Muyni
← Back to Murfreesboro

Water Resources Board

Regular Meeting

Murfreesboro, TN · July 28, 2026

Agenda
Add to calendar

Agenda

WATER RESOURCES BOARD Tuesday, July 28, 2026 Administrative Office Board Room 316 Robert Rose Drive 3:30 PM AGENDA 1. Public Comment 2. Consent Agenda: A. Consider sewer easement abandonment Love’s Country Stores Subd .......................... 2 B. Consider water & repurified water easement abandonment 1340 Gateway Blvd ........ 5 C. Consider Rockwell TechConnect SCADA support renewal........................................... 8 D. Consider Blue Water Industries Contract Amendment No. 1 ...................................... 11 3. Consider minutes of the June 23, 2026 meeting ................................................................... 15 4. Consider CUD/MWRD boundary amendment ................................................................... 18 5. Consider WRRF Full-Scale Biosolids Thermal Dryer SSR TO Amendment No. 3 ........ 24 6. Consider WRRF Wet Weather Upgrades SSR TO Amendment No. 3 ............................. 30 7. Dashboard 8. Other business 9. Adjourn WATER RESOURCES BOARD COMMUNICATION Meeting Date: 07/28/2026 Item Title: Sewer Easement Abandonment–Moody Building Addition Department: Engineering Presented by: Valerie Smith/Anita Heck Requested Action: Ordinance ☐ Resolution ☐ Motion ☒ Direction ☐ Information ☐ Summary SEC, on behalf of the developer, requests the existing sewer easement highlighted on the attached exhibit be abandoned. Staff Recommendation Approval of the requested abandonment. Background Information The requested portion of the existing sanitary sewer easement abandonment highlighted on the attached exhibit was dedicated by plat with the subdivision of Love’s Country Stores, Lot 1 & 2 recorded on December 7, 2011. The easement was shown on the plat at the request of staff with the thought that sewer might be extended for future service. There isn’t existing sewer within the easement currently and now that the City has adopted the policy of only serving City customers, staff believes the easement is no longer needed. Staff is comfortable with the abandonment. This request will also be taken to Planning Commission as a mandatory referral upon Board approval. Fiscal Impact None, as the easements were dedicated by plat and not purchased by the Department. Attachments 1. Easement Abandonment Request 2. Exhibit Page 2 June 29, 2026 Mrs. Valerie Smith Murfreesboro Water Resources Dept NW Broad Street Murfreesboro, Tennessee 37130 RE: Moody Excavation LLC, Building Addition Sanitary Sewer Easement Abandonment Request Murfreesboro, Tennessee SEC Project No. 25296 Dear Mrs. Smith: Please accept this as our formal request for the City of Murfreesboro to abandon the Sanitary Sewer Easement that is shown in Plat Book 36 Page 67. The sanitary sewer easement is no longer necessary or needed. The project is built out and sitting on a high point, making any sewer connection from the north have a lower elevation to connect to the existing sewer line. The attached exhibit highlights the sanitary sewer easement abandonment area. If you should have any questions concerning this letter, please feel free to call me at (615) 890-7901 or via email at jminer@sec-civil.com Sincerely, John Miner, P.E. Project Engineer SEC, Inc Page 3 Page 4 SITE ENGINEERING CONSULTANTS ENGINEERING SURVEYING LAND PLANNING LANDSCAPE ARCHITECTURE 850 MIDDLE TENNESSEE BOULEVARD MURFREESBORO, TENNESSEE 37129 PHONE: (615) 890-7901 E-MAIL: JMINER@SEC-CIVIL.COM FAX: (615) 895-2567 NO PORTION OF THIS DRAWING MAY BE REPRODUCED WITHOUT THE EXPRESSED WRITTEN CONSENT OF S.E.C. INC. COPYRIGHT S.E.C. INC., 2026 The site as shown on these construction drawings is intended to achieve specific engineering design criteria and objectives. It is the sole responsibility of the owner/developer to ensure that the construction of the site shown on these construction drawings is in total accordance with the design as noted, described, and illustrated. The engineer assumes no administrative liability or responsibility in the assurance that the site is constructed in accordance with the construction plans. WATER RESOURCES BOARD COMMUNICATION Meeting Date: 07/28/2026 Item Title: Water/Repurified Water Easement Abandonment – 1340 Gateway Boulevard Department: Engineering Presented by: Valerie Smith/George Reagan Requested Action: Ordinance ☐ Resolution ☐ Motion ☒ Direction ☐ Information ☐ Summary Pape Dawson, on behalf of the developer for 1340 Gateway Blvd, has requested the abandonment of an existing 10-foot Water and Repurified Water easement along the front of the property parallel with Gateway Blvd. This easement, in its current form, will no longer be needed once this development is constructed. Staff Recommendation Approval of this easement abandonment as shown highlighted on the attached. Background Information There The NHI Headquarters development project will be using the existing public water and repurified mains available to the site that are within an existing 20’ public utility easement parallel and adjacent to Gateway Blvd. The 10’ easement to be abandoned is parallel and adjacent to the 20’ easement and is not needed for the development or for any neighboring properties. The 20’ public utility easement will remain in place along the front of this parcel along Gateway Blvd and the existing 10’ highlighted easement is no longer needed. Staff is comfortable with the abandonment. This request will also be taken to Planning Commission as a mandatory referral upon Board approval. Fiscal Impact None, as this easement was dedicated by plat and not purchased by the Department. Attachments Easement Abandonment Request Page 5 July 16, 2026 Applicant Letter For Mandatory Referral Via Email: GReagan@murfreesborotn.gov Mr. George Reagan Murfreesboro Water Resources Department - Engineering 316 Robert Rose Drive Murfreesboro, TN 37129 Re: Repurified Water Easement Abandonment Map 091H, Group B, Parcel 007.00 Lot 4, Murfreesboro Gateway Phoenix Subdivision Gateway Boulevard - Murfreesboro, Tennessee Pape-Dawson Job# 21200036-000 (25-0388) Dear George: Pape-Dawson Consulting Engineers, LLC (Pape-Dawson), on behalf of National Health Investors, Inc. (NHI) and Inchin Along, LLC (Inchin Along), hereby submits this request for Mandatory Referral for the abandonment of an existing Repurified Water Easement located off Gateway Boulevard on property owned by Inchin Along. The existing Repurified Water Easement (labeled as “10’ Additional Water Main and Repurified Water Easement per MWRD 02-13-2008” on the recorded plat) was dedicated to the Murfreesboro Water Resources Department (MWRD) on March 19, 2008, as shown on the final plat entitled Resubdivision Plat, Lot 3 and Lot 4, Murfreesboro Gateway – Phoenix Subdivision, of record in Plat Cabinet 33, Page 300, in the Register's Office for Rutherford County, Tennessee. The easement is located within property identified as Parcel 007.00 on Rutherford County Property Map 091H, Group B. Pape-Dawson has been retained by NHI to provide civil engineering services for the proposed development of the subject property as their new headquarters. It is our understanding that MWRD no longer plans to extend the existing repurified water line across the subject property within the existing easement. Consequently, the existing repurified water easement is no longer required. Accordingly, approval is requested to abandon the existing repurified water easement. Enclosed with this submittal are an exhibit and description identifying the existing repurified water easement proposed for abandonment. Should you have any questions or require additional information, please do not hesitate to contact us. Thank you for your consideration of this request. Sincerely, Pape-Dawson Consulting Engineers, LLC Chris Mabery, RLS Survey Department Manager Page 6 GENERAL NOTES 1. THE PURPOSE OF THIS EXHIBIT IS TO SHOW A 10' RE-PURIFIED WATER ADDITIONAL WATER MAIN AND RE-PURIFIED WATER EASEMENT ABANDONMENT EASEMENT BEING ABANDONED BY MANDATORY REFERRAL. EXHIBIT 2. THIS EXHIBIT IS NOT A GENERAL PROPERTY SURVEY AS DEFINED UNDER RULES OF TENNESSEE STATE BOARD OF EXAMINERS FOR LAND SURVEYORS, CHAPTER 0820-3-07. EASEMENT REFERENCE BEING A 10' ADDITIONAL WATER MAIN AND RE-PURIFIED WATER EASEMENT SHOWN ON THE FINAL PLAT ENTITLED "MURFREESBORO GATEWAY PHOENIX SUBDIVISION LOT 3 AND Know what's below. LOT 4" OF RECORD IN PLAT CABINET 33, PAGE 300, REGISTER'S Callbefore you dig. OFFICE FOR RUTHERFORD COUNTY, TENNESSEE. 20' WATER, SEWER, POINT OF COMMENCEMENT ELECTRIC, SIDEWALK & EASEMENT DESCRIPTION RE-PURIFIED WATER EASEMENT (58' PUBLIC RIGHT-OF-WAY) PLAT BOOK 33, GATEWAY BOULEVARD PAGE 300, R.O.R.C.T. POINT OF BEGINNING IR(O) EASEMENT DESCRIPTION MOSELY L1 N65°11'15"E 114.87' C4 L2 C3 S65°11'15"W 114.89' C1 C2 10' ADDITIONAL WATER MAIN & RE-PURIFIED WATER EASEMENT L8 LOT 4 TO BE ABANDONED L3 MURFREESBORO GATEWAY L6 L7 3,590 SQUARE FEET PHOENIX SUBDIVISION LOT 3 PLAT WAY 0.08 ACRE± L5 76 LOT 3 AND LOT 4 PLAT BOOK 33, PAGE 300 GATE RECORD BOOK 24 MAP 092E, GROU L4 R.O.R.C.T. PLAT BOOK 33, PAGE 300, R.O.R.C.T. BOOK BORO N REES IO MAP 091H, GROUP B, PARCEL 007.00 33, P IS MURF NIX SUBDIV 4 INCHIN ALONG, LLC METGATE, LLC LINE TABLE RECORD BOOK 1682, PAGE 1093 R.O.R.C.T. PHOE LINE BEARING DISTANCE OT . P "A", PARCEL 01 AND L .R.C.T , PAGE 2702, R.O. L1 S35°51'05"E 20.11' LOT 3 AGE 300, R.O L2 S35°51'05"E 10.05' CURVE TABLE L3 S18°37'37"E 44.86' CURVE RADIUS LENGTH DELTA TANGENT CHORD CHORD BRG L4 S65°23'52"W 55.02' C1 1014.05' 92.51' 5°13'38" 46.29' 92.48' S62°32'47"W L5 N28°24'58"W 10.02' 2.00 C2 40.00' 54.09' 77°28'37" 32.09' 50.06' S26°46'17"W L6 N65°23'52"E 26.57' R.C.T. C3 50.00' 68.20' 78°08'48" 40.60' 63.03' N26°24'09"E L7 N65°23'52"E 20.11' C4 1004.00' 90.58' 5°10'09" 45.32' 90.55' N62°34'31"E L8 N18°37'37"W 36.41' LEGEND IR(O) IRON ROD (OLD) NON-MONUMENTED POINT R.O.R.C.T. REGISTER'S OFFICE FOR RUTHERFORD COUNTY, TENNESSEE LOT 4 MURFREESBORO GATEWAY 1500 MEDICAL CENTER PKWY, STE 2A I MURFREESBORO, TN 37129 I 615.546.6050 PHOENIX SUBDIVISION TENNESSEE A&E PROFESSI ONALS FI RM #11104 13th CIVIL DISTRICT OF RUTHERFORD COUNTY, 1 OF 1 CITY OF MURFREESBORO, TENNESSEE Page 7 WATER RESOURCES BOARD COMMUNICATION Meeting Date: 07/28/2026 Item Title: Rockwell TechConnect SCADA Support Department: IT Presented by: Doug Swann Requested Action: Ordinance ☐ Resolution ☐ Motion ☒ Direction ☐ Information ☐ Summary Consider renewal of Rockwell Automation TechConnect support. Staff Recommendation Approve annual support pending Purchasing and Legal approval as to form. Background Information Our current Rockwell Automation software support will expire on July 31, 2026. The Department uses Rockwell Automation applications to run, program, connect, and view the wastewater and water treatment control systems. It is critical that these control systems continue to function as needed to enable the processes to run properly. This TechConnect Support includes technical support for any issues with the systems and software updates. The pricing is available single sourced from our appointed distributor, Crawford Electric Supply. Council Priorities Served Responsible budgeting Proper maintenance of software is critical for the effective and efficient operations of Water Resources Department SCADA systems. Fiscal Impact Funding for the support, $26,760.60, will come from the FY27 software maintenance budget for water and wastewater. Attachments Rockwell Automation quote Page 8 Rockwell Automation Services Agreement - Renewal FIXED PRICE PROPOSAL 3801067530 City of Murfreesboro Murfreesboro, TN Date of Issue: Monday, June 1, 2026 Quotation #: 385275 (RA Approval - QXSK10533A) Presented to: Proposed by: City of Murfreesboro Crawford Electric Supply Company LLC 2032 Blanton Dr 1284 Heil Quaker Blvd Murfreesboro, Tn 37129-2912 La Vergne, TN 37086-3515 United States United States Rockwell Automation 318 Seaboard Lane Suite 400 Franklin, Tn 37067 United States Page 9 City of Murfreesboro 30074141 Rockwell Automation Support Agreement Fixed Price Proposal 3801067530 2 Distributor Commercial Terms 2.1 Pricing Summary Crawford Electric Supply Company LLC's price is based on the Statement of Work set forth in Section 1 above. All prices are in USD. Item Product Price 1 9800-DC8AUTOC 6,549.90 Automation Control Hardware, Product Support, 8 x 5 M-F, 11-25 Total Devices 2 9800-DC8HMICOM 13,216.49 HMI Software, Product Support, 8 x 5 M-F 3 9800-DC8LEHDWA 2,523.32 Legacy Hardware, Product Support, 8 x 5 M-F, 1-5 Total Devices 4 9800-DC8ABDRIVLHPC 518.19 LV Drives Low HP, Product Support, 8 x 5 M-F, 11-25 Total Devices 5 9800-DC8ABDRIVMHPB 1,582.62 LV Drives Med HP, Product Support, 8 x 5 M-F, 5-10 Total Devices 6 9800-DC24ABDRIVHHPA 2,340.08 LV Drives High HP, Product Support, 24 x 7 x 365, 1-4 Total Devices TOTAL PRICE: USD 26,730.60 Contract Reinstatement Fee: USD 2,673.06 If this contract is not renewed before the current Contract Expiration Date Saturday, August 1, 2026, a 10% Contract Reinstatement Fee will be applied to the Suggested Resale Price. LEARNING+ SUBSCRIPTION (OPTIONAL): Web hosted, self-paced training courses including virtual classroom sessions are available for customers with an active TechConnect support agreement, as either single course access or annual subscription to all course content available in the Rockwell Automation Digital Learning Library. Please add the net amount for the Learning+ option desired in the correct quantity of desired users to your renewal PO. Catalog Description List Price per User Number Learning+ LP-3TC USD 820.00 1 Class available for 3 months Learning+ LP-SU1 USD 4,940.00 Single User Subscription 2.2 Invoicing Schedule Contract Start Date The information contained in this document consists of technical, commercial and/or financial information, which is confidential and proprietary to Rockwell Automation, Inc. This information is furnished in confidence and with the understanding that it may not be disclosed to third parties or reproduced or used, in whole or in part, for any purpose other than evaluation of this document. Copyright © 2026 Rockwell Automation, Inc., All Rights Reserved Page 14 STANDARD-en(V7.1) Page 10 WATER RESOURCES BOARD COMMUNICATION Meeting Date: 07/28/2026 Item Title: Blue Water Industries Department: MWRD Operation & Maintenance Presented by: Donald Hughes Requested Action: Renewal Of Contract Ordinance ☐ Resolution ☐ Motion ☒ Direction ☐ Information ☐ Summary Consider renewal of the contract with Blue Water Industries to purchase crushed stone used in our daily operations. Staff Recommendation Recommend to the City Council approving the Contract Amendment with Blue Water Industries. Background Information The crushed stone contract was bid out in August of 2023 for a 1-year period with two 2-year renewals. Blue Water Industries is requesting a price adjustment from the original pricing ranging from $0.50 a ton to $1.00 a ton. Council Priorities Served Responsible budgeting Bidding affords the Department the best prices possible. Fiscal Impact Estimated increase to contract is $8,000 per year. The expenses for crushed stone will be covered from FY27 and FY28 budgets. Attachments 1. Contract Amendment with Blue Water Industries 2. Request for Price Adjustment Letter Page 11 Docusign Envelope ID: AF855EDF-7DF0-81F1-82E1-3301F8043741 FIRST AMENDMENT TO THE CONTRACT BETWEEN THE CITY OF MURFREESBORO AND BWI MTN II, INC. dba BLUE WATER INDUSTRIES (A SUBSIDIARY OF MARTIN MARIETTA MATERIALS, INC.) FOR CRUSHED STONE This First Amendment (“First Amendment”) to the Contract, entered into September 1, 2023 (“Contract”), is effective as of ________________, by and between the City of Murfreesboro, a municipal corporation of the State of Tennessee (the "City"), and BWI MTN II, Inc. dba Blue Water Industries (a subsidiary of Martin Marietta Materials, Inc.), a corporation of the State of Tennessee (“Contractor”). RECITALS WHEREAS, on September 1, 2023, the City entered into a contract with BWI MTN II, Inc. dba Blue Water Industries (a subsidiary of Martin Marietta Materials, Inc.), for crushed stone; and, WHEREAS, pursuant to Section 2 of the Contract, the first two-year renewed term of the Contract between the City and Contractor was from September 1, 2024, to August 31, 2026; and, WHEREAS, pursuant to Section 2 of the Contract, the City and Contractor wish to extend the Contract for an additional two-year period, the last of the additional two-year renewals allowed under the Contract; and, WHEREAS, this second two-year renewed term of the Contract between the City and Contractor will run from September 1, 2026, to August 31, 2028; and, WHEREAS, pursuant to Section 8 of the Contract, the parties wish to modify the price of the “Picked up Price” for this second two-year term, which runs from September 1, 2026, to August 31, 2028. NOW THEREFORE, 1. The City and Contractor mutually agree to extend the term of the Contract from September 1, 2026, to August 31, 2028. 2. The City and Contractor mutually agree to the price adjustment to the “Picked Up Price” schedule of the crushed stone as shown in the chart below. 3. All other terms of the Contract, including the “Delivered Price,” to remain the same. Picked Up Price Unit Price (per Ton) 303.01 CI A Grade D $12.25 Graded 67 $20.25 Quarter Down or #10 Stone $20.00 Surge Rock/Shot Rock $15.75 CITY OF MURFREESBORO BWI MTN II, Inc. dba Blue Water Industries (a subsidiary of Martin Marietta Materials, Inc. _________________________________ ____________________________________ Shane McFarland, Mayor G. Rollins, Nashville Sales Representative APPROVED AS TO FORM: _______________________________ Jeffrey L. Peach, City Attorney Page 12 Docusign Envelope ID: AF855EDF-7DF0-81F1-82E1-3301F8043741 Page 13 Docusign Envelope ID: AF855EDF-7DF0-81F1-82E1-3301F8043741 Page 14 MINUTES MURFREESBORO WATER RESOURCES BOARD June 23, 2026 _____________________________________________________________________________________ The Murfreesboro Water Resources Board met on Tuesday, June 23, 2026, in the Board Room of the Administration Building, 316 Robert Rose Drive. Present at the meeting were Board Members, Ms. Kathy Nobles, Mr. Warren Russell, Ms. Madelyn Scales-Harris, and Ms. Sandra Trail. Also present were Valerie Smith, Doug Swann, Michele Pinkston, John Strickland, Andy Cieslak, Anita Heck, Joseph Leonard, April Pedigo, David Pendley, Matt Powers, George Reagan, Joe Russell, Sharon Seibert, Brent Fowler, Travis Wilson with other members of the public. The Consent Agenda was presented to the Board for approval: A. Consider Lawn Care Service Agreement Amendment No. 1 B. Consider Brenntag Mid-South LLC Chemical Contract Third Amendment for WTP C. Consider WRRF Full-Scale Thermal Dryer contingency allocations Sandra Trail made a motion to accept the Consent Agenda as presented. Kathy Nobles seconded the motion. The motion carried unanimously. The Minutes of the May 26, 2026 Board meeting were presented. Madelyn Scales-Harris made a motion to approve. Sandra Trail seconded. The motion unanimously passed. The Board considered the approval of one permanent and temporary easement offer to Teresa Jones Dunaway for Cherry Lane Extension Phase 3B. CIA has provided the permanent sewer and temporary construction easement description and exhibit to the Department. This information was used by the Legal Department to prepare the easement document. Legal and the City have acquired the right of way for all of Phase 3B, which required the City to use eminent domain for this Dunaway parcel. Based on that process Legal has calculated the offer amount of $85,000/acre which was greater than the appraised amount of $71,500/acre. With the size of the permanent and temporary construction easement, the easement offer is calculated at $37,900. Since that settlement amount was substantially greater than the appraised value, the City is not offering an additional premium for a consensual transaction. The City’s current schedule to bid the project is in August of this year therefore time is of the essence in acquiring the easement. Kathy Nobles made a motion to approve. Madelyn Scales-Harris seconded. The motion unanimously passed. Page 15 Water Resources Board Minutes June 23, 2026 Page 2 The Board considered LJA TO 2963-0011 Amendment No. 1 for construction administration associated with the 2025 Sewer Rehab. Since the start of construction, there have been additions to LJA’s scope of work. Additional sewer mains have been added that need lining from several development projects and there have been several sewer rehab warranty issues of our own with manhole and mains that have needed coordination. Also, staff requested LJA to request pricing from SBW for the replacement of the suction lines within two sewer pump stations. The design of these suction pipe replacements is currently within SSR contract, but time is of the essence to have these replaced so they will be removed from their scope of work, and staff felt that the price for replacement would be cheaper through this contract. The additional TO expenditure, $31,436, will be funded through the FY26 Budget and Working Capital Reserves. This brings the TO total to $483,936. Sandra Trail made a motion to approve. Madelyn Scales-Harris seconded. The motion passed unanimously. The Board considered Change Order No. 1 for the 2025 Sewer Rehabilitation contract. The contractor requests additional time be added to the contract to complete work related to requested scope changes. The big changes have been additional Development warranty work added to the project (paid by the developer) and proposed pump station suction line replacements which will be removed from the Pump Station Improvement Project currently under design by SSR. Even though these have been added to the rehab project, other items have been removed which have resulted in a decrease in the contract amount. This change order decreases the total contract by $2,844 for a total contract of $4,333,389 and extends the contract time by 26 days. Kathy Nobles made a motion to approve. Madelyn Scales-Harris seconded. The motion passed unanimously. Under Other Business, the Board considered the Chemical Contract Third Amendment with Brenntag Mid-South, LLC for chemicals used at the Water Resource Recovery Facility. Brenntag Mid-South LLC supplies disinfection chemicals used at the Water Resource Recovery Facility to support effluent compliance and public health protection. These products are applied in the treatment process to effectively eliminate pathogens prior to discharge. The contract ensures a reliable supply of critical disinfection chemicals for continuous operations. The cost of sodium hypochlorite is estimated at $225,000. Funding will come from the FY27 Operating Budget. Sandra Trail made a motion to approve. Kathy Nobles seconded. The motion passed unanimously. Staff presented the Water Resources Dashboard Performance for May 2026. Page 16 Water Resources Board Minutes June 23, 2026 Page 3 Staff presented the Financial Reports for eleven months ending May 31, 2026. There being no further business, the meeting was adjourned. _____________________________ Warren Russell, Chairman Page 17 WATER RESOURCES BOARD COMMUNICATION Meeting Date: 07/28/2026 Item Title: MWRD/CUD Boundary Amendment No. 12 Department: Engineering Presented by: Valerie Smith Requested Council Action: Ordinance ☐ Resolution ☐ Motion ☒ Direction ☐ Information ☐ Summary Attached is documentation requesting a revision to the MWRD/CUD water service boundary south of N. Rutherford Boulevard and east of Husky Truss. Staff Recommendation Approve Amendment No. 12 to the CUD/MWRD boundary subject to Legal approval of the amendment language. Background Information Staff, CUD and SEC, Inc., on behalf of the property owner Brian Berryman, have been working together on this request for a boundary revision for several months. Currently CUD cannot serve the project as their water main large enough to serve the project is along Elam Road. The master plan for the development is to extend to Elam Road, however, that will be years down the road and Mr. Berryman wishes to access the property initially from Rutherford Blvd as both MWRD water and sewer are available. MWRD’s service area encompasses less than half of the development, being along the north end. CUD did not wish to release any of their current service area. With that being said and after receiving the layout of the development, staff agreed to support releasing some of our boundary to CUD. The attached Exhibit 1 shows the boundary change. Per the development master plan, CUD will gain approximately 2.5 acres or 3 lots. This request is being taken to CUD’s July Board meeting for approval. The attached Amendment #12, if approved by both Boards, will be taken to Council for approval and then executed by both parties. Council Priorities Served Responsible budgeting CUD and MWRD continue to adjust service boundaries in the interest of least cost to our departments and the developers with highest benefit to the public in providing water service for domestic and fire protection uses. Attachments Page 18 1. Boundary Amendment Agreement No.12 2. GIS Exhibit 1 3. Development Master Plan 2 Page 19 AMENDMENT TWELVE TO SERVICE AREA AND TERRITORIAL BOUNDARY AMENDMENT AGREEMENT THIS AMENDMENT TWELVE, made and entered into as of this the ____ day of _________________, 20___, by and between CONSOLIDATED UTILITY DISTRICT OF RUTHERFORD COUNTY, TENNESSEE, (“CUD”), and the CITY OF MURFREESBORO, a Tennessee municipal corporation, through its WATER RESOURCES DEPARTMENT (MWRD), amends the service area and Territorial Boundary Agreement as previously amended. WITNESSETH: WHEREAS, the area designated in Exhibit 1 can be served more readily by CUD per the layout of the Master Plan of the development in relation to the current boundary, south of S. Rutherford Blvd and east of CSX Railroad, than can MWRD. WHEREAS, the parties ratify and confirm the previous territorial boundaries in existence between them except as modified hereafter. NOW, THEREFORE, the parties agree as follows: 1. All of the right, title, and interest of MWRD in and to the Water Service Area shown on “Exhibit 1” are released by MWRD and transferred to CUD, this area being portions of Map 113 Parcels 13.00 and 11.08; and 2. This amendment and the terms hereof are, as with all previous amendments, subject to the written consent and approval of the owners of any CUD bond indebtedness and to the terms of 7 United States Code 1926 (b). CONSOLIDATED UTILITY OF RUTHERFORD COUNTY By: ___________________________ Title: __________________________ ATTEST: _________________________ Secretary: Approved by a vote of the Commissioners of the District at a duly noticed public meeting of the Commissioners on ____ ____, 2026. Page 20 This instrument approved as to form this the ____ day of ________________, 2026. _______________________________ Jeffrey L. Reed Attorney for CUD CITY OF MURFREESBORO By: ____________________________ Shane McFarland, Mayor ATTEST: ____________________________ Erin Tucker, City Recorder Approved by a vote of the Board of Murfreesboro Water Resources Department at a duly noticed public meeting of the Board on the ____ day of ______, 2026. MURFREESBORO WATER RESOURCES DEPARTMENT By: ____________________________ Warren Russell, Chairman ATTEST: ___________________________ Valerie Smith, Director This instrument approved as to form this the ____day of _______________, 2026. _____________________________ Jeff Peach City Attorney Page 21 Page 22 SITE ENGINEERING CONSULTANTS ENGINEERING SURVEYING LAND PLANNING 850 MIDDLE TENNESSEE BOULEVARD MURFREESBORO, TENNESSEE 37129 LANDSCAPE ARCHITECTURE PHONE: (615) 890-7901 E-MAIL: MTAYLOR@SEC-CIVIL.COM FAX: (615) 895-2567 Current MWRD Service Area Notes: 1: Construct a 200' eastbound right turn lane on South Rutherford Boulevard at the proposed access roadway. 2: Restripe South Rutherford Boulevard to provide a 200' westbound left turn lane at the proposed access roadway. 3: To Accommodate future traffic, construct a five-lane access road with two 250' northbound left turn lanes, one right turn lane, and one through lane (striped out) approaching South Rutherford Boulevard. Note, if a three-lane cross-section is provided based on the initial development, then right-of-way for the five-lane cross-section will need to be reserved for the future improvements shown. R To CUD Know what's below. Call beforePage you dig. 23 WATER RESOURCES BOARD COMMUNICATION Meeting Date: 07/28/2026 Item Title: Full-Scale Biosolids Thermal Dryer Engineering Services Task Order Amendment No. 3 Department: Engineering Presented by: John Strickland Requested Council Action: Ordinance ☐ Resolution ☐ Motion ☒ Direction ☐ Information ☐ Summary Consider SSR TO Amendment No. 3 for additional engineering evaluation services for the Water Resources Recovery Facility’s (WRRF) full-scale thermal dryer project. Staff Recommendation Approve Task Order Amendment No. 3 pending Legal approval as to form. Background Information The Council approved the initial task order in November of 2022 for the report, preliminary design, and final design services for a new thermal sludge dryer to be installed in the existing biosolids building at the City’s Water Resource Recovery Facility. The purpose of the project is to manufacture a beneficially reusable soil amendment and eliminate landfilling approximately eight truckloads per day of dewatered biosolids. The drying operation will produce less than one truckload a day of Class A Excellent Quality dried biosolids which can be spread across turf fields or agricultural property. Amendment 1 added construction and operational phase services, approved February 2024. Amendment 2 added additional design, quality control of MR Systems design, staff requested evaluations, approved May 2025. Amendment 3 is for engineering services (support, review and revise instrumentation and control design) that are outside the original scope of work. Council Priorities Served Expand infrastructure Expanding the biosolids operations at the City’s WRRF to manufacture a beneficial land applied soil amendment eliminates the WRRF’s reliance on a regional landfill. Fiscal Impact The original task order and prior two amendments totaled $2,083,760. This expense, $78,031, would be funded by MWRD’s working capital reserves and bring the current total to $2,161,791. $2,250,000 is allocated in working capital reserves for the project. Attachments SSR Task Order 2241030.0 Amendment 3 Documents Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 WATER RESOURCES BOARD COMMUNICATION Meeting Date: 07/28/2026 Item Title: WRRF Wet Weather Upgrades - SSR Task Order Amendment 3 Department: Water Resources Presented by: John Strickland Requested Action: Ordinance ☐ Resolution ☐ Motion ☒ Direction ☐ Information ☐ Summary Consider approval of an Amendment to Task Order 2141002.0 with Smith Seckman Reid (SSR) regarding engineering associated with the WRRF Wet Weather Upgrades. Staff Recommendation Approve Task Order Amendment No. 3 pending Legal approval as to form. Background Information In July of 2022, the Board and Council approved SSR Task Order 2141002.0 for the engineering services to study the recommissioning of the Headworks 1 facility and for the design and construction administration services related to wet weather upgrades to the Water Resource Recovery Facility. In January of 2025, the Board and Council approved Amendment 1 for evaluation of the hydraulic performance of the existing filters. In May of 2025, the Board and Council approved Amendment 2 for revising the design to include micropiles etc., because of unexpected soils around the foundation of new UV influent structure. Amendment 3 is for engineering work outside the currently contracted scope of services due to unforeseeable conditions. During construction, several structural discrepancies were discovered. For example, the upper section of the filter wall was out of slump range, and cracks were found in the pipe gallery wall. Council Priorities Served Expand infrastructure The expansion of the WRRF will allow development and redevelopment to continue into approximately 2048. Fiscal Impact This amendment is for $110,000 and would come from MWRD’s Working Capital Reserves. The total fees for the TO and amendments is now $872,060. Attachments Task Order Amendment No. 3 Documents Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 WATER RESOURCES DASHBOARD PERFORMANCE June 2026 NO. PROJECT MWRD FY2026-2030 CIP 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 TOTAL DEBT FY26 FY27 FY28 FY29 FY30 X486 Construction- Biosolids Full-scale Dryer ($33.1M) $33,100,000 $33,100,000 X628 Construction - WRRF Expansion ($115M) $115,000,000 $115,000,000 TOTAL Capital Improvements funded from Debt Service $33,100,000 $115,000,000 $148,100,000 NO. PROJECT 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 TOTAL WORKING CAPITAL RESERVES FY26 FY27 FY28 FY29 FY30 W&S CAPITAL IMPROVEMENT PROJECTS Misc FY26 W&S Working Reserve Commitments $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000 X628 WRRF Expansion (Permitting & Preliminary Eng.) $405,000 $405,000 X628 WRRF Expansion Engineering & Land Acquisition $500,000 $3,000,000 $3,000,000 $500,000 $7,000,000 X485 WRRF Standby Power Yrs 1-3 Improvements $1,327,110 $1,000,000 $2,327,110 X369 WRRF Thermal Drying (Engineering & RPR) $750,000 $1,000,000 $1,750,000 X474 WRRF Wet Weather Treatment Train Impr (Eng & Constr) $5,775,000 $250,000 $6,025,000 X577 WRRF Old Headworks Recommissioning (Eng & Constr) $400,000 $6,600,000 $6,000,000 $13,000,000 X594 SRWTP Disinfection System Replacement $100,000 $1,000,000 $1,500,000 $2,600,000 X582 SRWTP Isolation Valve Replacements (Eng & Constr) $675,000 $675,000 X696 Town Creek Improvements (Constr) (20% Sewer & 80% Water) $937,500 $312,500 $1,250,000 X717 Burnt Knob/Veterans Pkwy (MTE Prop) Gravity, FM & PS (Sewer) $225,000 $1,500,000 $1,500,000 $3,225,000 X587 Thompson Lane / Battlefield P.S. Replacement (Sewer) $60,000 $3,000,000 $3,060,000 X692 Pump Station Improvements (Sewer) $192,000 $300,000 $3,000,000 $3,492,000 Subtotal CAPITAL PROJECTS $10,019,500 $16,289,610 $16,500,000 $3,500,000 $1,000,000 $47,309,110 TRANSPORTATION (Water/Sewer Imp.) Misc FY26 Transport Reserve Commitments (1/2 Water & 1/2 Sewer) $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000 X221 Thompson Lane (60% Water 40% Sewer) $2,000,000 $4,000,000 $4,000,000 $4,000,000 $14,000,000 X697 W Rutherford Blvd Extension over I-24 (3/4 Water & 1/4 Sewer) $100,000 $700,000 $100,000 $900,000 W934 Bradyville Pike (2/3 Sewer & 1/3 Water) X602 Cherry Lane 3A Utilities (18" Repur, 12" Sewer & FM)(Sewer) $100,000 $500,000 $2,000,000 $2,000,000 $4,600,000 X643 Cherry Lane 3B Utilities (18" Repur, 12" Sewer & FM)(Sewer) $200,000 $1,500,000 $2,000,000 $3,700,000 X198 Cherry Ln 2 (18" Repur, 12" Sewer & FM)(Sewer) $100,000 $500,000 $2,000,000 $2,000,000 $4,600,000 Brinkley Road Ph 2(Sewer) $100,000 $1,000,000 $1,100,000 Broad St./Church St./Front St. /Vine St.(70% Sewer 30% Water) $100,000 $1,500,000 $1,600,000 Old Fort Parkway (I-24 to Ordway St.) (70% Water 30% Sewer) $1,000,000 $1,000,000 Subtotal TRANSPORTATION PROJECTS $3,000,000 $7,800,000 $13,100,000 $8,600,000 $1,500,000 $34,000,000 REHABILITATION Sewer Rehabiliation - Maintenance Contracts $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $15,000,000 INFORMATION TECHNOLOGY PROJECTS IT/Computer Systems Upgrades $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 Electronic Content Management (Scanning/Imaging) $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 IT Design Services & Consulting $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 Comp Maintenance Management System (CMMS) $50,000 $50,000 $50,000 $50,000 $50,000 $250,000 Subtotal INFORMATION TECHNOLOGY PROJECTS $275,000 $275,000 $275,000 $275,000 $275,000 $1,375,000 TOTAL Projects from Working Capital Reserves $16,294,500 $27,364,610 $32,875,000 $15,375,000 $5,775,000 $97,684,110 NO. ADDITIONS TO RESERVES 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 TOTAL FY26 FY27 FY28 FY29 FY30 RESERVE REVENUES Water Taps, Sewer Taps, Special Assessments $5,800,000 $6,000,000 $6,000,000 $6,000,000 $6,000,000 $29,800,000 Reserve funds Interest Income $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000 TOTAL RESERVES REVENUES $6,800,000 $7,000,000 $7,000,000 $7,000,000 $7,000,000 $34,800,000 RATE-FUNDED SINKING FUNDS Sewer rehab $1,500,000 $1,500,000 $1,500,000 $1,500,000 $1,500,000 $7,500,000 Biolsolids Processing Equip & Storage Sinking Fund $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000 Future CIP Sinking Fund $1,900,000 $1,500,000 $1,500,000 $1,500,000 $1,500,000 $7,900,000 Lift Station Replacement Sinking Fund $250,000 $300,000 $300,000 $300,000 $300,000 $1,450,000 Cherry Lane Sanitary Sewer Sinking Fund $625,000 $625,000 $625,000 $625,000 $625,000 $3,125,000 TOTAL SINKING FUNDS $4,775,000 $4,425,000 $4,425,000 $4,425,000 $4,425,000 $22,475,000 TOTAL ADDITIONS TO RESERVES from Rates $11,575,000 $11,425,000 $11,425,000 $11,425,000 $11,425,000 $57,275,000 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 FY26 FY27 FY28 FY29 FY30 CAPITAL RESERVES 7/1 BALANCE 92,722,662 88,003,162 72,063,552 50,613,552 46,663,552 PROJECTED RESERVE FUND BALANCE REVENUE (TAPS) 6,800,000 7,000,000 7,000,000 7,000,000 7,000,000 SINKING FUND DEPOSITS TO RESERVES FROM RATES 4,775,000 4,425,000 4,425,000 4,425,000 4,425,000 AVAILABLE WORKING CAPITAL RESERVES 104,297,662 99,428,162 83,488,552 62,038,552 58,088,552 PROJECTED CIP PROJECTS (16,294,500) (27,364,610) (32,875,000) (15,375,000) (5,775,000) PROJECTED ENDING WORKING CAPITAL RESERVES 6/30 88,003,162 72,063,552 50,613,552 46,663,552 52,313,552 SECURED MIN. BALANCE FOR WORKING CAPITAL RESERVES (3%/year) 36,500,000 37,595,000 38,722,850 39,884,536 41,081,072 EXCESS WORKING CAPITAL RESERVES ABOVE POLICY 51,503,162 34,468,552 11,890,702 6,779,017 11,232,480 6 MOS. OPERATING EXPENSES 18,250,000 18,797,500 19,361,425 19,942,268 20,540,536 EXCESS USING LOWER MINIMUM BALANCE 69,753,162 53,266,052 31,252,127 26,721,284 31,773,016 Prepared by: VSmith 5/20/2026 STONES RIVER WATER TREATMENT PLANT Dashboard Report June 2026 Drinking Water Laboratory Section Drinking Water Laboratory Section Water Quality Complaints New & Repaired Lines Tested 2.5 2 2 1 1.5 1 1 0.5 0 0 0 2 0 New Lines Repaired Lines Water Quality Plant Operations Section Water Used Not Sold Flow (MGD) 12.507 20.000 16.053 570,200 0 18.000 16.373 16.000 14.000 7.975 11.959 12.000 10.910 7.912 10.000 7.147 8.000 4.532 6.000 5.564 3.686 4.000 1.390 7,385,887 2.000 0.000 Process Water SRWTP (gal) Auxiliary Raw River Raw Water Total Raw Water Finished Water Water Pump Pump Station Flow Flow Station Water Quality Hydrant Flushing (gal) Storage Tank Draining (gal) Avg Max Min Plant Operations Section Plant Operations Section Chlorine (mg/L) Finished Turbidity (NTU) 0.15 4.00 3.30 3.50 2.95 0.12 3.00 2.40 2.50 1.98 0.09 2.00 1.30 1.50 1.00 0.06 0.06 1.00 0.50 0.03 0.02 0.00 0.01 Avg Max Min 0.00 Finished Distibution Avg Max Min STONES RIVER WATER TREATMENT PLANT Dashboard Report June 2026 Cross-Connection Control Section Cross-Connection Control Section Number of Devices Tested By Category Number of Devices Tested 214 377 382 482 63 Residential Commerical Domestic Fire Protection Irrigation Drinking Water Operations Section Drinking Water Maintenance Section Pall Membrane Module Pin Count Work Order Status 5.0 3 4.0 47 3.0 2.0 1 1 1.0 00 000 000 000 000 000 00 00 00 00 0 00 114 0.0 Corrective Work Orders Completed Preventative Work Orders Completed 2024 2025 2026 Emergency Work Orders Completed MURFREESBORO WATER RESOURCE RECOVERY FACILITY DASHBOARD REPORT June, 2026 BOD PERCENT AMMONIA PERCENT REMOVAL REMOVAL 99.1 99.9 437.486 MILLION GALLONS TREATED 2,662.38 TONS BIOSOLIDS REMOVED OPERATIONS & MAINTENANCE DASHBOARD REPORT | FY 2026 JUL AUG SEP Oct NOV DEC JAN FEB MAR APR MAY JUN TOTAL DISTRIBUTION SYSTEMS Water Meter Installs 14 18 5 4 6 4 2 16 11 28 12 11 131 Water Service Line Install 2 0 10 3 0 0 0 5 3 2 0 0 25 Water Service Line Repair 2 4 8 5 6 6 7 4 5 4 2 8 61 Leaks Repaired 4 4 4 4 8 7 1 1 8 5 3 4 53 AMI Leaks Repaired 1 0 1 0 0 3 0 0 1 2 1 2 11 Meters Tested 196 124 125 104 124 74 124 74 74 71 92 68 1,250 COLLECTION SYSTEMS TV Lines 48,603 45,827 33,359 37,895 28,471 10,145 23,248 66,275 38,106 24,837 26,423 29,517 412,707 TV Lines (Warranty) 197 0 0 0 836 15,029 5,367 1,921 2,631 13,832 7,267 7,208 54,289 TV Laterals 685 4,800 251 1,442 444 596 662 369 555 440 753 675 11,672 Manhole Inspections - Vertical Feet 1,735 1,609 1,772 3,452 330 0 0 50 0 155 0 0 9,103 Line Cleaning 53,801 72,910 18,974 33,531 2,859 19,187 62,664 34,808 41,500 31,494 22,658 33,477 427,863 Stormwater Line Cleaning 12,124 7,172 19,081 21,677 12,947 15,011 27,618 33,546 12,210 27,120 25,712 5,584 219,802 Cleanouts - New 47 36 42 69 42 64 60 62 51 48 59 45 625 Cleanouts - Replaced 1 3 1 1 3 3 3 3 7 1 1 1 28 SERVICES Service Requests 38 33 30 46 25 44 36 33 46 49 39 54 473 Work Order Requests 179 183 147 152 110 95 82 105 157 149 154 132 1,645 Inspections - Commercial 26 13 248 26 29 33 10 14 7 17 22 20 465 Inspections - Residential 230 190 238 206 125 154 165 177 198 165 162 220 2,230 TN One Call Locates 1,903 2,017 2,306 2,105 1,759 2,053 1,753 2,021 2,351 2,340 2,454 2,790 25,852 PIPE FOOTAGE New Development- Main Water Line 219 154 2,677 346 207 4 388 418 506 692 30 86 5,727 New Development - Main Sewer Line 0 0 0 0 0 0 0 0 0 0 240 295 535 Water Service Line Repairs Footage 40 31 515 1,213 61 29 12 25 507 8 56 94 2,591 Sewer - Repairs 0 808 0 113 72 0 6 0 0 0 0 1 1,000 Sewer - Rehab 891 0 18 0 0 0 0 162 136 0 0 0 1,207 OPERATIONS & MAINTENANCE NON-BILLED FLUSHING REPORT | FY 2026 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN TOTAL O&M DEPT. Meters (Events) 0 0 0 0 0 0 0 0 0 0 0 0 0 Fire Hydrants 0 0 0 0 0 0 0 0 0 0 0 0 0 Jet\Wash Trucks 94,350 63,200 68,450 66,400 48,250 40,250 37,850 49,500 41,550 38,650 28,712 46,800 623,962 Sweepers & Saw 200 450 100 200 50 0 100 150 200 600 300 300 2,650 Stub & Meter Connection 2,300 5,000 8,000 1,500 1,550 6,100 3,000 1,200 1,800 6,500 1,000 1,200 39,150 Valves Exercised 0 294 443 242 72 271 New Construction 0 0 0 300 36,043 25,000 16,000 0 18,752 18,742 0 17,810 132,646 Main Line Leaks 80,250 85,560 65,500 66,500 189,500 80,500 84,500 250,265 187,460 275,560 156,250 65,000 1,586,845 Subtotal O&M 177,100 154,210 142,050 134,900 275,393 151,850 141,450 301,409 250,205 340,294 186,334 2,255,194 ENGINEERING DEPT. 1,165,649 323,147 0 1,792,590 0 8,764 456,144 0 90,386 492,423 277,054 4,606,157 FIRE DEPT. 107,970 47,000 15,000 360,000 6,716 0 0 0 0 15,300 86,952 91,500 730,438 STREET DEPT. 12,180 12,540 11,900 28,900 13,500 4,200 15,200 27,880 18,280 19,900 21,775 7,180 193,435 Subtotal Other Depts 1,285,799 382,687 26,900 2,181,490 20,216 12,964 471,344 27,880 108,666 527,623 108,727 5,154,296 Total 1,462,899 536,897 168,950 2,316,390 295,609 164,814 612,794 329,289 358,871 867,917 295,061 7,409,490 0 0 OPERATIONS & MAINTENANCE ASPHALT QUOTES | FY 2026 Wire Grass Const Co. Hawkins Vulcan Notes Binder Topping Binder Topping Binder Topping Jul $72.35 $86.18 $78.00 $84.50 $75.58 $86.27 Aug $72.35 $86.18 $78.00 $84.00 $75.58 $86.27 Sep $72.35 $86.18 $75.58 $84.00 $75.58 $86.27 Oct $72.35 $86.18 $75.58 $84.00 $75.51 $86.19 Nov $73.35 $87.18 $75.58 $84.00 $75.26 $85.84 Dec $73.35 $87.18 $75.58 $84.00 $75.03 $85.54 Jan $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Closed Feb $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Closed Mar $0.00 $0.00 $0.00 $0.00 $77.82 $88.10 Apr $0.00 $0.00 $82.00 $88.00 $81.50 $88.00 May $78.00 $89.00 $82.00 $89.00 $85.19 $97.91 Jun $78.00 $89.00 $82.00 $89.00 $85.19 $97.91 July ASPHALT PURCHASES OPERATIONS & MAINTENANCE ASPHALT PURCHASES 2026 Invoice Date Approval Vendor Type Rate Qty Total FY Total 7/8 Dhughes Vulcan 307BM $78.00 8.03 $626.34 $626.34 # 7/11 Dhughes Vulcan 307BM $78.00 20.33 $1,558.74 $2,185.08 4 7/11 Dhughes Vulcan 307BM $78.00 20.03 $1,562.34 $3,747.42 4 7/11 Dhughes Vulcan 307BM $78.00 5.10 $397.80 $4,145.22 7/18 Dhughes Vulcan 307BM $78.00 20.09 $1,567.02 $5,712.24 2 Valves 8/5 Exercised Dhughes Vulcan 307BM $78.00 20.06 $1,564.68 $7,276.92 8/5 Dhughes Vulcan 307BM $78.00 19.92 $1,553.76 $8,830.68 # 8/5 Dhughes Vulcan 307BM $78.00 20.14 $1,570.92 $10,401.60 8/5 Dhughes Vulcan 307BM $78.00 20.58 $1,605.24 $12,006.84 # 8/5 Dhughes Vulcan 307BM $78.00 20.33 $1,585.74 $13,592.58 # 8/25 Dhughes Vulcan 307BM $78.00 20.38 $1,589.64 $15,182.22 # 8/25 Dhughes Vulcan 307BM $78.00 21.58 $1,683.24 $16,865.46 # 8/25 Dhughes Vulcan 307BM $78.00 20.58 $1,605.24 $18,470.70 # 8/25 Dhughes Vulcan 307BM $78.00 20.03 $1,562.34 $20,033.04 # 8/25 Dhughes Vulcan 307BM $78.00 20.13 $1,570.14 $21,603.18 # 8/26 Dhughes Vulcan 307BM $78.00 20.30 $1,583.40 $23,186.58 8/26 Dhughes Vulcan 307BM $78.00 20.02 $1,561.56 $24,748.14 8/26 Dhughes Vulcan 307BM $78.00 20.48 $1,597.44 $26,345.58 # 8/26 Dhughes Vulcan 307BM $78.00 20.07 $1,565.46 $27,911.04 # 8/26 Dhughes Vulcan 307BM $78.00 20.61 $1,607.58 $29,518.62 # 8/27 Dhughes Vulcan 307BM $78.00 20.93 $1,632.54 $31,151.16 # 8/27 Dhughes Vulcan 307BM $78.00 20.59 $1,606.02 $32,757.18 # 8/27 Dhughes Vulcan 307BM $78.00 13.25 $1,033.50 $33,790.68 8/27 Dhughes Vulcan 307BM $78.00 3.36 $262.08 $34,052.76 # 9/30 Dhughes Vulcan 307BM $78.00 12.19 $950.82 $35,003.58 # 9/30 Dhughes Vulcan 307BM $78.00 6.60 $514.80 $35,518.38 # 9/30 Dhughes Vulcan 307BM $78.00 20.41 $1,591.68 $37,110.06 9/30 Dhughes Vulcan 307BM $78.00 19.88 $1,550.64 $38,660.70 10/14 DHughes Vulcan 307BM $78.00 20.43 $1,593.54 $40,254.24 10/14 Dhughes vulcan 307BM $78.00 11.46 $893.88 $41,148.12 10/28 Dhughes Vulcan 307BM $78.00 19.30 $1,505.40 $42,653.52 11/7 Dhughes Vulcan 307BM $78.00 18.50 $1,443.00 $44,096.52 11/7 Dhughes Vulcan 307BM $78.00 6.29 $490.62 $44,587.14 11/7 Dhughes Vulcan 307BM $78.00 14.34 $1,118.52 $45,705.66 11/11 Dhughes Vulcan 307BM $78.00 16.13 $1,258.14 $46,963.80 3/6 Dhughes Vulcan 307BM $77.82 6.08 $473.14 $47,436.94 3/24 Dhughes Vulcan 307BM $77.82 41.56 $3,234.19 $50,671.13 4/10 Dhughes vulcan 307BM $80.50 18.47 $1,486.84 $52,157.97 4/10 Dhughes Vulcan 307BM $80.50 3.31 $266.46 $52,424.43 4/8 Dhughes Vulcan 307BM $80.50 18.49 $1,488.45 $53,912.88 4/8 Dhughes Vulcan 307BM $80.50 16.75 $1,348.38 $55,261.26 4/9 Dhughes Vulcan 307BM $92.00 18.49 $1,701.08 $56,962.34 4/9 Dhughes Vulcan 307BM $92.00 15.31 $1,408.52 $58,370.86 4/15 Dhughes Vulcan 307BM $80.50 9.28 $747.04 $59,117.90 4/14 Dhughes Vulcan 307BM $80.50 18.00 $1,449.00 $60,566.90 4/14 Dhughes Vulcan 307BM $80.50 14.30 $1,151.15 $61,718.05 4/13 Dhughes Vulcan 307BM $80.50 18.12 $1,458.66 $63,176.71 4/13 Dhughes Vulcan 307BM $80.50 7.28 $586.04 $63,762.75 4/21 Dhughes Vulcan 307BM $81.50 18.48 $1,506.12 $65,268.87 4/21 Dhughes Vulcan 307BM $81.50 18.91 $1,541.17 $66,810.04 4/22 Dhughes Vulcan 307BM $81.50 18.31 $1,492.27 $68,302.31 4/22 Dhughes Vulcan 307BM $81.50 12.54 $1,022.01 $69,324.32 4/20 Dhughes Vulcan 307BM $81.50 18.33 $1,493.90 $70,818.21 4/20 Dhughes Vulcan 307BM $81.50 18.69 $1,523.24 $72,341.45 4/20 Dhughes Vulcan 307BM $81.50 18.67 $1,521.61 $73,863.06 6/10 Dhughes Vulcan 307BM $81.50 22.03 $2,507.99 $76,371.05 6/11 Dhughes Vulcan 307BM $81.50 54.09 $4,607.94 $80,978.99 OPERATIONS & MAINTENANCE - SERVICES FY 2026 250 220 198 Valves 200 Exercised 177 165 165 157 162 149 154 150 132 105 100 82 49 54 46 50 36 39 33 17 22 20 10 14 7 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Service Requests Work Order Requests Residential Inspections Commerical Inspections Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Service Requests 36 33 46 49 39 54 257 Work Order Requests 82 105 157 149 154 132 779 Residential Inspections 165 177 198 165 162 220 1,087 Commerical Inspections 10 14 7 17 22 20 90 Total 293 329 408 380 377 426 2,213 Stormwater Dashboard – July 2026 Inspection Program Construction Phase Inspections of Stormwater SCM Maintenance Inspections (FY) Control Measures (SCMs) *MWRD Sites with stormwater controls under construction Pre-construction meetings (with controls) June 19 109 114 110 106 109 88 98 110 126 99 62 3 3 6 1 6 4 3 13 JUL-23 JAN-24 JUL-24 JAN-25 JUL-25 JAN-26 JUN-26 2021-22 2022-23 2023-24 2024-2025 2025-26 *Data includes follow-up inspections. Education and Outreach LID/ Green Infrastructure 59.5 acres 3 SCM operators educated. porous 80.9 acres 45 People educated at Farmer’s Market (6/2). concrete/ wetland 4 Employees trained. pavers conservation 254 rain gardens, bioretention areas, infiltration sites (G.I.) *Outreach and education programs aided in part by MTSU/Project WET. Stormwater Program Calendar Streambank Protection 9/3: Stormwater and Coffee talk. Permanent stormwater controls 567.5 acres Sites/subdivisions with 749 Detention stormwater controls (includes sites in development process) 18.9 miles stream buffer Manufactured Treatment Devices 110 (1 or more (MTDs) sides) Underground Storage 70 Priority watersheds: acres treated .39 *Acres treated is a result of infill/redevelopment and includes SCM retrofits and impervious reductions.

Get email alerts for Murfreesboro

A daily email when new agendas and minutes are posted.

Report an issue with this meeting