MURFREESBORO WATER RESOURCES BOARD
December 11, 2018
The Murfreesboro Water Resources Board met on Tuesday, December 11, 2018 in the conference
room at the Operations and Maintenance Building, 1725 S. Church Street. Present at the meeting were
Board members: Mr. John Sant Amour, Dr. Al Carter, Mr. Ron Crabtree, Mr. Brian Kidd, Ms. Kathy
Nobles, Mr. Kirt Wade, and Ms. Madelyn Scales-Harris. Also present were Darren Gore, Doug Swann,
Valerie Smith, Michele Pinkston, Anita Heck, Adam Tucker, Steve Tate, Matt Powers, Jimmy Stacey,
Donald Hughes, Alan Cranford, Joe Russell, John Strickland, Sharon Seibert, Carolyn Davidson, Jay
Bradley, Mike Bernard, Lynda Sullivan, Travis Wilson, Jimmy Jobe, and Drew Nickerson, along with other
members of the public.
Mr. Sant Amour administered the Oath of Office to Mr. Kirt Wade as the newest member of the
Water Resources Board.
Item D was removed from the Consent Agenda.
Items A, B, C, and E of the Consent Agenda were presented for the following considerations:
A. Consider Barker & Burton St. Waterline Replacement Bid –
MWRD Operations & Maintenance requested sealed bids for the materials necessary for the water
line replacement on Barker and Burton St. The table below shows the bid results.
Project: Barker & Burton St (Water Line, Pipe, Valves, Fittings)
Company Total
Fortiline Waterworks $51,726.95
G&C Supply $52,269.75
Southern Pipe & Supply $52,966.69
Hayes Pipe $53,147.00
Core & Main $54,465.40
Consolidated Pipe $54,520.00
Staff recommended the Board recommend to City Council approval of purchasing all materials for
the project from the lowest bidder, Fortiline Waterworks. Funds are available in the capital budget
expenditures in the 2018-2019 (FY19) budget.
B. Consider O&M Vehicle Purchase –
Operations & Maintenance requested to replace unit #6 used by the New Construction Division
and unit #82 used by the Sewer Rehab Division. Staff located the desired vehicles on the State of Tennessee
Vehicle Contract with Ford of Murfreesboro.
Page 2
Water Resources Board Minutes December 11, 2018 Page 2
VEHICLE DETAILS
Qty Description Cost Budgeted
1 2019 Ford F-350 Crew Cab 4x4 (New Const) $59,960 $60,000
1 2019 Ford F-150 Super Cab 4x4 (Sewer Rehab) $26,131 $35,000
Staff recommended the Board recommend City Council to approve the purchase of these vehicles
with funding coming from the FY 2018-2019 budgeted capital account.
C. Consider a Proposal from Wiser Consultants for Engineering Design Services for Rucker
Lane Widening project –
The City is moving forward with the design to reconstruct and widen Rucker Lane. Typically, the
Department’s policy is to replace and possibly upgrade the existing water and sewer mains with new
roadway reconstruction projects to avoid having old lines within a new road. This roadway is within
Consolidated Utility District’s water service area, so the Department will not have any water main
replacements. Our sewer mains do not run the length of the roadway so there will not be old sewer mains
to replace. There are only three points where the sewer mains have been extended, by development, to
Rucker Lane from the Interceptor sewers to the west and east.
The City is under contract with Wiser Consultants to design the roadway improvements and as
matter of standard practice, staff has requested a proposal from Wiser to design the sewer main extensions
to cross the roadway as it is being widened.
Wiser has provided their proposal of an amount not to exceed $4,669. An estimate on the extension
of the sewer mains is $30,000.
Staff recommended the Board recommend City Council to approve the proposal for engineering
design services. This project is proposed to be funded from working capital reserves.
E. Consider SRWTP Improvements Change Item No. 10 –
Staff submitted Change Item No. 10 for a 30-day time extension to the Stones River Water
Treatment Plant Improvements for repairing the sink holes in Sludge Lagoon No. 2. Blakely Construction
is the contractor performing the SRWTP Improvements.
The option of concrete injection was approved by the Board at the October meeting for Change
Item No. 7, at an estimated $34,000 to repair two sinkholes. The existing sinkholes are preventing the
lagoons from retaining all its contents and require attention to put the lagoon back into service. The change
includes site prep from the contractor, Blakely Construction, as well as the repairs to be done by the
geotechnical subcontractor GeoFirma.
Prior to Blakely being able to start construction, staff and SSR worked with Tuscaloosa Testing
Laboratory (TTL who specializes in geotechnical engineering, analytical laboratory testing and
construction materials testing) to try and determine the extent of the sinkholes in the Sludge Lagoon No. 2.
Staff requested TTL to perform noninvasive testing to check for the presence or absence of karst features
Page 3
Water Resources Board Minutes December 11, 2018 Page 3
in the lagoon so that identified features will be repaired prior to determining the more permanent repair.
TTL plans are to make between eight and ten traverses in each lagoon, with each traverse performed on
approximately 50-foot centers in an east-west direction. The depth that subsurface data is gathered is a
function of the geophone spacing. The method that they are using is Seismic Refraction.
The data that TTL obtains will be used to estimate the depth to bedrock, check for indications of
weathering in the bedrock, and possibly locate any large subsurface voids that may be present beneath the
traverses. Once the evaluation is complete for the Sludge Lagoon No. 2, a report will be provided. Blakely
has already begun the necessary site prep for the geotechnical subcontractor GeoFirma, but further work
cannot be conducted until the report from TTL is completed. This has delayed Blakely from beginning in
November and therefore they are asking for an additional 30-day time extension. Staff and SSR believe
this is reasonable as the delay is out of their control.
Change Item No. 10 will not result in any increase of the total contract amount; however, the
substantial completion date would be changed to within 240 days from the Notice to Proceed and no later
than December 27, 2018 and the final completion would be changed to be completed within 260 days of
the Notice to Proceed or no later than January 16, 2019.
Staff recommended the Board recommend to the City Council approving proposed Change Item
No. 10 with the 30-days extension of time.
A motion was made by Brian Kidd to accept Items A, B, C, and E of the Consent Agenda as
presented and it was seconded by Kathy Nobles. The Board voted unanimously to approve.
Item D removed from the Consent Agenda was discussed and voted on as an individual item.
D. Consider SRWTP Commercial Structures & Facilities Painting Bid –
The Commercial Structures and Facilities Painting bid was to allow for repainting of the Stones
River Water Treatment Plant and Auxiliary Intake Building over the next four years.
There were three contractors that provided a bid. They were HP Ventures dba CertaPro Painters
of Nashville North-Bowling Green, Commercial Painting, Inc. and Charlie Irwin Painting, Inc. Staff
reviewed the bids and determined that CertaPro Painters did not meet the requirements for this project.
They did not have the proper bond limit and they are not licensed for sandblasting which is a part of this
project. The bid tabulation is below.
Contractor Name 2018-19 2019-20 2020-21 2021-22 Grand Total
CertaPro Painters of Nashville North-
Bowling Green $444,857 $467,646 $142,563 $69,244 $1,124,310
Commercial Painting, Inc. $341,265 $500,425 $123,200 $161,350 $1,126,240
Charlie Irwin Painting, Inc. $436,082 $746,494 $164,208 $109,334 $1,456,118
Preferred Sandblasting & Painting No bid No bid No bid No bid No bid
McKinney Painting, Inc. No bid No bid No bid No bid No bid
Leland Corporation No bid No bid No bid No bid No bid
The Pressure King No bid No bid No bid No bid No bid
Page 4
Water Resources Board Minutes December 11, 2018 Page 4
Staff therefore recommended accepting the lowest responsive and responsible bid from
Commercial Painting, Inc. Commercial Painting, Inc. painted the facility when under construction and has
done additional painting onsite since the 2010 expansion. Their work meets all specifications in the ITB.
The FY 2018-19 capital budget has $225,000 budgeted for facility painting. In accordance with
the ITB and speaking with the contractor, there will be some adjustments to which areas are painted in the
FY 2018-19 to stay within budget. This will not change the overall grand total amount.
Contractor Name 2018-19 2019-20 2020-21 2021-22 Grand Total
Commercial Painting, Inc. $224,900 $320,465 $419,525 $161,350 $1,126,240
The cost of the 2018-2019 project, after adjustment, is $224,900. The amount in the FY 2018-2019
capital is $225,000. This will bring the project $100 under budget for FY 2018-2019.
Staff recommended that the Board recommend to the City Council accepting the bid from
Commercial Painting, Inc. in accordance with their bid.
A motion was made by Dr. Carter to accept Item D of the Consent Agenda as presented and it was
seconded by Madelyn Scales-Harris. The Board voted unanimously to approve.
Staff and the Board congratulated Ms. Carolyn Davidson on her upcoming retirement and
expressed appreciation for her 40 years of service with the Department.
The October 23, 2018 Board Minutes were unanimously accepted as presented.
The Board considered Stormwater Fund Financial Audit for FY18.
There are no findings in this year’s audit.
The table below summarizes the Department’s financial position for the stormwater fund:
June 30, 2018 June 30, 2017
Cash 5,856,604 10,469,071
Utility Plant $ 6,296,594 $ 6,342,886
Deferred Outflows 91,689 166,627
Prepaid Expenses and Other Assets 45,263 39,018
Total Assets and Deferred Outflows of Resources $ 12,290,150 $ 17,017,602
Trade Accounts Payable $ 39,178 $ 64,703
Other Liabilities 75,848 61,907
Deferred Inflows 52,352 24,428
Due to Other Funds 1,252,823 6,180,545
Long‐Term Liabilities 1,157,414 228,152
Total Liabilities and Deferred Inflows of Resources $ 2,577,615 $ 6,559,735
Net Assets
Net Investment in Capital Assets 6,296,594 6,342,886
Unrestricted 3,415,941 4,114,951
Total Net Position 9,712,535 10,457,837
Total Liabilities, Deferred Inflows and Net Position $ 12,290,150 $ 17,017,572
Page 5
Water Resources Board Minutes December 11, 2018 Page 5
Staff recommended approval of the June 30, 2018 audit of the Murfreesboro Stormwater Fund.
Dr. Carter made a motion to approve. Madelyn Scales-Harris seconded. The motion unanimously
passed.
The Board considered the Water Resources Fund Financial Audit for FY18.
There are no findings in this year’s audit.
The table below summarizes the Department’s financial position for the water resources fund:
June 30, 2017
June 30, 2018 as restated
Current Assets $ 101,122,393 $ 84,357,612
Capital Assets 417,131,278 416,976,867
Non-Current Other Assets 86,799 123,647
Deferred Outflows 2,616,525 4,034,092
Total Assets and Deferred Outflows $ 520,956,995 $ 505,492,218
Current Liabilities $ 16,573,301 $ 15,514,994
Non-current Liabilities 122,557,631 129,947,706
Deferred Inflows 870,391 392,307
Total Liabilities and Deferred Inflows $ 140,001,323 $ 145,855,007
Net investment in capital assets $ 307,032,011 $ 300,550,306
Restricted 86,799 123,647
Unrestricted 73,836,862 58,963,258
Total Net Position $ 380,955,672 $ 359,637,211
Total Liabilities, Deferred Inflows
and Net Position $ 520,956,995 $ 505,492,218
Staff recommended approval of the June 30, 2018 audit of the Murfreesboro Water Resources
Department.
Madelyn Scales-Harris made a motion to approve. Dr. Carter seconded. The motion unanimously
passed.
The Board considered purchase of Mission monitors.
In 2016, Operations & Maintenance began installing Mission Communication Monitors to the
pumping stations. The monitors are configured to generate alarms based on various events including pump
run times, wet well levels, station floods, power and pump failures. These alerts are sent via phone, text,
and email.
At the October Board meeting, O&M received approval to purchase an additional 8 monitors
included in the FY19 budget. During this discussion, it was brought to the Board’s attention that an
additional 22 monitors were required for all stations to be monitored. The Board requested staff to ask the
vendor if they would provide a discount if we purchased the remaining 22 monitors.
Staff contacted Mission Communication and they offered 15% off each monitor which equates to
a discount of $329.25 per monitor which provides a total savings of $7,243.50.
Page 6
Water Resources Board Minutes December 11, 2018 Page 6
Staff recommended the Board recommend to City Council to approve purchase of 22 additional
monitors to replace the remaining wireless radio systems at the cost of $2,747.15 each for a total of
$60,437.30. This cost also includes 1 year of cell service, hosting, and security.
This amount was not included in MWRD’s FY19 Capital Budget and funding is requested to come
from working capital reserves.
Brian Kidd made a motion to approve. Madelyn Scales-Harris seconded. The motion unanimously
passed.
The Board considered S&ME Task Order 20181130, 2019 Sanitary Sewer Rehab project design.
S&ME has been advising the Department regarding our sewer CCTV (closed-circuit TV) databases
and our sewer rehabilitation under a Master Services Agreement since 2012. Over the last several years,
S&ME has demonstrated their expertise in all aspects, from their method of project design of plans and
specifications, detail of inspections and quality control measures as well as as-built information that will
easily merge into our GIS system. Staff believes that having S&ME to design, bid, provide construction
administration and resident project inspection has enhanced our program.
Staff has delivered defective sewer main, sewer lateral and manhole information to S&ME and we
have requested a Task Order for the design, construction administration and resident inspection for this
work. They have preliminary estimates for their work, based on a construction project size of $4.0M, in an
amount not to exceed $432,000 total. Of this total, $121,500 is for design, $7,500 is for surveying only as
directed by staff, $98,000 for construction administration, and $205,000 for resident inspection. Staff also
intends to have a staff inspector assigned to the project since at times up to 3-4 crews can be working in
separate locations at the same time.
By the time the project is bid, approved by the Board and Council, contracts are executed, and a
pre-construction meeting is held, the next fiscal year funding will be available.
Staff recommended that the Board recommend to the City Council approval of Task Order No.
20181130 under the Master Service Agreement with S&ME. Bids for construction will be brought back to
the Board for approval at a later date.
Funding for the Engineering, Construction Administration, Inspection and Construction is
approved from a combination of the remaining 2017/2018 Budget & Working Capital Reserves, as well as
2018/2019 and 2019/2020 Budget & Working Capital Reserves. The Department has $720,246 remaining
to spend in the 2017/2018 allotment.
Rehab Rate Funded Budget & Working Capital Reserves 2018/2019 + $720,246 (Remaining)
Total WO# Project Project Remaining
Expenditure 2018/2019 Budget
2019 Sewer Rehab
$3,470,246 TBD Construction, Eng. ~$4.0M ($529,754)
& Inspect above.
Page 7
Water Resources Board Minutes December 11, 2018 Page 7
Rehab Rate Funded Budget & Working Capital Reserves 2019/2020
Total WO# Project Project Remaining
Expenditure 2019/2020 Reserves
$2,250,000 1,720,246
Ron Crabtree made a motion to approve. Dr. Carter seconded. The motion unanimously passed.
The Board considered SSR Task Order 09-47-001.2 Amendment #6, Winter 2018 & Summer 2019
East and West Fork Bioassessment Sampling.
AquAeTer has completed its water quality and stream assessments for the West and East Fork
Stones River commissioned for 2014, 2015, 2016 and 2017. The bioassessment monitoring results were
very encouraging and demonstrate that the West Fork Stones River is healthy and meeting its designated
uses. Staff believes the task order is necessary to continue this work through the summer of 2019, as a next
installment of developing the protocol that we believe will help create a new permitting framework for the
City of Murfreesboro with the Tennessee Department of Environment and Conservation (TDEC).
All results demonstrate the West Fork is exceeding the standard for Tennessee Macroinvertebrate
Index (TMI) of 32 of Murfreesboro’s ecoregion. Additionally, the assessments demonstrate that the
effluent being discharged from the Water Resource Recovery Facility (WRRF) is not impacting stream
health. TMI scores assess biological integrity of streams. Macroinvertebrates are used by TDEC as
indicator organisms to determine if a stream supports fish and aquatic life.
The continued sampling efforts and TMI scores are intended to support the strategy of approaching
TDEC to offer alternate permitting potentials to the City of Murfreesboro as we attempt to get ahead of the
growth projected in the City’s Murfreesboro 2035 Comprehensive Plan. One of the main overarching goals
that the Department has over the next 20 years is to influence the regulatory framework focusing on
reclaimed water.
Staff recommended the Board approve Amendment #6 to SSR Task Order 09-47-001.2 to allow
for continued biological sampling of the West and East Fork Stones River.
The extension to sampling and monitoring the West and East Fork Stones River is a net additional
fee of $90,500 from previous approved fee ceilings. Staff recommended funding coming from the
Department’s working capital reserves. MWRD’s 5-yr CIP earmarked $500,000 for Stones River Water
Quality studies (including the Waste Load Allocation modeling) in FY18, of which only approximately
$250,000 was expended. Staff has budgeted an additional $150,000 for FY19 through FY23.
Brian Kidd made a motion to approve. Kathy Nobles seconded. The motion unanimously passed.
The Board considered Overall Creek Pump Station upgrades.
In May 2018, a memo was presented to the Board, for information only, outlining proposed
upgrades to the Overall Creek Pump Station. Staff proposed new variable frequency drives (VFDs),
improvements to the existing pump controls by upgrading the existing control panel with a new
Page 8
Water Resources Board Minutes December 11, 2018 Page 8
programmable logic controller (PLC), a new Human Machine Interface (HMI), new local network switch,
and new 240 watt, 24 volt DC power supply; a new stand-alone bubbler level system; a new backup
ultrasonic level system; and a new cellular remote terminal unit (RTU).
In June 2018, the Board approved SSR to design these improvements. During the kick-off meeting
for the project, it was requested by O&M Maintenance Technicians to add to the scope of work to replace
the check valves, that haven’t been working correctly, and to install a by-pass pump connection for
emergencies.
SSR provided the design drawings and specifications for the initial project as well as the requested
additions, and on behalf of the Department, requested pricing from John Bouchard and MR Systems to
construct the project utilizing our existing Master Service Agreements approved by the Board in February
and March 2018 respectively.
Staff recommended the Board recommend to the City Council approval of Task Order 18-06 to
include work by John Bouchard and MR Systems for the Upgrade to the Overall Creek Pump Station in the
amount of $351,042.06 to be funded from Working Capital Reserves.
At the May 2018 meeting, the estimated total project cost was $310,000 consisting of $125,000 for
electrical upgrades, $110,000 for instrumentation and controls upgrades, $20,000 for possible HVAC
upgrades, $20,000 for possible bypass pumping, and $35,000 for engineering services. With the added
scope, the project has gone over this initial estimate by $41,042. Additional upgrades are planned in the
future to double the size of the station, which is also factored into the CIP beginning next year.
Kathy Nobles made a motion to approve. Madelyn Scales-Harris seconded. The motion
unanimously passed.
The Board considered changes to the Policies, Procedures, and General Design Requirements.
The Policies, Procedures, and General Design Requirements (P&P) was originally approved by the
Board on August 25, 2009 and Council on September 17, 2009. There have been two amendments to these
P&P that have been approved by the Board and Council in 2010 and 2016.
At this time, staff proposes a few changes to the P&P as well as our Standard Development
Agreement that will have cost implications to the development community. Staff reached out to the
Development Community and held a Stakeholders meeting November 29th at City Hall to discuss the
changes. Two developers were present at the meeting and did not have any negative feedback regarding
the changes.
These potential cost implications can be broken into those that are Contractor increases and those
that only affect the Developer. These are:
1. Contractor / Increased Construction costs include:
a. Potential bid increase to pre-test the sewer manholes prior to paving and the required MH
testing after paving.
Page 9
Water Resources Board Minutes December 11, 2018 Page 9
b. Bid increase to provide a 5” Storz Connection on all new fire hydrant installations. This
connection is a “quick connect” for the Murfreesboro Fire & Rescue Department’s fire
truck hoses.
c. The discontinuance of SDR 35 PVC for sewer mains which is a thinner wall pipe and
requiring SDR 26 PVC which is thicker.
d. Potential increase in large (3” and larger) meter installations since these are to be purchased
and installed by the Contractor per the Department’s specifications. May include
Contractor mark-up.
2. Developer Increases:
a. Potential increase in per lot price to cover the loss of property associated with wider
easement widths.
b. Increased surety costs to cover the increased minimum surety amounts.
c. Hold Harmless Agreements – City not responsible for stormwater quality related fixtures
within area encumbered by water/sewer/repurified water easements (specialty pavement,
porous concrete, bio-swales, etc).
Staff proposes these changes to be incorporated to water, sewer and repurified water construction
projects beginning with any approval on and after March 1, 2019, except for the requirement of wider
easement widths. Staff feels that it would be unfair for a developer to be required to incorporate wider
easement widths into a Master Plan that has already been approved by Planning Commission. Therefore,
if a Master Plan or Preliminary Plat have been approved by Planning Commission prior to March 1, 2019,
then the easement widths would be under the current requirements.
Staff recommended that the Board recommend to the City Council approval of these changes to the
Policies, Procedures, and General Design Requirements as well as the Standard Development Agreement.
Ron Crabtree made a motion to approve. Kirt Wade seconded. The motion unanimously passed.
Staff provided the Board a PowerPoint presentation reviewing the Working Capital Reserve
Account in conjunction with FY2019-2023 Capital Improvements Plan (CIP).
The Murfreesboro Water Resources Department (MWRD) staff has drafted an updated 5-Year CIP
from FY 2019 through 2023. The primary focus of this preliminary draft is the capital improvements
projected to be funded by working capital reserves. After receiving the FY17-18 draft estimate of the
Department’s working capital reserve amount of $73,836,861 provided by Jobe Hastings, PLLC (JH), staff
has been able to “reset” the amount of available funds in the Department’s working capital reserve account
and therefore provide a more updated accurate reflection of the Department’s reserve balance.
The FY19-23 Capital Improvements Plan highlights three (3) major project classifications:
1. Projects funded through Debt Service
2. Projects/Purchases funded through Rates
3. Projects/Purchases funded through Working Capital Reserves
The largest components of the FY19-23 CIP are those projects funded through working capital
reserves. They are sub-classified as the following:
1. Water and Sewer Capital Improvement Projects
2. Transportation (Water/Sewer Improvements)
Page 10
Water Resources Board Minutes December 11, 2018 Page 10
3. Sewer Rehabilitation
4. Information Technology Projects
Based on the available cash (designated and undesignated) minus the outstanding committed
projects and sanctioned/pending projects, approximately $44.9M of unassigned cash in reserves is
determined available as of November 2018 (2nd quarter of FY19). When applying this to the FY19-23 CIP,
and assuming projected additional FY19 reserve fund revenue and expenditures a working capital account
balance of available funds is estimated as $53.2M at FY19 year-end. Subsequent year-end available reserve
balances have been estimated over the 5-year CIP horizon.
When plotting that balance against the Department’s 12 months operating expenses (i.e., the
minimum allowable working capital reserve fund balance), current planned expenditures never go below
the secured level but get very close in FY23. Operational expenses are assumed to increase at 2% annually
over the 5-yr CIP. The 12 months’ worth of O&M expense is considered a secured minimum balance for
the working capital reserve account as approved at the December 17, 2013 Board meeting through the
adoption of the Water and Sewer Enterprise Fund Financial Management Policies. The City Council also
approved these policies at their January 9, 2014 meeting.
No debt funding has been programmed into the proposed 5-yr CIP. All projects as currently
budgeted could potentially be funded with working capital reserve cash. Funding all major capital projects
with cash is not required; several would qualify for State Revolving Fund (SRF) loans. The increase in
capital improvement projects jumped from $60.5M to $88.49M, or $27.99M. The projects that created this
increase are as follows:
Project FY18 FY19 Difference Notes
Biosolids Thermal $4,750,000 $16,000,000 $11,250,000 Landfill closure; Funding necessary
Drying Processing for full-scale implementation
Overall Creek P.S. $0 $8,850,000 $8,850,000 Increased capacity is necessary to
Update support growth
SR840/Veterans $0 $2,400,000 $2,400,000 Economic Development; Special
Interchange Sewer Assessment potential
Hwy96 Park Sewer $0 $4,300,000 $4,300,000 Economic Development; Special
Assessment Potential
Cherry Lane Extension $0 $2,075,000 $2,075,000 Economic Development; Special
Sewer 840 to Memorial Assessment Potential
Cherry Lane Extension, $0 $2,500,000 $2,500,000 Economic Development; Special
I-24 to Florence Assessment Potential
Total $4,750,000 $36,125,000 $31,375,000
As is customary in presenting the 5-year Capital Improvements Plan, all debt funded and reserve
funded projects are qualified insofar as they must come back before the Board for consideration and
recommendation to City Council before expending any funds on them. The CIP is meant to chart out a
road-map for the Board to see the Department’s priority projects.
Page 11
Water Resources Board Minutes December 11, 2018 Page 11
Staff is providing this to the Board as information only. Subsequent discussion and appropriate
recommendations will be provided as projects are requested for design and construction.
The 5-yr CIP provides a pro forma for anticipated capital costs and the effect against the
Department’s secured minimum reserve amount of 12 months of operating expenses.
Staff presented and discussed the Water Resources Dashboard Performance for October 2018.
Staff presented the Financial Reports for the year ending October 31, 2018.
Staff reminded the Board that the Department Christmas lunch will be held on Thursday, December
th
13 at the Operations and Maintenance building.
There being no further business, the meeting was adjourned.