EXPANDED DRAFT MEETING SUMMARY
THIS IS NOT AN OFFICIAL TRANSCRIPT OF TAPE RECORDED PROCEEDINGS
THE INFORMATION CONTAINED HEREIN HAS NOT BEEN REVIEWED OR APPROVED BY THE NCPB
NASHUA CITY PLANNING BOARD
February 5, 2026
The regularly scheduled meeting of the Nashua City Planning
Board was held on February 5, 2026 at 7:00PM in the 3rd floor
auditorium in City Hall.
Members Present: Bob Bollinger, Chair
Adam Varley, Vice Chair
Dan Hudson, City Engineer
Ald. Patricia Klee
Cameron Green
Larry Hirsch
Also Present: Sam Durfee, Planning Manager
Connor Muise, Deputy Planning Manager
Scott McPhie, Planner I
APPROVAL OF MINUTES
January 8, 2026
MOTION by Ald. Klee to approve the minutes, as written
SECONDED by Mr. Green
MOTION 5-0-1 (Bollinger abstained)
COMMUNICATIONS
o A25-0215, 60 Crown Street
▪ Updated Landscaping plan
o A25-0185 & A25-0200, 16 East Glenwood St
▪ Updated staff report
REPORT OF CHAIR, COMMITTEE, & LIAISON
None
PROCEDURES OF THE MEETING
After the legal notice of each conditional, special use permit,
site plan or subdivision plan is read by the Chair, the Board
will determine if that the application is complete and ready for
the Board to take jurisdiction. The public hearing will begin at
which time the applicant or representative will be given time to
present an overview and description of their project. The
NCPB
January 8, 2026
Page 2
applicant shall speak to whether or not they agree with
recommended staff stipulations. The Board will then have an
opportunity to ask questions of the applicant or staff.
The Chair will then ask for testimony from the audience. First
anyone wishing to speak in opposition or with concern to the
plan may speak. Please come forward to the microphone, state
their name and address for the record. This would be the time to
ask questions they may have regarding the plan. Next public
testimony will come from anyone wishing to speak in favor of the
plan. The applicant will then be allowed a rebuttal period at
which time they shall speak to any issues or concerns raised by
prior public testimony.
One public member will then be granted an opportunity to speak
to those issues brought by the applicant during their rebuttal
period. The Board will then ask any relevant follow-up questions
of the applicant if need be.
After this is completed the public hearing will end and the
Board will resume the public meeting at which time the Board
will deliberate and vote on the application before us. The Board
asks that both sides keep their remarks to the subject at hand
and try not to repeat what has already been said.
Above all, the Board wants to be fair to everyone and make the
best possible decision based on the testimony presented and all
applicable approval criteria established in the Nashua Revised
Ordinances for conditional, special use permits, site plans and
subdivisions. Thank you for your interest and courteous
attention. Please turn off your cell phones and pagers at this
time.
NEW BUSINESS – SPECIAL USE PERMITS
A25-0200 Silver Lining Development, LCC (Owner), Doug Seppala
(Applicant) Proposed Special Use Permit to allow the
construction of a single-family home with access from
a paper street. Property is located 16 East Glenwood
Street & “L” Linton Street. Map 129 – Lots 187 & 259.
Zoned A-Urban Residence (R-A). Ward 7. (Postponed to
the February 5, 2026 meeting by applicant request)
NEW BUSINESS – SUBDIVISION PLANS
A25-0185 Doug Seppala, Silver Lining Development, LCC (Owner &
Applicant) requesting approval for a boundary plan and
3-lot subdivision. The property is located 16 East
NCPB
January 8, 2026
Page 3
Glenwood Street. Map 129 – Lot 187. Zoned A Urban
Residence (R-A). Ward 7. (Postponed to the February 5,
2026 meeting by applicant request)
MOTION by Mr. Varley that A25-0185 and A25-0200 are complete and
the Planning Board is ready to take jurisdiction.
SECONDED by Mr. Hirsch
MOTION CARRIED 6-0
Ethan Beals, Civil Engineer, IMEG Corp, 3 Congress St, Nashua NH
Mr. Beals introduced himself on behalf of the applicant. With
him is Atty. Andy Prolman.
Mr. Beals described the subject lot and surrounding properties.
They propose to subdivide the existing lot into three lots, and
construct a new residence on a lot to the north. The Zoning
Board granted a total of 12 variances on July 22, 2025, and a
special exception to disturb a wetland buffer. All dwellings are
intended to fit the character of the neighborhood. The existing
sewer easement and sewer run will be relocated. Two residences
will be access from East Glenwood Street, and two from a new
driveway off of Linton Street. All will be serviced by city
sewer, water, gas, and overhead electric.
Mr. Beals said in terms of stormwater there will be a
considerable improvement. The end of Linton Street drains to the
west and causes active erosion on the slop towards the wetland.
We are able to capture 2.2 acres of the 2.9 acre drainage area
and provide qualitative and quantitative treatment, improving
existing conditions substantially.
Mr. Beals said the two northern lots will have access from the
paper street portion of Linton Street. Atty. Prolman will
explain further.
Atty. Andy Prolman, Prunier & Prolman PA
Atty. Prolman said the undeveloped portion of Linton Street
exists as a private way. In 1924 this whole neighborhood was
laid out with 200 lots, and over time Linton got built in
sections and the city accepted portions of Linton over time. The
law of the time is that when a street was dedicated, the city
had rights for a period of 20 years. If not accepted, the rights
lapse. The paper street is still there and is subject to private
rights to the street. Lot 259 is an existing lot of record and
NCPB
January 8, 2026
Page 4
has implied right of access. The question is whether lot 195 has
the same implied access rights, he believes it does. If not they
will obtain easements to access it and provide that to staff.
Atty. Prolman said the statute has been amended where now you
need a petition to discontinue the street. We will have a trip
to the Board of Alderman for a building permit on a private way.
That’s a condition shown in the staff report. There are going to
be several shared agreements between the lots.
Mr. Varley asked if the intent is that the paper street section
would remain private.
Atty. Prolman said correct.
Ald. Klee asked if the two lots will be put together for a
larger development.
Atty. Prolman said there will be two separate driveways and
lots.
Mr. Bollinger asked if lot 256 or 198 have any interest in this.
Atty. Prolman said they do not have to participate. The shared
driveway agreement anticipates the possibility that it could be
subdivided, and they would share the driveway agreement.
Mr. Bollinger said they have existing access on the built out
portion of Linton Street. Do they need to be direct
participants?
Atty. Prolman said no. But the agreement anticipates the
possibility that they could.
Ald. Klee asked if this paper street will belong to the two
properties.
Atty. Prolman said yes.
Ald. Klee asked if this belongs to the abutters as well.
Atty. Prolman said it does today. All the property owners own it
subject to the private rights of access.
Ald. Klee asked if they have to negotiate a right of way with
the abutters.
NCPB
January 8, 2026
Page 5
Atty. Prolman said we sketched the underlying ownership as it is
today, subject to the access rights. Lot 259 has implied right
of access such that we don’t have to get easements. The question
is the new lot that is being created. If it doesn’t, they will
go to the neighbors. We are waiting on that interpretation.
Mr. Beals said this is very complicated and nuanced and goes
into complex road law. A special use permit is required to get
access to these lots, and requires meeting six criteria. He
summarized the criteria. Based on the plans we believe we have
fulfilled all the criteria required. We are requesting three
waivers, as detailed in the staff report. We believe the plan
conforms to the requirements and have no objections to the
conditions outlined in the staff report.
Mr. Bollinger asked staff if the conditions as written
accurately describe the next steps regarding aldermanic action.
If not approved would the applicant have to return here?
Mr. Muise said this requires aldermanic approval. He believes
the conditions cover subsequent actions.
Mr. Varley asked if the requirement for sprinklers is captured
in the subsequent conditions.
Mr. Muise said the Fire Marshal did not provide a formal comment
letter.
SPEAKING IN OPPOSITION OR CONCERN
Joseph Cotreau, 45 East Glenwood St, Nashua NH
Mr. Cotreau said he has a question. He doesn’t understand where
the additional dwellings are going.
Mr. Muise showed the plan and explained it.
Mr. Cotreau said the drainage in front of this particular lot is
very poor. What impact will this new construction have on the
street?
Mark Connolly, 36 East Glenwood St, Nashua NH
Mr. Connolly said he would like to second what has been said
about the drainage. He is also concerned about how trash and
NCPB
January 8, 2026
Page 6
snow will be handled on the common driveway. There is quite the
drop-off back there.
SPEAKING IN FAVOR
None
APPLICANT REBUTTAL
Ethan Beals, Civil Engineer
Mr. Beals gave a brief explanation of the stormwater analysis
requirements and the drainage directions of the area. We showed
significant reductions in peak flows leaving the site through a
combination of treatment practices. The driveway will be porous
pavement. Each dwelling has a roof infiltration unit. The
proposed development has treatment infrastructure that will
improve the area.
Mr. Beals said in terms of trash and snow removal, which they
will have to work out with DPW. The two dwelling units will have
what is essentially a long driveway. If they choose not to walk
their barrels out, they can have private pickup. They will have
to work with DPW where the snow will go and a shared maintenance
agreement for the porous pavement.
Mr. Bollinger said the elevation drop is 20+ feet. Are they
leveling that? It won’t be as much of a steep drop off?
Mr. Beals said yes. Our goal is to pick up the slope a little,
some of the units will have a drive-under garage.
Ald. Klee said now that the driveways will be there, where will
the plows put the snow? We can’t leave a wall of snow there
anymore.
Mr. Hudson said we raised snow storage as an issue. He doesn’t
have an answer today, but he is comfortable with the condition
that they will work with the applicant.
Ald. Klee said so long as the new owners are aware of how this
will work.
Mr. Beals said he has represented three developments at dead end
streets, and he looks forward to working with staff again.
NCPB
January 8, 2026
Page 7
Mr. Bollinger said he thinks there will be continued discussions
on a number of topics.
PUBLIC MEETING
Mr. Bollinger closed the public meeting and opened the public
meeting. He summarized the discussion. He feels comfortable
moving forward.
Ald. Klee asked for clarification on the aldermanic action
required.
Mr. Muise said approval is needed to issue the permits.
Ald. Klee said we need to consider the neighbors when planning
the snow removal and drainage.
Mr. Hudson said the Zoning Board allowed zero frontage so it is
a buildable lot.
Mr. Muise said correct.
Mr. Bollinger said he sees nothing unusual with the waiver
requests.
MOTION by Mr. Green to approve the following waivers for New
Business – Subdivision Plan A25-0185:
a. §190-282 B. (9): To waive the requirement to show physical
features on-site and within 1,000 feet of subdivision
boundaries.
b. §190-212 A. (1.): To waive the requirement that a sidewalk
be located on at least one side of the street, and provide
a payment in lieu of $7,000.
c. §190-221: To waive the requirement to provide utilities
underground.
As per RSA 674:36(II)(N), RSA 674:44(III)(e), and §190-148(D),
Strict conformity would pose an unnecessary hardship to the
Applicant and the waiver would not be contrary to the spirit and
intent of the regulations; and specific circumstances, or
conditions of the land, and the waiver will properly carry out
the spirit and intent of the regulations.
NCPB
January 8, 2026
Page 8
SECONDED by Mr. Varley
MOTION CARRIED 6-0
MOTION by Mr. Green to approve New Business – Special Use permit
A25-0200. Board finds that the application does fulfill the
conditions of §190-8 (d), and delegate the formalization of a
plan (2) for snow removal and trash removal to staff if the
Board finds the current plan unsatisfactory.
SECONDED by Mr. Hirsch
MOTION CARRIED 6-0
MOTION by Mr. Green to approve A25-0185 – Subdivision Plan. The
Board finds that the application meets the Approval Criteria
under §190-138(G) with the following conditions:
a. All conditions from the Planning Board decision letter will
be added to the plan.
b. Any waiver(s) granted shall be listed on the plan. Should
any waiver(s) be denied, the plan must be revised to comply
with the applicable site plan regulations.
c. All Technical Review Comments listed in Section 5 of the
Planning Board staff report shall be addressed to the
satisfaction of the Planning Department.
d. All comments from the Engineering Department, provided in a
letter dated January 20th, 2026, shall be addressed to the
satisfaction of the Department of Public Works.
e. Final plan set shall include seals and signatures for state
licensed engineer, land surveyor, and wetland scientist.
f. All proposed demolition activities require inspections for
the presence of asbestos containing materials prior to
Environmental Health’s sign-off on Nashua’s Building Safety
Department’s Demolition Permit Approval Form. If any
asbestos-containing materials are found, they must be
abated and documented according to state and local
regulations.
NCPB
January 8, 2026
Page 9
g. Prior to any work, a pre-construction meeting shall be
held, and a financial guarantee for all off-site
improvements shall be approved and submitted to the City.
h. Prior to the issuance of a building permit for lots 259 and
195, approval from the Board of Aldermen will sought for
the issuance of building permits on a private street,
pursuant RSA 674:41, I. (d).
i. Prior to the issuance of a building permit, stormwater
documents in accordance with §190-217 shall be recorded at
the Applicant’s expense.
j. Prior to the issuance of a building permit, driveway plans
shall be submitted and approved by the Engineering
department.
k. Prior to the issuance of a building permit, the
contribution in lieu of construction of sidewalk, in the
amount of $7,000, shall be made to the City.
l. Prior to the issuance of a building permit, proof of access
rights across the undeveloped portion of Linton Street, to
the benefit of Lots 195 and 259, will need to be provided
to staff for review, if determined to be necessary.
m. Prior to the issuance of the first Certificate of
Occupancy, provide for Staff review, the HOA committee
charter, condominium documents, or similar, that speaks to
the private maintenance of all shared infrastructure
internal to the site, including but not limited to:
driveways, utilities, landscaping, stormwater controls, and
lighting.
n. Prior to the issuance of a Certificate of Occupancy, school
impact fees shall be paid, in accordance with Article VIII
Impact Fees of the Nashua Land Use Code.
o. Prior to the issuance of a Certificate of Occupancy, all
site improvements will be completed in accordance with the
approved plan.
p. Prior to the release of any financial guarantee held for
project improvements, an asbuilt plan locating all
driveways, structures, utilities, and landscaping shall be
NCPB
January 8, 2026
Page 10
completed by a professional New Hampshire licensed engineer
or surveyor and submitted to the Planning and Engineering
Departments. As-built submittals shall include .pdf
documents and CAD files. The as-built shall include a
certification by an NH-licensed Professional Engineer that
all construction was generally completed in accordance with
the approved subdivision and applicable regulations.
SECONDED by Mr. Varley
MOTION CARRIED 6-0
NEW BUSINESS – SITE PLANS
A25-0215 Arc Source/Nichols Realty, LLC (Owners & Applicants),
requesting site plan approval for the construction of
a 50-unit multi-family development with associated
site improvements. Property is located at 60 Crown
Street. Map 24 – Lot 49. Zoned General Industrial /
Transit Oriented Development Overlay (GI / TOD). Ward
7.
MOTION by Mr. Varley that the application is complete and the
Planning Board is ready to take jurisdiction
SECONDED by Mr. Hirsch
MOTION CARRIED 6-0
Nick Golan, Civil Engineer, TF Moran, 48 Constitution Dr,
Bedford, NH
Mr. Golan introduced himself on behalf of the owners and
applicants. With him is Joe Tamposi.
Mr. Golan described the subject lot and surrounding lots. This
property has multiple frontages and interesting geometry, it was
a challenge to redevelop and envision access. We developed the
immediately adjacent lot on Avery Lane, this will be similar. We
are proposing a 5-story affordable housing project with 54
parking spaces and 50-units. Access is through Crown Street. We
are proposing two dumpsters, which will be more than adequate.
There will be 25 1-bedroom and 25 2-bedroom units. We will be
using the existing utility lines, and we are still working with
staff on landscaping.
NCPB
January 8, 2026
Page 11
Mr. Golan said traffic is fairly minimal. Crown Street is on the
smaller side, but will be able to manage the traffic. We are
contributing to the traffic corridor fund for offsite
improvements.
Mr. Golan presented architectural designs for the development,
which will be very similar to the development next door. We are
requesting one waiver, as detailed in the staff report.
Mr. Bollinger said some of the landscaping plan looks like it is
in the right of way. Who will maintain them?
Mr. Golan said the expectation is to have a note on the plan
that the property owner will maintain them. If it isn’t in the
city’s best interest for them to be there, they will be removed.
Ald. Klee said they received an abutter letter concerned about
Crown Street. Avery Lane has 95 units, and this will bring that
number to 145 units in a short time. She is for affordable
housing, but she doesn’t want to create a nightmare for the
residents.
Mr. Golan said some of this goes to the master planning that the
city has done, which targets this area for residential. We
worked with city staff to make sure the use and density is
consistent with what has been approved in the past. Avery Lane
provides a cut through to East Hollis Street. This will add
traffic, but the road can sustain that traffic.
Ald. Klee said she appreciates that clarification. The residents
will be able to go to East Hollis Street.
Mr. Golan said that is correct.
Ald. Klee said that also depends on the traffic on East Hollis
Street.
Mr. Golan said there are also right of way improvements
contemplated by staff, which we are contributing to.
SPEAKING IN OPPOSITION OR CONCERN
Letter from Carl Swanson, 42 Crown St
Carl Swanson, 42 Crown St, Nashua NH
NCPB
January 8, 2026
Page 12
Mr. Swanson said he sent the letter in. He has 95 apartments 15-
ft from his backyard and now there will be 55-units two doors
down. On Crown Street you have to go right over the bridge on
Avery Lane, you can’t go to Main Street. So everyone will be
going through right in front of his house to get to Crown
Street. Sometimes he has to wait for the train. What will they
do when there are 50-75 cars backed up behind the train?
SPEAKING IN FAVOR
None
APPLICANT REBUTTAL
Nick Golan, Civil Engineer
Mr. Golan said we’re evaluating peak hours, this isn’t 50 cars
coming in and out all at once. If we compare the traffic to a
commercial use where cars are coming in and out all the time,
those uses drive up traffic in the area. These are people’s
homes, just vertical. Ground street is suitable for that number
of trips.
Mr. Bollinger asked about the public efforts that will improve
traffic in the area.
Mr. Hudson said we have completed some work on Crown Street to
modify the intersection on Arlington Street. We have a future
project at the intersection of Bridge and East Hollis to be more
pedestrian and bike friendly. The temporary signal at D Street
will be made permanent. We have a 10-year corridor project to
make changes along the corridor.
Mr. Bollinger asked if operational enhancements along East
Hollis Street will address some concerns.
Mr. Hudson said correct. The contribution will help towards
future improvements in the area.
Mr. Varley asked if the traffic impact report didn’t trigger for
additional review.
Mr. Golan said correct.
PUBLIC MEETING
NCPB
January 8, 2026
Page 13
Mr. Bollinger closed the public meeting and opened the public
meeting. He summarized the discussion. He feels comfortable
moving forward.
Ald. Klee said 50 units coming in is a shock to the
neighborhood, that is significant. But the master plan calls us
to increase our housing units, and these are affordable. Her
concern is the railroad, you can’t get by the train going
through. Where Avery Lane is private, does it allow for public
cut through?
Mr. Durfee said he doesn’t know.
MOTION by Ald. Klee to reopen the hearing
SECONDED by Mr. Green
MOTION CARRIED 6-0
Mr. Golan said it is a private lane but is it not signed to
restrict public traffic.
PUBLIC MEETING II
Mr. Bollinger closed the public meeting and opened the public
meeting.
Ald. Klee said she is inclined to support it but we have to keep
in consideration the neighborhood. With or without the
additional traffic he will be stuck behind the train.
Mr. Bollinger said we can’t do much about the train. But this
will be a relatively small peak hour increase. The applicant has
provided sufficient traffic documentation.
Mr. Varley said we see this come up quite frequently,
incremental traffic impacts. The question we have to ask is
whether it’s significant enough that it demands certain
improvements be made by the applicant. He would say it isn’t.
Ald. Klee said this incremental, at what point do we say that
this is too much? This is on top of the other 95 units just put
in there.
Mr. Bollinger said a similar discussion came up with the new
public works facility. Mr. Hudson is good keeping them to date
NCPB
January 8, 2026
Page 14
on the projects they are trying to improve corridors with to the
betterment of all. He is comfortable moving forward with the
voluntary contribution.
MOTION by Mr. Varley to approve the following waivers for New
Business – Site Plan A25-0215:
a. §190-279 EE to waive the requirement to show all existing
conditions on adjacent properties.
As per RSA 674:36(II)(N), RSA 674:44(III)(e), and §190-148(D),
Strict conformity would pose an unnecessary hardship to the
Applicant and the waiver would not be contrary to the spirit and
intent of the regulations; and specific circumstances, or
conditions of the land, and the waiver will properly carry out
the spirit and intent of the regulations.
SECONDED by Mr. Hirsch
MOTION CARRIED 6-0
MOTION by Mr. Varley to approve A25-0215 – Site Plan. The Board
finds that the application meets the Approval Criteria under
§190-146(D) with the following conditions:
a. All conditions from the Planning Board decision letter
shall be added to the plan.
b. Any waiver(s) granted shall be listed on the plan. Should
any waiver(s) be denied, the plan must be revised to comply
with the applicable site plan regulations.
c. The plan set shall be sealed and signed by a professional
engineer, land surveyor, architect, and wetland scientist
on applicable plan set sheets.
d. Prior to the signing of the plan, all technical review
comments listed in Section 5 above shall be addressed to
the satisfaction of the Planning Department.
e. Prior to the Chair signing the plan, all comments in an e-
mail from Joe Mendola, Senior Engineer, dated January 16,
2026 shall be addressed to the satisfaction of the
Engineering Department. Note comment 16 from the City
Traffic Engineer includes a $7,000 payment to the East
Hollis Street Traffic Corridor account.
NCPB
January 8, 2026
Page 15
f. Prior to the Chair signing the plan, all comments in an e-
mail from Nashua Fire, dated, January 20, shall be
addressed to the satisfaction of the Fire Department.
g. All new addressing for the site shall be approved by the
Nashua Fire Marshal’s Office.
h. All proposed demolition activities require inspections for
the presence of asbestos-containing materials prior to
Environmental Health’s sign-off on Nashua’s Building Safety
Department’s Demolition Permit Approval Form. If any
asbestos-containing materials are found, they must be
abated and documented according to state and local
regulations.
i. Prior to the issuance of a building permit, stormwater
documents in accordance with §190-217 shall be submitted
for review by City staff and recorded at the Applicant’s
expense.
j. Prior to the issuance of a Certificate of Occupancy, all
site improvements will be completed in accordance with the
approved plan.
k. All easements will be submitted to City Staff for review
and recorded with the plan.
l. Prior to any work, a pre-construction meeting shall be held
and a financial guarantee shall be approved.
m. Prior to the issuance of the first Certificate of
Occupancy, all safety and directional signs shall be
posted.
n. Prior to issuance of the final certificate of occupancy for
the development, an as-built plan locating all driveways,
units, other buildings, utilities and site landscaping
shall be completed by a professional engineer and submitted
to the Planning Department. The as-built plan shall include
a statement that all construction was generally completed
in accordance with the approved site plan and applicable
local regulations.
NCPB
January 8, 2026
Page 16
o. The Building Department will determine how they will
approve individual C/O’s for the building.
p. Prior to the issuance of a Certificate of Occupancy, school
impact fees shall be paid, in accordance with Article VIII
Impact Fees of the Nashua Land Use Code.
SECONDED by Mr. Green
MOTION CARRIED 6-0
NEW BUSINESS – SITE PLANS
A26-0005 Lofts 34, LLC (Owner & Applicant) requesting site plan
amendment to renovate existing commercial building
space into 9 residential units. Property is located at
44 Franklin Street. Map 78 – Lot 89. Zoned General
Industrial / Mixed Use (GI/MU). Ward 3.
MOTION by Mr. Hudson that the application is complete and the
Planning Board is ready to take jurisdiction
SECONDED by Mr. Green
MOTION CARRIED 6-0
Bianca Carlson, Brady Sullivan Properties, 670 North Commercial
St, Manchester NH
Ms. Carlson said she is here on behalf of the owner. We are
proposing to convert the first floor from commercial space to
residential space. This is permitted under the mixed use
overlay. She described the surrounding uses. She said they are
not proposing to make any exterior changes to the building, and
the residences would be using the parking lot located at L
Charles Street. The parking lot is offsite, and we have drafted
a parking easement for review. We would modify the parking lot
to include handicap parking and flow improvements. This would
not negatively impact the neighborhood.
Ms. Carlson said Engineering has requested they obtain a sewer
permit, which we have no issue with. Engineering also requested
we repair the emergency railroad access, but it is our
understanding that the land is owned by the railroad. Mr.
Mendola said he would confirm and is confortable removing that
condition if it is the case. The unit numbering is noted on the
NCPB
January 8, 2026
Page 17
plan, as per Fire requirements. The request tonight is to use
offsite parking for this development.
Ald. Klee said this is her ward. The parking lot is completely
filled during the day. Will the parking spaces be labeled?
Ms. Carlson said yes. Those spaces would have signage so the
residents will have parking spaces.
Ald. Klee said we don’t know that the residential spaces
wouldn’t be needed during the day. This parking lot is quite
crowded. Brady Sullivan has parking for Lofts 34, will these
residents be able to use that parking?
Ms. Carlson said she imagines so. Brady Sullivan has a number of
parking lots in the area.
Ald. Klee said parking is premium during the day there. A lot of
on street parking has been removed in the area because of the
school. It will be difficult if there is not an agreement.
Ms. Carlson said we could reserve them around the clock, but she
wouldn’t want to leave them empty during the day, that won’t
serve anyone. She imagines that the previous use of the space
would have had more demand than the proposed 9 residential
units.
Ald. Klee said she’s not asking for the school to have access,
but having the school there will create issues. She just wanted
to air that concern.
Mr. Bollinger said he has no issue with it being reserved during
the overnight. He is sure if there is an issue they will hear
from the tenants.
SPEAKING IN OPPOSITION OR CONCERN
None
SPEAKING IN FAVOR
None
PUBLIC MEETING
NCPB
January 8, 2026
Page 18
Mr. Bollinger closed the public meeting and opened the public
meeting. He summarized the discussion. He said this seems pretty
straightforward. He asked staff if this type of request will
continue to come to the Board in the future or will be addressed
by the code.
[No audible response from Mr. Durfee]
Mr. Bollinger said he doesn’t see anything too unusual given the
character of the neighborhood. He appreciates Ald. Klee’s deep
dive into parking.
Mr. Green asked if condition A leaves the door open if the gate
is not under ownership of Brady Sullivan.
Mr. McPhie said that they can leave that condition intact.
Mr. Hudson said he can affirm the discussion that was had.
MOTION by Mr. Green to approve Off-Site Parking Approval for New
Business – Site Plan A26-0005. The Board finds the following:
1. The parking is within 300 feet of the closest lot line of
44 Franklin Street
2. Both lots are under common ownership and the applicant has
provided a parking easement, as required in §190-192(A).
SECONDED by Mr. Hirsch
MOTION CARRIED 6-0
MOTION by Mr. Green to approve A26-0005 – Site Plan. The Board
finds that the application meets the Approval Criteria under
§190-146(D) with the following conditions:
a. Prior to the Chair signing the plan, all comments in an e-
mail from Joe Mendola, Senior Engineer, dated January 20,
2026 shall be addressed to the satisfaction of the
Engineering Department.
b. Prior to the Chair signing the plan, all comments in an e-
mail from Nashua Fire, dated, January 20, 2026 shall be
addressed to the satisfaction of the Fire Department.
NCPB
January 8, 2026
Page 19
c. Prior to the issuance of the Certificate of Occupancy, the
language within the parking easement document will be
finalized and approved by staff and will subsequently be
placed on file at the Registry of Deeds at the applicant's
expense.
d. Prior to the issuance of a Certificate of Occupancy, school
impact fees shall be paid, in accordance with Article VIII
Impact Fees of the Nashua Land Use Code.
SECONDED by Ald. Klee
MOTION CARRIED 6-0
The Board held a five minute recess.
NEW BUSINESS – SITE PLANS
A25-0214 Friartown Properties, LLC (Owner & Applicant),
requesting subdivision approval for a 2-lot
subdivision. Property is located at 72 Linwood Street.
Map 103 – Lot 245. Zoned B-Urban Residence (RB). Ward
6.
MOTION by Mr. Varley that the application is complete and the
Planning Board is ready to take jurisdiction
SECONDED by Ald. Klee
MOTION CARRIED 6-0
Greg Wood, Civil Engineer, Meridian Land Services, 31 Old Nashua
Rd #2, Amherst, NH
Mr. Wood introduced himself on behalf of the applicant. We are
proposing a two lot subdivision, no variances required. We are
seeking four waivers, as detailed in the staff report. This is a
fairly straightforward request.
Mr. Bollinger asked if these are conforming lots.
Mr. Wood said yes. We received comments from Engineering and
have addressed them and received confirmation that everything is
satisfactory.
Mr. Hudson said Mr. Mendola issued an all-clear so condition F
can be removed from the conditions of approval.
NCPB
January 8, 2026
Page 20
SPEAKING IN OPPOSITION OR CONCERN
None
SPEAKING IN FAVOR
None
PUBLIC MEETING
Mr. Bollinger closed the public meeting and opened the public
meeting. This is as straightforward as it gets, a lot split down
the middle with existing access to a public street. He has no
issues with this or the waivers requested.
Ald. Klee said we often get some of these waiver requests. When
you’re building in an already established area, a sidewalk to
nowhere is counterintuitive. It’s better to pay the in lieu
funds to build the sidewalk elsewhere. The underground utilities
are good for large developments, but it makes no sense to do it
when there are already overhead lines. She says this for any of
the residents who might wonder why we waive the requirements.
Mr. Bollinger said he appreciates Ald. Klee elaborating. The
waiver mechanism gives the Board the ability to recognize that
it’s not a one size fits all situation.
MOTION by Mr. Green to approve the following waivers for New
Business – Site Plan A25-0214:
a. §190-282, B. (9): To waive the requirement to show existing
conditions within 1000 feet of property boundaries;
b. §190-221: To waive the requirement that all electrical
communication lines servicing new subdivisions to be
provided underground.
c. §190-275: To waive the requirement that a lighting plan to
be submitted for subdivision or site plan approval
d. §190-212 D (2): To waive the requirement that new sidewalks
be constructed along the property’s frontage of public
streets, and provide a financial contribution in lieu, in
the amount of $5,800.
NCPB
January 8, 2026
Page 21
As per RSA 674:36(II)(N), RSA 674:44(III)(e), and §190-148(D),
Strict conformity would pose an unnecessary hardship to the
Applicant and the waiver would not be contrary to the spirit and
intent of the regulations; and specific circumstances, or
conditions of the land, and the waiver will properly carry out
the spirit and intent of the regulations.
SECONDED by Ald. Klee
MOTION CARRIED 6-0
MOTION by Mr. Green to approve A25-0214 – Subdivision Plan. The
Board finds that the application meets the Approval Criteria
under §190-138(G) with the following conditions:
a. All conditions from the approval letter will be added to
the cover page of the plan.
b. Any waiver(s) granted shall be listed on the plan. Should
any waiver(s) be denied, the plan must be revised to comply
with the applicable site plan regulations.
c. All conditions from the Planning Board decision letter will
be added to the plan.
d. The plan set shall be sealed and signed by a New Hampshire
licensed land surveyor.
e. All technical review comments listed in Section 5 above
shall be addressed to the satisfaction of the Planning
Department.
f. Prior to the recording of the plan, a CAD file depicting
the new lot line configuration shall be submitted to the
Planning Department.
g. Following signature of the final plat by the Planning Board
Chair, the Applicant shall submit recording fees required
by the Hillsborough County Registry of Deeds for the plat
to be recorded.
h. Prior to the issuance of a building permit, the
contribution in lieu of construction of sidewalk, in the
amount of $5,800 dollars, shall be made to the City.
NCPB
January 8, 2026
Page 22
i. Prior to the issuance of a building permit, driveway plans
shall be submitted and approved by the Engineering
department
j. Prior to the issuance of a Certificate of Occupancy, all
relevant stormwater documents shall be recorded at the
Applicant’s expense.
k. Prior to the issuance of a Certificate of Occupancy, all
site improvements will be completed in accordance with the
approved plan.
l. Prior to the issuance of a Certificate of Occupancy, school
impact fees shall be paid for the newly created residential
lot, in accordance with Article VIII Impact Fees of the
Nashua Land Use Code.
SECONDED by Mr. Hirsch
MOTION CARRIED 6-0
OTHER BUSINESS
1. Review of tentative agenda to determine proposals of regional
impact.
Mr. Hudson said regarding the charitable gaming facility,
impacts across the state line do not count.
Mr. Bollinger said there was another property along the
Dunstable border that was determined similarly. Neighboring
municipalities in Massachusetts did not have to be notified.
MOTION by Mr. Hudson that there are no items of regional impact
SECONDED by Mr. Hirsch
MOTION CARRIED 5-0-1 (Bollinger abstained)
2. ReCode Update
Sam Durfee, Planning Manager
Mr. Durfee said he would like to provide an update presentation
in March. They are tentatively shooting for July 1st.
NCPB
January 8, 2026
Page 23
DISCUSSION ITEMS
Past PEDC Re-Code Presentations: Mr. Durfee said there are
recordings of discussions on the ReCode available, links are in
the agenda.
RSA amendments: Ald. Klee led a brief discussion regarding Land
Use Code changes made at the state house.
MOTION to adjourn by Mr. Green at 9:00 PM
MOTION CARRIED 6-0
DIGITAL RECORDING OF THIS MEETING IS AVAILABLE FOR LISTENING
DURING REGULAR OFFICE HOURS. DIGITAL COPY OF AUDIO OF THE
MEETING MAY BE MADE AVAILABLE UPON 48 HOURS ADVANCED NOTICE AND
PAYMENT OF THE FEE.
Kate Poirier – Taped Hearing
Agenda
City of Nashua
Planning Department Planning & Zoning 589-3090
Fax 589-3119
229 Main Street
WEB www.nashuanh.gov
Nashua, New Hampshire 03061-2019
January 23, 2026
AGENDA
To: NCPB Members
From: Planning Staff
Re: Regular Meeting and Public Hearing February 5, 2026
Notice is hereby given that a Public Hearing of the City of Nashua Planning Board will occur on Thursday,
February 5, 2026 at 7:00 PM at the Nashua City Hall located at 229 Main Street, Nashua, NH. The public may
submit their comments in advance of the meeting via email pb@nashuanh.gov or by mail (please make sure
to include your name/address and comments) by 4PM on February 4, 2026. Letters should be addressed to
City of Nashua, Planning Department, P.O. Box 2019, Nashua, NH 03061. Plans can be viewed online starting
February 2, 2026 at nashuanh.gov. The public may request access via Zoom; contact the Planning Department
before 4PM on February 4, 2026, and a link will be provided.
A. Call to Order
B. Roll Call
C. Approval of Minutes – January 8, 2025
D. Communications
E. Report of Chairman, Committee, & Liaison
F. Executive Session
NEW BUSINESS – CONDITIONAL/SPECIAL USE PERMITS
A25-0200 Silver Lining Development, LCC (Owner), Doug Seppala (Applicant) requesting a special use
permit to allow the construction of a single-family home with access from a paper street.
Property is located 16 East Glenwood Street & “L” Linton Street. Map 129 – Lots 187 & 259.
Zoned A-Urban Residence (R-A). Ward 7.
NEW BUSINESS – SITE PLANS
A25-0215 Arc Source/Nichols Realty, LLC (Owners & Applicants), requesting site plan approval for the
construction of a 50-unit multi-family development with associated site improvements.
Property is located at 60 Crown Street. Map 24 – Lot 49. Zoned General Industrial / Transit
Oriented Development Overlay (GI / TOD). Ward 7. (Postponed to February 5, 2026)
A26-0005 Lofts 34, LLC (Owner & Applicant) requesting site plan amendment to renovate existing
commercial building space into 9 residential units. Property is located at 44 Franklin Street.
Map 78 – Lot 89. Zoned General Industrial / Mixed Use (GI/MU). Ward 3. (Postponed to
February 5, 2026)
NEW BUSINESS – SUBDIVISION PLANS
A25-0185 Doug Seppala, Silver Lining Development, LCC (Owner & Applicant) requesting approval for
a boundary plan and 3-lot subdivision. The property is located 16 East Glenwood Street. Map
129 – Lot 187. Zoned A Urban Residence (R-A). Ward 7. (Postponed to February 5, 2026)
A25-0214 Friartown Properties, LLC (Owner & Applicant), requesting subdivision approval for a 2-lot
subdivision. Property is located at 72 Linwood Street. Map 103 – Lot 245. Zoned B Urban
Residence (R-B). Ward 6. (Postponed to February 5, 2026)
OTHER BUSINESS
1. Review of tentative agenda to determine developments of regional impact.
2. Re-Code Update
DISCUSSION ITEMS
1. PEDC Re-Code Presentations
a. October 9, 2024: Land Use Code
b. April 15, 2025: Building Types, District, and Density
c. June 5, 2025: Redevelopment Overlay Districts
d. August 21, 2025: Mobility & Parking
e. August 26, 2025: Inclusionary Zoning
f. September 16, 2025: Zoning Map & Green Score
g. September 29, 2025: Use Table & Site Standards
NONPUBLIC SESSION
The Planning Board will need to make a motion to enter into a Nonpublic Session under RSA 91-A:3, II (e)
for consideration or negotiation of pending claims or litigation which has been threatened in writing or filed
against the public body.
NEXT MEETING: February 19, 2026
ADJOURN