Design Review Board
Regular MeetingMount Pleasant, SC · June 28, 2017
Minutes
DESIGN REVIEW BOARD
JUNE 28, 2017
MINUTES
Present: Beth Santilli, chair, Brian Wurst, Mickey Seabrook, Nopporn Kichanan.
Absent: Brian Boan
Staff: Michael Robertson, Chris Luly, Lynnette Lynes
Ms. Santilli called the meeting to order at 5:05 pm and reviewed the
procedures with the public.
1. Approval of Minutes
Mr. Wurst moved for approval of the minutes. Mr. Seabrook seconded the motion.
All in favor.
2. Public Comment & General Correspondence
Mr. Luly stated that all correspondence received was distributed to the Board.
Mr. Wurst moved for approval of item C and D. The motion failed due to the lack
of a second.
Mr. Wurst moved for approval of item C. Mr. Kichanan seconded the motion. All in
favor.
There being no further comments, Ms. Santilli continued with the agenda.
3. Business
A. 349 Coleman Blvd, 349 Coleman Boulevard, 517-06-00-060, Final Approval
of Site and Landscaping
Mr. William O’Neill and Mr. Michael Cain reviewed the request with the Board.
Mr. Kichanan asked about the curb and gutter and on-street inlet at the corner
of Broadway Street and if the water would sheet into the bio-swale. Mr. O’Neill
answered in the affirmative and showed where the new inlet is located within
the bio-swale on the plans for the Board. Mr. Kichanan asked if the size of the
bio-swale is sufficient and if the number of plantings be reduced near the
Design Review Board
June 28, 2017
Page 2 of 8
canopy trees. Mr. O’Neill answered that the plantings could be reduced if
needed.
Mr. Seabrook asked if Mount Pleasant Waterworks (MPW) has approved the
trees being placed within the easement on top of the sewer mains. Mr. O’Neill
answered in the negative. He stated that the trees proposed meet the line of
site restrictions. He stated that they are willing to work with staff and all
agencies for a final plan.
Mr. Luly reviewed staff comments with the Board (attachment 1).
Mr. Wurst suggested that the sidewalk could be moved with the bio-swale
inside the property line. He suggested that it would be best to comply with the
design of the overlay district.
Mr. Kichanan suggested that completing the curb with inlet cuts might be a
better option in terms of stormwater detention and be more of an urban design.
He suggested that the plantings could be removed from under the trees and
different plantings used. He stated that it is difficult as the other jurisdictions
have not commented on the proposed plan.
Mr. Kichanan moved for deferral for restudy with approval of the project through
a committee and staff. Mr. Seabrook seconded the motion. All in favor.
B. Sea Island Hamlet, 1047 Chuck Dawley Blvd, 532-08-00-001, Preliminary
Approval of Site, Landscape, and Architecture
Ms. Santilli noted that the applicant has withdrawn this application.
C. Baker Motors Parking Facility, 2121 Highway 17, 558-00-00-203, Final
Approval of Site, Landscape and Architecture
This item was approved through a consent motion.
D. Brookgreen Town Center Lot C-2, 730 Coleman Blvd, 532-02-00-129, Final
Approval of Site, Landscape and Architecture
Mr. Rivers Cape and Mr. Eddie Fava reviewed the submittal with the Board.
Design Review Board
June 28, 2017
Page 3 of 8
Mr. Kichanan asked about the proposed changes. Mr. Cape answered that the
pavers were removed from around the tree to better preserve the tree and to
provide a better definition for the entrance. Mr. Kichanan asked how the pavers
would be installed. Mr. Cape answered that they would be installed in cast-in-
place pavers, which would only encroach approximately 1 ½ inches.
Mr. Luly and Mr. Robertson reviewed staff comments with the Board
(attachment 1).
Mr. Kichanan suggested that only one paver type should be used to provide
better uniformity and simplicity. Mr. Cape answered that this could be
accomplished.
Mr. Kichanan moved for approval with the condition that the entrance pavers
are restudied. Mr. Seabrook seconded the motion. All in favor.
E. Freddy’s Frozen Custard & Steakburgers, Lowe’s at Oakland Outparcel,
Highway 17N, 600-00-00-067, Conceptual Approval of Site
Mr. Quinten Ellis and Mr. Mike Lucas reviewed the application with the Board.
Mr. Wurst asked if the retention wall would be extended. Mr. Ellis answered in
the affirmative and stated that it is required because of the grade of the
property.
Mr. Seabrook expressed concern with the alternate plan and traffic pattern. He
suggested that the other plan would be a better option. Mr. Lucas answered
that they would prefer the first plan.
Mr. Luly reviewed staff comments with the Board (attachment 1).
Mr. Kichanan stated that he agrees with Mr. Seabrook that the first option with
the drive-thru surrounding the building would be preferred.
Mr. Seabrook suggested that this is a similar plan to the McDonalds on Johnnie
Dodds Blvd. He suggested that the conceptual plan would be preferred to the
alternate.
Design Review Board
June 28, 2017
Page 4 of 8
Mr. Kichanan suggested that the area around the transformer should be better
landscaped.
Mr. Wurst suggested that the building should be pushed back from US17 to
provide more space for the patio and mitigate the amount of sod. He stated
that he prefers the first conceptual plan as well.
F. Hotel Indigo (formerly Holiday Inn), 250 Johnnie Dodds Blvd., 514-00-00-
110, Final Approval of Site, Landscape and Architecture
Ms. Mary Martsnich and Mr. Christopher Alrecht reviewed the request with the
Board.
Mr. Wurst asked if the columns are existing steel columns. Mr. Alrecht
answered in the affirmative.
Mr. Kichanan asked if this is proposed for final approval. Mr. Luly answered in
the affirmative. Mr. Kichanan which landscape plan is the final plan. Ms.
Martsnich answered that the plan reviewed with the Board is the final plan.
Mr. Luly and Mr. Robertson reviewed staff comments with the Board
(attachment 1).
Mr. Kichanan asked about L1.1 and suggested that the layout should be
coordinated with the main building. He suggested that scored concrete near
the left entrance might be a better option.
Mr. Wurst agreed that the base of the building should be simplified in addition
to simplifying the color scheme under the port cochere. He suggested that the
roof area at the center section is too thin and should be widened with the
projected mullion and banding more “knitted” with the façade. He suggested
that the area around the windows should be a different color to better
emphasize the window areas and feel more vertical.
Mr. Wurst moved for approval including all staff and board comments with study
of the addition of color to make the white segments on the main tower portion
Design Review Board
June 28, 2017
Page 5 of 8
more slender; simplify base to be more continuous; width of the roof on main
entry façade reconsidered. Mr. Seabrook seconded the motion. All in favor.
G. Heartland Dental, 1100 McKnight Rd., 578-00-00-034, Preliminary Approval
of Site, Landscape and Architecture
Mr. Kevin Berry and Mr. Dan Sherer reviewed the request with the Board.
Mr. Kichanan asked about the proposed future office building and that it would
be too close in proximity to the proposed building. Mr. Berry answered that it
is only showing potential future building area with a shared courtyard. Mr.
Berry asked about the sidewalk and how it would connect to the parking. Mr.
Berry showed this on sheet C-200 for the Board.
Mr. Seabrook asked about parking for the future building and if the site could
provide sufficient parking. Mr. Berry answered in the affirmative and stated
that they would have the parking be more linear as recommended by staff. Mr.
Seabrook stated that he is not opposed to a 50-foot buffer on the front.
Mr. Wurst asked if the attic space would be used and if the pitch of the roof
could be lowered. Mr. Sherer answered in the negative and stated that this
could be considered. Mr. Wurst also suggested that the gables could be lowered
as well.
Mr. Luly and Mr. Robertson reviewed staff comments with the Board
(attachment 1).
Mr. Kichanan suggested that the site might not provide sufficient parking and as
proposed should be restudied. He agreed that the buffer could be reduced to
50 feet. He suggested that future buildings should be more fully shown to see
the massing in relation to the parking.
Mr. Seabrook asked for clarification on comment #12 and if the existing service
needs to be relocated. Mr. Luly answered that the route should be relocated so
it does not go through the buffer. Mr. Berry stated that they are not opposed
to re-routing the sewer line. Mr. Seabrook suggested that there could be
restrictions and suggested that trees should be preserved as much as possible.
Design Review Board
June 28, 2017
Page 6 of 8
Mr. Wurst suggested that roof line should be lowered. He suggested that the
columns appear thin and the windows under the gable should be combined. He
suggested that the window awnings should attach to the lap siding and not the
board and batten. He suggested that the same should be done for the doors.
He suggested that the water table should be restudied and lowered to ensure a
window is not sitting in that table.
Mr. Seabrook moved for deferral for restudy of the landscape as recommended
by staff and review and inclusion of architectural comments. Mr. Wurst
seconded the motion. All in favor.
H. Offices at Belle Hall Bldg. 1, Point Drive at Belle Isle Dr., 540-00-00-110,
Preliminary Approval of Site, Landscape and Architecture
Mr. Rush Dixon and Mr. Taylor Critcher reviewed the request with the Board.
Mr. Seabrook asked if an arborist has reviewed the pecan trees in the parking
area. Mr. Critcher answered in the negative. Mr. Seabrook suggested that this
should be considered as they may be reaching the end of their life cycle.
Mr. Kichanan asked if palmettos would be used near the building. Mr. Critcher
answered in the negative.
Mr. Wurst asked how the brick would be utilized for the entrance. Mr. Dixon
showed this on the plans for the Board.
Mr. Luly and Mr. Robertson reviewed staff comments with the Board
(attachment 1).
Mr. Wurst cautioned about the size of the glass. Mr. Dixon answered that they
could go to a maximum of 50 feet. He stated that he has no problem with the
metal siding. He asked if final materials have been submitted and what type of
brick would be used.
Mr. Wurst moved for approval including all staff comments with approval of the
metal siding. Mr. Seabrook seconded the motion. All in favor.
Design Review Board
June 28, 2017
Page 7 of 8
I. Ferry Wharf Office Building, Tract 3W, Parcel 1, 558-00-00-100, Final
Approval of Site, Landscape and Architecture
Ms. Abigail Richardson, Mr. Nathan Schutte, and Mr. Taylor Critcher reviewed
the request with the Board. Mr. Schutte reviewed the materials with the Board.
Mr. Kichanan asked if there is a sample of the pavers. Mr. Critcher answered
that they can provide a sample. Mr. Kichanan asked if they would be a standard
4x8 paver. Mr. Critcher answered in the affirmative. Mr. Kichanan asked if there
were any flower varieties proposed with the grasses. Mr. Critcher answered in
the negative.
Mr. Wurst asked about the corner detail near the top floor. Mr. Schutte
answered that because it is separate from the other details, it was considered
the best option to have it match the other corner details.
Mr. Luly and Mr. Robertson reviewed staff comments with the Board
(attachment 1).
Mr. Robertson suggested that the corner should be aligned with the crosswalk
to avoid a slight “jogging over”. Mr. Schutte answered that this could be
considered.
Mr. Wurst applauded the design and revisions.
Mr. Kichanan agreed that more interest in the plantings should be considered
for the public path area to better match the other facades. He suggested that
the paver under the angled canopy should be differentiated from the vehicle
access.
Mr. Kichanan moved for final approval with further study of the trail side for
more emphasis on the planting plan and drop-off. Mr. Seabrook seconded the
motion. All in favor.
Design Review Board
June 28, 2017
Page 8 of 8
J. Towne Centre, Barnes & Noble Parking Addition, Mount Pleasant Towne
Centre, 558-00-00-203, Final Approval of Site and Landscape
This request was withdrawn by the applicant.
There being no further business, the meeting adjourned at 7:22 pm.
Submitted by,
L. Lynes
DRB06282017
Attachment 1
COMMERCIAL DESIGN REVIEW BOARD
Staff Report
June 28, 2017
1. 349 Coleman/Kickin Chicken, 349 Coleman, 5170600060, Final Approval of Site
and Landscape
Site and Landscape Comments- This submittal is for a plan revision requesting the
Board’s after the fact approval of a site and landscape change. DOT has denied
the request for on-street parking closest to Coleman Blvd. as approved previously
by DRB. The project improvised by removing from the plans both the on-street
parking along with the curb and gutter, filling in this area with sod and a single
species of ground cover. What is installed at present and is now up for review
and approval this month is not in keeping with the quality of design the Town is
seeking along Coleman Boulevard, arguably the Town’s most design focused
district. If curb and gutter, components of an urban corridor, are going to be left
off for a “bioswale”, this swale should be better designed and not left in its
current state as an afterthought on a prominent corner. Also, there is no buffer
requirement for this side street but there is a street tree requirement of one 4”
canopy tree per 100 linear feet along Broadway. Now that on-street parking is
not present, there is adequate room to fulfill the street tree requirement. At
present there are three 4” street trees along approximately 270’ feet of Broadway
frontage. All of this being said, the sidewalk that is supposed to be in the public
right-of-way in accordance with the code is now inside the property lines of the
project and any new street trees will need to be located in the public right-of-way
which DOT may or may not allow at this point. Staff recommends the applicant
restudy the bioswale area to meet the requirements as set forth in the Town’s
code of ordinances and to also feature a higher quality of landscape design with a
resubmittal to staff for final approval.
Architecture Comments- N/A
2. Sea Island Hamlet, 1047 Chuck Dawley, 532-08-00-001, Final Preliminary Approval
of Architecture, Site and Landscape
Site and Landscape Comments-
The residential project on Chuck Dawley Blvd. is before the Board for review and
comments on the activity zone. The submittal has not followed the provided
checklist of submittal requirements and is highly cluttered with information that is
illegible on most sheets. Unrequired information has also been provided that
makes the submittal even more difficult to decipher. Any information not
required by the provided checklist shall be eliminated on the next submittal.
Some checklist items that require fixing include: The project address is not listed
on pages 35-37, the submittal type is not specified on pages 15-20, pages 15-20
and 35-37 need complete dates, building setbacks are not clearly identified on the
site plan, flood zone and silt fencing is not indicated clearly on the grading plan,
the required bufferyard and landscape requirements chart is missing, location of
trees to be saved have not been shown on all plans and individual sheet titles
we’re given. Staff recommends the Board defer the project as there is either not
enough information to properly review the project or the necessary information is
not readable.
Architecture Comments- The applicant has met with staff to discuss this
project. Section 156.318 O.3.a requires the primary entrance of buildings
facing boulevards to have their entrance from the street. As a result, the
end units should appear to front Chuck Dawley Boulevard. The design seeks
to address Chuck Dawley by creating a secondary gable to break down the
massing of the long side of the unit. Doors face this side but the detailing
needs to be refined to create a true primary façade. The second floor doors
are larger than the primary entrance below. Side lights and a transom could
help establish a more prominent entry and focal feature. The second floor
deck is a mere extension of the primary porches that are covered facing the
internal street. The porch should be extended and roofed like a porch.
Ideally both porches should wrap the end unit. While the design has a
strong start to create a nice façade for the end units facing Chuck Dawley, it
should be further refined to establish the primary façade on the boulevard.
The primary facades on the internal street have a strong vernacular design
with subtle variations in material and design to create interest and variety
without appearing too forced. Staff would recommend some further study
to alter the triple gable more in the overall streetscape mixture similar to
Building C or add more of this unit type throughout. Also, the gable
projections appear to hang over the driveway without any support. The
corner columns should appear to support the structure above and be an
extension of the house to the ground. Staff recommends preliminary
approval with further study and refinement of details as noted.
3. Baker Motors Parking Facility, 2121 Highway 17 North, 558-00-00-203, Final
Approval of Site and Landscape
Site and Landscape Comments- This submittal features a tear down of an existing
strip building to make way for a parking area that will serve the Baker Motor
Company’s dealership next door. The project has gone before the Board of
Zoning Appeals for a number of variances and the vested site plan approved by
that body matches what has been submitted to DRB.
1. Dates and information on variances shall be provided on the title sheet as
stated on the provided checklist so that staff, the Board and the public are
aware of the history of this project.
2. There is a large oak set to be saved at the back, eastern corner of the site.
There are proposed changes in grade to the tree’s protection zone. No
existing grades were easily identified for this area on the grading plan so
staff cannot verify impacts. Adding or removing earth in this area will
impact the tree’s health. Also, there is a gas line running through the
protection zone currently that may be removed. If this tree is to be saved,
the line should be cut and abandoned or pulled out but not dug up. The
encroachment into the protection zone was approved by the Board of
Zoning Appeals and the site plan is vested but the applicant may need to
remove and mitigate for the tree is these impacts will affect it’s life.
3. No paver detail was given showing what the pavers will look like.
4. The buffers cannot count off site trees nor may they count parking island
trees towards requirements.
Staff recommends final approval with minor comments addressed and
resubmitted to staff for review and stamping.
Architecture Comments- N/A
4. Brookgreen Outparcel, 2121 Highway 17 North, 5320200129, Final Approval of
Architecture, Site and Landscape
Site and Landscape Comments- Three areas clouded in red are proposed for site
and landscape changes. All revisions are minor in nature and are mainly in
response to ADA requirements. The back/north side of the building adjusts an
already approved ramp to accommodate a new door. The left/west of the
building expands an area of sidewalk to provide a mean of egress from the
building. The third area under consideration to the east of the building is less
clear. The change to the originally approved plans shows the adjustment of cast
in place concrete pavers within the tree protection zone. The pavers shifted from
one side of the tree to the other and changed in form. The applicant shall explain
the rationale behind the alteration. Staff recommends final approval.
Architecture Comments- The applicant has met with staff to discuss revisions to
the original design. In addition to the minor changes listed in the site and
landscape comments above, the window on the east front elevation is being
changed to an ADA door. Staff recommends approval.
5. Freddy’s Frozen Custard and Burgers, 2121 Highway 17 North, 6000000067,
Conceptual Approval of Site Layout
Site and Landscape Comments- The purpose of Freddy’s conceptual submittal is
to acquire the Board’s direction on site layout. The projects representatives have
met with staff and addressed comments that have arisen. The project sits on an
outparcel adjacent to the DRB approved Lowes that is currently under
construction. As a part of that DRB process, the Lowes project was required to
conceptually design this outparcel to show how the two spaces might work
together. What Freddy’s has shown in this submittal meets that “master plan”
provided by Lowes to the best extent possible, while maintaining the necessary
characteristics that Freddy’s requires to be operational. Two potential site plans
have been provided along with the earlier DRB approved plan for Lowes and
outparcel. Staff and the applicant seek the Board’s preference on site layout and
any additional commentary that may help drive the project.
Architecture Comments- N/A
6. Hotel Indigo, former Holiday Inn, 2121 Highway 17 North, 5140000110, Final
Approval of Architecture, Site and Landscape
Site and Landscape Comments- The existing Holiday Inn near the Ravenel Bridge
is undergoing modifications as it becomes Hotel Indigo. Site and landscape work
involved removal and replacement of landscaping, adjustment of sidewalk,
curbing, asphalt and retaining walls. Much of the proposed work is to take place
in the amenity area where the pool and surrounding amenities will undergo a
major overhaul. There are no apparent additions or subtractions from the
existing building and the parking areas and drive aisles are to remain in the same
configuration as they currently stand. Comments include:
1. The applicant shall explain the intention to demolish and rebuild existing
sidewalks, retaining walls and such. Staff has concerns with the proposed
work around the saved grand trees and requests more information.
2. The applicant shall explain the reasoning for removal of existing
landscaping and trees in areas that are not undergoing major changes like
the pool area. There are numerous trees called out as removed that
require explanation.
3. The bike rack relocation should be shown on the plans. The location shall
be somewhere easily accessed and prominent, such as near a building
entrance.
4. All parking islands are to have a canopy tree from the list of accepted
species in the zoning code. This includes islands that currently do not have
trees. Palms, street lamps and sidewalk may not be located in parking
islands unless these islands are expanded to accommodate required canopy
trees as well.
5. Hardscape around the pool will need to be pulled back to at least 10’ from
the property line to meet the landscape bufferyard requirements except
when providing a means of egress as seen where the patio extends to the
pool gates in the eastern corner.
6. Trees 135-139 that are shown as removed were not found on the tree
summary so staff cannot verify if they need to be mitigated.
Staff recommends final approval with all minor comments addressed and a full
resubmittal made to staff.
Architecture Comments- The applicant has met with staff to discuss this
design. The proposed renovation creates a base for the building and seeks
to create a visual focal point with the renovation of the elevator lobbies on
each floor. A panel has been added to the large, blank wing walls adjacent
to the windowed panels to give a better balance to the front façade. A base
of brick and stone veneer has been added to the building to create a base.
The applicant may want to consider simplifying this feature using one
material or the other. The overall building height of the new tower will
need to be submitted to verify compliance with the height limitations of
the zoning code. Staff recommends approval.
7. Heartland Dental, 2121 Highway 17 North, 5780000034, Preliminary Approval of
Architecture, Site and Landscape
Site and Landscape Comments- This site’s location falls within a handful of
overlay districts with different requirements and constraints. Like numerous
projects the Board has seen before, there are three different front yard buffers on
Highway 17. The Board has the ability to grant the applicant relief on one of
these three. The Board may allow a reduction from 100’ to a minimum of 50’ but
only if the applicant demonstrates exceptional conditions. These include parcel
size, presence or lack of natural vegetation, any public rights-of-way being
acquired for roadways, existence of easements or any other conditions that the
Board that agrees constrain the site. Site and landscape comments are:
1. The site layout and parking plan need to be refined. What is shown
currently appears to maximize site development at the expense of good
design. Staff has requested that the drive aisles be straightened and linked
to create circulation and eliminate dead ends. The buildings can shrink to
accommodate.
2. Ponds may meander into a required bufferyard but a pond may not take up
an entire buffer as shown here. This will need to be redesigned
completely.
3. The title sheets needs to go into greater detail on the overlays that this
parcel falls under. These overlays have specific requirements on setbacks,
buffers, etc. This detailed information must be present on the title sheet
as presented to the applicant through the submittal checklist.
4. Town trees on Highway 17 need to be surveyed, labeled and protected to
the full extent of the tree protection zones.
5. No trees may be removed from the natural buffers unless they are dead or
hazardous.
6. Silt fence cannot run through a trees required protection zone.
7. All trees that are saved must have required tree protection in accordance
with the code. Some tree protection zones need to be expanded.
8. A schedule of all removed trees is needed. Show size, species, rating, etc.
9. A building corner encroaches into the 50” undisturbed buffer. This corner
and any footings cannot fall within tree protection zones or undisturbed
buffers.
10.The applicant shall explain the rationale for removing trees within a
proposed landscape buffer. Without the required tree chart there is no
way to tell if these are dead trees that need to be removed or of good
quality that should be saved.
11.Fill or grading cannot affect saved trees. As shown there appears to be dirt
placed on top of tree protection zones. Again, the tree barricades must
encompass the entire tree protection zone as stated in the zoning code.
Staff is particularly concerned with the cluster of large trees to the north of
the site. The grading plan needs to be restudied.
12. Utilities need to run perpendicular to the front yard natural buffer and not
through the buffer in a parallel manner as shown. Tree protection
barricades may need to be broken up to accommodate a perpendicular
utility line installation but these utility lines cannot run through the
protection zones. There is a utility easement on the other side of the
buffer than may be utilized.
13.Numerous checklist items are missing.
Staff recommends restudy of the site and landscape plans.
Architecture Comments- The applicant has met with staff to discuss this
design. In addition to the standard design review guidelines, the building is
located in the Sweetgrass Basket Overlay District (156.316 I.2). Section
156.316 I.2.a and a.1 state “The intent of the design requirements for this
district is to reflect a more rural visual context rather than a suburban or
urban look. Therefore, building materials should consist of cementitious
siding to give the appearance of wood siding rather than brick or adorned
masonry siding, pitch [sic] roofs are preferred over flat roofs, and the use of
porches are [sic] encouraged.”
The building has been redesigned slightly from the original proposal. The
gable elements have been increased in height for a more vertical
appearance and also to break the eaves line of the large hipped roof.
Exposed rafters have been added for a more rural feel. The cupola must be
a working roof vent in order to meet the ordinance requirements for roof
appurtenances. Staff recommends approval.
8. Offices at Belle Hall Bldg. 1, 2121 Highway 17 North, 5400000110, Preliminary
Approval of Architecture, Site and Landscape
Site and Landscape Comments- The first phase of the Office at Belle Hall (called
Building 2) has been completed along with some of the site work for this second
phase (called Building 1). This plan is in keeping with the original master plan and
shows the building located on an already cleared and graded pad along with
parking to the side and rear. Staff’s greatest concern is the growth of trees over
time since this plan was created. There are two large pecans that are saved in a
parking island that appear to have inadequate protection zones. Also, the trees
along the existing stormwater pond to the rear of the building have likely grown
since the original plan was created and the protection zones may now be
encroached upon. Tree protection shall be designed and installed according to
the zoning code in areas around saved trees and silt fence, etc. should not
encroach into these areas. On another note, bicycle parking in accordance with
the code will be required. Staff recommends final approval for this preliminary
submittal with tree encroachment addressed with staff before stamping.
Architecture Comments- The applicant has met with staff to discuss this
design. This is the third design proposed for the site. The first two matched
the building designs approved for the adjacent office building number 2.
The design features the traditional panel elements featured throughout the
buildings in the Belle Hall Shopping Center but in a more interesting and
contemporary interpretation. The design draws from the existing design
elements of the center but puts them together in a unique way creating a
much lighter feel to the building. Metal wall panels, not cementitious
siding, is proposed for the second floor and primary entrance. The
ordinance prohibits the use of metal siding except when used between
floors at interstitial space or metal cladding used as an architectural accent;
however, the Board may grant relief from the strict interpretation of the
guidelines. Staff recommends approval.
9. Ferry Wharf Holder Office, 2121 Highway 17 North, 5170000245, Final Approval
of Architecture, Site and Landscape
Site and Landscape Comments- Ferry Wharf has been through the Design Review
Board process on numerous occasions with Board approvals for the master plan
and the adjacent hotel. This final submittal is a refinement of the preliminary
approved plan last seen in November of 2016. The building pad continues to fit in
with the already established street grid as seen on all submittals prior to this. The
most apparent change is the progression from a generic plaza landscape plan
noted for a sea of hardscape and patterned tree cut outs to a softer entry area
and a higher level of design throughout. Staff does recommend that the
embankment going down to the public waterfront pathway be considered for a
higher level of landscape design as experience elsewhere on site. The only
ground cover at this time is seeded grass. This side of the building is potentially
more visible than the main entrance side by those users of the path, travelers on
the bridge and those on the water. Additional landscaping may keep people off
the grass reducing the wear on the embankment while also providing a greater
level of security for the building. Staff recommends final approval with the Board
giving direction on the landscaping of the embankment. Any changes to the plan
may be addressed through a submittal and review with staff.
Architecture Comments- The applicant has met with staff to discuss this
design. The design received Preliminary Approval at the November 2016,
meeting. The architect has continued to refine the design and address the
comments of the Board. The final design maintains the lightness and large
expanses of glass from the original design concept but incorporates the
vertical proportions, materials, and design elements consistent with the
overall development and the existing buildings at Patriot’s Point. Staff’s
only concern is how the building will look in its context. It should be shown
in elevation with the adjacent hotel which has been approved. The floor to
floor and building element relationships need to be harmonious within the
development. Also, the material palette should be compatible and shown
together. Staff recommends approval of the design as a stand-alone
building but it should be presented within the broader context of the
approved Ferry Wharf hotel building in both elevation and material. The
current brick color appears drab.
10. Towne Centre Barnes and Noble Parking, 2121 Highway 17 North, 5580000100,
Final Approval of Site and Landscape
Site and Landscape Comments- Towne Centre wishes to gain additional parking
by adjusting an existing drive aisle and other parking areas near Barnes and
Noble. The reformatting of this parking area also features an overhaul of the
landscaping in the vicinity. Comments include:
1. No encroachments at all will be allowed into any tree protection zones as
stated by the Town Arborist. Compacting earth in the protection zones for
plantation mix installation, digging to install 7 gallon southern yews and
other proposed work may have a detrimental effect on these trees. The
59” live oak’s protection zone will also need expansion. As shown there are
approximately four proposed parking spaces that overlap the edge of the
tree protection zone. The Town Arborist has recommended that these four
spaces become a parking island to protect this grand tree. He also noted
that this tree has been recognized by Town Council as one of importance
and therefore greater measures shall be taken to ensure its protection and
health moving forward. Stages, sidewalks and concrete plank pavers will
not be allowed within the protection zone. The same goes for the 46” live
oak that shows brick walls and plank pavers in the protection zone.
2. Contours need to be labeled. Staff cannot determine grading impacts to
trees.
3. A schedule of removed trees is needed to assess mitigation. Species, size
quality and such must be provided for these trees.
4. Reasoning for removal of trees not directly in the way of proposed parking
or drive aisles is required.
5. Proposed sidewalk may not run through tree protection zones to the
southwest.
6. Protection zones for numerous trees need to be expanded to their full
extent.
7. A great number of parking islands in the vicinity have lost their required
canopy trees over the years. Throughout the site, new replacement trees
shall be planted where the required trees once existed. Code section
156.200C4 requires the owner to guarantee all landscaping be of good
quality and in keeping with Town requirements.
8. Parking islands need to be expanded closest to the roundabout. The
openings for the trees shall be a minimum of 150 square feet.
9. The six palms nearest the roundabout will need to be readjusted to account
or a required canopy tree at the end of the parking row.
10. As the provided parking chart shows this shopping center is already over
parked according to the Town’s code, all spaces for this proposal will need
to be porous concrete or a system of pervious pavers.
Staff recommends deferral and restudy with a resubmittal to the Board after
consultation with the Town Arborist and other necessary staff.
Architecture Comments- N/A
Agenda
COMMERCIAL DESIGN REVIEW BOARD
MEETING NOTICE
June 28, 2017
5:00 PM
Municipal Complex
100 Ann Edwards Lane
Council Chambers, Building C
AGENDA
NOTE: Items in blue are hyperlinked (some file sizes are large and may take a minute to load).
A. Roll Call
B. Approval of Minutes
C. Public Comment & General Correspondence
D. Business
STAFF REPORT
1. 349 Coleman Blvd, 349 Coleman Boulevard, 517-06-00-060, Final Approval of
Site and Landscaping
2. Sea Island Hamlet, 1047 Chuck Dawley Blvd, 532-08-00-001, Preliminary
Approval of Site, Landscape, and Architecture
3. Baker Motors Parking Facility, 2121 Highway 17, 558-00-00-203, Final Approval
of Site, Landscape and Architecture
4. Brookgreen Town Center Lot C-2, 730 Coleman Blvd, 532-02-00-129, Final
Approval of Site, Landscape and Architecture
5. Freddy’s Frozen Custard & Steakburgers, Lowe’s at Oakland Outparcel, Highway
17N, 600-00-00-067, Conceptual Approval of Site
6. Hotel Indigo (formerly Holiday Inn), 250 Johnnie Dodds Blvd., 514-00-00-110,
Final Approval of Site, Landscape and Architecture
7. Heartland Dental, 1100 McKnight Rd., 578-00-00-034, Preliminary Approval of
Site, Landscape and Architecture
8. Offices at Belle Hall Bldg. 1, Point Drive at Belle Isle Dr., 540-00-00-110,
Preliminary Approval of Site, Landscape and Architecture
9. Ferry Wharf Office Building, Tract 3W, Parcel 1, 558-00-00-100, Final Approval
of Site, Landscape and Architecture
10. Towne Centre, Barnes & Noble Parking Addition, Mount Pleasant Towne
Centre, 558-00-00-203, Final Approval of Site and Landscape
E. Adjournment
RESOURCE LINKS
Commercial Design Review Guidelines
Urban Corridor Overlay District Ordinance
NOTICE: §156.049 Town of Mount Pleasant Code of Ordinances in compliance with S.C. Code §§ 6-29-1510 et
seq. grants certain rights to property owners regarding the time frame for which the town’s land use decisions
can be vested to confer vested rights. Approved site specific plans shall be vested for a period of two years from
the date of final approval by the local governing body (§156.049 C.1).