Central Vermont Public Safety Authority
Regular MeetingMontpelier, VT · July 21, 2016
Minutes
Central Vermont Public Safety Authority
Central Vermont Chamber of Commerce Building
July 21, 2016
Meeting Minutes – Draft
Directors present: Dona Bate and Tom Golonka, representing the City of Montpelier; Michael Smith,
representing Barre City; Kim Cheney and Alexandra Pastor, at-large directors.
Directors absent: Martin Prevost, representing Barre City; Doug Hoyt, at-large director.
Others attending: Joe Aldsworth; Paco Aumand, CVPSA Executive Director; Tim Bombardier; Scott
Cameron, CVPSA labor attorney; Tony Facos (6:35); and Bob Sager, Board Treasurer.
The meeting was opened by Tom at 6:31pm.
The Agenda was approved, as presented, without objection.
A motion to approve the minutes of the June 16th meeting was made by Michael, seconded by
Alexandra. Motion passed.
Paco led a discussion of the negotiations with Burlington Communications (BCS) regarding the radio
upgrades and the effort to achieve redundancy and interoperability between the two municipalities’
dispatch centers. BCS offered two proposals. The first would purchase a third dispatch console for
Barre City dispatch and provide interoperability by way of a “bridge” connecting the two dispatch
centers – the cost of the proposal would be $62,000 for equipment and $19,000 for installation. The
second proposal would provide for additional base stations, along with the additional dispatch console.
This option would allow for the creation of redundant radio communication system between Montpelier
and Barre. However, while redundancy is important this option would require Capital West to invest
additional funds through the purchase of commercial circuits in order for Barre City to dispatch for
them. This was found to be an unacceptable solution. Without the additional radio circuits Barre would
not be able to communicate with the Capital West partners. Therefore, voice interoperability would not
be possible between the two Cities. Interoperability (the ability to communicate between locations) and
redundancy (the ability for one center two fully communicate in the event the other suffered a
catastrophic shut down) are important attributes of this CVPSA plan for dispatching. However, it is
important that at a minimum both Montpelier and Barre need to be able to communicate
(interoperable communications) with each other’s partners. The cost of second proposal would be
$78,000 for the equipment and $20,140 for the installation.
Barre City Deputy Fire Chief Joe Aldsworth, Barre City Director of Public Safety Tim Bombardier and,
Montpelier Police Chief Tony Facos all were part of the negotiations and agreed with the Executive
Director’s recommendation that the Board choose the first proposal. The Board continued the
discussion of funding installation costs for the current proposal and, the need to put funds for future
installations in the upcoming budget request.
A motion to approve the Executive Director’s recommendation of option 1 “the Bridge”, to approve the
purchasing of the travel, project management and installation associated with option 1 and, to authorize
the Executive Director to sign the necessary contracts with Burlington Communications (BCS), was made
by Dona, seconded by Kim. Motion passed.
The Board wanted to discuss labor contracts and meetings with labor leaders. A motion finding that
premature public knowledge of this discussion would clearly place the Authority at a substantial
disadvantage should the discussion be public, was made by Dona, seconded by Michael. Motion
passed.
A motion to go into executive session under the provisions of 1 VSA section 313 to discuss labor
contracts and meetings with labor leaders, was made by Alexandra, seconded by Dona. Motion passed.
The Board went into executive session at 7:10pm. Barre City Deputy Fire Chief Joe Aldsworth, Barre
City Director of Public Safety Tim Bombardier, labor attorney Scott Cameron, Montpelier Police Chief
Tony Facos and, Board Treasurer Bob Sager were all invited to join the executive session.
A motion to come out of executive session was made by Michael, seconded by Dona. Motion passed.
The Board came out of executive session at 8:38pm. No action was taken.
Without objection Tom adjourned the meeting at 8:39pm.
Respectfully submitted by,
Michael Smith
CVPSA Secretary
The Next regularly scheduled meeting of the Central Vermont Public Safety Authority will be held
August 18 6:30pm at the Central Vermont Chamber of Commerce Building.
Agenda
Central Vermont Public Safety Authority Board Meeting
July 21, 2016 – 6:30PM-8:00PM
(Central Vermont Chamber Office – Berlin, VT)
Regular Meeting
1. Call to Order
2. Approve Agenda
3. Public Comment
4. Approve Minutes 05/16/16
5. Executive Director’s Report -Paco
6. Radio communication console grant update - Paco
7. FY 16 end of year budget review - Paco
8. Dispatcher Training Schedule - Paco
9. Executive Session – Scott Cameron will be in attendance at our meeting to discuss
meetings with the union and labor contracts. Therefore, the Board is asked to make a
finding that premature general knowledge concerning on going and future discussions
with the unions about labor contracts would clearly place the public body involved at a
substantial disadvantage in keeping with 1 V.S.A. Sec 313 (1)
The Board then should move to go into executive session to discuss labor relations with
employees and contracts in keeping with T. 1 Sec. 313 (A) and (B).
10. Adjournment
Get email alerts for Montpelier
A daily email when new agendas and minutes are posted.