Water Resources Board
Regular MeetingMurfreesboro, TN · July 28, 2026
Agenda
Add to calendar
Agenda
WATER RESOURCES BOARD
Tuesday, July 28, 2026
Administrative Office Board Room
316 Robert Rose Drive
3:30 PM
AGENDA
1. Public Comment
2. Consent Agenda:
A. Consider sewer easement abandonment Love’s Country Stores Subd .......................... 2
B. Consider water & repurified water easement abandonment 1340 Gateway Blvd ........ 5
C. Consider Rockwell TechConnect SCADA support renewal........................................... 8
D. Consider Blue Water Industries Contract Amendment No. 1 ...................................... 11
3. Consider minutes of the June 23, 2026 meeting ................................................................... 15
4. Consider CUD/MWRD boundary amendment ................................................................... 18
5. Consider WRRF Full-Scale Biosolids Thermal Dryer SSR TO Amendment No. 3 ........ 24
6. Consider WRRF Wet Weather Upgrades SSR TO Amendment No. 3 ............................. 30
7. Dashboard
8. Other business
9. Adjourn
WATER RESOURCES BOARD COMMUNICATION
Meeting Date: 07/28/2026
Item Title: Sewer Easement Abandonment–Moody Building Addition
Department: Engineering
Presented by: Valerie Smith/Anita Heck
Requested Action:
Ordinance ☐
Resolution ☐
Motion ☒
Direction ☐
Information ☐
Summary
SEC, on behalf of the developer, requests the existing sewer easement highlighted on
the attached exhibit be abandoned.
Staff Recommendation
Approval of the requested abandonment.
Background Information
The requested portion of the existing sanitary sewer easement abandonment
highlighted on the attached exhibit was dedicated by plat with the subdivision of Love’s
Country Stores, Lot 1 & 2 recorded on December 7, 2011. The easement was shown
on the plat at the request of staff with the thought that sewer might be extended for
future service. There isn’t existing sewer within the easement currently and now that
the City has adopted the policy of only serving City customers, staff believes the
easement is no longer needed. Staff is comfortable with the abandonment. This request
will also be taken to Planning Commission as a mandatory referral upon Board approval.
Fiscal Impact
None, as the easements were dedicated by plat and not purchased by the Department.
Attachments
1. Easement Abandonment Request
2. Exhibit
Page 2
June 29, 2026
Mrs. Valerie Smith
Murfreesboro Water Resources Dept
NW Broad Street
Murfreesboro, Tennessee 37130
RE: Moody Excavation LLC, Building Addition
Sanitary Sewer Easement Abandonment Request
Murfreesboro, Tennessee
SEC Project No. 25296
Dear Mrs. Smith:
Please accept this as our formal request for the City of Murfreesboro to
abandon the Sanitary Sewer Easement that is shown in Plat Book 36 Page
67.
The sanitary sewer easement is no longer necessary or needed. The
project is built out and sitting on a high point, making any sewer connection
from the north have a lower elevation to connect to the existing sewer line.
The attached exhibit highlights the sanitary sewer easement abandonment
area.
If you should have any questions concerning this letter, please feel free to
call me at (615) 890-7901 or via email at jminer@sec-civil.com
Sincerely,
John Miner, P.E.
Project Engineer
SEC, Inc
Page 3
Page 4
SITE ENGINEERING CONSULTANTS
ENGINEERING SURVEYING LAND PLANNING
LANDSCAPE ARCHITECTURE
850 MIDDLE TENNESSEE BOULEVARD MURFREESBORO, TENNESSEE 37129
PHONE: (615) 890-7901 E-MAIL: JMINER@SEC-CIVIL.COM FAX: (615) 895-2567
NO PORTION OF THIS DRAWING MAY BE REPRODUCED WITHOUT THE EXPRESSED WRITTEN CONSENT OF S.E.C. INC.
COPYRIGHT S.E.C. INC., 2026
The site as shown on these construction drawings is intended to achieve specific engineering design criteria and objectives. It is
the sole responsibility of the owner/developer to ensure that the construction of the site shown on these construction drawings is
in total accordance with the design as noted, described, and illustrated. The engineer assumes no administrative liability or
responsibility in the assurance that the site is constructed in accordance with the construction plans.
WATER RESOURCES BOARD COMMUNICATION
Meeting Date: 07/28/2026
Item Title: Water/Repurified Water Easement Abandonment – 1340 Gateway
Boulevard
Department: Engineering
Presented by: Valerie Smith/George Reagan
Requested Action:
Ordinance ☐
Resolution ☐
Motion ☒
Direction ☐
Information ☐
Summary
Pape Dawson, on behalf of the developer for 1340 Gateway Blvd, has requested the
abandonment of an existing 10-foot Water and Repurified Water easement along the
front of the property parallel with Gateway Blvd. This easement, in its current form, will
no longer be needed once this development is constructed.
Staff Recommendation
Approval of this easement abandonment as shown highlighted on the attached.
Background Information
There The NHI Headquarters development project will be using the existing public water
and repurified mains available to the site that are within an existing 20’ public utility
easement parallel and adjacent to Gateway Blvd. The 10’ easement to be abandoned
is parallel and adjacent to the 20’ easement and is not needed for the development or
for any neighboring properties. The 20’ public utility easement will remain in place
along the front of this parcel along Gateway Blvd and the existing 10’ highlighted
easement is no longer needed. Staff is comfortable with the abandonment. This request
will also be taken to Planning Commission as a mandatory referral upon Board approval.
Fiscal Impact
None, as this easement was dedicated by plat and not purchased by the Department.
Attachments
Easement Abandonment Request
Page 5
July 16, 2026
Applicant Letter For Mandatory Referral
Via Email: GReagan@murfreesborotn.gov
Mr. George Reagan
Murfreesboro Water Resources Department - Engineering
316 Robert Rose Drive
Murfreesboro, TN 37129
Re: Repurified Water Easement Abandonment
Map 091H, Group B, Parcel 007.00
Lot 4, Murfreesboro Gateway Phoenix Subdivision
Gateway Boulevard - Murfreesboro, Tennessee
Pape-Dawson Job# 21200036-000 (25-0388)
Dear George:
Pape-Dawson Consulting Engineers, LLC (Pape-Dawson), on behalf of National Health Investors, Inc. (NHI) and
Inchin Along, LLC (Inchin Along), hereby submits this request for Mandatory Referral for the abandonment of an
existing Repurified Water Easement located off Gateway Boulevard on property owned by Inchin Along.
The existing Repurified Water Easement (labeled as “10’ Additional Water Main and Repurified Water Easement per
MWRD 02-13-2008” on the recorded plat) was dedicated to the Murfreesboro Water Resources Department (MWRD)
on March 19, 2008, as shown on the final plat entitled Resubdivision Plat, Lot 3 and Lot 4, Murfreesboro Gateway –
Phoenix Subdivision, of record in Plat Cabinet 33, Page 300, in the Register's Office for Rutherford County,
Tennessee. The easement is located within property identified as Parcel 007.00 on Rutherford County Property Map
091H, Group B.
Pape-Dawson has been retained by NHI to provide civil engineering services for the proposed development of the
subject property as their new headquarters. It is our understanding that MWRD no longer plans to extend the existing
repurified water line across the subject property within the existing easement. Consequently, the existing repurified
water easement is no longer required.
Accordingly, approval is requested to abandon the existing repurified water easement.
Enclosed with this submittal are an exhibit and description identifying the existing repurified water easement
proposed for abandonment.
Should you have any questions or require additional information, please do not hesitate to contact us. Thank you for
your consideration of this request.
Sincerely,
Pape-Dawson Consulting Engineers, LLC
Chris Mabery, RLS
Survey Department Manager
Page 6
GENERAL NOTES
1. THE PURPOSE OF THIS EXHIBIT IS TO SHOW A 10'
RE-PURIFIED WATER
ADDITIONAL WATER MAIN AND RE-PURIFIED WATER EASEMENT ABANDONMENT
EASEMENT BEING ABANDONED BY MANDATORY REFERRAL.
EXHIBIT
2. THIS EXHIBIT IS NOT A GENERAL PROPERTY SURVEY AS
DEFINED UNDER RULES OF TENNESSEE STATE BOARD OF
EXAMINERS FOR LAND SURVEYORS, CHAPTER 0820-3-07.
EASEMENT REFERENCE
BEING A 10' ADDITIONAL WATER MAIN AND RE-PURIFIED
WATER EASEMENT SHOWN ON THE FINAL PLAT ENTITLED
"MURFREESBORO GATEWAY PHOENIX SUBDIVISION LOT 3 AND
Know what's below.
LOT 4" OF RECORD IN PLAT CABINET 33, PAGE 300, REGISTER'S Callbefore you dig.
OFFICE FOR RUTHERFORD COUNTY, TENNESSEE.
20' WATER, SEWER, POINT OF COMMENCEMENT
ELECTRIC, SIDEWALK & EASEMENT DESCRIPTION
RE-PURIFIED WATER
EASEMENT (58' PUBLIC RIGHT-OF-WAY)
PLAT BOOK 33, GATEWAY BOULEVARD
PAGE 300, R.O.R.C.T.
POINT OF BEGINNING IR(O)
EASEMENT DESCRIPTION MOSELY
L1
N65°11'15"E 114.87' C4
L2
C3
S65°11'15"W 114.89' C1
C2
10' ADDITIONAL WATER MAIN &
RE-PURIFIED WATER EASEMENT
L8 LOT 4
TO BE ABANDONED
L3 MURFREESBORO GATEWAY
L6 L7 3,590 SQUARE FEET
PHOENIX SUBDIVISION
LOT 3
PLAT
WAY
0.08 ACRE±
L5
76
LOT 3 AND LOT 4 PLAT BOOK 33, PAGE 300
GATE
RECORD BOOK 24 MAP 092E, GROU
L4 R.O.R.C.T.
PLAT BOOK 33, PAGE 300, R.O.R.C.T.
BOOK
BORO N
REES
IO
MAP 091H, GROUP B, PARCEL 007.00
33, P IS
MURF NIX SUBDIV 4
INCHIN ALONG, LLC
METGATE, LLC
LINE TABLE
RECORD BOOK 1682, PAGE 1093
R.O.R.C.T.
PHOE
LINE BEARING DISTANCE
OT .
P "A", PARCEL 01
AND L .R.C.T
, PAGE 2702, R.O.
L1 S35°51'05"E 20.11'
LOT 3 AGE 300, R.O
L2 S35°51'05"E 10.05'
CURVE TABLE L3 S18°37'37"E 44.86'
CURVE RADIUS LENGTH DELTA TANGENT CHORD CHORD BRG L4 S65°23'52"W 55.02'
C1 1014.05' 92.51' 5°13'38" 46.29' 92.48' S62°32'47"W L5 N28°24'58"W 10.02'
2.00
C2 40.00' 54.09' 77°28'37" 32.09' 50.06' S26°46'17"W L6 N65°23'52"E 26.57'
R.C.T. C3 50.00' 68.20' 78°08'48" 40.60' 63.03' N26°24'09"E L7 N65°23'52"E 20.11'
C4 1004.00' 90.58' 5°10'09" 45.32' 90.55' N62°34'31"E L8 N18°37'37"W 36.41'
LEGEND
IR(O)
IRON ROD (OLD)
NON-MONUMENTED POINT
R.O.R.C.T. REGISTER'S OFFICE FOR
RUTHERFORD COUNTY,
TENNESSEE
LOT 4
MURFREESBORO GATEWAY
1500 MEDICAL CENTER PKWY, STE 2A I MURFREESBORO, TN 37129 I 615.546.6050
PHOENIX SUBDIVISION TENNESSEE A&E PROFESSI ONALS FI RM #11104
13th CIVIL DISTRICT OF RUTHERFORD COUNTY,
1 OF 1 CITY OF MURFREESBORO, TENNESSEE
Page 7
WATER RESOURCES BOARD COMMUNICATION
Meeting Date: 07/28/2026
Item Title: Rockwell TechConnect SCADA Support
Department: IT
Presented by: Doug Swann
Requested Action:
Ordinance ☐
Resolution ☐
Motion ☒
Direction ☐
Information ☐
Summary
Consider renewal of Rockwell Automation TechConnect support.
Staff Recommendation
Approve annual support pending Purchasing and Legal approval as to form.
Background Information
Our current Rockwell Automation software support will expire on July 31, 2026. The
Department uses Rockwell Automation applications to run, program, connect, and view
the wastewater and water treatment control systems. It is critical that these control
systems continue to function as needed to enable the processes to run properly. This
TechConnect Support includes technical support for any issues with the systems and
software updates.
The pricing is available single sourced from our appointed distributor, Crawford Electric
Supply.
Council Priorities Served
Responsible budgeting
Proper maintenance of software is critical for the effective and efficient operations of
Water Resources Department SCADA systems.
Fiscal Impact
Funding for the support, $26,760.60, will come from the FY27 software maintenance
budget for water and wastewater.
Attachments
Rockwell Automation quote
Page 8
Rockwell Automation Services Agreement
- Renewal
FIXED PRICE PROPOSAL
3801067530
City of Murfreesboro
Murfreesboro, TN
Date of Issue: Monday, June 1, 2026
Quotation #: 385275 (RA Approval - QXSK10533A)
Presented to: Proposed by:
City of Murfreesboro Crawford Electric Supply Company LLC
2032 Blanton Dr 1284 Heil Quaker Blvd
Murfreesboro, Tn 37129-2912 La Vergne, TN 37086-3515
United States United States
Rockwell Automation
318 Seaboard Lane
Suite 400
Franklin, Tn 37067
United States
Page 9
City of Murfreesboro 30074141
Rockwell Automation Support Agreement
Fixed Price Proposal
3801067530
2 Distributor Commercial Terms
2.1 Pricing Summary
Crawford Electric Supply Company LLC's price is based on the Statement of Work set forth in Section 1
above. All prices are in USD.
Item Product Price
1 9800-DC8AUTOC 6,549.90
Automation Control Hardware, Product Support, 8 x 5 M-F, 11-25 Total
Devices
2 9800-DC8HMICOM 13,216.49
HMI Software, Product Support, 8 x 5 M-F
3 9800-DC8LEHDWA 2,523.32
Legacy Hardware, Product Support, 8 x 5 M-F, 1-5 Total Devices
4 9800-DC8ABDRIVLHPC 518.19
LV Drives Low HP, Product Support, 8 x 5 M-F, 11-25 Total Devices
5 9800-DC8ABDRIVMHPB 1,582.62
LV Drives Med HP, Product Support, 8 x 5 M-F, 5-10 Total Devices
6 9800-DC24ABDRIVHHPA 2,340.08
LV Drives High HP, Product Support, 24 x 7 x 365, 1-4 Total Devices
TOTAL PRICE: USD 26,730.60
Contract Reinstatement Fee: USD 2,673.06
If this contract is not renewed before the current Contract Expiration Date Saturday, August 1, 2026, a
10% Contract Reinstatement Fee will be applied to the Suggested Resale Price.
LEARNING+ SUBSCRIPTION (OPTIONAL): Web hosted, self-paced training courses including virtual
classroom sessions are available for customers with an active TechConnect support agreement, as either
single course access or annual subscription to all course content available in the Rockwell Automation
Digital Learning Library. Please add the net amount for the Learning+ option desired in the correct quantity
of desired users to your renewal PO.
Catalog Description List Price per User
Number
Learning+
LP-3TC USD 820.00
1 Class available for 3 months
Learning+
LP-SU1 USD 4,940.00
Single User Subscription
2.2 Invoicing Schedule
Contract Start Date
The information contained in this document consists of technical, commercial and/or financial information, which is confidential and proprietary to Rockwell Automation, Inc. This information is
furnished in confidence and with the understanding that it may not be disclosed to third parties or reproduced or used, in whole or in part, for any purpose other than evaluation of this document.
Copyright © 2026 Rockwell Automation, Inc., All Rights Reserved Page 14 STANDARD-en(V7.1)
Page 10
WATER RESOURCES BOARD COMMUNICATION
Meeting Date: 07/28/2026
Item Title: Blue Water Industries
Department: MWRD Operation & Maintenance
Presented by: Donald Hughes
Requested Action: Renewal Of Contract
Ordinance ☐
Resolution ☐
Motion ☒
Direction ☐
Information ☐
Summary
Consider renewal of the contract with Blue Water Industries to purchase crushed stone
used in our daily operations.
Staff Recommendation
Recommend to the City Council approving the Contract Amendment with Blue Water
Industries.
Background Information
The crushed stone contract was bid out in August of 2023 for a 1-year period with two
2-year renewals. Blue Water Industries is requesting a price adjustment from the
original pricing ranging from $0.50 a ton to $1.00 a ton.
Council Priorities Served
Responsible budgeting
Bidding affords the Department the best prices possible.
Fiscal Impact
Estimated increase to contract is $8,000 per year. The expenses for crushed stone will
be covered from FY27 and FY28 budgets.
Attachments
1. Contract Amendment with Blue Water Industries
2. Request for Price Adjustment Letter
Page 11
Docusign Envelope ID: AF855EDF-7DF0-81F1-82E1-3301F8043741
FIRST AMENDMENT
TO THE CONTRACT BETWEEN
THE CITY OF MURFREESBORO
AND
BWI MTN II, INC. dba BLUE WATER INDUSTRIES
(A SUBSIDIARY OF MARTIN MARIETTA MATERIALS, INC.)
FOR CRUSHED STONE
This First Amendment (“First Amendment”) to the Contract, entered into September 1, 2023 (“Contract”),
is effective as of ________________, by and between the City of Murfreesboro, a municipal corporation
of the State of Tennessee (the "City"), and BWI MTN II, Inc. dba Blue Water Industries (a subsidiary of
Martin Marietta Materials, Inc.), a corporation of the State of Tennessee (“Contractor”).
RECITALS
WHEREAS, on September 1, 2023, the City entered into a contract with BWI MTN II, Inc. dba Blue
Water Industries (a subsidiary of Martin Marietta Materials, Inc.), for crushed stone; and,
WHEREAS, pursuant to Section 2 of the Contract, the first two-year renewed term of the Contract
between the City and Contractor was from September 1, 2024, to August 31, 2026; and,
WHEREAS, pursuant to Section 2 of the Contract, the City and Contractor wish to extend the
Contract for an additional two-year period, the last of the additional two-year renewals allowed under
the Contract; and,
WHEREAS, this second two-year renewed term of the Contract between the City and Contractor
will run from September 1, 2026, to August 31, 2028; and,
WHEREAS, pursuant to Section 8 of the Contract, the parties wish to modify the price of the
“Picked up Price” for this second two-year term, which runs from September 1, 2026, to August 31, 2028.
NOW THEREFORE,
1. The City and Contractor mutually agree to extend the term of the Contract from September
1, 2026, to August 31, 2028.
2. The City and Contractor mutually agree to the price adjustment to the “Picked Up Price”
schedule of the crushed stone as shown in the chart below.
3. All other terms of the Contract, including the “Delivered Price,” to remain the same.
Picked Up Price Unit Price (per Ton)
303.01 CI A Grade D $12.25
Graded 67 $20.25
Quarter Down or #10 Stone $20.00
Surge Rock/Shot Rock $15.75
CITY OF MURFREESBORO BWI MTN II, Inc. dba Blue Water Industries (a
subsidiary of Martin Marietta Materials, Inc.
_________________________________ ____________________________________
Shane McFarland, Mayor G. Rollins, Nashville Sales Representative
APPROVED AS TO FORM:
_______________________________
Jeffrey L. Peach, City Attorney
Page 12
Docusign Envelope ID: AF855EDF-7DF0-81F1-82E1-3301F8043741
Page 13
Docusign Envelope ID: AF855EDF-7DF0-81F1-82E1-3301F8043741
Page 14
MINUTES
MURFREESBORO WATER RESOURCES BOARD
June 23, 2026
_____________________________________________________________________________________
The Murfreesboro Water Resources Board met on Tuesday, June 23, 2026, in the Board Room of
the Administration Building, 316 Robert Rose Drive. Present at the meeting were Board Members, Ms.
Kathy Nobles, Mr. Warren Russell, Ms. Madelyn Scales-Harris, and Ms. Sandra Trail. Also present were
Valerie Smith, Doug Swann, Michele Pinkston, John Strickland, Andy Cieslak, Anita Heck, Joseph
Leonard, April Pedigo, David Pendley, Matt Powers, George Reagan, Joe Russell, Sharon Seibert, Brent
Fowler, Travis Wilson with other members of the public.
The Consent Agenda was presented to the Board for approval:
A. Consider Lawn Care Service Agreement Amendment No. 1
B. Consider Brenntag Mid-South LLC Chemical Contract Third Amendment for WTP
C. Consider WRRF Full-Scale Thermal Dryer contingency allocations
Sandra Trail made a motion to accept the Consent Agenda as presented. Kathy Nobles seconded
the motion. The motion carried unanimously.
The Minutes of the May 26, 2026 Board meeting were presented.
Madelyn Scales-Harris made a motion to approve. Sandra Trail seconded. The motion unanimously
passed.
The Board considered the approval of one permanent and temporary easement offer to Teresa Jones
Dunaway for Cherry Lane Extension Phase 3B.
CIA has provided the permanent sewer and temporary construction easement description and
exhibit to the Department. This information was used by the Legal Department to prepare the easement
document. Legal and the City have acquired the right of way for all of Phase 3B, which required the City
to use eminent domain for this Dunaway parcel. Based on that process Legal has calculated the offer amount
of $85,000/acre which was greater than the appraised amount of $71,500/acre. With the size of the
permanent and temporary construction easement, the easement offer is calculated at $37,900.
Since that settlement amount was substantially greater than the appraised value, the City is not
offering an additional premium for a consensual transaction.
The City’s current schedule to bid the project is in August of this year therefore time is of the
essence in acquiring the easement.
Kathy Nobles made a motion to approve. Madelyn Scales-Harris seconded. The motion
unanimously passed.
Page 15
Water Resources Board Minutes June 23, 2026 Page 2
The Board considered LJA TO 2963-0011 Amendment No. 1 for construction administration
associated with the 2025 Sewer Rehab.
Since the start of construction, there have been additions to LJA’s scope of work. Additional sewer
mains have been added that need lining from several development projects and there have been several
sewer rehab warranty issues of our own with manhole and mains that have needed coordination. Also, staff
requested LJA to request pricing from SBW for the replacement of the suction lines within two sewer pump
stations. The design of these suction pipe replacements is currently within SSR contract, but time is of the
essence to have these replaced so they will be removed from their scope of work, and staff felt that the price
for replacement would be cheaper through this contract.
The additional TO expenditure, $31,436, will be funded through the FY26 Budget and Working
Capital Reserves. This brings the TO total to $483,936.
Sandra Trail made a motion to approve. Madelyn Scales-Harris seconded. The motion passed
unanimously.
The Board considered Change Order No. 1 for the 2025 Sewer Rehabilitation contract.
The contractor requests additional time be added to the contract to complete work related to
requested scope changes. The big changes have been additional Development warranty work added to the
project (paid by the developer) and proposed pump station suction line replacements which will be removed
from the Pump Station Improvement Project currently under design by SSR. Even though these have been
added to the rehab project, other items have been removed which have resulted in a decrease in the contract
amount.
This change order decreases the total contract by $2,844 for a total contract of $4,333,389 and
extends the contract time by 26 days.
Kathy Nobles made a motion to approve. Madelyn Scales-Harris seconded. The motion passed
unanimously.
Under Other Business, the Board considered the Chemical Contract Third Amendment with
Brenntag Mid-South, LLC for chemicals used at the Water Resource Recovery Facility.
Brenntag Mid-South LLC supplies disinfection chemicals used at the Water Resource Recovery
Facility to support effluent compliance and public health protection. These products are applied in the
treatment process to effectively eliminate pathogens prior to discharge. The contract ensures a reliable
supply of critical disinfection chemicals for continuous operations.
The cost of sodium hypochlorite is estimated at $225,000. Funding will come from the FY27
Operating Budget.
Sandra Trail made a motion to approve. Kathy Nobles seconded. The motion passed unanimously.
Staff presented the Water Resources Dashboard Performance for May 2026.
Page 16
Water Resources Board Minutes June 23, 2026 Page 3
Staff presented the Financial Reports for eleven months ending May 31, 2026.
There being no further business, the meeting was adjourned.
_____________________________
Warren Russell, Chairman
Page 17
WATER RESOURCES BOARD COMMUNICATION
Meeting Date: 07/28/2026
Item Title: MWRD/CUD Boundary Amendment No. 12
Department: Engineering
Presented by: Valerie Smith
Requested Council Action:
Ordinance ☐
Resolution ☐
Motion ☒
Direction ☐
Information ☐
Summary
Attached is documentation requesting a revision to the MWRD/CUD water service
boundary south of N. Rutherford Boulevard and east of Husky Truss.
Staff Recommendation
Approve Amendment No. 12 to the CUD/MWRD boundary subject to Legal approval of
the amendment language.
Background Information
Staff, CUD and SEC, Inc., on behalf of the property owner Brian Berryman, have been
working together on this request for a boundary revision for several months. Currently
CUD cannot serve the project as their water main large enough to serve the project is
along Elam Road. The master plan for the development is to extend to Elam Road,
however, that will be years down the road and Mr. Berryman wishes to access the
property initially from Rutherford Blvd as both MWRD water and sewer are available.
MWRD’s service area encompasses less than half of the development, being along the
north end. CUD did not wish to release any of their current service area. With that
being said and after receiving the layout of the development, staff agreed to support
releasing some of our boundary to CUD.
The attached Exhibit 1 shows the boundary change. Per the development master plan,
CUD will gain approximately 2.5 acres or 3 lots.
This request is being taken to CUD’s July Board meeting for approval. The attached
Amendment #12, if approved by both Boards, will be taken to Council for approval and
then executed by both parties.
Council Priorities Served
Responsible budgeting
CUD and MWRD continue to adjust service boundaries in the interest of least cost to
our departments and the developers with highest benefit to the public in providing
water service for domestic and fire protection uses.
Attachments
Page 18
1. Boundary Amendment Agreement No.12
2. GIS Exhibit 1
3. Development Master Plan
2
Page 19
AMENDMENT TWELVE TO SERVICE AREA AND
TERRITORIAL BOUNDARY AMENDMENT AGREEMENT
THIS AMENDMENT TWELVE, made and entered into as of this the ____ day of
_________________, 20___, by and between CONSOLIDATED UTILITY DISTRICT OF
RUTHERFORD COUNTY, TENNESSEE, (“CUD”), and the CITY OF MURFREESBORO, a
Tennessee municipal corporation, through its WATER RESOURCES DEPARTMENT (MWRD),
amends the service area and Territorial Boundary Agreement as previously amended.
WITNESSETH:
WHEREAS, the area designated in Exhibit 1 can be served more readily by CUD per the layout
of the Master Plan of the development in relation to the current boundary, south of S. Rutherford Blvd
and east of CSX Railroad, than can MWRD.
WHEREAS, the parties ratify and confirm the previous territorial boundaries in existence
between them except as modified hereafter.
NOW, THEREFORE, the parties agree as follows:
1. All of the right, title, and interest of MWRD in and to the Water Service Area shown on
“Exhibit 1” are released by MWRD and transferred to CUD, this area being portions of Map
113 Parcels 13.00 and 11.08; and
2. This amendment and the terms hereof are, as with all previous amendments, subject to the
written consent and approval of the owners of any CUD bond indebtedness and to the terms
of 7 United States Code 1926 (b).
CONSOLIDATED UTILITY OF
RUTHERFORD COUNTY
By: ___________________________
Title: __________________________
ATTEST:
_________________________
Secretary:
Approved by a vote of the Commissioners of the District at a duly noticed public meeting
of the Commissioners on ____ ____, 2026.
Page 20
This instrument approved as to form this the ____ day of ________________, 2026.
_______________________________
Jeffrey L. Reed
Attorney for CUD
CITY OF MURFREESBORO
By: ____________________________
Shane McFarland, Mayor
ATTEST:
____________________________
Erin Tucker, City Recorder
Approved by a vote of the Board of Murfreesboro Water Resources Department at a duly noticed public
meeting of the Board on the ____ day of ______, 2026.
MURFREESBORO WATER
RESOURCES DEPARTMENT
By: ____________________________
Warren Russell, Chairman
ATTEST:
___________________________
Valerie Smith, Director
This instrument approved as to form this the ____day of _______________, 2026.
_____________________________
Jeff Peach
City Attorney
Page 21
Page 22
SITE ENGINEERING CONSULTANTS
ENGINEERING SURVEYING LAND PLANNING
850 MIDDLE TENNESSEE BOULEVARD MURFREESBORO, TENNESSEE 37129
LANDSCAPE ARCHITECTURE
PHONE: (615) 890-7901 E-MAIL: MTAYLOR@SEC-CIVIL.COM FAX: (615) 895-2567
Current MWRD
Service Area
Notes:
1: Construct a 200' eastbound right turn lane on South Rutherford Boulevard at the
proposed access roadway.
2: Restripe South Rutherford Boulevard to provide a 200' westbound left turn lane at the
proposed access roadway.
3: To Accommodate future traffic, construct a five-lane access road with two 250'
northbound left turn lanes, one right turn lane, and one through lane (striped out)
approaching South Rutherford Boulevard. Note, if a three-lane cross-section is provided
based on the initial development, then right-of-way for the five-lane cross-section will need
to be reserved for the future improvements shown.
R
To CUD Know what's below.
Call beforePage
you dig. 23
WATER RESOURCES BOARD COMMUNICATION
Meeting Date: 07/28/2026
Item Title: Full-Scale Biosolids Thermal Dryer Engineering Services
Task Order Amendment No. 3
Department: Engineering
Presented by: John Strickland
Requested Council Action:
Ordinance ☐
Resolution ☐
Motion ☒
Direction ☐
Information ☐
Summary
Consider SSR TO Amendment No. 3 for additional engineering evaluation services for
the Water Resources Recovery Facility’s (WRRF) full-scale thermal dryer project.
Staff Recommendation
Approve Task Order Amendment No. 3 pending Legal approval as to form.
Background Information
The Council approved the initial task order in November of 2022 for the report,
preliminary design, and final design services for a new thermal sludge dryer to be
installed in the existing biosolids building at the City’s Water Resource Recovery Facility.
The purpose of the project is to manufacture a beneficially reusable soil amendment
and eliminate landfilling approximately eight truckloads per day of dewatered biosolids.
The drying operation will produce less than one truckload a day of Class A Excellent
Quality dried biosolids which can be spread across turf fields or agricultural property.
Amendment 1 added construction and operational phase services, approved February
2024. Amendment 2 added additional design, quality control of MR Systems design,
staff requested evaluations, approved May 2025.
Amendment 3 is for engineering services (support, review and revise instrumentation
and control design) that are outside the original scope of work.
Council Priorities Served
Expand infrastructure
Expanding the biosolids operations at the City’s WRRF to manufacture a beneficial land
applied soil amendment eliminates the WRRF’s reliance on a regional landfill.
Fiscal Impact
The original task order and prior two amendments totaled $2,083,760. This expense,
$78,031, would be funded by MWRD’s working capital reserves and bring the current
total to $2,161,791. $2,250,000 is allocated in working capital reserves for the project.
Attachments
SSR Task Order 2241030.0 Amendment 3 Documents Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
WATER RESOURCES BOARD COMMUNICATION
Meeting Date: 07/28/2026
Item Title: WRRF Wet Weather Upgrades - SSR Task Order Amendment 3
Department: Water Resources
Presented by: John Strickland
Requested Action:
Ordinance ☐
Resolution ☐
Motion ☒
Direction ☐
Information ☐
Summary
Consider approval of an Amendment to Task Order 2141002.0 with Smith Seckman
Reid (SSR) regarding engineering associated with the WRRF Wet Weather Upgrades.
Staff Recommendation
Approve Task Order Amendment No. 3 pending Legal approval as to form.
Background Information
In July of 2022, the Board and Council approved SSR Task Order 2141002.0 for the
engineering services to study the recommissioning of the Headworks 1 facility and for
the design and construction administration services related to wet weather upgrades to
the Water Resource Recovery Facility. In January of 2025, the Board and Council
approved Amendment 1 for evaluation of the hydraulic performance of the existing
filters. In May of 2025, the Board and Council approved Amendment 2 for revising the
design to include micropiles etc., because of unexpected soils around the foundation of new
UV influent structure.
Amendment 3 is for engineering work outside the currently contracted scope of services
due to unforeseeable conditions. During construction, several structural discrepancies
were discovered. For example, the upper section of the filter wall was out of slump
range, and cracks were found in the pipe gallery wall.
Council Priorities Served
Expand infrastructure
The expansion of the WRRF will allow development and redevelopment to continue into
approximately 2048.
Fiscal Impact
This amendment is for $110,000 and would come from MWRD’s Working Capital
Reserves. The total fees for the TO and amendments is now $872,060.
Attachments
Task Order Amendment No. 3 Documents
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
WATER RESOURCES
DASHBOARD PERFORMANCE
June 2026
NO. PROJECT MWRD FY2026-2030 CIP
2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 TOTAL
DEBT FY26 FY27 FY28 FY29 FY30
X486 Construction- Biosolids Full-scale Dryer ($33.1M) $33,100,000 $33,100,000
X628 Construction - WRRF Expansion ($115M) $115,000,000 $115,000,000
TOTAL Capital Improvements funded from Debt Service $33,100,000 $115,000,000 $148,100,000
NO. PROJECT 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 TOTAL
WORKING CAPITAL RESERVES FY26 FY27 FY28 FY29 FY30
W&S CAPITAL IMPROVEMENT PROJECTS
Misc FY26 W&S Working Reserve Commitments $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
X628 WRRF Expansion (Permitting & Preliminary Eng.) $405,000 $405,000
X628 WRRF Expansion Engineering & Land Acquisition $500,000 $3,000,000 $3,000,000 $500,000 $7,000,000
X485 WRRF Standby Power Yrs 1-3 Improvements $1,327,110 $1,000,000 $2,327,110
X369 WRRF Thermal Drying (Engineering & RPR) $750,000 $1,000,000 $1,750,000
X474 WRRF Wet Weather Treatment Train Impr (Eng & Constr) $5,775,000 $250,000 $6,025,000
X577 WRRF Old Headworks Recommissioning (Eng & Constr) $400,000 $6,600,000 $6,000,000 $13,000,000
X594 SRWTP Disinfection System Replacement $100,000 $1,000,000 $1,500,000 $2,600,000
X582 SRWTP Isolation Valve Replacements (Eng & Constr) $675,000 $675,000
X696 Town Creek Improvements (Constr) (20% Sewer & 80% Water) $937,500 $312,500 $1,250,000
X717 Burnt Knob/Veterans Pkwy (MTE Prop) Gravity, FM & PS (Sewer) $225,000 $1,500,000 $1,500,000 $3,225,000
X587 Thompson Lane / Battlefield P.S. Replacement (Sewer) $60,000 $3,000,000 $3,060,000
X692 Pump Station Improvements (Sewer) $192,000 $300,000 $3,000,000 $3,492,000
Subtotal CAPITAL PROJECTS $10,019,500 $16,289,610 $16,500,000 $3,500,000 $1,000,000 $47,309,110
TRANSPORTATION (Water/Sewer Imp.)
Misc FY26 Transport Reserve Commitments (1/2 Water & 1/2 Sewer) $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
X221 Thompson Lane (60% Water 40% Sewer) $2,000,000 $4,000,000 $4,000,000 $4,000,000 $14,000,000
X697 W Rutherford Blvd Extension over I-24 (3/4 Water & 1/4 Sewer) $100,000 $700,000 $100,000 $900,000
W934 Bradyville Pike (2/3 Sewer & 1/3 Water)
X602 Cherry Lane 3A Utilities (18" Repur, 12" Sewer & FM)(Sewer) $100,000 $500,000 $2,000,000 $2,000,000 $4,600,000
X643 Cherry Lane 3B Utilities (18" Repur, 12" Sewer & FM)(Sewer) $200,000 $1,500,000 $2,000,000 $3,700,000
X198 Cherry Ln 2 (18" Repur, 12" Sewer & FM)(Sewer) $100,000 $500,000 $2,000,000 $2,000,000 $4,600,000
Brinkley Road Ph 2(Sewer) $100,000 $1,000,000 $1,100,000
Broad St./Church St./Front St. /Vine St.(70% Sewer 30% Water) $100,000 $1,500,000 $1,600,000
Old Fort Parkway (I-24 to Ordway St.) (70% Water 30% Sewer) $1,000,000 $1,000,000
Subtotal TRANSPORTATION PROJECTS $3,000,000 $7,800,000 $13,100,000 $8,600,000 $1,500,000 $34,000,000
REHABILITATION
Sewer Rehabiliation - Maintenance Contracts $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $15,000,000
INFORMATION TECHNOLOGY PROJECTS
IT/Computer Systems Upgrades $100,000 $100,000 $100,000 $100,000 $100,000 $500,000
Electronic Content Management (Scanning/Imaging) $25,000 $25,000 $25,000 $25,000 $25,000 $125,000
IT Design Services & Consulting $100,000 $100,000 $100,000 $100,000 $100,000 $500,000
Comp Maintenance Management System (CMMS) $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Subtotal INFORMATION TECHNOLOGY PROJECTS $275,000 $275,000 $275,000 $275,000 $275,000 $1,375,000
TOTAL Projects from Working Capital Reserves $16,294,500 $27,364,610 $32,875,000 $15,375,000 $5,775,000 $97,684,110
NO. ADDITIONS TO RESERVES 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 TOTAL
FY26 FY27 FY28 FY29 FY30
RESERVE REVENUES
Water Taps, Sewer Taps, Special Assessments $5,800,000 $6,000,000 $6,000,000 $6,000,000 $6,000,000 $29,800,000
Reserve funds Interest Income $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000
TOTAL RESERVES REVENUES $6,800,000 $7,000,000 $7,000,000 $7,000,000 $7,000,000 $34,800,000
RATE-FUNDED SINKING FUNDS
Sewer rehab $1,500,000 $1,500,000 $1,500,000 $1,500,000 $1,500,000 $7,500,000
Biolsolids Processing Equip & Storage Sinking Fund $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
Future CIP Sinking Fund $1,900,000 $1,500,000 $1,500,000 $1,500,000 $1,500,000 $7,900,000
Lift Station Replacement Sinking Fund $250,000 $300,000 $300,000 $300,000 $300,000 $1,450,000
Cherry Lane Sanitary Sewer Sinking Fund $625,000 $625,000 $625,000 $625,000 $625,000 $3,125,000
TOTAL SINKING FUNDS $4,775,000 $4,425,000 $4,425,000 $4,425,000 $4,425,000 $22,475,000
TOTAL ADDITIONS TO RESERVES from Rates $11,575,000 $11,425,000 $11,425,000 $11,425,000 $11,425,000 $57,275,000
2025-2026 2026-2027 2027-2028 2028-2029 2029-2030
FY26 FY27 FY28 FY29 FY30
CAPITAL RESERVES 7/1 BALANCE 92,722,662 88,003,162 72,063,552 50,613,552 46,663,552
PROJECTED RESERVE FUND BALANCE REVENUE (TAPS) 6,800,000 7,000,000 7,000,000 7,000,000 7,000,000
SINKING FUND DEPOSITS TO RESERVES FROM RATES 4,775,000 4,425,000 4,425,000 4,425,000 4,425,000
AVAILABLE WORKING CAPITAL RESERVES 104,297,662 99,428,162 83,488,552 62,038,552 58,088,552
PROJECTED CIP PROJECTS (16,294,500) (27,364,610) (32,875,000) (15,375,000) (5,775,000)
PROJECTED ENDING WORKING CAPITAL RESERVES 6/30 88,003,162 72,063,552 50,613,552 46,663,552 52,313,552
SECURED MIN. BALANCE FOR WORKING CAPITAL RESERVES (3%/year) 36,500,000 37,595,000 38,722,850 39,884,536 41,081,072
EXCESS WORKING CAPITAL RESERVES ABOVE POLICY 51,503,162 34,468,552 11,890,702 6,779,017 11,232,480
6 MOS. OPERATING EXPENSES 18,250,000 18,797,500 19,361,425 19,942,268 20,540,536
EXCESS USING LOWER MINIMUM BALANCE 69,753,162 53,266,052 31,252,127 26,721,284 31,773,016
Prepared by: VSmith 5/20/2026
STONES RIVER WATER TREATMENT PLANT
Dashboard Report
June 2026
Drinking Water Laboratory Section Drinking Water Laboratory Section
Water Quality Complaints New & Repaired Lines Tested
2.5
2
2
1
1.5
1
1
0.5
0 0 0 2
0
New Lines Repaired Lines
Water Quality Plant Operations Section
Water Used Not Sold Flow (MGD)
12.507
20.000
16.053
570,200 0
18.000
16.373
16.000
14.000 7.975 11.959
12.000
10.910 7.912
10.000 7.147
8.000 4.532
6.000 5.564 3.686
4.000 1.390
7,385,887 2.000
0.000
Process Water SRWTP (gal) Auxiliary Raw River Raw Water Total Raw Water Finished Water
Water Pump Pump Station Flow Flow
Station
Water Quality Hydrant Flushing (gal)
Storage Tank Draining (gal) Avg Max Min
Plant Operations Section Plant Operations Section
Chlorine (mg/L) Finished Turbidity (NTU)
0.15
4.00
3.30
3.50 2.95 0.12
3.00 2.40
2.50 1.98 0.09
2.00
1.30
1.50 1.00 0.06
0.06
1.00
0.50
0.03 0.02
0.00 0.01
Avg Max Min
0.00
Finished Distibution Avg Max Min
STONES RIVER WATER TREATMENT PLANT
Dashboard Report
June 2026
Cross-Connection Control Section Cross-Connection Control Section
Number of Devices Tested By Category Number of Devices Tested
214
377 382
482 63
Residential Commerical Domestic Fire Protection Irrigation
Drinking Water Operations Section Drinking Water Maintenance Section
Pall Membrane Module Pin Count Work Order Status
5.0 3
4.0 47
3.0
2.0
1 1
1.0
00 000 000 000 000 000 00 00 00 00 0 00
114
0.0
Corrective Work Orders Completed
Preventative Work Orders Completed
2024 2025 2026 Emergency Work Orders Completed
MURFREESBORO WATER RESOURCE RECOVERY FACILITY
DASHBOARD REPORT
June, 2026
BOD PERCENT AMMONIA PERCENT
REMOVAL REMOVAL
99.1 99.9
437.486
MILLION GALLONS
TREATED
2,662.38
TONS
BIOSOLIDS
REMOVED
OPERATIONS & MAINTENANCE
DASHBOARD REPORT | FY 2026
JUL AUG SEP Oct NOV DEC JAN FEB MAR APR MAY JUN TOTAL
DISTRIBUTION SYSTEMS
Water Meter Installs 14 18 5 4 6 4 2 16 11 28 12 11 131
Water Service Line Install 2 0 10 3 0 0 0 5 3 2 0 0 25
Water Service Line Repair 2 4 8 5 6 6 7 4 5 4 2 8 61
Leaks Repaired 4 4 4 4 8 7 1 1 8 5 3 4 53
AMI Leaks Repaired 1 0 1 0 0 3 0 0 1 2 1 2 11
Meters Tested 196 124 125 104 124 74 124 74 74 71 92 68 1,250
COLLECTION SYSTEMS
TV Lines 48,603 45,827 33,359 37,895 28,471 10,145 23,248 66,275 38,106 24,837 26,423 29,517 412,707
TV Lines (Warranty) 197 0 0 0 836 15,029 5,367 1,921 2,631 13,832 7,267 7,208 54,289
TV Laterals 685 4,800 251 1,442 444 596 662 369 555 440 753 675 11,672
Manhole Inspections - Vertical Feet 1,735 1,609 1,772 3,452 330 0 0 50 0 155 0 0 9,103
Line Cleaning 53,801 72,910 18,974 33,531 2,859 19,187 62,664 34,808 41,500 31,494 22,658 33,477 427,863
Stormwater Line Cleaning 12,124 7,172 19,081 21,677 12,947 15,011 27,618 33,546 12,210 27,120 25,712 5,584 219,802
Cleanouts - New 47 36 42 69 42 64 60 62 51 48 59 45 625
Cleanouts - Replaced 1 3 1 1 3 3 3 3 7 1 1 1 28
SERVICES
Service Requests 38 33 30 46 25 44 36 33 46 49 39 54 473
Work Order Requests 179 183 147 152 110 95 82 105 157 149 154 132 1,645
Inspections - Commercial 26 13 248 26 29 33 10 14 7 17 22 20 465
Inspections - Residential 230 190 238 206 125 154 165 177 198 165 162 220 2,230
TN One Call Locates 1,903 2,017 2,306 2,105 1,759 2,053 1,753 2,021 2,351 2,340 2,454 2,790 25,852
PIPE FOOTAGE
New Development- Main Water Line 219 154 2,677 346 207 4 388 418 506 692 30 86 5,727
New Development - Main Sewer Line 0 0 0 0 0 0 0 0 0 0 240 295 535
Water Service Line Repairs Footage 40 31 515 1,213 61 29 12 25 507 8 56 94 2,591
Sewer - Repairs 0 808 0 113 72 0 6 0 0 0 0 1 1,000
Sewer - Rehab 891 0 18 0 0 0 0 162 136 0 0 0 1,207
OPERATIONS & MAINTENANCE
NON-BILLED FLUSHING REPORT | FY 2026
JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN TOTAL
O&M DEPT.
Meters (Events) 0 0 0 0 0 0 0 0 0 0 0 0 0
Fire Hydrants 0 0 0 0 0 0 0 0 0 0 0 0 0
Jet\Wash Trucks 94,350 63,200 68,450 66,400 48,250 40,250 37,850 49,500 41,550 38,650 28,712 46,800 623,962
Sweepers & Saw 200 450 100 200 50 0 100 150 200 600 300 300 2,650
Stub & Meter Connection 2,300 5,000 8,000 1,500 1,550 6,100 3,000 1,200 1,800 6,500 1,000 1,200 39,150
Valves Exercised 0 294 443 242 72 271
New Construction 0 0 0 300 36,043 25,000 16,000 0 18,752 18,742 0 17,810 132,646
Main Line Leaks 80,250 85,560 65,500 66,500 189,500 80,500 84,500 250,265 187,460 275,560 156,250 65,000 1,586,845
Subtotal O&M 177,100 154,210 142,050 134,900 275,393 151,850 141,450 301,409 250,205 340,294 186,334 2,255,194
ENGINEERING DEPT. 1,165,649 323,147 0 1,792,590 0 8,764 456,144 0 90,386 492,423 277,054 4,606,157
FIRE DEPT. 107,970 47,000 15,000 360,000 6,716 0 0 0 0 15,300 86,952 91,500 730,438
STREET DEPT. 12,180 12,540 11,900 28,900 13,500 4,200 15,200 27,880 18,280 19,900 21,775 7,180 193,435
Subtotal Other Depts 1,285,799 382,687 26,900 2,181,490 20,216 12,964 471,344 27,880 108,666 527,623 108,727 5,154,296
Total 1,462,899 536,897 168,950 2,316,390 295,609 164,814 612,794 329,289 358,871 867,917 295,061 7,409,490
0
0
OPERATIONS & MAINTENANCE
ASPHALT QUOTES | FY 2026
Wire Grass Const Co. Hawkins Vulcan Notes
Binder Topping Binder Topping Binder Topping
Jul $72.35 $86.18 $78.00 $84.50 $75.58 $86.27
Aug $72.35 $86.18 $78.00 $84.00 $75.58 $86.27
Sep $72.35 $86.18 $75.58 $84.00 $75.58 $86.27
Oct $72.35 $86.18 $75.58 $84.00 $75.51 $86.19
Nov $73.35 $87.18 $75.58 $84.00 $75.26 $85.84
Dec $73.35 $87.18 $75.58 $84.00 $75.03 $85.54
Jan $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Closed
Feb $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Closed
Mar $0.00 $0.00 $0.00 $0.00 $77.82 $88.10
Apr $0.00 $0.00 $82.00 $88.00 $81.50 $88.00
May $78.00 $89.00 $82.00 $89.00 $85.19 $97.91
Jun $78.00 $89.00 $82.00 $89.00 $85.19 $97.91
July
ASPHALT PURCHASES
OPERATIONS & MAINTENANCE
ASPHALT PURCHASES 2026
Invoice Date Approval Vendor Type Rate Qty Total FY Total
7/8 Dhughes Vulcan 307BM $78.00 8.03 $626.34 $626.34 #
7/11 Dhughes Vulcan 307BM $78.00 20.33 $1,558.74 $2,185.08 4
7/11 Dhughes Vulcan 307BM $78.00 20.03 $1,562.34 $3,747.42 4
7/11 Dhughes Vulcan 307BM $78.00 5.10 $397.80 $4,145.22
7/18 Dhughes Vulcan 307BM $78.00 20.09 $1,567.02 $5,712.24 2
Valves 8/5
Exercised Dhughes Vulcan 307BM $78.00 20.06 $1,564.68 $7,276.92
8/5 Dhughes Vulcan 307BM $78.00 19.92 $1,553.76 $8,830.68 #
8/5 Dhughes Vulcan 307BM $78.00 20.14 $1,570.92 $10,401.60
8/5 Dhughes Vulcan 307BM $78.00 20.58 $1,605.24 $12,006.84 #
8/5 Dhughes Vulcan 307BM $78.00 20.33 $1,585.74 $13,592.58 #
8/25 Dhughes Vulcan 307BM $78.00 20.38 $1,589.64 $15,182.22 #
8/25 Dhughes Vulcan 307BM $78.00 21.58 $1,683.24 $16,865.46 #
8/25 Dhughes Vulcan 307BM $78.00 20.58 $1,605.24 $18,470.70 #
8/25 Dhughes Vulcan 307BM $78.00 20.03 $1,562.34 $20,033.04 #
8/25 Dhughes Vulcan 307BM $78.00 20.13 $1,570.14 $21,603.18 #
8/26 Dhughes Vulcan 307BM $78.00 20.30 $1,583.40 $23,186.58
8/26 Dhughes Vulcan 307BM $78.00 20.02 $1,561.56 $24,748.14
8/26 Dhughes Vulcan 307BM $78.00 20.48 $1,597.44 $26,345.58 #
8/26 Dhughes Vulcan 307BM $78.00 20.07 $1,565.46 $27,911.04 #
8/26 Dhughes Vulcan 307BM $78.00 20.61 $1,607.58 $29,518.62 #
8/27 Dhughes Vulcan 307BM $78.00 20.93 $1,632.54 $31,151.16 #
8/27 Dhughes Vulcan 307BM $78.00 20.59 $1,606.02 $32,757.18 #
8/27 Dhughes Vulcan 307BM $78.00 13.25 $1,033.50 $33,790.68
8/27 Dhughes Vulcan 307BM $78.00 3.36 $262.08 $34,052.76 #
9/30 Dhughes Vulcan 307BM $78.00 12.19 $950.82 $35,003.58 #
9/30 Dhughes Vulcan 307BM $78.00 6.60 $514.80 $35,518.38 #
9/30 Dhughes Vulcan 307BM $78.00 20.41 $1,591.68 $37,110.06
9/30 Dhughes Vulcan 307BM $78.00 19.88 $1,550.64 $38,660.70
10/14 DHughes Vulcan 307BM $78.00 20.43 $1,593.54 $40,254.24
10/14 Dhughes vulcan 307BM $78.00 11.46 $893.88 $41,148.12
10/28 Dhughes Vulcan 307BM $78.00 19.30 $1,505.40 $42,653.52
11/7 Dhughes Vulcan 307BM $78.00 18.50 $1,443.00 $44,096.52
11/7 Dhughes Vulcan 307BM $78.00 6.29 $490.62 $44,587.14
11/7 Dhughes Vulcan 307BM $78.00 14.34 $1,118.52 $45,705.66
11/11 Dhughes Vulcan 307BM $78.00 16.13 $1,258.14 $46,963.80
3/6 Dhughes Vulcan 307BM $77.82 6.08 $473.14 $47,436.94
3/24 Dhughes Vulcan 307BM $77.82 41.56 $3,234.19 $50,671.13
4/10 Dhughes vulcan 307BM $80.50 18.47 $1,486.84 $52,157.97
4/10 Dhughes Vulcan 307BM $80.50 3.31 $266.46 $52,424.43
4/8 Dhughes Vulcan 307BM $80.50 18.49 $1,488.45 $53,912.88
4/8 Dhughes Vulcan 307BM $80.50 16.75 $1,348.38 $55,261.26
4/9 Dhughes Vulcan 307BM $92.00 18.49 $1,701.08 $56,962.34
4/9 Dhughes Vulcan 307BM $92.00 15.31 $1,408.52 $58,370.86
4/15 Dhughes Vulcan 307BM $80.50 9.28 $747.04 $59,117.90
4/14 Dhughes Vulcan 307BM $80.50 18.00 $1,449.00 $60,566.90
4/14 Dhughes Vulcan 307BM $80.50 14.30 $1,151.15 $61,718.05
4/13 Dhughes Vulcan 307BM $80.50 18.12 $1,458.66 $63,176.71
4/13 Dhughes Vulcan 307BM $80.50 7.28 $586.04 $63,762.75
4/21 Dhughes Vulcan 307BM $81.50 18.48 $1,506.12 $65,268.87
4/21 Dhughes Vulcan 307BM $81.50 18.91 $1,541.17 $66,810.04
4/22 Dhughes Vulcan 307BM $81.50 18.31 $1,492.27 $68,302.31
4/22 Dhughes Vulcan 307BM $81.50 12.54 $1,022.01 $69,324.32
4/20 Dhughes Vulcan 307BM $81.50 18.33 $1,493.90 $70,818.21
4/20 Dhughes Vulcan 307BM $81.50 18.69 $1,523.24 $72,341.45
4/20 Dhughes Vulcan 307BM $81.50 18.67 $1,521.61 $73,863.06
6/10 Dhughes Vulcan 307BM $81.50 22.03 $2,507.99 $76,371.05
6/11 Dhughes Vulcan 307BM $81.50 54.09 $4,607.94 $80,978.99
OPERATIONS & MAINTENANCE - SERVICES
FY 2026
250
220
198
Valves
200 Exercised
177
165 165
157 162
149 154
150
132
105
100
82
49 54
46
50 36 39
33
17 22 20
10 14
7
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Service Requests Work Order Requests Residential Inspections Commerical Inspections
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
Service Requests 36 33 46 49 39 54 257
Work Order Requests 82 105 157 149 154 132 779
Residential Inspections 165 177 198 165 162 220 1,087
Commerical Inspections 10 14 7 17 22 20 90
Total 293 329 408 380 377 426 2,213
Stormwater Dashboard – July 2026
Inspection Program
Construction Phase Inspections of Stormwater SCM Maintenance Inspections (FY)
Control Measures (SCMs) *MWRD
Sites with stormwater controls under construction
Pre-construction meetings (with controls) June
19
109 114 110 106 109
88 98
110 126
99
62
3 3 6 1 6 4 3
13
JUL-23 JAN-24 JUL-24 JAN-25 JUL-25 JAN-26 JUN-26
2021-22 2022-23 2023-24 2024-2025 2025-26
*Data includes follow-up inspections.
Education and Outreach
LID/ Green Infrastructure
59.5 acres
3 SCM operators educated. porous 80.9 acres
45 People educated at Farmer’s Market (6/2). concrete/ wetland
4 Employees trained. pavers conservation
254
rain gardens,
bioretention
areas, infiltration
sites (G.I.)
*Outreach and education programs aided in part by MTSU/Project WET.
Stormwater Program Calendar
Streambank Protection
9/3: Stormwater and Coffee talk.
Permanent stormwater controls
567.5 acres
Sites/subdivisions with 749 Detention
stormwater controls (includes sites
in development process)
18.9 miles
stream buffer
Manufactured Treatment Devices 110
(1 or more
(MTDs)
sides)
Underground Storage 70
Priority watersheds: acres treated .39
*Acres treated is a result of infill/redevelopment and includes
SCM retrofits and impervious reductions.