City Council Committee Agendas
Regular MeetingMount Vernon, WA · September 14, 2022
Minutes
Public Works/Library Committee Meeting
September 14, 2022, 6:00 pm
Attendees Present:
Mayor Boudreau
Council Members: Beaton, Brocksmith, Carias, Hudson, Hulst, Molenaar, Morales
Staff Members: Public Works – Bullock, Chesterfield, Phillips; City Attorney – Rogerson;
Library Director – Huffman; Special Projects Manager – Donovan
1. Approval of Public Works/Library Committee Meeting Minutes:
Councilmember Beaton moved to approve the minutes from August 10, 2022; Seconded by
Councilmember Hulst; Carried by all.
2. Program Coordination Division Updates – Blaine Chesterfield
Six new log aligners were installed beginning on August 16, 2022. The locations of the new
aligners were based upon the 2021 flood event and will improve performance and reduce
damage to the log boom.
The duck bill check valve at the Hoag Road pump station, damaged in the 2021 flood event,
was replaced on August 30, 2022, with a CheckMate inline backflow valve.
The floodwall components for the Mount Vernon Terminal Railroad and Burlington
Northern Santa Fe mainline are being manufactured now and are estimated to arrive in
September or early October. In anticipation of the components, a new stoplog storage
container has been purchased and will be modified to store the new parts.
The Freeway Drive forcemain outfall was completed on September 8, 2022. This project
upsized the outfall from an old 10” corrugated metal pipe to a 24” high density
polyethylene pipe.
Staff anticipates adding a professional services agreement with Tower Engineering
Company to the September 28, 2022, council agenda. The agreement is to prepare plans
and specifications to conduct repairs on the Stokely Tower.
Staff expects an upcoming professional services agreement with Gunnerson Consulting in
the amount of $15,000 to continue contracting for communication tower services.
A professional services agreement with Associated Earth Sciences, Inc., is anticipated to be
on the September 28, 2022, council agenda for well installation and one year of slope
stability monitoring on the Skagit Highlands pond where some cracking was detected;
estimated costs for the contract are $65,100.
September 14, 2022, Public Works Library Committee Minutes
Page 1 of 2
3. Project Updates – Bill Bullock
A bid to conduct repairs to the retaining wall on Alpine Way was advertised on September
2, 2022; bid opening is scheduled for September 23, 2022. The engineer’s estimate is
$40,000 to $60,000 and the project has an estimated construction start date of October 24,
2022.
The bid for the Hoag/Laventure Intersection Improvements project is expected to be
advertised the first week of January 2023.
The annual street improvement (overlay) project will include an up to date concrete
contract coming out this fall; the paving contract should be out to bid in January 2023.
TranTech Engineering has begun working on plans, specifications, and engineering for
Riverside Drive Improvements.
David Evans & Associates is working on plans, specifications, and engineering for 30th Street
Improvements. A National Oceanic and Atmospheric Administration (NOAA) grant
application for these improvements was submitted in August 2022 and a Department of
Ecology grant application will be submitted in October 2022.
4. Library Updates – Isaac Huffman
Director Huffman noted the library lighting project has wrapped up; images were shown of
the new library lights.
Updates were provided on summer reading, the wellness fair, library garden beds, and the
new take home kits.
The next steps for the Mount Vernon Library Commons (MVLC) project were highlighted,
including the groundbreaking, scheduled for September 17, 2022.
5. Miscellaneous / For the Good of the Order
Director Phillips provided a MVLC construction parking and traffic lane closure and
signage plan update.
Mayor Boudreau provided a HUD/CDBG update and a briefing on the MVLC
Groundbreaking Ceremony.
The meeting adjourned at 6:53 p.m.
Submitted by:
Chris Phillips
Chris Phillips, Public Works Department
September 14, 2022, Public Works Library Committee Minutes
Page 2 of 2
Agenda
AGENDA
PUBLIC WORKS / LIBRARY COMMITTEE
September 14, 2022 – 6:00 PM
Police / Court Campus – 1805 Continental Place
1. APPROVAL OF MINUTES
2. PROGRAM COORDINATION DIVISION – Blaine Chesterfield
a. Project Updates:
• Log Aligners
• Hoag Road Tide Flex CheckMate Valve
• BNSF Floodwall parts – Stoplog Container
• Freeway Drive Outfall
b. Tower Engineering Company PSA Contract
c. Gunnerson Consulting PSA Contract
d. Associated Earth Sciences, Inc. PSA Contract
3. PROJECT UPDATES – Bill Bullock
a. Alpine Way Wall Repair
b. Project Updates:
• Hoag/Laventure Intersection Improvements
• Street Improvements
• Riverside Drive Improvements
• 30th Street Improvements
4. LIBRARY COMMITTEE TOPICS – Isaac Huffman
a. Lighting Project wrap-up
b. General updates
c. Mount Vernon Library Commons Next Steps
5. MISCELLANEOUS / FOR THE GOOD OF THE ORDER
COMMITTEE COMMENTS
Attachments:
Public Works Committee August 2022 Meeting Minutes
Get email alerts for Mount Vernon
A daily email when new agendas and minutes are posted.