Muyni
← Back to New Richmond

Park Board

Regular Meeting

New Richmond, WI · December 4, 2024

Agenda

Agenda

Park Board Meeting Agenda Wednesday, December 4, 2024 at 6:00 PM Conference Room Page 1. CALL TO ORDER 2. ROLL CALL 3. ADOPTION OF AGENDA 4. APPROVAL OF MINUTES a. Minutes from August 28, 2024 2-9 Park Board - 28 Aug 2024 5. OLD BUSINESS a. 2024 CIP Project Update 10 - 12 2024 CIP Project Update 6. NEW BUSINESS a. Sather Nature Center- Buckthorn Removal 13 Memo: Sather Nature Center- Buckthorn Removal b. Oakes Ruins Update 14 Memo: Oakes Ruins Update c. 2025 Campground Rates 15 Memo: 2025 Campground Rates d. Freedom Park Prairie Restoration 16 - 17 Memo: Freedom Park Prairie Restoration e. 2025 CIP Project Review 18 - 24 Memo: 2025 CIP Project Review f. 2025 Meeting Dates 25 Memo: 2025 Meeting Dates 7. COMMUNICATIONS AND MISCELLANEOUS 8. ADJOURNMENT Park Board Meeting Minutes 5:30 PM - Wednesday, August 28, 2024 Council Chambers The Park Board of the City of New Richmond was called to order on Wednesday, August 28, 2024, at 5:30 PM, in the Council Chambers, with the following members present: PRESENT: Craig Kittel, Jon Hailey, Dave Newman, Krista Miller, Anthony Howe ABSENT: Rose Kosin, Megan Kliszcz OTHERS Erik Evenson, Rob Weldon, Jamie Larson, Pete Vrieze PRESENT: CALL TO ORDER ADOPTION OF AGENDA Anthony Howe made a motion to adopt the agenda. Jon Hailey seconded the motion. Carried unanimously. APPROVAL OF MINUTES Jon Hailey made a motion to approve the minutes from 26 June 2024. Dave Newman seconded the motion. Carried unanimously. NEW BUSINESS PLAYGROUND EQUIPMENT REPLACEMENT Playground Replacement PPT Erik Evenson explained that there is currently $20,000.00 allocated to playground replacement and repairs in the 2024 CIP. Evenson went on to say that City Staff are recommending that those funds be spent based on safety being the highest priority. Evenson shared that the swing set at Nothside Park is beginning to fail, explaining that the welds on the arch are beginning to crack causing the swing set to be unsafe. Evenson moved on to Paperjack Park, explaining that several swings had broken over time and were in need of replacement. In addition, the swinging bench near the playground equipment is in very poor condition and should be replaced for safety reasons. Lastly, Evenson conveyed that these funds should not only be used for repairs but to also enhance parks where needed and when funds allow. Evenson shared that staff would like to replace the arch climber at Greaton Park with a more appealing climber that would accommodate a more wide age range. Evenson wrapped up discussion by giving a brief update on other CIP projects happening throughout the City. Park Board Meeting August 28, 2024 Jon Hailey made a motion to approve the recommended playground equipment purchases for Northside Park, Paperjack Park and Greaton Park as dicussed. Dave Newman seconded the motion. Carried unanimously. ADJOURNMENT Jon Hailey made a motion to adjourn at 6:00 PM. Krista Miller seconded the motion. Carried unanimously. Park Board Meeting August 28, 2024 PLAYGROUND PARK REPLACEMENT PAPERJACK PARK DEFICIENCIES DEFICIENCIES RECOMMENDATIONS  BROKEN BABY BUCKET SWING FAR RIGHT))  BABY BUCKET SWING REPLACEMENT  BROKEN SWINGS ON LEFT SIDE  AGE RANGE: 2-5 YEARS OLD  COST: $110.00  AGING SWINGING BENCH  HIGH CAPACITY ADAPTIVE SWING REPLACEMENT  AGE RANGE 5-12 YEARS OLD  COST: $1,400.00  SWINGING BENCH REPLACEMENT  BELSON- $2,000.00 NORTHSIDE PARK DEFICIENCIES DEFICIENCIES RECOMMENDATIONS  CRACKED WELDS ON SWINGS  ARCH SWING SET  AGE RANGE: 2-12 YEARS OLD  COST: $4,300.00  ADDITIONAL COSTS: CONCRETE $200.00 GREATON PARK UPGRADES Upgrade Arch Climber AGE RANGE: 5-12 YEARS OLD COST: $5,000.00 PLAYGROUND PARK REPLACEMENT RECOMMENDATION • BREAKDOWN OF COSTS: • $20,000 ALLOCATED TO PLAYGROUND EQUIPMENT IN CIP FOR 2024 • PAPERJACK PARK COSTS: Swings & Bench : $3,510.00 • NORTHSIDE PARK COSTS: Arch Swings: $4,500.00 • GREATON PARK COSTS: $5,000.00 • TOTAL: $13,010.00 CIP Park Project Update 2024 2024 CIP PROJECTS AT A GLANCE COMPLETED WORK IN PROGRESS POSTPONED ● Historic Signage- Citizens Field ● Playground equipment received ● Paving of Freedom Park Trail- Tabled ● Paved Landing- Hatfield Park -Installation scheduled for Spring: by Council POSTPONED ○ Casey Park ● Controlled Burn- Community Need took ● Minnesota Avenue Trail priority ○ MaRita Park ● ADA Water Fountain- Mary Park ○ Greaton Park ● Stock Bluegill- Lack of Funds from DNR ● Native Vegetation Plantings- ○ Paperjack Park ● Restore Monette Ballfield- Carrying Mill Pond & Victoria Park ● Mary Park Sign Restoration this project over to 2025. ○ Delay in receiving stone- will ● Oakes Ruins Fence complete in Spring ● Shelter- Whispering HIlls ● Wills Playground Signage ● Practice Hole - Whispering HIlls ○ Waiting on final draft from Impression Signs MISC PARK PROJECTS COMPLETED: Hemenway Park Concrete/Amenities; Citizens Field Dugout Repairs; Disc Golf Berms, Freedom Park Parking Lot; Disc Golf Retaining Wall MEMO Prepared for: Park Board Members Staff Contact: Erik Evenson, Noah Wiedenfeld Meeting: Park Board - 04 Dec 2024 Subject: Sather Nature Center- Buckthorn Removal BACKGROUND INFORMATION: Staff will provide a brief update on the continued Buckthorn removal efforts at the Sather Nature Center. The Board should consider the possibility of a fall prescribed burn at the Nature Center. MEMO Prepared for: Park Board Members Staff Contact: Erik Evenson Meeting: Park Board - 04 Dec 2024 Subject: Oakes Ruins BACKGROUND INFORMATION: Paul Mayer on behalf of the Heritage Center will be presenting on the Oakes Ruins. Paul would like to discuss the next steps and future of the project. MEMO Prepared for: Park Board Members Staff Contact: Erik Evenson Meeting: Park Board - 04 Dec 2024 Subject: 2025 Campground Rates BACKGROUND INFORMATION: The current rates at Hatfield Campground are $30 per night and $810 per month and were put in place in 2022. Prior to 2022, the nightly rates were $25/night with a monthly rate of $680. The Park Board should consider an increase in rates for 2025. Staff recommends that rates be increased to $35 per night and $850 per month along with an increase from $5 to $10 for use of the Dumping Station. The suggested rates are in line with other campgrounds in the area and Staff feel that the increase will not deter campers from choosing to stay at Hatfield. Other nearby campgrounds charge:  Rivers Edge(Somerset) - $20  North Park (Amery)- $35/night o Dump- $10.00  Clear Lake Park - $35/night  Hoffman Park (River Falls) – $25/night o Dump Station- $10.00 RECOMMENDATION: Staff recommends increasing the nightly campground rates at Hatfield from $30 to $35 and the monthly rate from $810 to $850. In addition, Staff recommends increasing the Dumping Station fee from $5 to $10. MEMO Prepared for: Park Board Staff Contact: Noah Wiedenfeld Meeting: Park Board - 04 Dec 2024 Subject: Freedom Park Prairie Restoration BACKGROUND INFORMATION: One of the projects identified in the five-year capital improvement plan, as well as the Freedom Park Master Plan, is the conversion of much of the northern half of Freedom Park to native vegetation. In 2024, the Earth First student organization at New Richmond High School, along with volunteers from the New Richmond Pathway Committee, planted more than 1,000 native plants and seed in Freedom Park as a demonstration plot. The project received grant funding from Star Prairie Fish & Game, and the New Richmond Area Community Foundation. The intention is to use lessons learned and some of the partnerships developed through this project and apply them on a larger size and scope nearby, in an area that is currently leased to a local farmer and is not suitable for growing traditional turf grass. While this project was identified for 2027, efforts to apply for state or federal funding in advance of that date requires advance planning given the timelines associated with various grant applications. Staff initiated dialogue this fall with representatives from U.S. Fish & Wildlife, Pheasants Forever, and the Pathway Committee to gauge interest and potential support for the project, such as technical support, volunteer labor, or financial assistance. The initial response was overwhelmingly positive; there is a strong possibility that all of the seed mix would be generously provided, and there is interest to potentially start the project sooner. The existing farm lease runs through December 31, 2026. The City receives $130 per acre x 40.1 acres for a total amount of $5,213 per year. Staff would like to solicit feedback from the Park Board as to whether they are still supportive of this project. If so, staff will continue to move forward with developing a more detailed plan and timeline for the project and formalize partnerships. It's also possible that staff could apply for a Knowles Nelson Stewardship grant or other funding opportunities in the coming months. ATTACHMENTS: Freedom Park Master Plan Freedom Park Master Plan 0’ 200’ City of New Richmond, WI Hatfield New Richmond Park Page 2 of 2 January 2020 Regional Airport 5 Hatfield Lake 6 12 16 5 12 15 12 16 11 10 18 6 17 13 8 15 12 15 21 20 15 19 3 1 14 15 7 5 15 24 24 15 Liberty Drive 1 2 1 9 3 3 Industrial Boulevard 1 7 Highway 64 7 24 24 22 22 3 4 8 24 23 3 7 6 1 22 22 9 24 2 2 5 County Highway CC / Wall Street 1 Drive - 22’ wide asphalt drive with curb and gutter. 6 Mown Trail - 10’ wide, minimum. Keep mown to 6” height, max. 11 Boardwalk - Provide 12’ wide boardwalk to island. 16 Fishing/Boating Pier - T-shaped pier, length to be sufficiently out of cattail 22 Youth Baseball/Softball Fields - 250’ outfield with skinned infield, dugouts, area. backstop fence, and five row bleachers. Provide new field lighting and irriga- 2 Entry Sign - Vertical entry sign. 7 Park Trail - 6’ wide decomposed granite or asphalt paved path. 12 Island Camping Sites - Rustic camp sites to include gravel tent pad, fire ring, tion system (including irrigation pump and well). and picnic table. 17 Perched Beach - Elevated sand beach adjacent to lake. 3 Parking - Asphalt parking lot with curb and gutter. Include shade trees in 8 Prairie Restoration - Establish mix of short and long grass prairies 23 Concessions/Restroom/Shelter Building - Provide four single stall parking lot islands or adjacent landscape areas. interspersed with oak savanna. Interim land use: continue agricultural lease, 13 Island Council Ring - Gathering area in tree/scrub clearing with lake over- 18 Pea Gravel Beach - For swimming and canoe/kayak/SUP launch. restrooms, concessions stand, and roof overhang for picnic area. encouraging no-till methods (if not already in practice) to increase biomass in look. 4 Overflow Parking - Pave access point in asphalt. Delineate grass overflow soil. 19 Picnic Shelter - Preserve existing picnic shelter, provide connection to walk. 24 Multiuse Fields - Maintain existing irrigated multiuse fields for soccer, parking area with tree perimeter. 14 VFW Development Site - 10,000 SF assembly building, parking area, and football, lacrosse, and all field sports. Remove rock and top with clean topsoil 9 Tree Plantings - Plant native trees for shade and blocking winds. memorial garden. 20 Picnic Shelter/Restrooms - New picnic shelter with restrooms and patio. as necessary. 5 Periphery Path - Complete park periphery path. Width and paving to match existing. 10 Restrooms - Provide two single stall restrooms at island campsite trail head. 15 Story Walk - Provide overlooks with seating and permanent signage honoring 21 Nature Play Area - Nature based playground to include climbing areas, sand local veterans. and water play, boulders, logs, and walking path. MEMO Prepared for: Park Board Members Staff Contact: Erik Evenson Meeting: Park Board - 04 Dec 2024 Subject: 2025 CIP Project Review BACKGROUND INFORMATION: City Staff will lead a discussion on the proposed CIP projects for 2025. ATTACHMENTS: Park Board 2024 thru 2028 CIP 2024-2028 Parks and Trails System Improvements Summary 2024-2028 PROJECTS ACCORDING TO SOURCE OF FUNDING YEAR PARKLAND BORROWING OPERATING GRANTS DONATIONS IMPACT FEES INSURANCE TOTAL COST TRUST BUDGET 2024 $ 96,648 $ 78,122 $ - $ 1,750 $ 55,825 $ 56,413 $ 32,000 $ 320,758 2025 $ 104,500 $ 163,000 $ 20,000 $ 183,000 $ 2,000 $ - $ - $ 472,500 2026 $ 90,500 $ 75,000 $ 30,000 $ - $ 5,000 $ 10,000 $ - $ 210,500 2027 $ 38,500 $ 260,000 $ 35,000 $ 1,190,000 $ - $ 30,000 $ - $ 1,553,500 2028 $ 70,500 $ 465,000 $ 40,000 $ - $ - $ 60,000 $ - $ 635,500 TOTAL $ 400,648 $ 1,041,122 $ 125,000 $1,374,750 $ 62,825 $ 156,413 $ 32,000 $3,192,758 2024-2028 PROJECTS ACCORDING TO PARK CLASSIFICATION YEAR COMMUNITY NATURAL AREA NEIGHBORHOOD REGIONAL SPECIAL USE TOTAL COST FACILITY 2024 $ 118,583 $ 4,500 $ 76,075 $ 116,600 $ 5,000 $ 320,758 2025 $ 391,500 $ 19,500 $ 61,000 $ - $ 500 $ 472,500 2026 $ 32,000 $ 17,500 $ 35,500 $ 125,000 $ 500 $ 210,500 2027 $ 1,355,000 $ 18,000 $ 30,000 $ 150,000 $ 500 $ 1,553,500 2028 $ 50,000 $ 10,000 $ - $ 575,000 $ 500 $ 635,500 TOTAL $ 1,947,083 $ 69,500 $ 202,575 $966,600 $ 7,000 $3,192,758 2024-2028 PROJECTS ACCORDING TO PROJECT CATEGORY YEAR ENCHANCEMENT MAINTENANCE NEW PARK REPLACEMENT TOTAL COST TO EXISTING OF EXISTING OR TRAIL 2024 $ 201,933 $ 40,000 $ 46,825 $ 32,000 $ 320,758 2025 $ 10,500 $ 35,000 $ 376,000 $ 51,000 $ 472,500 2026 $ 145,500 $ 42,500 $ - $ 22,500 $ 210,500 2027 $ 150,000 $ 53,500 $ 1,330,000 $ 20,000 $ 1,553,500 2028 $ 575,000 $ 50,500 $ - $ 10,000 $ 635,500 TOTAL $ 1,082,933 $ 221,500 $ 1,752,825 $ 135,500 $3,192,758 1|Page Page 2 of 7 2024 Parks and Trails System Improvements - Details PROJECT DESCRIPTION LOCATION PARKLAND TRUST BORROWING GRANTS DONATIONS IMPACT INSURANCE TOTAL COST FEES Amenities Casey Park $ 20,000 $ 20,000 Historic Signage Citizens Field $ 5,000 $ 5,000 Pave Trail Freedom Park $ 78,122 $ 38,478 $ 116,600 Winter Trail Grooming Golf Course $ 5,000 $ 5,000 Playground Equipment Greaton Park $ 13,000 $ 13,000 Controlled Burn Greenway East $ - Stock Bluegill Hatfield Lake $ 2,000 $ 2,000 Concrete Replacement Hatfield Park $ 12,000 $ 12,000 Skate Park Bench Hatfield Park $ 750 $ 750 Pave Landing Hatfield Park $ 18,180 $ 18,180 Amenities MaRita Park $ 15,640 $ 15,640 Trail (Minnesota Avenue) MaRita Park $ 17,935 $ 17,935 Restore Entrance Signage Mary Park $ 32,000 $ 32,000 Water Fountain Mary Park $ 7,000 $ 7,000 Will's Playground Signage Mary Park $ 10,000 $ 10,000 Convert Turf Grass to Native Vegetation Mill Pond $ 1,500 $ 1,500 Restore Softball Infield Monette Park $ 1,000 $ 1,000 Playground Equipment North Side Park $ 7,000 $ 7,000 Fencing Oakes Ruins $ 6,828 $ 6,828 Controlled Burn Paperjack Greenway $ - Willow River Water Trail Signage Sather Nature Center $ 1,000 $ 1,000 Convert Turf Grass to Native Vegetation Victoria Park $ 1,500 $ 1,500 Shelter Whispering Hills $ 18,500 $ 18,500 Signage (Remaining 50%) Whispering Hills $ 3,855 $ 3,855 Practice Basket Whispering Hills $ 4,470 $ 4,470 TOTAL $ 96,648 $ 78,122 $ 1,750 $ 55,825 $ 56,413 $ 32,000 $ 320,758 ASSUMPTIONS - Campground Revenue: $45,000 - Impact Fee Revenue: $10,000 - Controlled Burns by Fire Department – No Charge - Hatfield Lake Fish Stocking by DNR – No Charge - Hatfield Lake Fishing Pier Replacement Moved Back to 2025 ESTIMATED PARKLAND TRUST FUND BALANCE ON DEC. 31, 2024: $161,352 ESTIMATED IMPACT FEE BALANCE ON DEC. 31, 2024: $6,641 2|Page Page 3 of 7 2025 Parks and Trails System Improvements - Details PROJECT DESCRIPTION LOCATION PARKLAND TRUST BORROWING OPERATING GRANTS DONATIONS IMPACT TOTAL COST BUDGET FEES Chip Seal Parking Lot Dog Park $ 4,500 $ 4,500 Park Amenities - Phase 2 Fox Run Park $ 50,000 $ 50,000 Winter Trail Grooming Golf Course $ 500 $ 500 Stock Bluegill Hatfield Lake $ 2,000 $ 2,000 Fishing Pier Replacement Hatfield Park $ 20,000 $ 20,000 $ 40,000 Fishing Pier (from Hatfield) Hemenway Park $ 1,000 $ 1,000 Remove West Playground & Restore Area Mary Park $ 1,000 $ 1,000 Trail Construction Oakes Ruins $ 163,000 $ 163,000 $ 326,000 Electricity to Shelter Sather Nature Center $ 2,500 $ 2,500 Trail Enhancements (Wood Chips, Rope, Signage) Sather Nature Center $ 5,000 $ 5,000 Playground Replacement TBD $ 10,000 $ 10,000 Buckthorn Removal TBD $ 10,000 $ 10,000 Trail Maintenance TBD $ 20,000 $ 20,000 TOTAL $ 104,500 $ 163,000 $ 20,000 $ 183,000 $ 2,000 $ - $ 472,500 ASSUMPTIONS - Campground Revenue: $50,000 (Fee Increase) - Impact Fee Revenue: $25,000 - Trail Maintenance Included in 2025 Operating Budget - Grant Obtained for Fishing Pier Replacement - Hatfield Lake Fish Stocking by DNR – No Charge - Oakes Trail Completed in Coordination with Bilmar Avenue Reconstruction ESTIMATED PARKLAND TRUST FUND BALANCE ON DEC. 31, 2025: $106,852 ESTIMATED IMPACT FEE BALANCE ON DEC. 31, 2025: $31,641 3|Page Page 4 of 7 2026 Parks and Trails System Improvements - Details PROJECT DESCRIPTION LOCATION PARKLAND TRUST BORROWING OPERATING GRANTS DONATIONS IMPACT TOTAL COST BUDGET FEES Convert Turf Grass to Native Vegetation Cherokee Park $ 2,500 $ 2,500 Controlled Burn Doar Prairie Resotration $ - Pave South Parking Lot Freedom Park $ 40,000 $ 75,000 $ 10,000 $ 125,000 Winter Trail Grooming Golf Course $ 500 $ 500 Backstop Greaton Park $ 3,000 $ 3,000 Chipseal Parking Lot Paperjack Park $ 2,000 $ 2,000 Tree Plantings Sather Nature Center $ 2,500 $ 2,500 Picnic Tables Sather Nature Center $ 5,000 $ 5,000 Playground Replacement TBD $ 20,000 $ 20,000 Trail Maintenance TBD $ 30,000 $ 30,000 Buckthorn Removal TBD $ 10,000 $ 10,000 Nature Trail Woodland Creek Park $ 5,000 $ 5,000 $ 10,000 TOTAL $ 90,500 $ 75,000 $ 30,000 $ - $ 5,000 $ 10,000 $ 210,500 ASSUMPTIONS - Campground Revenue: $50,000 - Impact Fee Revenue: $25,000 - Controlled Burn by Fire Department – No Charge - Paving of South Parking Lot at Freedom Park included in 2026 CIP ESTIMATED PARKLAND TRUST FUND BALANCE ON DEC. 31, 2026: $66,352 ESTIMATED IMPACT FEE BALANCE ON DEC. 31, 2026: $46,641 4|Page Page 5 of 7 2027 Parks and Trails System Improvements - Details PROJECT DESCRIPTION LOCATION PARKLAND TRUST BORROWING OPERATING GRANTS DONATIONS IMPACT TOTAL COST BUDGET FEES Trail Construction CTH K $ 260,000 $ 1,040,000 $ 1,300,000 Park Amenities - Phase 3 Fox Run Park $ 30,000 $ 30,000 Prairie Restoration Freedom Park $ 150,000 $ 150,000 Winter Trail Grooming Golf Course $ 500 $ 500 Controlled Burn Greenway East $ - Controlled Burn Paperjack Greenway $ - Shelter Roof Replacement Sather Nature Center $ 3,000 $ 3,000 Chip Seal Parking Lot Sather Nature Center $ 5,000 $ 5,000 Playground Replacement TBD $ 20,000 $ 20,000 Trail Maintenance TBD $ 35,000 $ 35,000 Buckthorn Removal TBD $ 10,000 $ 10,000 TOTAL $ 38,500 $ 260,000 $ 35,000 $ 1,190,000 $ - $ 30,000 $ 1,553,500 ASSUMPTIONS - Campground Revenue: $55,000 (fee increase) - Impact Fee Revenue: $25,000 - Controlled Burn by Fire Department – No Charge - Grant funding pays for prairie restoration for northern half of Freedom Park - City’s portion of CTH K Trail Project included in 2027 CIP, and done in coordination with the County’s reconstruction of CTH K ESTIMATED PARKLAND TRUST FUND BALANCE ON DEC. 31, 2027: $82,852 ESTIMATED IMPACT FEE BALANCE ON DEC. 31, 2027: $41,641 5|Page Page 6 of 7 2028 Parks and Trails System Improvements - Details PROJECT DESCRIPTION LOCATION PARKLAND TRUST BORROWING OPERATING GRANTS DONATIONS IMPACT TOTAL COST BUDGET FEES Engineering & Design Freedom Park $ 50,000 $ 25,000 $ 75,000 Pave East Parking Lot & Driveway Freedom Park $ 465,000 $ 35,000 $ 500,000 Winter Trail Grooming Golf Course $ 500 $ 500 Playground Replacement TBD $ 10,000 $ 10,000 Trail Maintenance TBD $ 40,000 $ 40,000 Buckthorn Removal TBD $ 10,000 $ 10,000 TOTAL $ 70,500 $ 465,000 $ 40,000 $ - $ - $ 60,000 $ 635,500 ASSUMPTIONS - Campground Revenue: $55,000 - Impact Fee Revenue: $25,000 - Paving of east parking lot and driveway at Freedom Park included in 2028 CIP ESTIMATED PARKLAND TRUST FUND BALANCE ON DEC. 31, 2028: $67,352 ESTIMATED IMPACT FEE BALANCE ON DEC. 31, 2028: $6,641 6|Page Page 7 of 7 MEMO Prepared for: Park Board Members Staff Contact: Erik Evenson Meeting: Park Board - 04 Dec 2024 Subject: 2025 Meeting Dates BACKGROUND INFORMATION: The Park Board should determine if the current meeting schedule (last Wednesday of the month at 5:30) is preferred for 2025 meetings. The following dates should be considered: January 22, 2025 February 26, 2025 March 26, 2025 April 23, 2025 May 28, 2025 June 25, 2025 July 23, 2025 August 27, 2025 September 24, 2025 October 22, 2025 November 26, 2025 No December meeting A few potential conflicts to consider: * The last Wednesday in January is when the Chamber of Commerce typically hosts their annual dinner, the Board has sometimes skipped January or moved it up one week *The last Wednesday in March falls over the NRSD Spring Break *Historically, June & July meetings have been skipped * November & December meetings are typically combined to avoid any potential schedule conflicts.

Get email alerts for New Richmond

A daily email when new agendas and minutes are posted.

Report an issue with this meeting