Park Board
Regular MeetingNew Richmond, WI · December 4, 2024
Agenda
Park Board Meeting
Agenda
Wednesday, December 4, 2024 at 6:00 PM
Conference Room
Page
1. CALL TO ORDER
2. ROLL CALL
3. ADOPTION OF AGENDA
4. APPROVAL OF MINUTES
a. Minutes from August 28, 2024 2-9
Park Board - 28 Aug 2024
5. OLD BUSINESS
a. 2024 CIP Project Update 10 - 12
2024 CIP Project Update
6. NEW BUSINESS
a. Sather Nature Center- Buckthorn Removal 13
Memo: Sather Nature Center- Buckthorn Removal
b. Oakes Ruins Update 14
Memo: Oakes Ruins Update
c. 2025 Campground Rates 15
Memo: 2025 Campground Rates
d. Freedom Park Prairie Restoration 16 - 17
Memo: Freedom Park Prairie Restoration
e. 2025 CIP Project Review 18 - 24
Memo: 2025 CIP Project Review
f. 2025 Meeting Dates 25
Memo: 2025 Meeting Dates
7. COMMUNICATIONS AND MISCELLANEOUS
8. ADJOURNMENT
Park Board Meeting
Minutes
5:30 PM - Wednesday, August 28, 2024
Council Chambers
The Park Board of the City of New Richmond was called to order on Wednesday, August 28, 2024, at
5:30 PM, in the Council Chambers, with the following members present:
PRESENT: Craig Kittel, Jon Hailey, Dave Newman, Krista Miller, Anthony Howe
ABSENT: Rose Kosin, Megan Kliszcz
OTHERS
Erik Evenson, Rob Weldon, Jamie Larson, Pete Vrieze
PRESENT:
CALL TO ORDER
ADOPTION OF AGENDA
Anthony Howe made a motion to adopt the agenda. Jon Hailey seconded the motion. Carried
unanimously.
APPROVAL OF MINUTES
Jon Hailey made a motion to approve the minutes from 26 June 2024. Dave Newman seconded the
motion. Carried unanimously.
NEW BUSINESS
PLAYGROUND EQUIPMENT REPLACEMENT
Playground Replacement PPT
Erik Evenson explained that there is currently $20,000.00 allocated to playground replacement and
repairs in the 2024 CIP. Evenson went on to say that City Staff are recommending that those funds
be spent based on safety being the highest priority. Evenson shared that the swing set at Nothside
Park is beginning to fail, explaining that the welds on the arch are beginning to crack causing the
swing set to be unsafe. Evenson moved on to Paperjack Park, explaining that several swings had
broken over time and were in need of replacement. In addition, the swinging bench near the
playground equipment is in very poor condition and should be replaced for safety reasons. Lastly,
Evenson conveyed that these funds should not only be used for repairs but to also enhance parks
where needed and when funds allow. Evenson shared that staff would like to replace the arch climber
at Greaton Park with a more appealing climber that would accommodate a more wide age range.
Evenson wrapped up discussion by giving a brief update on other CIP projects happening throughout
the City.
Park Board Meeting August 28, 2024
Jon Hailey made a motion to approve the recommended playground equipment purchases for
Northside Park, Paperjack Park and Greaton Park as dicussed. Dave Newman seconded the motion.
Carried unanimously.
ADJOURNMENT
Jon Hailey made a motion to adjourn at 6:00 PM. Krista Miller seconded the motion. Carried
unanimously.
Park Board Meeting August 28, 2024
PLAYGROUND PARK
REPLACEMENT
PAPERJACK PARK DEFICIENCIES
DEFICIENCIES RECOMMENDATIONS
BROKEN BABY BUCKET SWING FAR RIGHT)) BABY BUCKET SWING REPLACEMENT
BROKEN SWINGS ON LEFT SIDE AGE RANGE: 2-5 YEARS OLD
COST: $110.00
AGING SWINGING BENCH
HIGH CAPACITY ADAPTIVE SWING REPLACEMENT
AGE RANGE 5-12 YEARS OLD
COST: $1,400.00
SWINGING BENCH REPLACEMENT
BELSON- $2,000.00
NORTHSIDE PARK DEFICIENCIES
DEFICIENCIES RECOMMENDATIONS
CRACKED WELDS ON SWINGS ARCH SWING SET
AGE RANGE: 2-12 YEARS OLD
COST: $4,300.00
ADDITIONAL COSTS: CONCRETE $200.00
GREATON PARK UPGRADES
Upgrade Arch Climber
AGE RANGE: 5-12 YEARS OLD
COST: $5,000.00
PLAYGROUND PARK REPLACEMENT
RECOMMENDATION
• BREAKDOWN OF COSTS:
• $20,000 ALLOCATED TO PLAYGROUND EQUIPMENT IN CIP FOR 2024
• PAPERJACK PARK COSTS: Swings & Bench : $3,510.00
• NORTHSIDE PARK COSTS: Arch Swings: $4,500.00
• GREATON PARK COSTS: $5,000.00
• TOTAL: $13,010.00
CIP Park
Project Update
2024
2024 CIP PROJECTS AT A GLANCE
COMPLETED WORK IN PROGRESS POSTPONED
● Historic Signage- Citizens Field ● Playground equipment received ● Paving of Freedom Park Trail- Tabled
● Paved Landing- Hatfield Park -Installation scheduled for Spring: by Council POSTPONED
○ Casey Park ● Controlled Burn- Community Need took
● Minnesota Avenue Trail priority
○ MaRita Park
● ADA Water Fountain- Mary Park ○ Greaton Park ● Stock Bluegill- Lack of Funds from DNR
● Native Vegetation Plantings- ○ Paperjack Park ● Restore Monette Ballfield- Carrying
Mill Pond & Victoria Park ● Mary Park Sign Restoration this project over to 2025.
○ Delay in receiving stone- will
● Oakes Ruins Fence complete in Spring
● Shelter- Whispering HIlls ● Wills Playground Signage
● Practice Hole - Whispering HIlls ○ Waiting on final draft from
Impression Signs
MISC PARK PROJECTS COMPLETED: Hemenway Park Concrete/Amenities; Citizens Field Dugout Repairs; Disc Golf Berms, Freedom Park Parking Lot; Disc Golf
Retaining Wall
MEMO
Prepared for: Park Board Members
Staff Contact: Erik Evenson, Noah Wiedenfeld
Meeting: Park Board - 04 Dec 2024
Subject: Sather Nature Center- Buckthorn Removal
BACKGROUND INFORMATION:
Staff will provide a brief update on the continued Buckthorn removal efforts at the Sather Nature
Center. The Board should consider the possibility of a fall prescribed burn at the Nature Center.
MEMO
Prepared for: Park Board Members
Staff Contact: Erik Evenson
Meeting: Park Board - 04 Dec 2024
Subject: Oakes Ruins
BACKGROUND INFORMATION:
Paul Mayer on behalf of the Heritage Center will be presenting on the Oakes Ruins. Paul would like to
discuss the next steps and future of the project.
MEMO
Prepared for: Park Board Members
Staff Contact: Erik Evenson
Meeting: Park Board - 04 Dec 2024
Subject: 2025 Campground Rates
BACKGROUND INFORMATION:
The current rates at Hatfield Campground are $30 per night and $810 per month and were put in
place in 2022. Prior to 2022, the nightly rates were $25/night with a monthly rate of $680. The Park
Board should consider an increase in rates for 2025. Staff recommends that rates be increased to
$35 per night and $850 per month along with an increase from $5 to $10 for use of the Dumping
Station. The suggested rates are in line with other campgrounds in the area and Staff feel that the
increase will not deter campers from choosing to stay at Hatfield.
Other nearby campgrounds charge:
Rivers Edge(Somerset) - $20
North Park (Amery)- $35/night
o Dump- $10.00
Clear Lake Park - $35/night
Hoffman Park (River Falls) – $25/night
o Dump Station- $10.00
RECOMMENDATION:
Staff recommends increasing the nightly campground rates at Hatfield from $30 to $35 and the
monthly rate from $810 to $850. In addition, Staff recommends increasing the Dumping Station fee
from $5 to $10.
MEMO
Prepared for: Park Board
Staff Contact: Noah Wiedenfeld
Meeting: Park Board - 04 Dec 2024
Subject: Freedom Park Prairie Restoration
BACKGROUND INFORMATION:
One of the projects identified in the five-year capital improvement plan, as well as the Freedom Park
Master Plan, is the conversion of much of the northern half of Freedom Park to native vegetation.
In 2024, the Earth First student organization at New Richmond High School, along with volunteers
from the New Richmond Pathway Committee, planted more than 1,000 native plants and seed in
Freedom Park as a demonstration plot. The project received grant funding from Star Prairie Fish &
Game, and the New Richmond Area Community Foundation. The intention is to use lessons learned
and some of the partnerships developed through this project and apply them on a larger size and
scope nearby, in an area that is currently leased to a local farmer and is not suitable for growing
traditional turf grass.
While this project was identified for 2027, efforts to apply for state or federal funding in advance of
that date requires advance planning given the timelines associated with various grant applications.
Staff initiated dialogue this fall with representatives from U.S. Fish & Wildlife, Pheasants Forever, and
the Pathway Committee to gauge interest and potential support for the project, such as technical
support, volunteer labor, or financial assistance. The initial response was overwhelmingly positive;
there is a strong possibility that all of the seed mix would be generously provided, and there is interest
to potentially start the project sooner.
The existing farm lease runs through December 31, 2026. The City receives $130 per acre x 40.1
acres for a total amount of $5,213 per year.
Staff would like to solicit feedback from the Park Board as to whether they are still supportive of this
project. If so, staff will continue to move forward with developing a more detailed plan and timeline for
the project and formalize partnerships. It's also possible that staff could apply for a Knowles Nelson
Stewardship grant or other funding opportunities in the coming months.
ATTACHMENTS:
Freedom Park Master Plan
Freedom Park Master Plan
0’ 200’ City of New Richmond, WI
Hatfield
New Richmond Park
Page 2 of 2
January 2020 Regional Airport
5
Hatfield Lake
6 12 16
5 12
15 12 16
11
10 18
6 17
13
8
15
12 15 21 20
15 19
3
1
14
15 7
5 15 24 24
15
Liberty Drive
1
2
1 9 3 3
Industrial Boulevard
1 7
Highway 64
7 24 24
22 22
3 4
8 24
23
3 7
6 1
22 22 9 24
2
2
5
County Highway CC / Wall Street
1 Drive - 22’ wide asphalt drive with curb and gutter. 6 Mown Trail - 10’ wide, minimum. Keep mown to 6” height, max. 11 Boardwalk - Provide 12’ wide boardwalk to island. 16 Fishing/Boating Pier - T-shaped pier, length to be sufficiently out of cattail 22 Youth Baseball/Softball Fields - 250’ outfield with skinned infield, dugouts,
area. backstop fence, and five row bleachers. Provide new field lighting and irriga-
2 Entry Sign - Vertical entry sign. 7 Park Trail - 6’ wide decomposed granite or asphalt paved path. 12 Island Camping Sites - Rustic camp sites to include gravel tent pad, fire ring, tion system (including irrigation pump and well).
and picnic table. 17 Perched Beach - Elevated sand beach adjacent to lake.
3 Parking - Asphalt parking lot with curb and gutter. Include shade trees in 8 Prairie Restoration - Establish mix of short and long grass prairies 23 Concessions/Restroom/Shelter Building - Provide four single stall
parking lot islands or adjacent landscape areas. interspersed with oak savanna. Interim land use: continue agricultural lease, 13 Island Council Ring - Gathering area in tree/scrub clearing with lake over- 18 Pea Gravel Beach - For swimming and canoe/kayak/SUP launch. restrooms, concessions stand, and roof overhang for picnic area.
encouraging no-till methods (if not already in practice) to increase biomass in look.
4 Overflow Parking - Pave access point in asphalt. Delineate grass overflow soil. 19 Picnic Shelter - Preserve existing picnic shelter, provide connection to walk. 24 Multiuse Fields - Maintain existing irrigated multiuse fields for soccer,
parking area with tree perimeter. 14 VFW Development Site - 10,000 SF assembly building, parking area, and football, lacrosse, and all field sports. Remove rock and top with clean topsoil
9 Tree Plantings - Plant native trees for shade and blocking winds. memorial garden. 20 Picnic Shelter/Restrooms - New picnic shelter with restrooms and patio. as necessary.
5 Periphery Path - Complete park periphery path. Width and paving to match
existing. 10 Restrooms - Provide two single stall restrooms at island campsite trail head. 15 Story Walk - Provide overlooks with seating and permanent signage honoring 21 Nature Play Area - Nature based playground to include climbing areas, sand
local veterans. and water play, boulders, logs, and walking path.
MEMO
Prepared for: Park Board Members
Staff Contact: Erik Evenson
Meeting: Park Board - 04 Dec 2024
Subject: 2025 CIP Project Review
BACKGROUND INFORMATION:
City Staff will lead a discussion on the proposed CIP projects for 2025.
ATTACHMENTS:
Park Board 2024 thru 2028 CIP
2024-2028 Parks and Trails System Improvements
Summary
2024-2028 PROJECTS ACCORDING TO SOURCE OF FUNDING
YEAR PARKLAND BORROWING OPERATING GRANTS DONATIONS IMPACT FEES INSURANCE TOTAL COST
TRUST BUDGET
2024 $ 96,648 $ 78,122 $ - $ 1,750 $ 55,825 $ 56,413 $ 32,000 $ 320,758
2025 $ 104,500 $ 163,000 $ 20,000 $ 183,000 $ 2,000 $ - $ - $ 472,500
2026 $ 90,500 $ 75,000 $ 30,000 $ - $ 5,000 $ 10,000 $ - $ 210,500
2027 $ 38,500 $ 260,000 $ 35,000 $ 1,190,000 $ - $ 30,000 $ - $ 1,553,500
2028 $ 70,500 $ 465,000 $ 40,000 $ - $ - $ 60,000 $ - $ 635,500
TOTAL $ 400,648 $ 1,041,122 $ 125,000 $1,374,750 $ 62,825 $ 156,413 $ 32,000 $3,192,758
2024-2028 PROJECTS ACCORDING TO PARK CLASSIFICATION
YEAR COMMUNITY NATURAL AREA NEIGHBORHOOD REGIONAL SPECIAL USE TOTAL COST
FACILITY
2024 $ 118,583 $ 4,500 $ 76,075 $ 116,600 $ 5,000 $ 320,758
2025 $ 391,500 $ 19,500 $ 61,000 $ - $ 500 $ 472,500
2026 $ 32,000 $ 17,500 $ 35,500 $ 125,000 $ 500 $ 210,500
2027 $ 1,355,000 $ 18,000 $ 30,000 $ 150,000 $ 500 $ 1,553,500
2028 $ 50,000 $ 10,000 $ - $ 575,000 $ 500 $ 635,500
TOTAL $ 1,947,083 $ 69,500 $ 202,575 $966,600 $ 7,000 $3,192,758
2024-2028 PROJECTS ACCORDING TO PROJECT CATEGORY
YEAR ENCHANCEMENT MAINTENANCE NEW PARK REPLACEMENT TOTAL COST
TO EXISTING OF EXISTING OR TRAIL
2024 $ 201,933 $ 40,000 $ 46,825 $ 32,000 $ 320,758
2025 $ 10,500 $ 35,000 $ 376,000 $ 51,000 $ 472,500
2026 $ 145,500 $ 42,500 $ - $ 22,500 $ 210,500
2027 $ 150,000 $ 53,500 $ 1,330,000 $ 20,000 $ 1,553,500
2028 $ 575,000 $ 50,500 $ - $ 10,000 $ 635,500
TOTAL $ 1,082,933 $ 221,500 $ 1,752,825 $ 135,500 $3,192,758
1|Page
Page 2 of 7
2024 Parks and Trails System Improvements - Details
PROJECT DESCRIPTION LOCATION PARKLAND TRUST BORROWING GRANTS DONATIONS IMPACT INSURANCE TOTAL COST
FEES
Amenities Casey Park $ 20,000 $ 20,000
Historic Signage Citizens Field $ 5,000 $ 5,000
Pave Trail Freedom Park $ 78,122 $ 38,478 $ 116,600
Winter Trail Grooming Golf Course $ 5,000 $ 5,000
Playground Equipment Greaton Park $ 13,000 $ 13,000
Controlled Burn Greenway East $ -
Stock Bluegill Hatfield Lake $ 2,000 $ 2,000
Concrete Replacement Hatfield Park $ 12,000 $ 12,000
Skate Park Bench Hatfield Park $ 750 $ 750
Pave Landing Hatfield Park $ 18,180 $ 18,180
Amenities MaRita Park $ 15,640 $ 15,640
Trail (Minnesota Avenue) MaRita Park $ 17,935 $ 17,935
Restore Entrance Signage Mary Park $ 32,000 $ 32,000
Water Fountain Mary Park $ 7,000 $ 7,000
Will's Playground Signage Mary Park $ 10,000 $ 10,000
Convert Turf Grass to Native Vegetation Mill Pond $ 1,500 $ 1,500
Restore Softball Infield Monette Park $ 1,000 $ 1,000
Playground Equipment North Side Park $ 7,000 $ 7,000
Fencing Oakes Ruins $ 6,828 $ 6,828
Controlled Burn Paperjack Greenway $ -
Willow River Water Trail Signage Sather Nature Center $ 1,000 $ 1,000
Convert Turf Grass to Native Vegetation Victoria Park $ 1,500 $ 1,500
Shelter Whispering Hills $ 18,500 $ 18,500
Signage (Remaining 50%) Whispering Hills $ 3,855 $ 3,855
Practice Basket Whispering Hills $ 4,470 $ 4,470
TOTAL $ 96,648 $ 78,122 $ 1,750 $ 55,825 $ 56,413 $ 32,000 $ 320,758
ASSUMPTIONS
- Campground Revenue: $45,000
- Impact Fee Revenue: $10,000
- Controlled Burns by Fire Department – No Charge
- Hatfield Lake Fish Stocking by DNR – No Charge
- Hatfield Lake Fishing Pier Replacement Moved Back to 2025
ESTIMATED PARKLAND TRUST FUND BALANCE ON DEC. 31, 2024: $161,352
ESTIMATED IMPACT FEE BALANCE ON DEC. 31, 2024: $6,641
2|Page
Page 3 of 7
2025 Parks and Trails System Improvements - Details
PROJECT DESCRIPTION LOCATION PARKLAND TRUST BORROWING OPERATING GRANTS DONATIONS IMPACT TOTAL COST
BUDGET FEES
Chip Seal Parking Lot Dog Park $ 4,500 $ 4,500
Park Amenities - Phase 2 Fox Run Park $ 50,000 $ 50,000
Winter Trail Grooming Golf Course $ 500 $ 500
Stock Bluegill Hatfield Lake $ 2,000 $ 2,000
Fishing Pier Replacement Hatfield Park $ 20,000 $ 20,000 $ 40,000
Fishing Pier (from Hatfield) Hemenway Park $ 1,000 $ 1,000
Remove West Playground & Restore Area Mary Park $ 1,000 $ 1,000
Trail Construction Oakes Ruins $ 163,000 $ 163,000 $ 326,000
Electricity to Shelter Sather Nature Center $ 2,500 $ 2,500
Trail Enhancements (Wood Chips, Rope, Signage) Sather Nature Center $ 5,000 $ 5,000
Playground Replacement TBD $ 10,000 $ 10,000
Buckthorn Removal TBD $ 10,000 $ 10,000
Trail Maintenance TBD $ 20,000 $ 20,000
TOTAL $ 104,500 $ 163,000 $ 20,000 $ 183,000 $ 2,000 $ - $ 472,500
ASSUMPTIONS
- Campground Revenue: $50,000 (Fee Increase)
- Impact Fee Revenue: $25,000
- Trail Maintenance Included in 2025 Operating Budget
- Grant Obtained for Fishing Pier Replacement
- Hatfield Lake Fish Stocking by DNR – No Charge
- Oakes Trail Completed in Coordination with Bilmar Avenue Reconstruction
ESTIMATED PARKLAND TRUST FUND BALANCE ON DEC. 31, 2025: $106,852
ESTIMATED IMPACT FEE BALANCE ON DEC. 31, 2025: $31,641
3|Page
Page 4 of 7
2026 Parks and Trails System Improvements - Details
PROJECT DESCRIPTION LOCATION PARKLAND TRUST BORROWING OPERATING GRANTS DONATIONS IMPACT TOTAL COST
BUDGET FEES
Convert Turf Grass to Native Vegetation Cherokee Park $ 2,500 $ 2,500
Controlled Burn Doar Prairie Resotration $ -
Pave South Parking Lot Freedom Park $ 40,000 $ 75,000 $ 10,000 $ 125,000
Winter Trail Grooming Golf Course $ 500 $ 500
Backstop Greaton Park $ 3,000 $ 3,000
Chipseal Parking Lot Paperjack Park $ 2,000 $ 2,000
Tree Plantings Sather Nature Center $ 2,500 $ 2,500
Picnic Tables Sather Nature Center $ 5,000 $ 5,000
Playground Replacement TBD $ 20,000 $ 20,000
Trail Maintenance TBD $ 30,000 $ 30,000
Buckthorn Removal TBD $ 10,000 $ 10,000
Nature Trail Woodland Creek Park $ 5,000 $ 5,000 $ 10,000
TOTAL $ 90,500 $ 75,000 $ 30,000 $ - $ 5,000 $ 10,000 $ 210,500
ASSUMPTIONS
- Campground Revenue: $50,000
- Impact Fee Revenue: $25,000
- Controlled Burn by Fire Department – No Charge
- Paving of South Parking Lot at Freedom Park included in 2026 CIP
ESTIMATED PARKLAND TRUST FUND BALANCE ON DEC. 31, 2026: $66,352
ESTIMATED IMPACT FEE BALANCE ON DEC. 31, 2026: $46,641
4|Page
Page 5 of 7
2027 Parks and Trails System Improvements - Details
PROJECT DESCRIPTION LOCATION PARKLAND TRUST BORROWING OPERATING GRANTS DONATIONS IMPACT TOTAL COST
BUDGET FEES
Trail Construction CTH K $ 260,000 $ 1,040,000 $ 1,300,000
Park Amenities - Phase 3 Fox Run Park $ 30,000 $ 30,000
Prairie Restoration Freedom Park $ 150,000 $ 150,000
Winter Trail Grooming Golf Course $ 500 $ 500
Controlled Burn Greenway East $ -
Controlled Burn Paperjack Greenway $ -
Shelter Roof Replacement Sather Nature Center $ 3,000 $ 3,000
Chip Seal Parking Lot Sather Nature Center $ 5,000 $ 5,000
Playground Replacement TBD $ 20,000 $ 20,000
Trail Maintenance TBD $ 35,000 $ 35,000
Buckthorn Removal TBD $ 10,000 $ 10,000
TOTAL $ 38,500 $ 260,000 $ 35,000 $ 1,190,000 $ - $ 30,000 $ 1,553,500
ASSUMPTIONS
- Campground Revenue: $55,000 (fee increase)
- Impact Fee Revenue: $25,000
- Controlled Burn by Fire Department – No Charge
- Grant funding pays for prairie restoration for northern half of Freedom Park
- City’s portion of CTH K Trail Project included in 2027 CIP, and done in coordination with
the County’s reconstruction of CTH K
ESTIMATED PARKLAND TRUST FUND BALANCE ON DEC. 31, 2027: $82,852
ESTIMATED IMPACT FEE BALANCE ON DEC. 31, 2027: $41,641
5|Page
Page 6 of 7
2028 Parks and Trails System Improvements - Details
PROJECT DESCRIPTION LOCATION PARKLAND TRUST BORROWING OPERATING GRANTS DONATIONS IMPACT TOTAL COST
BUDGET FEES
Engineering & Design Freedom Park $ 50,000 $ 25,000 $ 75,000
Pave East Parking Lot & Driveway Freedom Park $ 465,000 $ 35,000 $ 500,000
Winter Trail Grooming Golf Course $ 500 $ 500
Playground Replacement TBD $ 10,000 $ 10,000
Trail Maintenance TBD $ 40,000 $ 40,000
Buckthorn Removal TBD $ 10,000 $ 10,000
TOTAL $ 70,500 $ 465,000 $ 40,000 $ - $ - $ 60,000 $ 635,500
ASSUMPTIONS
- Campground Revenue: $55,000
- Impact Fee Revenue: $25,000
- Paving of east parking lot and driveway at Freedom Park included in 2028 CIP
ESTIMATED PARKLAND TRUST FUND BALANCE ON DEC. 31, 2028: $67,352
ESTIMATED IMPACT FEE BALANCE ON DEC. 31, 2028: $6,641
6|Page
Page 7 of 7
MEMO
Prepared for: Park Board Members
Staff Contact: Erik Evenson
Meeting: Park Board - 04 Dec 2024
Subject: 2025 Meeting Dates
BACKGROUND INFORMATION:
The Park Board should determine if the current meeting schedule (last Wednesday of the month at
5:30) is preferred for 2025 meetings. The following dates should be considered:
January 22, 2025
February 26, 2025
March 26, 2025
April 23, 2025
May 28, 2025
June 25, 2025
July 23, 2025
August 27, 2025
September 24, 2025
October 22, 2025
November 26, 2025
No December meeting
A few potential conflicts to consider:
* The last Wednesday in January is when the Chamber of Commerce typically hosts their annual
dinner, the Board has sometimes skipped January or moved it up one week
*The last Wednesday in March falls over the NRSD Spring Break
*Historically, June & July meetings have been skipped
* November & December meetings are typically combined to avoid any potential schedule conflicts.