Board of Zoning Appeals
Regular MeetingMurfreesboro, TN · January 22, 2020
Minutes
Regular Meeting Minutes of the Murfreesboro
Board of Zoning Appeals
January 22, 2020 – 1:00 P.M.
Council Chambers
MEMBERS PRESENT MEMBERS ABSENT
Ken Halliburton, Vice-Chair Davis Young, Chair
Tim Tipps
Julie King
Misty Foy
STAFF PRESENT
Jafar Ware, Planner
David Ives, Assistant City Attorney
Matthew Blomeley, Acting Planning Director
Brenda Davis, Recording Assistant
Chairman Vice-Chair Halliburton called the meeting to order at 1:00 P.M.
The minutes from the December 19, 2019 regular meeting were approved as submitted.
New Business
Special Use Permit Request
Application Z-20-001 by Mr. Clyde Rountree of Huddleston-Steele Engineering,
Inc., representing Enterprise Holdings, Inc., requesting a special use permit in order
to establish a motor vehicle sales and rental facility on property in the Commercial
Highway (CH) district located along the south side of Franklin Road east of Franklin
Heights Drive (the subject property is also identified as Tax Map 0920, Group B, Parcel
00200).
Mr. Ware reviewed the application and staff comments. If the Board approved this
request, Staff recommends the following conditions of approval:
1) The design of the gates will be subject to the final review and approval of the
Planning Department to ensure that there are adequate turnaround areas for
vehicles and to ensure that vehicles will not be forced to back out into the public
right-of-way.
2) A privacy fence shall be required along the south and west property lines. The
privacy fence shall not be a substitute for any of the standard Type E buffer yard
BZA Minutes
Regular Meeting
January 22, 2020
plantings; rather, it shall be in addition to the standard Type E buffer yard
plantings.
3) The landscaping screening plan for the overhead doors that are proposed to face
the new public street shall be subject to final review and approval of the Planning
Department prior to the issuance of building permits.
Mr. Blomeley received a revised site plan at 11:00 A.M. this morning which did not give
Staff adequate time to review the revised site plan. Staff recommended the Board, after
conducting a public hearing, defer action until the February BZA meeting. Mr.
Blomeley said no public hearing would be required at that meeting if we conduct the
public hearing today, as advertised. He said the changes weren’t substantial enough to
warrant another public hearing however there hasn’t been adequate time for Staff to
review the revised plans therefore Staff feels unprepared to offer the Board guidance on
the revised plan. Mr. Blomeley said the revised plan is what is before the members. He
asked, if it pleases the Board for you to conduct the public hearing and then vote to defer
action until our February regular meeting.
Mr. Tipps asked for the definition of a Type E buffer.
Mr. Blomeley said a Type E buffer is a 20-foot wide buffer and typically is required
between single-family residential uses and industrial uses. He said it is the most densely
planted and widest buffer. Mr. Blomeley said the Type A buffer is the smallest buffer
and requires a 10-foot wide buffer and a Type E is twice that and requires a 20-foot wide
buffer and would have the greatest volume of evergreen trees and shrubs.
Mr. Tipps verified this location would also have a privacy fence on the south and west
side.
Mr. Blomeley said yes.
Vice-Chair Halliburton asked if the applicant had anyone present to speak.
Mr. Clyde Rountree with Huddleston-Steele Engineering, representing the applicant
came to the podium. Mr. Rountree said the architect is present as well. He said the
primary goal with this process is to make sure they are respecting the adjacent
neighbors. He said as has been mentioned on both the western side and the southern
side the Type E buffer is provided. He said from a detail standpoint there are typically
two rows of evergreen trees and then two rows of evergreen shrubs, so it is very dense
and then they added a 6-foot fence to provide a physical barrier. Mr. Rountree said the
distance is important too. He said the original drawings showed a “wash-bay station”
directly behind the main building but it was oriented in such a way that wash /
operational doors faced the public right-of-way, adding that wasn’t the best scenario.
They were first under the impression they could buffer or screen them, but Enterprise
2
BZA Minutes
Regular Meeting
January 22, 2020
wanted to make sure everyone was happy with the plans. Mr. Rountree said they took
the wash-bay station and moved it to the lower southern portion on the left-hand side to
get it behind the building. He said there is still a chance you would still be able to see
the doors from Franklin Road. Mr. Rountree has been working with Mr. Blomeley to
move the wash-bay station to the right-hand side and that put it as far away from the
adjacent neighbor as possible. Mr. Rountree said that was one of the major adjustments
that modified the site plan substantially. He said the second change is they have the
dumpster on the very rear portion of the property and after review he moved it up a few
bays, so it is no longer against the property lines. Mr. Rountree said there are a lot of
moving parts trying to solidify the plan. He said they have met the criteria they feel is
necessary for a car lot to be on this particular piece of property. He was available to
answer any questions the Board might have specifically about the design. Mr. Bill
Huddleston is present and Mr. Preston, the architect is present to answer questions as
well.
Vice-Chair Halliburton asked Mr. Rountree about car haulers coming in and out of this
location. He sees on the site plan where the car hauler is supposed to park and asked if
there is enough space for it to be able to unload.
Mr. Rountree said it is 150 X 25 and said they meet the criteria for the unloading zone.
He said when Enterprise Corporate did the revisions, they put the unloading zone in a
traffic lane. Mr. Rountree understands any unloading should not impede on any of the
normal traffic on-site. By taking it down and putting it at the proposed location is
appropriate as it meets the required dimensions. Mr. Rountree said Enterprise does not
run any car haulers as that is not part of their business model. He said they don’t ship
their product and they addressed the requirement for an unloading zone.
Mr. Halliburton asked Mr. Blomeley if the Board were to approve this special use permit
would it be only for this applicant. He verified it can’t be used for someone else that
might purchase this property.
Mr. Blomeley said the special use permit runs with the property.
Mr. Rountree said it meets all the requirements for a car lot even though the car haulers
are not a part of Enterprises’ business model. He said that is a requirement based on the
City Zoning Ordinance.
Mr. Blomeley said he can’t say, at this time, what he does or does not feel comfortable
with. He said there are moving parts to this and we received a revised plan two hours
ago. He consulted a little bit with Mr. Rountree at the front counter yesterday, received
a plan from him at 5:15 yesterday afternoon which he responded to after business hours
yesterday by e-mail. Today, he received a revised plan addressing some comments at
11:00 a.m. this morning. Mr. Blomeley said it is not reasonable to expect Staff to be
3
BZA Minutes
Regular Meeting
January 22, 2020
able to fully vet a plan with that little amount of time considering other things we have
on our plates as well.
Ms. King said procedurally it would be appropriate for the Board to take a public
hearing for those who have taken the time to be here today and then defer. She said the
Board would not need to have a discussion on the matter unless they feel so moved. She
said they could defer the discussion and approval of this until the next month when Staff
can review it with the Board again.
Mr. Blomeley felt it would be appropriate if the Board had feedback based upon what
the neighbors might have to say, or you observe things on the plan or about their
application that you would them to address before the next meeting.
Ms. King said if after the review a public hearing would be necessitated according to
Staff, if there was something that Mr. Blomeley felt would be appropriate for public to
be notified of or if you would send out notification again and another public hearing.
Mr. Blomeley said if Staff felt the application changed substantially and another public
hearing was warranted, we would certainly do that. Based upon the plans that have been
submitted, he does not think that would be the case. He said it is just a matter of having
adequate time to review a plan before we come to a televised meeting where we are
making decisions.
Ms. King verified that anyone present today would be welcome to come back to hear
any further discussion but there would not be another invitation or any further comments
from the public.
Mr. Blomeley agreed adding it would be a public meeting but not a public hearing so
people could attend and listen. He said the meeting will be televised again so they can
listen on TV but there would not be another public hearing.
Mr. Tipps asked Mr. Rountree what revisions were done within the past day that he
didn’t have prior to this meeting.
Mr. Rountree said the primary change was the wash-bay building orientation. After
working with City Staff, it was determined that the wash-bay couldn’t stay in its current
location and would need to provide an extended island of landscaping along the eastern
side. After Corporate saw that concern, they saw the opportunity to go ahead and move
that wash-bay building back which allowed them to put parking adjacent to the building
on the rear. Where the wash-bay was originally located, there was no parking on the
rear of the building. He said that is the biggest change. Mr. Rountree said the dumpster
is the second change adding it has moved three times within the last week. The final
location where the dumpster is now is what Mr. Blomeley has not reviewed. He feels
4
BZA Minutes
Regular Meeting
January 22, 2020
like the dumpster is away from the property line enough where it is not in the way of any
sort of circulation around the building. He said those are the primary things and then
Corporate sent Mr. Rountree a plan which is really interesting as they had it very
detailed pertaining to the parking being color coded. He sent that plan to Mr. Blomeley
and said it was like looking at a matrix cube. Mr. Blomeley asked Mr. Rountree to
simplify the plan and changed parking allocations all around the site. He said Corporate
asked Mr. Rountree to do queuing lanes on this plan and Mr. Blomeley was not
comfortable with that. Mr. Rountree needed to make sure all these pieces are as far
away from the property lines as possible. He said most of the front stayed the same and
most of the changes took place on the rear portion of the development.
Vice-Chair Halliburton opened the public hearing.
Mr. Joseph Plummer at 304 Franklin Heights Drive came to the podium. Mr. Plummer
said his home is up the road about ½ mile from this project and they have lived there
going on 29 years. The City and the State has done an excellent job developing that area
of Highway 96 and he believes it is the nicest part of the City. Excellent setbacks,
plenty of greenery, parking and many small businesses that are useful. He was excited
when the Hardees came in and then the Burger King and the Just Love Coffee and the
dental care, etc., etc. He said when he read the public notice in the newspaper, his first
private thought was this must be a Ponzi scheme. A car lot there? He said that is some
high dollar real estate right there and he always wondered what useful business would
go in there just seconds from his home. He thought it might be a land lease deal should
the car lot fail then we would be stuck with all the ugly left behind and we have plenty
of that around the City. He said next to the proposed car lot, modern Speedway or
whatever they are building is near completion. Mr. Plummer asked what the monster, 2-
story, ugly structure next to Speedway that is nearing completion. He said, “Here we go
again. The City has relaxed setback, not much parking, built a structure that just
doesn’t fit in with the surrounding architecture.” He said he didn’t understand why the
City cannot stick to its original game plans. Mr. Plummer said he opposed this car lot
there that backs up into their neighborhood. He said let’s stick with our game plans and
make this city beautiful. He thanked the Board.
Ms. Marsha L. Richardson, Executer of the Estate of Lois Jean Richardson at 3088 Old
Fort Parkway Franklin Road came to the podium. She moved there when she was five
years old and the house is 60 years old now as it was built in 1960. She said it was the
country then but now it is residential. She got a notice of this last week in the mail that
there was going to be an Enterprise car company there. Ms. Richardson asked the Board
to please employ to not to do this without a little bit more notice and at least letting the
people that see this that live there and are going to be affected by this every day, let
them have some input into it. She said this has come as a surprise to both her sister and
her. Ms. Richardson said they haven’t even had a time to have a response. She had to
take off work to come here today to address this, one stamp and that is it. She added
5
BZA Minutes
Regular Meeting
January 22, 2020
they are the only property from I-24 on down to Paschal Drive that is still zoned
Residential on Franklin Road. She is not trying to protect that. She said her Dad used to
have a saying, “That’s progress”. She said it is going to come out this way and she
knows that and accept that. She said that was a 2-lane little bitty road that didn’t even
have a strip down it when her dad bought that property. Ms. Richardson knows things
have changed but she would like to be appraised of this because this is going to have,
maybe a positive but it could certainly have a devasting impact on our home. Ms.
Richardson thanked the Board.
Mr. Allen Holfield at 115 Franklin Heights Drive came to the podium. His property is
located adjacent, next door to the west side of the property that is in question. He had
several questions and concerns. 1) He asked the hours of construction. He said when
they built the Racetrac because it is one property over from being in his back yard. He
said they were working late into the night. They were hauling hundreds of truckloads of
dirt and rock in there working till 11:00 or 12:00 at night. He said that was one of his
big concerns. Mr. Holfield said he knows it is coming and is ok with it and is ok with
Enterprise being there. He thinks Enterprise will be good neighbors and he too is trying
to be a good neighbor. He was concerned about the impact of what it is going to be on
his family. Again, he said (1) is the hours of construction; (2) proposed start and finish
date; (3) what are their hours of work going to be adding they are old and go to bed
early. He knows there is going to be progress and he is ok with it. He referred to the (4)
buffer stating he appreciates the privacy fence, the Type E buffer with 2-3 rows. Mr.
Holfield asked about a berm because there is an option – option 1, 2, or 3 on the Type E
buffers pointing out one option is a 3-foot berm which is a raised bed and then the 6-foot
trees or privacy fence. He thinks the berm would be a tremendous help since you are
starting off with 9-10 feet. Mr. Holfield said that will block off a lot of the light and (5)
he is concerned with the lighting in the parking lot. He was concerned the parking lot
will be lit up like day light, but he is ok with that as there is a new high-tech light that
shine down. He said if they are shining on a parking lot, that is fine but if they are going
to be shining on cars and the reflection off those cars is going to be reflected right back
up and will light up the neighborhood. He questioned Mr. Ware about the berm, and he
said they weren’t planning to install a berm.
Mr. Ware said the reason they may not install a berm is because there might be some
issues with the drainage.
Mr. Holfield said the drainage would cause a dam which he thinks would be better if the
water stays on that side of the property than coming on his side of the property. He said
that is another question on his list. He appreciates the privacy fence and the trees and
questions the berm. It would be nice with a buffer to be installed before the construction
to block off some of the construction. He didn’t know if you have heard a dump truck
dump, but it goes KaToon KaToon and he heard that enough at Racetrac. His next point
was (6) elevation and the run-off, drainage. He said the Racetrac was built
6
BZA Minutes
Regular Meeting
January 22, 2020
approximately 3-4 feet elevation between their property and Enterprise property. He
asked if Enterprise would build up their property too. He was afraid the shot rock and
dirt would cause a drainage issue on his property. Mr. Holfield’s next concern (7) was
about the proposed stormwater management pond and asked where the water goes if the
pond fills up. He answered, downhill. He had questions about the wash-bay doors but
understands where they have been moved. He wanted to get the hours of operation on
record as Mr. Ware told him 7:00 A.M. to 7:00 P.M. Mr. Holfield thanked the Board.
Vice-Chair Halliburton closed the public hearing.
Vice-Chair Halliburton asked Mr. Ware and Mr. Blomeley to address the concerns.
Mr. Ware referred to the lighting and said the light will shine no more than ½-foot
candle across the property line. He couldn’t say if the light would reflect off the cars
and disturb residential neighbors.
Mr. Ware referred to the hours of operation along with the start and finish times stating
he did not know at the time he spoke with Mr. Holfield.
Mr. Blomeley referred to the hours of construction stating the hours of construction
depend on the season. He said any kind of violation of those hours of construction can
be called in to the City. He will pass that information along to the appropriate people
that enforce those hours of construction.
Vice-Chair Halliburton referred to questions that were asked. He asked if the setbacks
have been changed on Highway 96, not specific to the subject property.
Mr. Blomeley said the Commercial Highway standard setback is 42-feet. Some
developments may choose to have their building further back than the 42-feet but that is
up to their site design. He said the new building that is under construction he referenced
is where the old Town and Country Apartments used to be. He said both of those
buildings will be demolished and he thinks one has already been demolished. This is a
three-phase development and the first phase is close to Medical Center Parkway has
retail on the bottom and 8-10 apartments on the second story. He said south of that will
be an assisted living building and south of that will be a senior living apartment
building. Mr. Blomeley said it is a very difficult piece of property to develop because it
is so long and narrow but development with that is moving forward. He said the
building on that one may be pulled closer to Old Fort Parkway than the other buildings
in the area. The buildings where Jersey Mikes is located is in the old Blue Cactus and
are pulled all the way back to the rear of the property with all of the parking in the front
which is more of a model development that we saw in the early / mid 2000’s. He said
the development that is under construction right now is a little bit more modern and a
different design than that urban design that we saw in the traditional strip centers.
7
BZA Minutes
Regular Meeting
January 22, 2020
Mr. Blomeley referred to a question from Ms. Richardson about notices. He said we
followed all of our standard notifications and protocol for this public hearing. He said
we send out the notices in the mail two Fridays before the Board of Zoning Appeals
meeting so by the time the people get the notice it leaves roughly 9 or 10 days prior to
the meeting for them to research the request, call us to learn about the request or come to
the public hearing. We also put a notice in the Murfreesboro Post, we put a notice on
our web-site and put signs on the property. We followed all of our standard notification
with this like we do with any other Board of Zoning Appeals application.
Mr. Blomeley referred to the issues that Mr. Holfield brought up that Mr. Ware hasn’t
address already. He said the buffer would be at the Board’s discretion to increase any
elements of the buffering and screening plan that the Board deems needed to mitigate
any negative impact on the adjacent neighborhood. He said if that meant adding a berm
to the proposed buffer, that is certainly within the Board’s realm of approval. He
referred to the timing of the buffer installation stating the buffer is required to be
installed prior to the Certificate of Occupancy being issued. He said that would not be
installed prior to construction and the reason for that is because you install plant
materials, install a buffer and spent a lot of money putting a landscape package together
only to have construction occur directly around the base of it perhaps killing the plants,
disturbing them somehow. He said it is most prudent to install those after construction
is complete so that their ability to survive and thrive is enhanced.
Mr. Blomeley referred to drainage stating there is a stormwater management drainage
pond that is proposed and our Engineers on staff must review it to determine if the rate
of discharge post construction is no greater than the rate of discharge preconstruction.
He referred the specifics of the drainage to Mr. Sam Huddleston.
Mr. Blomeley said the hours of operation included in their operation would be 7:00
A.M. to 7:00 P.M. and as part of their application, that is something we could hold them
to. He said if they begin to operate till 8:00 or 9:00 at night, we could enforce that as a
part of their special use permit application. Likewise, if they wanted to request to be
able to operate longer, they could make a request to the Board of Zoning Appeals to
amend their special use permit to increase their hours of operation which would require
another public hearing and separate application. He said if they are approved, the
maximum hours of operation would be 7:00 A.M. to 7:00 P.M.
Mr. Blomeley said he answered everything he had written down.
Vice-Chair Halliburton said there was one question Staff would not be able to answer
but the applicant might. He asked the proposed start and finish date.
8
BZA Minutes
Regular Meeting
January 22, 2020
Mr. Preston Quirk, Architect for the project came to the counter and said assuming site
plan approval moves in a timely manner they would like to start in June 2020 with an 8-
month construction period.
Ms. King does not recall having limited hours unless the Board includes that as an
additional qualifier in our approval. She asked if that something because they have
applied to and their use in the application 7:00 A.M. to 7:00 P.M. would automatically
or would the Board need to specify that in a motion.
Mr. Blomeley said, in his opinion, it would not hurt to require that in the form of a
condition of approval should the Board wish to approve this today or at next month’s
meeting.
Ms. Foy referred to the Type E buffer and asked if the berm, rows of evergreen and two
rows of trees is the most that can be done for this type of buffer or are there other
options to provide even more separation.
Mr. Blomeley said there are several different cross sections that can be considered a
Type E buffer. He said one is just the standard buffering with the plantings in that 20-
feet. Another is to substitute a fence for some of the required plantings and another is to
include a berm within lieu of some of the required plantings. Mr. Blomeley specifically
asked them to add the privacy fence in addition to a Type E buffer so we are not
eliminating any of the plantings but adding the fence to the number of plantings that
would be there already. Mr. Blomeley said it is up to the Board to say you could either
use the cross-section in the Zoning Ordinance that has the berms substitute for some of
the required plantings. Or, the Board could say I want the required number of plantings
in addition to a 3-foot berm or whatever height berm. The Board has a lot of latitude
with a special use permit to require what you feel is necessary to properly mitigate any
negative impact on the adjacent residential uses.
Ms. King asked if someone from the City could look at any impact a berm would cause
to drainage.
Mr. Blomeley said yes.
Ms. King asked to have that information in the next month’s report, so the Board knows.
She would not want to make that requirement for site and then cause and impact with the
drainage easement when it comes to being close to commercial property.
Mr. Tipps said the elevation as it affects those residents to both sides.
Mr. Blomeley said we can do that.
9
BZA Minutes
Regular Meeting
January 22, 2020
Mr. Tipps asked about the lighting wanting to know how bright they will be. He asked
if they would be similar to the lighting installed at Siegel Park Soccer fields and Adams
Tennis Center. He said this type of lighting seems mitigate lighting to adjacent
properties.
Mr. Quirk came back to the podium and said they have not done a photometric plan yet
but will comply with the city requirements which is a ½-foot candle max on the property
line.
Mr. Blomeley said the city requires the lighting fixtures to be oriented primarily down
with a maximum angle oriented out. He said if there are any conditions the Board feels
would be necessary regarding lighting, it is certainly in your authority.
Mr. Blomeley asked for feedback on the dumpster location. He noticed that the
dumpster is still kind of on the side of the property adjacent to the neighborhood to the
west. He said it has been pulled off, but the original origination of this plan had the
dumpster directly behind and adjacent to the building. Mr. Blomeley thought that was a
good location for the dumpster and does not know why it has been pulled away from the
building. His preference would be to get as much separation as possible from the
adjacent residential lots but also not have it right up on the new public right-of-way. He
feels there is still room for improvement in pulling that farther off the western property
line. He would like some feedback on that issue.
Vice-Chair Halliburton agreed with Mr. Blomeley stating anytime you can get the
dumpster away from any adjacent neighbors would be the best thing.
Ms. King made a motion to defer the special use permit in order to establish a
motor vehicle sales and rental facility on property in the Commercial Highway
(CH) district located along the south side of Franklin Road east of Franklin
Heights Drive until the February 26, 2020 BZA meeting. The motion was seconded
by Ms. Foy and carried unanimously in favor.
Staff Reports and Other Business
None
The meeting adjourned at 1:45 P.M.
_____________________________ _______________________________
CHAIRMAN SECRETARY
10
Get email alerts for Murfreesboro
A daily email when new agendas and minutes are posted.