in compliance with all
applicable public health and safety regulations, which includes without limitation all
building codes, electrical codes, pole attachment regulations and regulations for
exposure to RF emissions. The design involves installations on an existing pole, which
would reduce new obstructions in the public rights-of-way that could impede access or
create hazards for pedestrians, persons protected under the federal Americans with
Disabilities Act, bicyclists or motorists. The application included a report prepared by
Hammett & Edison, Inc., Consulting Engineers, that determined the proposed PWS
facility will comply with the prevailing FCC standards for limiting public exposure to
radio frequency energy. Signage would be installed to notify utility workers and others
who might attempt to climb the pole about potential exposure to RF emissions, and
would include a toll-free number connected to an operator who can power-down the
transmitters. A disconnect switch would also be installed on the pole. PWS facility is
detrimental to the public health, safety or welfare because it will (1) not be equipped
with automatic fire detection or shutdown systems, (2) be installed on a pole that
is potentially structurally unsound, and (3) be surrounded by dry trees that pose
a fire danger.
5. The facility complies with all applicable design and development standards in the City
Code.
The proposed PWS facility, subject to conditions, complies does not comply with all
applicable design and development standards because:
a. The proposed PWS facility design is not the most-preferred under the circumstances
because there are more-preferred building-mounted designs. Undergrounded
equipment configurations and locations in commercial areas would appear to be
technically infeasible. Given that (1) the applicant’s intended service area is in the
residential neighborhood southwest of Monte Vista Elementary School, (2) feasible
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
13
Planning Commission Minutes Thursday, March 15, 2018
collocation opportunities do not exist and (3) building-mounted designs would not be
desired or appropriate on adjacent residences, the proposed facility in the public right-
of-way facility is most-preferred. Accordingly, the proposed facility qualifies as a
preferred design in compliance with Section 38-112.4.F.1.
b. Although the The proposed PWS facility would be located in a discouraged location,
there do not appear to be other technically feasible and potentially available locations
in the public rights-of-way that would be more preferred. The proposed utility pole
location is heavily screened by ground vegetation and existing mature trees that line
the public right-of-way along Mar Vista. Although the location is in an area zoned R-1
(single family residential), there are no industrial or commercial zoned parcels within
the vicinity of the intended service area. The proposed facility would be located more
than 65 feet from the nearest residence and there do not appear to be other nearby
poles that would be either further from residences or that would provide greater
screening opportunities with existing vegetation than the proposed location. Although
alternative pole locations in the vicinity may be able to support an underground vault to
conceal the radio equipment, the proposed location is more preferred because it is
further from nearby residences than those alternatives and the existing vegetation
around the pole would more effectively screen the pole-mounted radio equipment. In
addition, as shown in a photo simulation provided by the applicant, an underground
vault at the proposed location would displace the existing ground vegetation and
undermine the natural screening elements. Ultimately, the proposed location is more
consistent with the Zoning Ordinance’s structure and purpose to avoid the visual
impacts of additional above-ground infrastructure in close proximity to residential
dwellings. Accordingly, the PWS facility complies with Zoning Ordinance Sections 38-
112.4.F.2 and .3 because there do not appear to be more preferred alternatives.
c. Subject to conditions, the PWS facility incorporates concealment measures sufficient to
render it camouflaged, which blend with the underlying support structure, surrounding
environment and adjacent uses. The antenna would not be obscured from view with a
shroud that also conceals the mounting hardware. Although ExteNet does not propose
to install the radio equipment in an underground vault, the existing vegetation would
effectively screen the equipment from public view. In addition, a condition of approval
requires the radios, fiber splice box and diplexers to be concealed within a pole-
mounted equipment cage painted to match the color of the pole. This would create a
more streamlined appearance that blends with the pole and reduces the number of
visible components. The other pole-mounted equipment (the electric meter and
disconnect switch) cannot feasibly be placed underground based on CPUC General
Order 95 Rule 94, PG&E Electric and Gas Service Requirements Section 5.3.2.B and
PG&E Document 027911 Rev. #10. The shrouds and other pole-mounted equipment
would be painted to match the support structure’s natural wood color. These
techniques would: obscure the transmission equipment from public view; reduce the
visual impact from the equipment that cannot be placed underground; blend the pole-
mounted equipment into the underlying guy pole; and substantially mimic (to the extent
feasible) the existing above-ground utility equipment on poles along Mar Vista, Cuesta
Vista and other public rights-of-way in the City. Accordingly, subject to conditions, the
PWS facility complies with Zoning Ordinance Sections 38-112.4.F.4.a and .6.b. from
nearby residences and the intersection of Mar Vista and Soledad Place.
d. Pursuant to Zoning Ordinance Section 38-5.B, the public right-of-way is subject to the
zoning regulations applicable to the nearest abutting private property parcel. However,
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
14
Planning Commission Minutes Thursday, March 15, 2018
Zoning Ordinance Section 38-106.a. provides an exception to the zone height limit for
distribution towers, transmission towers, lines and poles. Accordingly, the proposed
PWS facility complies with Zoning Code Section 38-112.4.F.4.b because the zone
height limit does not apply to pole structures.
e. Pursuant to Zoning Ordinance Section 38-5.B, the public right-of-way is subject to the
zoning regulations applicable to the nearest abutting private property parcel. There is
no setback requirement for major utility infrastructure within R-1 districts. Accordingly,
the proposed PWS facility would be compliant with Zoning Ordinance Section 38-
112.4.F.4.c.
f. The proposed PWS facility design does not necessarily preclude collocation by future
facilities, as additional antennas could be mounted above the proposed antenna and
underground vaults could be placed in the vicinity. Accordingly, the PWS facility
complies with Zoning Ordinance Section 38-112.4.F.4.d because it could potentially
accommodate future collocated facilities.
g. The proposed PWS facility will be compliant with all applicable ambient noise limits for
the R-1 zone because the noise-emitting equipment would be pole-mounted and,
subject to a condition, placed in a passively-cooled equipment cage to obviate the need
for noise-producing cooling mechanisms like fans. The proposed pole-mounted design
would provide enough airflow to keep the noise-emitting equipment ventilated.
Moreover, a condition requires continued compliance with applicable ambient noise
limits in this zone. Accordingly, the PWS facility will be compliant with Zoning
Ordinance Section 38-112.4.F.4.e.
h. The proposed PWS facility avoids illumination impacts to adjacent properties to the
maximum extent feasible because ExteNet does not propose to install any lights.
Accordingly, the PWS facility complies with Zoning Ordinance Section 38-112.4.F.4.f.
i. The only signage proposed is a notice for utility workers and others who might attempt
the scale the utility pole that an antenna is placed within the shroud. The proposed
PWS facility does not include any commercial signage or advertisements. Accordingly,
the PWS facility complies with Zoning Ordinance Section 38-112.4.F.4.g.
j. Subject to conditions, the The PWS facility does not unreasonably subjects the public
use to inconvenience, discomfort, trouble and/or annoyance because there do not
appears to be more-preferred alternatives with undergrounded equipment and/or
locations in a commercial area, such as the Monte Vista Market approximately 0.6
miles from the proposed location. and the equipment would be camouflaged to the
extent feasible. The visual impact of the pole-mounted equipment would be mitigated
by an equipment cage and the existing vegetation around the pole provides sufficient
screening to obviate the need for a new underground vault. Staff finds that an
underground vault at this location would require ExteNet to remove a significant
amount of the vegetation and reduce the natural concealment already provided at the
proposed location. In addition, alternative poles in the vicinity would be closer to
residences with less natural screening, which would be less preferred to the proposed
location. Under these limited circumstances, the pole-mounted (rather than
undergrounded) design at the proposed location would not unreasonably subject the
public use to inconvenience, discomfort, trouble and/or annoyance. Accordingly, the
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
15
Planning Commission Minutes Thursday, March 15, 2018
PWS facility complies with Zoning Ordinance Section 38-112.4.F.6.a.
k. Although the non-antenna equipment would be pole-mounted rather than
undergrounded, undergrounding in this specific instance would be undesirable from an
aesthetic perspective because existing vegetation that already provides natural
screening would be removed in order to make space for an underground vault. ExteNet
submitted photo simulations that illustrate a potential underground vault design. One or
more of the native oak trees adjacent to the pole would likely need to be removed to
accommodate an underground vault at this location. Unlike with undergrounded
equipment, the pole-mounted design would preserve and utilize the natural screening,
which staff is more desirable under the circumstances. Along with the conditionally
required pole-mounted equipment cage, ExteNet would place the electric meter above
ground based on PG&E Electric and Gas Service Requirements Section 5.3.2.B and
PG&E Document 027911 Rev. #10. The disconnect switch needs to be in an
accessible location for compliance with CPUC General Order 95 Rule 94 de-energizing
protocols for PWS facilities installed on above-ground utility infrastructure. Accordingly,
the PWS facility equipment would be undergrounded to the extent feasible in
compliance with Zoning Ordinance Section 38-112.4.F.6.c because, in this case,
undergrounding is not aesthetically desirable.
l. The proposed PWS facility does not involve any ground-mounted equipment.
Accordingly, the PWS facility complies with Zoning Ordinance Section 38-112.4.F.6.d.
m. All pole-mounted equipment will be installed as close to the pole as technically and
legally feasible. As discussed more fully below, the side arm bracket antenna mount is
preferred to a pole-top design. The proposed antenna would be located on the utility
pole on a side arm bracket that is required to be at least two feet from the pole
centerline under CPUC General Order 95 Rule 94. The radios, diplexers and fiber
splice box would be installed in a conditionally required equipment cage mounted as
flush-to-the-pole as possible. ExteNet would install the pole-mounted disconnect switch
and conditionally required pole-mounted electric meter in accordance with PG&E
Document 027911, Rev. #10 and CPUC General Order 95 Rule 94. The pole-mounted
equipment and radome would be painted to match the replacement pole’s color and
texture. All signage would be placed to minimize visibility from adjacent sidewalks and
structures because it would be located above eye-level approximately two feet below
the antenna shroud and conditionally required to be oriented away from the nearby
residence. Cabling conduit would be flush-mounted to the pole. Accordingly, subject to
conditions, the proposed PWS facility complies with Zoning Ordinance Section 38-
112.4.F.6.e.
n. Although ExteNet proposes to mount the antenna below the pole top, this is preferable
to a top-mounted design under this circumstance. Given that power lines exist at the
top of the 43-foot-tall pole, and that CPUC General Order 95 requires that antennas
have at least six feet of vertical clearance from power conductors, a pole top design
would be undesirable because the taller overall height (approximately 52 feet above
ground—6 feet of required clearance plus the three-foot antenna/shroud), would be
visually inconsistent with the surrounding (shorter) utility poles and structures in the
neighborhood. Accordingly, the proposed PWS facility complies with Zoning Ordinance
Section 38-112.4.F.6.e.i because the side arm design is more consistent with the built
environment, neighborhood character and overall site appearance.
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
16
Planning Commission Minutes Thursday, March 15, 2018
o. Subject to conditions, the The proposed PWS facility is not consistent with the City’s
pole-mounted undergrounded equipment requirements. because the equipment
would be concealed in a cage to the extent feasible. A condition of approval requires
the radios, fiber splice box and diplexers to be concealed within a pole-mounted
equipment cage finished to match the natural wood color of the pole. In addition, the
cage is conditionally required to extend no more than 10 inches beyond the pole
centerline with metal flaps to conceal any PG&E required horizontal separation from
the pole. Accordingly, the proposed PWS facility, subject to conditions, complies with
Zoning Ordinance Section 38-112.4.F.6.e.ii.
p. The proposed PWS facility is finished in non-reflective colors and materials. The
antenna shroud, conduit, electric meter and disconnect switch would all be finished
with non-reflective materials subject to staff approval. Accordingly, the proposed PWS
facility is in compliance with Zoning Ordinance Section 38-112.4.F.6.f.
6. The facility is designed, constructed and operated in such a manner to minimize the
amount of noise impacts to adjacent uses and activities and shall be in conformance with
the General Plan and Zoning Ordinance noise exposure standards.
The facility is designed, constructed and operated in such a manner to minimize the
amount of noise impacts to adjacent uses and activities and shall be in conformance with
the General Plan and Zoning Ordinance noise exposure standards. The PWS facility will
be compliant with all applicable ambient noise limits for the R-1 zone because the
equipment would not emit audible noise and would be installed within a passively-cooled
equipment cage to obviate the need for noise-producing cooling mechanisms like fans. The
PWS facility would be unattended, with only periodic maintenance visits that would not
increase traffic or reduce parking in the vicinity.
7. The facility is designed to be resistant to and minimize opportunities for unauthorized
access, climbing, vandalism, graffiti, and other conditions that would result in hazardous
conditions, visual blight or attractive nuisances.
Subject to conditions, the The proposed PWS facility is not designed to be resistant to and
minimize opportunities for unauthorized access, climbing, vandalism, graffiti, and other
conditions that would result in hazardous conditions, visual blight or attractive nuisances.
The equipment would be placed in generally inaccessible locations on the pole at least
seven feet above ground. Opportunities for access and hazardous conditions have been
minimized as there there are at least two methods to power down the facility (the
disconnect switch and network operations center phone number on the notice sign). The
concealment measures such as the shrouding, non-reflective finishes and conditionally
required equipment cage are affirmative steps to mitigate visual blight. Lastly, subject to
conditions, ExteNet will be required to promptly remove any graffiti. automatically shut
down in the event of a fire. The equipment vault must be environmentally controlled and
watertight. The equipment vault would also be able to temporarily contain any fire.
8. The facility does not unreasonably impair or diminish views of and vistas from adjacent
properties and designated scenic corridors.
The proposed PWS facility does not unreasonably impairs and/or diminishes views of
and/or from designated scenic corridors because it is not located in or near a designated
scenic corridor. In addition, the proposed PWS facility does not unreasonably impair or
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
17
Planning Commission Minutes Thursday, March 15, 2018
diminish views of and/or from adjacent properties because there do not appear to be any
more preferred locations in the vicinity that are further from residences or provide more
natural vegetation for screening. The facility would be limited in size, installed on an
existing above ground utility pole that is not located in a scenic corridor and the equipment
would be substantially obscured from public view by shrouds and a conditionally required
equipment cage. Moreover, views from adjacent residences toward the proposed facility
are blocked by existing mature trees that line the public right-of-way along Mar Vista.
9. The facility is necessary or desirable for, and compatible with, the neighborhood or
community. The City may consider a number of factors, which may include, but shall not be
limited to, the proportionality and scale of the facility relative to the surrounding natural
and/or manmade environment, the proximity of the facility to residential structures, the
compatibility of the facility with uses on adjacent and nearby properties, the surrounding
topography, the surrounding tree coverage and foliage, and the compatibility with the
values and objectives expressed in the General Plan and any applicable specific plan.
The proposed PWS facility is not necessary, desirable for, and compatible with, the
neighborhood or community because it will improve mobile wireless services in the vicinity
and visually blend with the underlying utility pole. Communication equipment, when
properly placed and screened, is not per se incompatible with residential neighborhoods.
The proposed installation will be integrated with the utility pole and, as conditioned, the
radio equipment would be placed in pole-mounted equipment cage concealed from public
view by the existing ground vegetation. The pole-mounted disconnect switch and electric
meter would not cause any meaningful visual change to the pole because they are small
pieces of equipment commonly installed on utility poles in the vicinity. As discussed above,
the side arm mounted antenna is a more preferred design than a pole top antenna to avoid
increasing the overall height of the pole by more than six feet. The antenna would be
concealed within a radome that bears visual resemblance other types of equipment
germane to above ground utility poles (such as an electric transformer). In addition, after
staff and applicant investigation, the record reflects that no more preferred alternative
location exists that would allow wireless services to be provided to the intended service
area. Accordingly, the PWS facility complies with Zoning Ordinance Section 38-112.4.H.2.f.
the record does not demonstrate a coverage gap and the proposed location and design
does not comply with the Zoning Ordinance.
10. A limited exception is not warranted because the record reflects that there is no gap
in Verizon Wireless’ service coverage and there are less intrusive alternatives, such
as undergrounded equipment and locating in a commercial zone approximately 0.6
miles from the proposed site (Monte Vista Market).
Commissioner Fletcher seconded the motion.
On a motion by Commissioner Reed, seconded by Commissioner Fletcher, and carried by the
following vote, the Planning Commission adopted a resolution denying Use Permit UP-17-
0335 for a new PWS facility to be attached to an existing utility pole located in the City of
Monterey’s public right-of-way with amendments to the findings and deletion of all Conditions
of Approval:
AYES: 7 COMMISSIONERS: Millich, Dawson, Brassfield, Ezekiel, Fletcher,
Latasa, Reed
NOES: 0 COMMISSIONERS: None
ABSENT: 0 COMMISSIONERS: None
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
18
Planning Commission Minutes Thursday, March 15, 2018
ABSTAIN: 0 COMMISSIONERS: None
RECUSED: 0 COMMISSIONERS: None
5. Approve Use Permit UP-17-0338 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 3 Toda Vista Drive; Applicant Lawrence Beer for ExteNet Systems, Inc.;
Owner City of Monterey; Zoning Designation R-1-10; Exempt from CEQA Requirements
(Article 19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
6. Deny Use Permit UP-17-0337 for a New Personal Wireless Service (PWS) Facility
Attached to a Replacement Streetlight Pole Located in the Public Right-of-Way
Immediately Adjacent to the Corner of Skyline Drive and Huckleberry Drive; Applicant
Lawrence Beer for ExteNet Systems, Inc.; Owner City of Monterey; Zoning Designation
"O" (Open Space); Exempt from CEQA Requirements (Article 19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
7. Deny Use Permit UP-17-0342 for a New Personal Wireless Service (PWS) Facility
Attached to a Replacement Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 302 Via Paraiso; Applicant Lawrence Beer for ExteNet Systems, Inc.; Owner
City of Monterey; Zoning Designation R-1-10; Exempt from CEQA Requirements (Article
19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
8. Deny Use Permit UP-17-0340 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 598 Madison Street; Applicant Lawrence Beer for ExteNet Systems, Inc.;
Owner City of Monterey; Zoning Designation R-3-6; Exempt from CEQA Requirements
(Article 19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
9. Deny Use Permit UP-17-0344 for a New Personal Wireless Service (PWS) Facility
Attached to a Replacement Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 136 Herrmann Drive; Applicant Lawrence Beer for ExteNet Systems, Inc.;
Owner City of Monterey; Zoning Designation R-1-10; Exempt from CEQA Requirements
(Article 19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
10. Deny Use Permit UP-17-0341 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 1 Dorey Way; Applicant Lawrence Beer for ExteNet Systems, Inc.; Owner
City of Monterey; Zoning Designation R-1-20; Exempt from CEQA Requirements (Article
19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
19
Planning Commission Minutes Thursday, March 15, 2018
11. Deny Use Permit UP-17-0333 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 531 Toyon Drive; Applicant Lawrence Beer for ExteNet Systems, Inc.; Owner
City of Monterey; Zoning Designation R-1-8; Exempt from CEQA Requirements (Article
19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
12. Approve Use Permit UP-17-0336 for a New Personal Wireless Service (PWS) Facility
Attached to a Replacement Streetlight Located in the Public Right-of-Way Adjacent to 1
Yerba Buena Court; Applicant Lawrence Beer for ExteNet Systems, Inc.; Owner City of
Monterey; Zoning Designation R-1-15; Exempt from CEQA Requirements (Article 19,
Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
13. Deny Use Permit UP-17-0343 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 901 Monterey Circle; Applicant Lawrence Beer for ExteNet Systems, Inc.;
Owner City of Monterey; Zoning Designation R-1-8; Exempt from CEQA Requirements
(Article 19, Section 15303, Class 3)
ACTION: Application withdrawn by applicant.
COMMISSIONERS COMMENTS
None.
ADJOURNMENT
There being no further business, the meeting adjourned at 12:04 a.m.
Respectfully Submitted, Approved,
Elizabeth Caraker, AICP Chair
Housing and Community Development Manager Planning Commission
Planning Commission Special Meeting Minutes
Thursday, March 15, 2018
20
Agenda
Planning Commission Commissioners
Agenda Stephen Millich, Chair
Mike Dawson, Vice Chair
Special Meeting Mike Brassfield
Samuel Ezekiel
Thursday, March 15, 2018 Daniel Fletcher
Terry Latasa
Few Memorial Hall of Records Hansen Reed
Council Chambers
580 Pacific Street 6:00 p.m.
Monterey, California
FIELD TRIP
The Planning Commission will conduct a field trip on Monday, March 12, 2018 to review the
Thursday, March 15, 2018 Planning Commission Special Meeting agenda. The field trip will
depart from the field behind Colton Hall at 4:00 p.m. For more information, please call 831-
646-3885. Date Posted: March 2, 2018
CALL TO ORDER
PUBLIC COMMENTS
PUBLIC COMMENTS. At this time, the public may speak for a maximum of three minutes on any
subject which is within the jurisdiction of the Monterey Planning Commission and which is not on
the agenda. Any person or group desiring to bring an item to the attention of the Commission may
do so during Public Comments or by addressing a letter of explanation to the Commission, City
Hall, Monterey, CA 93940. Public Comments are taken during the afternoon session and
continued at the evening session. Individuals may choose to speak once for up to three minutes at
either session, but not both.
PUBLIC HEARING
PUBLIC HEARINGS are required by law for certain actions. You are welcome to offer your
comments after being recognized by the Chair. The Chair may limit the time allocated to each
speaker. Project representation is encouraged.
1. Deny Use Permit UP-17-0339 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 1006 Madison Street; Applicant Lawrence Beer for ExteNet Systems,
Inc.; Owner City of Monterey; Zoning Designation R-1-6; Exempt from CEQA
Requirements (Article 19, Section 15303, Class 3)
2. Deny Use Permit UP-17-0332 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 81 Via Encina; Applicant Lawrence Beer for ExteNet Systems, Inc.;
Owner City of Monterey; Zoning Designation R-1-8; Exempt from CEQA
Requirements (Article 19, Section 15303, Class 3)
3. Deny Use Permit UP-17-0334 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 231 Via Del Rey; Applicant Lawrence Beer for ExteNet Systems, Inc.;
Owner City of Monterey; Zoning Designation R-1-8; Exempt from CEQA
Requirements (Article 19, Section 15303, Class 3)
4. Approve Use Permit UP-17-0335 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 277 Mar Vista Drive and 7 Cuesta Vista Drive; Applicant Lawrence Beer
for ExteNet Systems, Inc.; Owner City of Monterey; Zoning Designation R-1-20;
Exempt from CEQA Requirements (Article 19, Section 15303, Class 3)
5. Approve Use Permit UP-17-0338 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 3 Toda Vista Drive; Applicant Lawrence Beer for ExteNet Systems, Inc.;
Owner City of Monterey; Zoning Designation R-1-10; Exempt from CEQA
Requirements (Article 19, Section 15303, Class 3)
6. Deny Use Permit UP-17-0337 for a New Personal Wireless Service (PWS) Facility
Attached to a Replacement Streetlight Pole Located in the Public Right-of-Way
Immediately Adjacent to the Corner of Skyline Drive and Huckleberry Drive;
Applicant Lawrence Beer for ExteNet Systems, Inc.; Owner City of Monterey;
Zoning Designation "O" (Open Space); Exempt from CEQA Requirements (Article
19, Section 15303, Class 3)
7. Deny Use Permit UP-17-0342 for a New Personal Wireless Service (PWS) Facility
Attached to a Replacement Utility Pole Located in the Public Right-of-Way
Immediately Adjacent to 302 Via Paraiso; Applicant Lawrence Beer for ExteNet
Systems, Inc.; Owner City of Monterey; Zoning Designation R-1-10; Exempt from
CEQA Requirements (Article 19, Section 15303, Class 3)
8. Deny Use Permit UP-17-0340 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 598 Madison Street; Applicant Lawrence Beer for ExteNet Systems,
Inc.; Owner City of Monterey; Zoning Designation R-3-6; Exempt from CEQA
Requirements (Article 19, Section 15303, Class 3)
9. Deny Use Permit UP-17-0344 for a New Personal Wireless Service (PWS) Facility
Attached to a Replacement Utility Pole Located in the Public Right-of-Way
Immediately Adjacent to 136 Herrmann Drive; Applicant Lawrence Beer for ExteNet
Systems, Inc.; Owner City of Monterey; Zoning Designation R-1-10; Exempt from
CEQA Requirements (Article 19, Section 15303, Class 3)
10. Deny Use Permit UP-17-0341 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 1 Dorey Way; Applicant Lawrence Beer for ExteNet Systems, Inc.;
Owner City of Monterey; Zoning Designation R-1-20; Exempt from CEQA
Requirements (Article 19, Section 15303, Class 3)
11. Deny Use Permit UP-17-0333 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 531 Toyon Drive; Applicant Lawrence Beer for ExteNet Systems, Inc.;
Owner City of Monterey; Zoning Designation R-1-8; Exempt from CEQA
Requirements (Article 19, Section 15303, Class 3)
12. Approve Use Permit UP-17-0336 for a New Personal Wireless Service (PWS) Facility
Attached to a Replacement Streetlight Located in the Public Right-of-Way Adjacent
to 1 Yerba Buena Court; Applicant Lawrence Beer for ExteNet Systems, Inc.; Owner
City of Monterey; Zoning Designation R-1-15; Exempt from CEQA Requirements
(Article 19, Section 15303, Class 3)
Planning Commission
Thursday, March 15, 2018
2
13. Deny Use Permit UP-17-0343 for a New Personal Wireless Service (PWS) Facility
Attached to an Existing Utility Pole Located in the Public Right-of-Way Immediately
Adjacent to 901 Monterey Circle; Applicant Lawrence Beer for ExteNet Systems,
Inc.; Owner City of Monterey; Zoning Designation R-1-8; Exempt from CEQA
Requirements (Article 19, Section 15303, Class 3)
COMMISSIONERS COMMENTS
COMMISSIONERS may ask a question for clarification, make a brief announcement or make a
brief report on his or her activities. In addition, a Commissioner may provide a referral to staff or
other resources for factual information, request staff to report back to the body at a subsequent
meeting concerning any City matter, or direct staff to place a request to agendize a matter of
business on a future agenda. (G.C. 54954.2)
ADJOURNMENT
ADJOURNMENT — The general policy of the Planning Commission is that the Afternoon Session will
end no later than 5:30 p.m. and the Evening Session will end no later than 11:00 p.m. Any public
agenda items that have not been completed within the designated adjournment time may be formally
extended by the Commission, or continued to the next regularly scheduled Planning Commission
Meeting, or continued to a Special Meeting.
Agenda packets may be reviewed by the public in the Monterey Public Library, in the Planning Office,
or on the web at http://www.monterey.org beginning late Friday afternoon prior to the date of the
meeting.
Members of the public have the right to address the Commission on any Agenda items. The Chair will
formally open the floor for public comment. However, if you wish to speak to items during "Consent
Agenda" or "Staff Informational Report," please advise the staff or the Chair prior to the action on that
item and you will be recognized. Notification as much in advance as possible is appreciated.
Information distributed to the Commission at the meeting becomes part of the public record. A copy of
written material, pictures, etc. should be provided to the Secretary for this purpose.
Planning Commission decisions may be appealed within ten (10) days from the date of the decision on
forms available in the Planning Division during business hours. When the tenth day falls on a weekend
or a holiday, the appeal deadline date is the next working day following the holiday or weekend. An
appeal fee will apply. For more agenda information, call the Planning Office at (831) 646-3885.
Planning Commission Meetings are cable cast live and videotaped for replay on Monterey's
Government Access Channel 25 by Access Monterey Peninsula (AMP).
CITY OF MONTEREY'S 24-HOUR SUGGESTION HOTLINES:
Voicemail: (831) 646-3799
FAX: (831) 646-3793
Email: suggest@monterey.org
WebPage: http://www.monterey.org
The City of Monterey is committed to including the disabled in all of its services, programs
and activities. In compliance with the Americans with Disabilities Act, if you need special
assistance to participate in this meeting, please contact the City Clerk’s Office at (831) 646-
3935. Notification 30 hours prior to the meeting will enable the City to make reasonable
arrangements to ensure accessibility to this meeting [28 CFR 35.102-35.104 ADA Title
II]. Later requests will be accommodated to the extent feasible. For communication-related
assistance, dial 711 to use the California Relay Service (CRS) to speak to City offices. CRS
offers free text-to-speech, speech-to-speech, and Spanish-language services 24 hours a day, 7
days a week. If you require a hearing amplification device to attend a meeting, dial 711 to use
CRS to talk to the City Clerk's Office at (831) 646-3935 to coordinate use of a device.
Planning Commission
Thursday, March 15, 2018
3
UPCOMING MEETINGS AT CITY HALL
Mar 20 Council Regular Meeting, Council Chamber - 4:00 PM
Mar 21 Architectural Review Committee Meeting, Council Chamber - 4:00 pm
Mar 26 Museums and Cultural Arts Commission Meeting, Council Chamber - 4:00 pm
Mar 27 Planning Commission Meeting, Council Chamber - 4:00 pm
Mar 28 Library Board Meeting, Library Community Room - 5:00 PM
Mar 28 Council Study Session, Council Chamber - 4:00 PM
Mar 29 Neighborhood Improvement Program Committee Meeting, Council Chamber - 7:00 PM
Apr 3 Council Regular Meeting, Council Chamber - 4:00 PM
Apr 4 Architectural Review Committee Meeting, Council Chamber - 4:00 pm
Apr 5 Zoning Administrator Meeting, Council Chamber - 4:00 pm
Apr 5 Neighborhood Improvement Program Committee Meeting, Council Chamber - 7:00 PM
Apr 10 Planning Commission Meeting, Council Chamber - 4:00 pm
Apr 12 Historic Preservation Commission Meeting, Council Chamber - 4:00 pm
Apr 12 MP Regional Water Authority Meeting, TBD - 7:00 PM
Apr 12 Neighborhood Improvement Program Committee Meeting, Hilltop Park Center - 6:30
PM
Apr 17 Council Regular Meeting, Council Chamber - 4:00 PM
Apr 18 Architectural Review Committee Meeting, Council Chamber - 4:00 pm
Apr 19 Parks and Recreation Commission Meeting, Council Chamber - 7:00 PM
Apr 19 Zoning Administrator Meeting, Council Chamber - 4:00 pm
Apr 19 Neighborhood Improvement Program Committee Meeting, Council Chamber - 7:00 PM
MORE INFORMATION IS AVAILABLE BY CALLING 646-3885
Planning Commission
Thursday, March 15, 2018
4