Plan Commission
Regular MeetingNew Richmond, WI · May 5, 2026
Agenda
Plan Commission
Agenda
Tuesday, May 5, 2026 at 5:00 PM
Council Chambers
Page
1. CALL TO ORDER
2. ROLL CALL
3. ADOPTION OF AGENDA
4. APPROVAL OF MINUTES
a. Plan Commission Minutes 2-4
Minutes: Plan Commission - April 9, 2026
5. PUBLIC HEARING
a. Rezoning Application - Evergreen Valley II Planned Unit Development Amendment 5-9
Memo: Rezoning Application - Evergreen Valley II Planned Unit Development
Amendment
b. Preliminary and Final Plat Applications – Evergreen Valley IV Planned Unit 10 - 22
Development
Memo: Preliminary and Final Plat Applications – Evergreen Valley IV Planned Unit
Development
6. ACTION ON PUBLIC HEARING AGENDA
7. NEW BUSINESS
a. Certified Survey Map Application – City of New Richmond (PID 261-1070-44-080) 23 - 26
Memo: Certified Survey Map Application – City of New Richmond (PID 261-1070-
44-080)
b. ETJ Certified Survey Map Application – Halleen Family Limited Partnership 27 - 30
Memo: ETJ Certified Survey Map Application – Halleen Family Limited Partnership
8. AGENDA TOPICS FOR FUTURE MEETINGS
9. ANNOUNCEMENTS
10. ADJOURNMENT
Plan Commission Meeting
Minutes
5:00 PM - Thursday, April 9, 2026
Council Chambers
The Plan Commission of the City of New Richmond was called to order on Thursday, April 9, 2026, at
5:00 PM, in the Council Chambers, with the following members present:
PRESENT: Mike Kastens, MaryKay Rice, Ben Kurth, Jorden Aufderhar, Scott Grady and
Mayor Jim Zajkowski joined by phone.
ABSENT: Joel Enders
OTHERS
Amber Toutge, Beth Thompson, Michelle Scanlan
PRESENT:
CALL TO ORDER
ROLL CALL
ADOPTION OF AGENDA
Jorden Aufderhar made a motion to adopt the Agenda. MaryKay Rice seconded the motion. Carried
unanimously.
APPROVAL OF MINUTES
Jorden Aufderhar made a motion to approve the minutes from March 3, 2026. Scott Grady seconded
the motion. Carried unanimously.
PUBLIC HEARING
CONDITIONAL USE PERMIT APPLICATION - THE TOWERS, LLC MONOPOLE TOWER
Amber Toutge presented a conditional use permit application submitted by Buell Consulting, Inc., on
behalf of The Towers, LLC and Pit Hog Properties II, LLC, for the property located at 1750 Madison
Avenue (PID 261-1070-44-300). The applicant is proposing to construct a 159-foot monopole
telecommunications tower south of Ellicott Dredges. A conditional use permit is required to allow a
new telecommunications tower within the Z7 Special Use/Industrial Zoning District. It was noted that
the City engaged VMC LLC, a consulting firm specializing in telecommunications infrastructure, to
assist in reviewing the application and provide technical expertise. The consultant’s findings and
recommended conditions were presented.
Plan Commission Meeting April 9, 2026
Discussion included the potential for collocation on existing City water towers, the process for
determining infeasibility, and the justification for constructing a new monopole tower. City code
requirements related to safety measures and the removal of unused towers were also reviewed.
City staff recommended approval of the conditional use permit application, subject to the ten
conditions outlined.
ACTION ON PUBLIC HEARING AGENDA
Scott Grady made a motion to recommend approval of the Conditional Use Permit Application for The
Towers, LLC Monopole Tower on PID 261-1070-44-300 to City Council. Jorden Aufderhar seconded
the motion. Carried unanimously.
NEW BUSINESS
ETJ CERTIFIED SURVEY MAP APPLICATION – MARY GLIEDEN
Amber Toutge shared an extraterritorial certified survey map (ETJ CSM) application for PID 026-
1084-70-020. The parcel is located in the Town of Richmond, east of 100th Street. The applicant is
seeking to create a total of 4 lots. The proposed lots range in size from 1.66 acres to 14 acres. A
portion of proposed Lots 3 and 4 originated from an adjacent parcel (PID 026-1086-10-020), via a lot
line adjustment CSM. The property is subject to the City of New Richmond’s extraterritorial plat
review authority as it is located within the 3-mile extraterritorial plat approval jurisdiction. City staff
recommend approval as submitted.
MaryKay Rice made a motion to approve the ETJ Certified Survey Map Application from Mary
Glieden. Ben Kurth seconded the motion. Carried unanimously.
ETJ CERTIFIED SURVEY MAP APPLICATION REAPPROVAL - BRANDON KROHN
Amber Toutge explained that Brandon Krohn's extraterritorial certified survey map (ETJ CSM)
application was originally approved in March of 2025. However, the CSM was not recorded within one
year of the final approval date, as required by Wisconsin State Statutes. As a result, the applicant is
now seeking reapproval. No changes have been made to the original CSM or application. The
property is subject to the City of New Richmond’s extraterritorial plat review authority as it is located
within the 3-mile extraterritorial plat approval jurisdiction. City staff recommend reapproval.
Jorden Aufderhar made a motion to reapprove the ETJ Certified Survey Map Application from
Brandon Krohn. Ben Kurth seconded the motion. Carried unanimously.
AGENDA TOPICS FOR FUTURE MEETINGS
ANNOUNCEMENTS
Appreciation was shared for Mayor Jim Zajkowski as this was his last Plan Commission meeting as
Mayor.
ADJOURNMENT
Plan Commission Meeting April 9, 2026
Jorden Aufderhar made a motion to adjourn at 5:15pm. Jim Zajkowski seconded the motion. Carried
unanimously.
Plan Commission Meeting April 9, 2026
MEMO
Prepared for: Plan Commission
Staff Contact: Amber Toutge
Meeting: Plan Commission - 05 May 2026
Subject: Rezoning Application - Evergreen Valley II Planned Unit Development Amendment
BACKGROUND INFORMATION:
Cedar Corporation, on behalf of AEM Construction, submitted a rezoning application to amend the
Evergreen Valley II Planned Unit Development (PUD) to establish updated development standards
for Lot 107. The subject parcel is located at the southeast corner of County Road A and West
Richmond Way (PID 261-1298-00-107).
The Evergreen Valley II PUD was originally established in 2005 to guide development on the site,
including a mix of housing types and modified design standards. The residential portions of the
development are fully built out. Lot 107 remains the only undeveloped parcel within the PUD and was
originally designated for commercial use.
The amendment would establish appropriate standards for lot coverage and occupancy on Lot 107,
and revise setback requirements to better accommodate residential development. The intent is to
ensure future development aligns with the existing neighborhood in terms of scale and layout, and
completes the overall development in a coordinated way.
The amendment is being reviewed in conjunction with preliminary and final plat applications for an
addition to the development known as Evergreen Valley IV. This proposal includes 48 residential lots
consisting of eight townhome buildings with six units each. All of the remaining land is proposed to be
platted as an outlot. The proposed exterior elevation is shown below:
PROCESS
The rezoning application is subject to review by City staff, the Plan Commission, and City Council. A
public hearing shall be held at the Plan Commission meeting on May 5, 2026, at 5:00 p.m. The
hearing was noticed via Class 2 in the Star Observer on April 16 and 23, 2026. The hearing notice
was also mailed to property owners located within 100 feet of the proposed rezoning.
DETAILED ANALYSIS
COMPREHENSIVE PLAN
The Future Land Use Map, found in the City of New Richmond’s Comprehensive Plan, guides the site
as a Mixed-Use Corridor. This land use category includes a mixture of regional commercial, retail,
office, lodging, and multi-family residential uses in a mixture of building forms, oriented either
vertically or horizontally. Mixed-Use Corridors are located along primary arterial streets. Development
will include landscaped parking lots, and interconnected sidewalks or multi-use trails. The proposed
development is consistent with the Future Land Use Map.
ZONING
The site is located within the Evergreen Valley II PUD. The underlying zoning designation is Z2 Sub-
Urban District. The purpose of the Z2 Sub-Urban District is to provide opportunities for low density
residential neighborhoods, limited neighborhood commercial uses, and complementary uses. The
proposed units are considered single-family dwellings, and therefore, the proposal is consistent with
the underlying zoning designation.
SURROUNDING USES
The table below describes the existing and planned uses directly surrounding the subject site. The
proposed development is compatible with the surrounding uses and is unlikely to have an adverse
impact on the future development of the surrounding properties.
Page 2 of 5
LOT OCCUPATION
The Evergreen Valley II PUD did not establish lot occupation standards for Lot 107. As a result, the
applicant is requesting a PUD amendment to define development parameters.
Page 3 of 5
The applicant is requesting a maximum lot coverage of 100%. This would allow each of the 48
individual units to have a maximum impervious surface coverage of 100%, to accommodate the
proposed building footprints. Despite this, the total impervious surface across the overall site is 52%.
The applicant is also requesting a minimum lot width of 26 feet, to allow for the proposed layout and
lot configuration. The 48 proposed lots are 26 feet x 74 feet. The requested flexibility is consistent
with the intent of PUD zoning, which allows for modifications to conventional zoning requirements
when supported by a comprehensive and cohesive site layout.
SETBACKS
The Evergreen Valley II PUD established setback requirements for Lot 107, which the applicant is
requesting to amend.
Page 4 of 5
The proposed amendment updates the Lot 107 setbacks to allow for the proposed townhome configuration,
while still maintaining an appropriate buffer and compatibility with surrounding development.
The applicant shall provide an exhibit to be included with the recorded document, illustrating
the revised setbacks
RECOMMENDATION:
City staff recommend approval of the rezoning application to amend the Evergreen Valley II PUD as
shown below, with one condition:
1. The applicant shall provide an exhibit to be included with the recorded document, illustrating
the revised setbacks
Lot 107 Lot Occupation
Lot Coverage: 100% maximum
Lot Width: 26 feet minimum
Lot 107 Setbacks
Principal Front: 0 feet minimum, except as shown
Secondary Front: 0 feet minimum, except as shown
Side: 0 feet minimum, except as shown
Rear: 0 feet minimum, except as shown
Page 5 of 5
MEMO
Prepared for: Plan Commission
Staff Contact: Amber Toutge
Meeting: Plan Commission - 05 May 2026
Subject: Preliminary and Final Plat Applications – Evergreen Valley IV Planned Unit
Development
BACKGROUND INFORMATION:
Cedar Corporation, on behalf of AEM Construction, submitted preliminary and final plat applications
for an addition to the Evergreen Valley II planned unit development (PUD), to be known as Evergreen
Valley IV. The proposed addition is located at the southeast corner of County Road A and West
Richmond Way (PID 261-1298-00-107). The proposal includes a total of 48 lots, featuring eight
townhome buildings with six units each. Each of the 48 lots is considered a single-family dwelling unit.
A separate rezoning application has been filed to amend the Evergreen Valley II PUD for Lot 107,
which is proposed to be platted with Evergreen Valley IV.
PROCESS
The preliminary plat application is subject to review by City staff, the Plan Commission, and the City
Council. The final plat is subject to review by City staff and the City Council. However, since the
preliminary plat and final plat were submitted and reviewed together, the final plat will also be
reviewed at the Plan Commission meeting. A public hearing shall be held at the Plan Commission
meeting on May 5, 2026, at 5:00 p.m. The hearing was noticed via Class 2 in the Star Observer on
April 16 and 23, 2026. The hearing notice was also mailed to property owners located within 100 feet
of the proposed plat.
DETAILED ANALYSIS
COMPREHENSIVE PLAN
The Future Land Use Map, found in the City of New Richmond’s Comprehensive Plan, guides the site
as a Mixed-Use Corridor. This land use category includes a mixture of regional commercial, retail,
office, lodging, and multi-family residential uses in a mixture of building forms, oriented either
vertically or horizontally. Mixed-Use Corridors are located along primary arterial streets. Development
will include landscaped parking lots, and interconnected sidewalks or multi-use trails. The proposed
development is consistent with the Future Land Use Map.
ZONING
The site is located within the Evergreen Valley II PUD. The underlying zoning designation is Z2 Sub-
Urban District. The purpose of the Z2 Sub-Urban District is to provide opportunities for low density
residential neighborhoods, limited neighborhood commercial uses, and complementary uses. The
proposed units are considered single-family dwellings, and therefore, the proposal is consistent with
the underlying zoning designation.
SURROUNDING USES
The table below describes the existing and planned uses directly surrounding the subject site. The
proposed development is compatible with the surrounding uses and is unlikely to have an adverse
impact on the future development of the surrounding properties.
Page 2 of 13
LOT OCCUPATION
The Evergreen Valley II PUD did not establish lot occupation standards for Lot 107. As a result, the
applicant is requesting a separate PUD amendment to define development parameters, with a
separate application. If approved, these parameters would also apply to Lots 138-186 in Evergreen
Valley IV.
Proposed Lot Occupation for Lots 138-186
Lot Coverage: 100% maximum
Lot Width: 26 feet minimum
The applicant is requesting a maximum lot coverage of 100%. This would allow each of the 48
individual units to have a maximum impervious surface coverage of 100%, to accommodate the
proposed building footprints. Despite this, the total impervious surface across the overall site is 52%.
The applicant is also requesting a minimum lot width of 26 feet, to allow for the proposed layout and
lot configuration. The 48 proposed lots are 26 feet x 74 feet. The requested flexibility is consistent
with the intent of PUD zoning, which allows for modifications to conventional zoning requirements
when supported by a comprehensive and cohesive site layout.
The lot coverage and lot width requirements shall be listed on the final plat for Lots 138-186 if
approved
SETBACKS
The Evergreen Valley II PUD established setback requirements for Lot 107, which the applicant is
requesting to amend with a separate application. If approved, these setbacks would also apply to Lots
138-186 and Outlot 15 in Evergreen Valley IV.
Page 3 of 13
Proposed Setbacks for Lots 138-186 and Outlot 15
Principal Front: 0 feet minimum, except as shown
Secondary Front: 0 feet minimum, except as shown
Side: 0 feet minimum, except as shown
Rear: 0 feet minimum, except as shown
The proposed amendment updates the setbacks to allow for the proposed townhome configuration, while still
maintaining an appropriate buffer and compatibility with surrounding development.
The setback requirements shall be listed and shown on the final plat for Lots 138-186 and
Outlot 15 if approved
BUILDING DESIGN
Per NRMC 121-38, principal buildings shall be limited to a maximum of three stories in height.
Additionally, stories may not exceed 14 feet in height from finished floor to finished ceiling, excluding
vaulted spaces. The proposed units are two stories, and 25’4” tall, which is consistent with City
requirements.
Future buildings shall also comply with the building material standards identified in NRMC 121-49.
Per the applicant, “LP 8-inch siding on the front of the buildings and vinyl siding on the remaining
three sides. While the specific siding colors are still being finalized, the buildings will feature a varied
Page 4 of 13
but uniform color palette. We will send the final color selections once they are confirmed. The soffit,
fascia, and gutters will be white.”
STREETS & ACCESS
Per NRMC 117-28, private streets shall be allowed based on City Staff Development Review
approval. The proposed development will be accessible via a private drive with two access points off
Ponderosa Lane, which connects to West Richmond Way. The 24’ wide private drive will feature
asphalt surfacing, with a variety of concrete curb and gutter. The rear drive aisle will be one-way from
north to south, with 5 visitor stalls. Pedestrian access to the site will be available from the sidewalk
located along the west side of Ponderosa Lane.
Per NRMC 117-28(h)(4)b., street intersection spacing should be 125 feet.
City staff recommend adding striping the curb between each row of 6 units to prevent parking
The one-way lane shall have a 20’ dedicated fire lane width. Where parking is desired, the lane
width shall be increased to a minimum of 28’ for parallel parking. “No Parking – Fire Lane”
signs should be placed on both sides of the lane for roads between 20 and 26 feet wide, and
on one side for roads more than 26 feet wide.
The setback from the one-way to the lot line shall be labeled
Written justification shall be provided for not aligning the northern driveway with Sugar Pine
Lane
The two driveways on the east side of Ponderosa Lane, across from the southern entrance,
shall be shown on the site plan
PARKING
Each individual unit will have two internal parking stalls, and two external parking stalls, for a total of
192 stalls. Additionally, 5 visitor stalls have been provided on the east side of the one-way.
Ponderosa Lane is a public road, which may accommodate overflow and/or guest parking if needed.
Winter odd/even parking is in effect on Ponderosa Lane from November 1st through April 1st, and
begins at 6:00 p.m. every day.
STREET LIGHTING
Street lighting is not required with a private drive. An existing street light is located south of the
northern entrance on Ponderosa Lane. A second existing street light is located on Ponderosa Lane in
the middle of the proposed southern entrance, which will be relocated to the south at the developer’s
expense.
STREET SIGNAGE
Per NRMC 121-29, the applicant shall develop a street signage plan to be approved by the City. The
applicant is responsible for all costs associated with street signage. A speed limit sign on Ponderosa
Lane, located in the proposed northern entrance, will be relocated to the north at the developer’s
expense.
The applicant shall provide multiple name options for the private drive, to be approved by the
City Engineer and St. Croix County. City staff suggest providing name options that include a
tree species, consistent with the streets in Evergreen Valley (Sugar Pine, Aspen, Sequoia,
Cypress, White Pine, Norway Pine). The name shall end in Way, Lane, Drive or Place.
“Street signs” for the private drive shall be added to each entrance
PARK DEDICATION
No parkland is proposed to be dedicated with the plat. The developer shall pay park impact fees in
accordance with the fee schedule established by the Common Council at the time of the building
permit applications, along with all other impact fees.
Page 5 of 13
STORMWATER AND EROSION CONTROL
The applicant submitted a grading and erosion control plan, and stormwater report, which was
reviewed by the City’s engineering consultant, Short Elliott Hendrickson.
The proposed plan shows the existing site is 4.767 acres and is divided into two drainage
areas, with one (2.525 acres) draining north to Richmond Way and the other (2.242 acres)
draining south towards four existing town houses on a separate property along Norway Pine
Circle. The attached ‘Evergreen Valley map 2003.04.01.pdf’ shows much more of the property
draining north to regional Pond 2, than the current plan shows.
The proposed plan routes a large majority of the runoff to a proposed biofilter that discharges
to a slope on the south edge of the site. For each 24-hour design storm, the overall post-
development peak runoff rate that discharges from the biofilter is not lower than the existing
peak rate from the southern drainage area and would not meet the performance standards if
the site were not tributary to regional detention. Although the site is tributary to regional
detention ponds, runoff must be routed to those ponds in a controlled manner. The report
narrative does not distinguish or address the developed peak discharge for the respective
north and south sides of the site, but the peak discharge exceedance is evident in the
HydroCAD models. The report must show two points of analysis for the peak flows and peak
flows must be limited to the downstream capacity of the existing storm sewer for the 10-year
24-hour storm event.
Per NRMC Sections 109-287, BMPs are to meet the design criteria of the DNR Technical
Standards. If a biofilter or biofilters are utilized in meeting the City’s standards they need to
follow the Technical Standard 1004, which include a maximum drainage area of 2-acres. If the
design remains largely the same, the southern biofilter should be broken into cells as to not
exceed the 2 acre maximum drainage area.
Please provide information that shows that the southern point of discharge isn’t going to
contribute to drainage issues on the neighboring property to the south. At the location of the
outlet control structure, the grades just off of the site to the south, appear to drain directly
towards a building at 1275 Norway Pine Circle. It is not evident on the plans whether this will
be problematic. An option would be to direct runoff, via overland flow or direct pipe connection,
to one of the two area inlets located on the north side of Norway Pine Circle. A level spreader
or other means of dissipating runoff could potentially be used, if runoff from the site is
discharged to existing ground at one single point. If the runoff cannot be piped to existing
storm sewer within the existing Evergreen Subdivision, or structural measures cannot be
shown to minimize concentrated run-on to the neighboring property, a drainage easement,
storm sewer connection, or agreement with the neighboring property may be an option to
pursue.
UTILITIES
Water, sewer and storm sewer shall be installed in accordance with New Richmond Utilities
specifications. Water, sewer and storm sewer submittals, including structure shop drawings, are
subject to approval by Water Superintendent.The applicant is aware a working in the right of way
permit will be required.
Potential elevation conflict where sanitary sewer and storm sewer cross near connecting to
existing 8” sanitary stub
Provide a 6” gate valve on each side of the 6”x8”x6” tee
ELECTRIC
Electric service must be installed in accordance with New Richmond Utilities Electric Service Rules
and appropriate codes.
Page 6 of 13
EASEMENTS
Per NRMC 117-41, the lots shall have a 10’ front and rear drainage and utility easement, and 5’ side
easement. Per NRMC-109-290, all stormwater rate control facilities shall be located within drainage,
utility, and/or flowage easements, dedicated to the City, to provide maintenance access and to
prevent future alteration or encroachment.
Drainage and utility easements, 10’ on front and rear lot lines, and 5’ on side lot lines shall be
added to the plat, around Lot 107 as a whole
The stormwater rate control facilities (bioretention basins) shall be located within a
drainage/stormwater easement dedicated to the City, with an access easement provided from
Ponderosa Lane. Alternatively, the property owner and City discussed providing a blanket
drainage, utility and access easement for Lot 107 as a whole
MAILBOXES
Mailboxes will be located on the northern side of each entrance.
Due to the one-way, the applicant may consider relocating the southern mailbox to the south
side of the entrance
REFUSE AND RECYCLING
Per NRMC 121-48, loading areas and trash/refuse collection areas shall be screened from view from
the front of the lot, public rights-of-way and adjacent properties, and located on the lot. The screening
shall be accomplished with an enclosed structure constructed of materials consistent with that of the
principal building and solid gate, as well as evergreen landscaping, earth berms, or a combination of
these items. The applicant is proposing two 14’ x 26’ dumpster pads, located on each side of the one-
way.
The trash/refuse collection areas shall be screened by enclosed structure constructed of
materials consistent with that of the principal building and solid gate
LANDSCAPING
Per NRMC 121-55, single family dwellings shall have hardy turf grass, one tree and 5 shrubs. All
other applications require a landscape plan subject to review of City Staff. The applicant submitted a
landscaping plan. The applicant is proposing 72 deciduous shrubs, and 13 evergreen shrubs.
The Woodward Globe Arborvitae and Andorra Juniper shall be a minimum of 3 feet in height,
in accordance with NMRC 121-55(5)(d)
The applicant is also proposing a total of 11 trees. Tree species include Autumn Blaze Maple,
Hackberry, and Japanese Tree Lilac.
City staff suggest adding additional trees on the south side of the lot to provide additional
privacy and screening
OTHER
A final plat shall be provided to City staff for review
The City would prefer that the streets, stormwater pond, and other outdoor space have shared
ownership within the development. Each property owner would own 1/48 interest in the
parcels. The homeowner’s association can still be created to manage the spaces, but in the
future, if the association dissolves, the ownership does not revert to the City or County. This is
also the preference of the St. Croix County Community Development Department when it
comes to such developments. An ownership note can be added to the plat to accomplish this.
DEVELOPMENT AGREEMENT
Page 7 of 13
Per NRMC 117-24, the applicant shall be required to enter into a development agreement or site
improvement agreement with the City for the construction of public improvements prior to the
commencement of construction, which shall include a financial guarantee for the construction of
public improvements and landscaping, unless landscaping and site stabilization is contributed at time
of building permit. A construction commencement checklist shall also be completed prior to
construction.
RECOMMENDATION:
City staff recommend approval of the preliminary and final plat applications with the following
conditions:
1. The lot coverage and lot width requirements shall be listed on the final plat for Lots 138-186 if
approved
2. The setback requirements shall be listed and shown on the final plat for Lots 138-186 and
Outlot 15 if approved
3. City staff recommend adding striping the curb between each row of 6 units to prevent parking
4. The one-way lane shall have a 20’ dedicated fire lane width. Where parking is desired, the lane
width shall be increased to a minimum of 28’ for parallel parking. “No Parking – Fire Lane”
signs should be placed on both sides of the lane for roads between 20 and 26 feet wide, and
on one side for roads more than 26 feet wide.
5. The setback from the one-way to the lot line shall be labeled
6. Written justification shall be provided for not aligning the northern driveway with Sugar Pine
Lane
7. The two driveways on the east side of Ponderosa Lane, across from the southern entrance,
shall be shown on the site plan
8. The applicant shall provide multiple name options for the private drive, to be approved by the
City Engineer and St. Croix County. City staff suggest providing name options that include a
tree species, consistent with the streets in Evergreen Valley (Sugar Pine, Aspen, Sequoia,
Cypress, White Pine, Norway Pine). The name shall end in Way, Lane, Drive or Place.
9. “Street signs” for the private drive shall be added to each entrance
10. The proposed plan shows the existing site is 4.767 acres and is divided into two drainage
areas, with one (2.525 acres) draining north to Richmond Way and the other (2.242 acres)
draining south towards four existing town houses on a separate property along Norway Pine
Circle. The attached ‘Evergreen Valley map 2003.04.01.pdf’ shows much more of the property
draining north to regional Pond 2, than the current plan shows.
11. The proposed plan routes a large majority of the runoff to a proposed biofilter that discharges
to a slope on the south edge of the site. For each 24-hour design storm, the overall post-
development peak runoff rate that discharges from the biofilter is not lower than the existing
peak rate from the southern drainage area and would not meet the performance standards if
the site were not tributary to regional detention. Although the site is tributary to regional
detention ponds, runoff must be routed to those ponds in a controlled manner. The report
narrative does not distinguish or address the developed peak discharge for the respective
north and south sides of the site, but the peak discharge exceedance is evident in the
HydroCAD models. The report must show two points of analysis for the peak flows and peak
flows must be limited to the downstream capacity of the existing storm sewer for the 10-year
24-hour storm event.
12. Per NRMC Sections 109-287, BMPs are to meet the design criteria of the DNR Technical
Standards. If a biofilter or biofilters are utilized in meeting the City’s standards they need to
follow the Technical Standard 1004, which include a maximum drainage area of 2-acres. If the
Page 8 of 13
design remains largely the same, the southern biofilter should be broken into cells as to not
exceed the 2 acre maximum drainage area.
13. Please provide information that shows that the southern point of discharge isn’t going to
contribute to drainage issues on the neighboring property to the south. At the location of the
outlet control structure, the grades just off of the site to the south, appear to drain directly
towards a building at 1275 Norway Pine Circle. It is not evident on the plans whether this will
be problematic. An option would be to direct runoff, via overland flow or direct pipe connection,
to one of the two area inlets located on the north side of Norway Pine Circle. A level spreader
or other means of dissipating runoff could potentially be used, if runoff from the site is
discharged to existing ground at one single point. If the runoff cannot be piped to existing
storm sewer within the existing Evergreen Subdivision, or structural measures cannot be
shown to minimize concentrated run-on to the neighboring property, a drainage easement,
storm sewer connection, or agreement with the neighboring property may be an option to
pursue.
14. Potential elevation conflict where sanitary sewer and storm sewer cross near connecting to
existing 8” sanitary stub
15. Provide a 6” gate valve on each side of the 6”x8”x6” tee
16. Drainage and utility easements, 10’ on front and rear lot lines, and 5’ on side lot lines shall be
added to the plat, around Lot 107 as a whole
17. The stormwater rate control facilities (bioretention basins) shall be located within a
drainage/stormwater easement dedicated to the City, with an access easement provided from
Ponderosa Lane. Alternatively, the property owner and City discussed providing a blanket
drainage, utility and access easement for Lot 107 as a whole
18. Due to the one-way, the applicant may consider relocating the southern mailbox to the south
side of the entrance
19. The trash/refuse collection areas shall be screened by enclosed structure constructed of
materials consistent with that of the principal building and solid gate
20. The Woodward Globe Arborvitae and Andorra Juniper shall be a minimum of 3 feet in height,
in accordance with NMRC 121-55(5)(d)
21. City staff suggest adding additional trees on the south side of the lot to provide additional
privacy and screening
22. A final plat shall be provided to City staff for review
23. The City would prefer that the streets, stormwater pond, and other outdoor space have shared
ownership within the development. Each property owner would own 1/48 interest in the
parcels. The homeowner’s association can still be created to manage the spaces, but in the
future, if the association dissolves, the ownership does not revert to the City or County. This is
also the preference of the St. Croix County Community Development Department when it
comes to such developments. An ownership note can be added to the plat to accomplish this.
ATTACHMENTS:
Evergreen Valley IV - Plat, Exterior Elevation, Landscape Plan & Site Plan
Page 9 of 13
There are no objections to this PRELIMINARY PLAT
with respect to the applicable provisions of s. 236.16
and 236.20, Wis. Stats., as provided by s. 236.11 and
236.12., Wis. Stats.
Certified __________________, 2026
FORWA RD
Department of Administration
Page 10 of 13
Exterior Elevation
Page 11 of 13
● ●
Page 12 of 13
● ●
Page 13 of 13
MEMO
Prepared for: Plan Commission
Staff Contact: Amber Toutge
Meeting: Plan Commission - 05 May 2026
Subject: Certified Survey Map Application – City of New Richmond (PID 261-1070-44-080)
BACKGROUND INFORMATION:
The City of New Richmond submitted a certified survey map (CSM) application for PID 261-1070-44-
080. The parcel is located on the southwest corner of West Richmond Way and Madison Avenue.
The applicant is seeking to create a total two lots and one outlot. Proposed Lot 31 is 4 acres, Lot 32 is
8 acres, and Outlot 1 is 7.305 acres.
PROCESS
The application is subject to review by City staff and Plan Commission.
DETAILED ANALYSIS
COMPREHENSIVE PLAN
The Future Land Use Map, found in the City of New Richmond’s Comprehensive Plan, guides the site
for industrial land uses. This category includes areas for manufacturing, assembly, warehousing,
laboratory, distribution, tech/flex, related office uses, and truck/transportation terminals. Areas in the
City identified for industrial are located on the north side of the City, near the airport, and on the south
side of the City, west of STH 65. Development will include landscaped parking lots, screened
loading, service and storage areas, and interconnected sidewalks or multi-use trails. Future
development shall be consistent with the Future Land Use Map.
ZONING
The parcel has a zoning designation of Z7 Special Use/Industrial District. The purpose of the Z7-I
District is to allow for continuation and expansion of industrial uses in specific areas of the City where
they will have less conflict with other functions. Future development shall be consistent with the
zoning designation.
WELLHEAD PROTECTION OVERLAY DISTIRCT
The northern side of the existing parcel is located within the Wellhead Protection Overlay District. Per
NRMC 121-60, land in Wellhead Protection Areas are subject to additional land use and development
restrictions due to their close proximity to the City’s wells and the corresponding higher risk of
contamination. Future development shall comply with NRMC 121-60.
SURROUNDING USES
The table below describes the existing and planned uses directly surrounding the proposed land
division. Future development shall be compatible with the surrounding uses.
Page 2 of 4
LOT OCCUPATION
Per NRMC 121-43 Table 7, the minimum lot width for parcels with a zoning designation of Z7 is 80
feet. The proposed minimum lot width is 256 feet, which is consistent with City requirements.
ACCESS
The proposed lots are accessible via Madison Avenue. For purposes of the certified survey map, the
access is sufficient. Specific driveway access will be reviewed with future development plans.
UTILITIES
Upon future development, the parcels will be served by New Richmond Utilities. All utility plans are
subject to review and approval by the Water Superintendent, Electric Superintendent and City
Engineer.
DRAINAGE AND UTILITY EASEMENTS
Per NRMC 117-41.C, easements for drainage and utilities at least ten feet wide along front and rear
lot lines and five feet wide along all abutting side lot lines are required. The easements shown on the
CSM are consistent with City requirements.
RECOMMENDATION:
City staff recommend approval of the certified survey map application with no conditions.
ATTACHMENTS:
Certified Survey Map - City of New Richmond (PID 261-1070-44-080)
Page 3 of 4
PRELIMINARY - APRIL 18, 2026
CERTIFIED SURVEY MAP
/2&$7(',13$572)7+(1( 2)7+(6: 2)6(&7,2171
5:&,7<2)1(:5,&+021'67&52,;&2817<:,6&216,1
: &251(56(&
67((/6859(<
0$5.1$,/)1' 6 6'
W. RICHMOND WAY 8 0' 8 6'
1 : 1 :
1 :
1 :
( &251(56(&
/27 67((/6859(<
6 6'
0$5.1$,/)1'
648$5()((7
$&5(6
1 :
33'33'
MADISON AVENUE
N
/27
6 :
648$5()((7
$&5(6
1 :
1 :
/(*(1'
6(&7,21&251(5 $6127('
2876,'(',$0(7(5,5213,3(
)281'
,5215(%$5)281'
2876,'(',$0(7(5,5213,3(
)281'
66' ;,5215(%$5:(,*+,1*
/%63(5/,1($5)2276(7
287/27 )(1&(
,1',&$7(687,/,7<($6(0(17
648$5()((7 )5217$1'5($5$1' $/21*
$&5(6 6,'(3523(57</,1(6
6 (
SURVEYOR: PREPARED FOR:
Page 4 of 4
MEMO
Prepared for: Plan Commission
Staff Contact: Amber Toutge
Meeting: Plan Commission - 05 May 2026
Subject: ETJ Certified Survey Map Application – Halleen Family Limited Partnership
BACKGROUND INFORMATION:
The Halleen Family Limited Partnership submitted an extraterritorial certified survey map (ETJ CSM)
application for PID 036-1053-10-000. The parcel is located in the Town of Stanton, east of 170th
Street. The applicant is seeking to create one new lot. Proposed Lot 1 is 2.674 acres, including right-
of-way. The property is subject to the City of New Richmond’s extraterritorial plat review authority as it
is located within the 3-mile extraterritorial plat approval jurisdiction, in accordance with Wis. Stat. §
236.02(5).
The City of New Richmond lacks extraterritorial zoning authority, as there is no joint extraterritorial
zoning committee or cooperative boundary agreement with the Town of Stanton. Therefore, the City
is not allowed to impose zoning regulations. Prior opinions by the Wisconsin Supreme Court and
Wisconsin Court of Appeals have also determined that cities cannot impose public improvement
requirements, require annexation, control density, or otherwise control the type of development that
can take place as a condition of approval. Said requirements or restrictions can only be exercised in
conjunction with neighboring towns via an extraterritorial zoning committee and/or cooperative
boundary agreement.
PROCESS
The application is subject to review by City staff and the Plan Commission.
DETAILED ANALYSIS
New Richmond Municipal Code (NRMC) Section 117-22A establishes criteria for approval of
subdivisions within the City’s extraterritorial jurisdiction. This criteria includes:
CONSISTENCY WITH COMPREHENSIVE PLAN
A proposed subdivision shall be consistent with the goals, policies, and recommendations of the
Comprehensive Plan regarding planned public street or utility corridors or constitute an infilling of
development.
The Future Land Use Map, found in the Comprehensive Plan, guides the site for low density
residential. This land use category includes the traditional residential neighborhoods adjacent to
downtown and the predominantly single-family detached subdivisions that occur throughout the
remainder of the community. In addition to single-family detached homes, two family dwellings would
also be allowed. Future development should take the City’s Future Land Use Map into account, as a
best planning practice.
ADEQUATE SEWER SYSTEMS
A proposed subdivision shall be deemed to have adequate waste disposal systems if there is
adequate onsite sewer capacity potential to support the subdivision if constructed to the maximum
permissible density.
The site is not served by municipal sewer services. The applicant shall contact St. Croix County for
information and regulations regarding private on-site septic systems if desired for future development.
ADEQUATE WATER SUPPLY
A proposed subdivision shall be deemed to have an adequate water supply if there is adequate
sources of water, either from public systems or private wells, to serve the proposed subdivision if
constructed to its maximum permissible density allowed by the Comprehensive Plan without causing
an unreasonable depreciation of existing water supplies for surrounding areas.
The site is not served by municipal water. The applicant shall contact St. Croix County for information
and regulations regarding private on-site wells if desired for future development.
ADEQUATE STORMWATER MANAGEMENT
A proposed subdivision shall provide for adequate management and treatment of stormwater runoff if:
a. Surface or subsurface water retention and runoff is such that it does not constitute a danger to
the structural security of structures within the proposed development.
b. Structures within the proposed subdivision will not result in pollution of water sources from
erosion and siltation.
c. Site grading will not cause harmful and irreparable damage from erosion and siltation on
downhill or downstream land.
d. The proposed subdivision complies with the provisions of the 1991 Wetland Conservation Act.
e. Factors to be considered in making these determinations may include: average rainfall for the
area; the relation of the land to the floodplain; the nature of soils and subsoils and their ability
to adequately support surface water runoff and waste disposal systems; the slope of the land
and its effect on effluents; and the presence of streams as related to effluent disposal.
Page 2 of 4
Future development of Lot 1 shall be subject to St. Croix County and DNR requirements as it relates
to stormwater management.
ADEQUATE STREETS AND ACCESS
A proposed subdivision shall be deemed to have adequate streets to serve the subdivision when:
a. Streets that access the proposed subdivision are of such a width, grade, stability, vertical and
horizontal alignment, site distance and surface condition that an increase in traffic volume
generated by the proposed subdivision will not create a hazard to public safety and general
welfare, not aggravate an already hazardous condition, and when, with due regard to the
advice of St. Croix County and/or the Wisconsin Department of Transportation, said streets are
appropriate for the intended use.
b. The traffic volume generated by the proposed subdivision would not create unreasonable
congestion or unsafe conditions on streets existing at the time of the application or proposed
for completion within the next two (2) years.
Proposed Lot 1 is accessible via 170th Street. Official driveway access shall be subject to approval of
the Town of Stanton and St. Croix County.
RIGHT-OF-WAY
170th Street is classified on the City’s Official Map as a minor arterial, which requires a minimum
right-of-way of 110’. The following note is included on the CSM, consistent with City requirements:
“Future right-of-way per City of New Richmond Official Map adopted March 13, 2023, Resolution
032301. 55’ east of the west line of the NW1/4.”
EASEMENTS
Per NRMC 117-41.C, an easement for drainage and utilities at least ten feet wide along front and rear
lot lines and five feet wide along all abutting side lot lines are required. The easements shown on the
CSM are consistent with City requirements.
FUTURE SUBDIVISION
Future subdivision of Lot 1 shall be reviewed and approved by the City of New Richmond.
RECOMMENDATION:
City staff recommend approval of the extraterritorial certified survey map application with no
conditions.
ATTACHMENTS:
ETJ Certified Survey Map - Halleen Family Limited Partnership
Page 3 of 4
CERTIFIED SURVEY MAP
LOCATED IN PART OF THE SOUTHWEST QUARTER OF THE NORTHWEST
QUARTER OF SECTION 22, TOWNSHIP 31 NORTH, RANGE 17 WEST,
TOWN OF STANTON, ST. CROIX COUNTY, WISCONSIN.
LEGEND
FOUND COUNTY SECTION CORNER,
ALUMINUM CAPPED MONUMENT
SET 1 INCH OUTSIDE DIAMETER BY 18 INCH LONG PREPARED FOR:
IRON PIPE, WEIGHING 1.13 LBS. PER LINEAR FOOT HALLEEN FAMILY LIMITED PARTNERSHIP
FUTURE DRAINAGE AND UTILITY EASEMENT, 9411 BROOKVIEW ROAD
REQUESTED BY CITY OF NEW RICHMOND WOODBURY, MN 55125
(5' ON SIDE LINES, 10' ON FRONT AND REAR)
NW CORNER SECTION 22
1900.46' UNPLATTED
LANDS
66'
S89°50'28"E 233.00'
33.01' 199.99'
03/11/2026
Future right-of-way per City of
33' 33'
New Richmond Official Map adopted
WEST LINE NW1/4
STREET
March 13, 2023, Resolution 032301.
LANDS
55’ west of the east line NE 1/4.
LANDS
N00°54'07"W 2650.46'
N00°54'07"W 500.00' S00°54'07"E 500.00'
N00°54'07"W 500.00'
UNPLATTED UNPLATTED
LOT 1 THE WEST LINE NW1/4 SECTION 22
116,480 SQ. FT.
BEARS N00°54'07"W
2.674 ACRES
99,980 SQ. FT.
2.295 ACRES
AS REFERENCED TO THE ST. CROIX
170TH
COUNTY COORDINATE SYSTEM
NORTH
SCALE: 1 INCH = 80 FEET
33' 33' 80 40 0 80
33.01' 199.99'
N89°50'28"W 233.00'
66'
UNPLATTED Each Parcel shown on this map is subject to
250.00'
State, County and Township laws, rules and
LANDS regulations (i.e., wetlands, minimum lot size,
access to parcel, etc.) Before purchasing or
developing any parcel contact the St. Croix
County Community Development Department
WEST 1/4 CORNER SECTION 22 and the Town of Stanton for advice.
SHEET 1 OF 2
Page 4 of 4
Get email alerts for New Richmond
A daily email when new agendas and minutes are posted.