Central Oklahoma Master Conservancy District Meeting
Regular MeetingNorman, OK · March 3, 2022
Minutes
MINUTES OF REGULAR BOARD MEETING
CENTRAL OKLAHOMA MASTER CONSERVANCY DISTRICT
Thursday, March 3, 2022
6:30 P.M.
Location: 12500 Alameda Dr. Norman, OK 73026
A. Call to Order
President Amanda Nairn called the meeting to Order at 6:30 pm.
Roll Call:
Board Members Present:
President Amanda Nairn
Treasurer Jann Knotts
Secretary Michael Dean
Roger Frech
William Janacek
Board Members Absent:
Kevin Anders
Dave Ballew
Staff Present:
Kyle Arthur, General Manager
Kelley Metcalf, Office Manager
Tim Carr, Operations & Maintenance Supervisor
Derek Underwood, O&M Tech I
Others Present:
Dean Couch
Tim Barnes
Chance Allison
Alan Swartz
Mark Roberts
Paul Streets
Geri Wellborn
Cole Niblett
Beverly Palmer
Virtually:
Matt Warren
Julie Chambers
Page 1 of 10
B. Statement of compliance with Open Meeting Act
Kelley Metcalf, Office Manager, stated the notice of the monthly board meeting had been posted in
compliance with the Open Meeting Act.
Ms. Nairn announced that Casey Hurt has moved out-of-state and is no longer on the Board. Dr.
Dave Ballew is the new Board member, representing Midwest City. Mr. Ballew could not be here
tonight due to a previous commitment. Paul Streets gave a brief background on Mr. Ballew.
C. Administrative
C.1. Introduction of new COMCD employee Derek Underwood
Ms. Nairn stated COMCD has a new staff member. Mr. Underwood introduced himself. He
previously worked at Norman Water Treatment Plant. His first day of work was on January 17th. His
job title is Operations and Maintenance Tech I.
C.2. Discussion of initial draft budget FY 2023-2025
Please see document titled “Projection for remainder of FY22 in the packet.
Mr. Arthur discussed the projection for remainder of FY22. The estimated balance at end of FY 2022
is $1,642,652. The list of proposed special projects over the next several months totals $880,000.
These projects would be subject to Board approval and funded from surplus funds. The Budgeting
Policy, that was approved by the Board on November 5, 2020, states the operating account balance
carryover shall be maintained between $750,000 and $1,250,000. If all of the proposed special
projects were approved the carryover balance would be $762,652, which is on the lower side of the
range. Mr. Arthur noted that $1,502,387 was utilized from surplus funds to pay for various expenses
since he arrived in 2020. Therefore, that has depleted the carryover to some extent.
Mr. Arthur discussed the draft 2023-2025 budget (please see document titled “draft budget” in the
packet). The budget gives a 3-year look, in the attempt to try to give some line-of-sight, to where the
District expenses maybe trending. Salary and wages increased more significantly, due to a new hire
and Mr. Arthur stated he included a 5% salary increase, which includes the usual 3% annual step
raise plus a 2% COLA raise was also added. The amount for employee’s retirement also increased
due to the District opting out of contributing funds to the defined benefit plan in FY 2022. The FY23
actuarial study has not been received to date. Mr. Arthur plugged in a 7% contribution for District
match until the actuary study is received. That percentage could increase or decrease. Ms. Nairn
asked why the FY24 salary and wages amount decreased. Mr. Arthur stated he is anticipating a
retirement. Mr. Arthur stated, thus far, he does not have a new employee budgeted for FY25.
Mr. Arthur pointed out the amount for legal services decreased based upon recent spending trends.
The budget increased for consultants and engineers to include fees for a pump curve test to be
performed. Additionally, $150,000 was added, in the non-assessed category, for costs associated
with a development of a drought contingency plan. This project would be a 50/50 cost share with
the Bureau of Reclamation, should the District be awarded the grant. Ms. Nairn asked who would
preform the work. Mr. Arthur stated the District would hire a 3rd party.
The District jointly applied, with Reclamation, for an Applied Science Grant for the paleohydrology
work. The work would be 100% funded and would be done internally.
Page 2 of 10
Mr. Arthur pointed out that the investment earnings, which last year the District began to use to
offset assessment amounts, are projected to be a little lower.
Mr. Arthur stated a notable change has been made in the way the budget financials are represented
that when monies are being spent there will be a line item on the financials, regardless if it was an
assessed expense or not. Previously, only if the expense was being assessed to the cities was it
included on the budget portion of the financials.
Ms. Nairn encouraged anyone with questions to reach out to Mr. Arthur. The budget is expected to
be an action item at the next meeting.
Mr. Streets thanked Mr. Arthur for sharing the proposed budget. Mr. Streets also stated most cities
are doing at least 2% on the COLA if not more. Commented [KA1]: Did he say 2% or 5% raise?
C.3. Discussion regarding replacement of Del City Pipeline segment West of Tinker Air Force Base at
and near Air Depot Boulevard
Ms. Nairn reminded the Board that there is a 640 LF segment, that is located immediately adjacent,
but outside the boundary of Tinker Air Force Base, that the District chose not to replace during the
Del City Pipeline project. The United States Army Corps of Engineers (USACE) is now currently
undertaking a project to abandon the portion of the existing Del City waterline that crosses the
middle of Tinker AFB and relocate it to the perimeter of the base on their property. This segment
was not replaced in the recent pipeline project. Mr. Arthur thought it might be advantageous to
speak to the Corps and consider replacing the 640 LF segment in conjunction with the USACE
project. Mr. Arthur requested a bid from Plummer and Associates to establish an approximate cost
simply to ensure the Board had some good estimate as to what it may cost. Please see document
titled “Opinion of Probable Construction Cost” in the packet. Ms. Nairn stated that this was not an
RFP, and any entity wishing to apply has to go through USACE.
In the board packet there is a Memorandum of Agreement between United States of America
Department of the Interior Bureau of Reclamation and COMCD that will establish a formal
mechanism for funding the 640 LF portion, should the Board decide to proceed with the project. The
Agreement also defines roles and responsibilities to complete design and construction of pipeline
and a road crossing west of Tinker Air Force Base. Ms. Nairn reminded the Board this item is not on
the agenda tonight for consideration, only discussion. The Agreement specifies $550,000 as a total
cost estimate, which also includes USACE’s anticipated expenditures on overseeing the project and
getting the project awarded. Mr. Arthur stated he has requested an estimate for the complete
project.
Mr. Arthur also requested a professional opinion from Plummer and Associates, due to their
familiarity on the Del City Pipeline Project, regarding the need to replace the 640 LF portion.
Plummer and Associates pointed out the remaining 640 LF was installed in approximately 1974, with
a design life of 50 years. Plummer and Associates recommends rehabilitation or replacement of the
remaining 640 LF of C-301 pipe. Please see the document in the packet titled “Del City Waterline
Replacement Recommendation”.
Mr. Dean stated that there are grants available that may assist or pay for the project. Mr. Arthur
stated the District has sent an application for American Recovery Plan Act (ARPA) funds to assist
with this project. In total, $1.9 billion dollars of ARPA funds has been allocated to be used for a
variety of projects across the state that will be awarded on a competitive basis. To date, applications
totaling $8 billion dollars have been requested. One criterium for award is, it has to directly relate to
Page 3 of 10
economic recovery from the pandemic. Mr. Arthur stated he characterized the District’s request for
funds due to the three cities losing revenue during the pandemic. Mr. Arthur also explained the
District decreased each cities FY 2020 4th quarter assessment by one-half. Mr. Arthur also included,
in the application, the list of expenses the District funded with surplus funds in an effort to decrease
the cities assessments--therefore resulting in a significant reduction of surplus funds.
Mr. Dean stated there is a second grant available to apply for, that is not pandemic related, the
expenses have to be associated with infrastructure. Mr. Dean suggested the District consult with the
cities for insight. Ms. Palmer stated the guidelines have been changing regularly.
Mr. Dean also expressed his concern regarding the advancement of $550,000. Mr. Dean suggested
the District may want to consider only advancing the expenses for the engineering costs. Mr. Dean
voiced his hesitation due to the unknown repercussions of the monies being sent and possibly
disqualifying the District from receiving grant money for the project. Mr. Arthur stated he would
consult with Reclamation.
Mr. Warren (BOR) stated if the District chooses to enter into the Agreement with Reclamation the
District would advance funding to Reclamation, who in turn will transfer the funding to USACE
through an Interagency Agreement so that USACE can design and construct the pipeline and road
crossing west of Tinker AFB. Please see document titled “Memorandum of Agreement between
United States of American Department of the Interior Bureau of Reclamation and COMCD”. Mr.
Warren stated this is not instantaneous. Mr. Arthur stated the District has 120 days after award of
contract to transfer the funds.
Mr. Arthur stated the expected date, as of now, for the USACE’s contractor to begin construction is
early spring of 2023. Funds would likely have to be transferred by July 2022.
Ms. Nairn requested Mr. Arthur investigate all options and in June or July have the subject on the
agenda for consideration.
C.4. Discussion of the announcement by the Oklahoma Turnpike Authority of a proposed turnpike
near Lake Thunderbird
Ms. Nairn stated on February 22, 2022, the Oklahoma Turnpike Authority announced an east/west
proposed route near Indian Hills Road and thru Norman and a north, south route going near 80th
Ave. Ms. Nairn stated the District did not have any knowledge regarding this until it became public.
The District is in the fact-finding stage.
Mr. Arthur stated the official OTA website is accessoklahoma.com and encouraged Board members
to visit the site. The Turnpike Authority is referring to the project as the “South Extension Turnpike”.
Mr. Arthur stated the project intersects with BOR/District property in a few areas that are worth
mentioning.
The following crosses over easements:
Relift line at approximately 96th Avenue Northeast and East of Bethel Road
Norman line at approximately Robinson Street and 80th Avenue Northeast
The following crosses BOR property:
Page 4 of 10
Between Franklin Road and Tecumseh Road to the north and south AND
Between 72nd Avenue Northeast and 84th Avenue Northeast to the west and east
Between Lindsey Street and Highway 9 to the north and south AND
Between 72nd Avenue Southeast and 84th Avenue Southeast to the west and east
Mr. Dean expressed concern over a route that was seen on social media outlets that showed a
proposed route actually going over Lake Thunderbird. He stated that the District should be opposed
to such a route and should voice our opposition as soon as possible.
Discussion was held and it was decided to have Mr. Arthur draft a letter to the Oklahoma Turnpike
Authority and present the draft letter for consideration at the next meeting.
D. Action: PURSUANT TO 82 OKLA. STAUTES, SECTION 541 (D) (10), THE BOARD OF DIRECTORS
SHALL PERFORM OFFICIAL ACTIONS BY RESOLUTION AND ALL OFFICIAL ACTIONS INCLUDING FINAL
PASSAGE AND ENACTMENT OF ALL RESOLUTIONS MUST BE APPROVED BY A MAJORITY OF THE
BOARD OF DIRECTORS PRESENT, A QUORUM BEING PRESENT, AT A REGULAR OR SPECIAL MEETING.
THE FOLLOWING ITEMS MAY BE DISCUSSED, CONSIDERED AND APPROVED, DISAPPROVED,
AMENDED, TABLED OR OTHER ACTION TAKEN:
D.5. Minutes of the regular board meeting held on Thursday, November 4, 2021, and corresponding
Resolution
The minutes were reviewed and finding those in good order as presented, Roger Frech made a
motion seconded by Jann Knotts to approve the Resolution.
Roll call vote:
President Amanda Nairn Yes
Treasurer Jann Knotts Yes
Secretary Michael Dean Yes
Member William Janacek Yes
Member Roger Frech Yes
Member Kevin Anders Absent
Member Dave Ballew Absent
Motion Passed
Treasurer Knotts entertained postponing item D6 thru D9 to follow item D11. After hearing no
objections, Ms. Nairn agreed and postponed item D6 thru D9 to follow item D11.
D.11. Annual audit report for fiscal year ended June 30, 2021, and corresponding Resolution
Mr. Tim Barnes and Mr. Chance Allison were present from Finley & Cook. Mr. Barnes presented the
FY 2021 results to the Board. Mr. Barnes indicated that it was a clean audit, with no surprises, major
adjustments, or problem areas. Please see document titled “Finley and Cook Financial Statements”.
Page 5 of 10
Finding the audit in good order as presented Michael Dean made a motion seconded by William
Janacek to approve the Resolution.
Roll call vote:
President Amanda Nairn Yes
Treasurer Jann Knotts Yes
Secretary Michael Dean Yes
Member William Janacek Yes
Member Roger Frech Yes
Member Kevin Anders Absent
Member Dave Ballew Absent
Motion Passed
D.6. Financial statements for operating accounts for October 2021, and corresponding Resolution
Treasurer Knotts pointed out this month the Del City Pipeline liability increased by $42,514.58. Ms.
Knotts called Mr. Arthur and received verification that some expenses still remain. Ms. Knotts stated
a miscalculation was keyed into the profit and loss budget vs actual on the pumping power. The
miscalculation will be corrected.
Finding the financial statements in good order otherwise as presented, Jann Knotts made a motion
seconded by Michael Dean to approve the Resolution.
Roll call vote:
President Amanda Nairn Yes
Treasurer Jann Knotts Yes
Secretary Michael Dean Yes
Member William Janacek Yes
Member Roger Frech Yes
Member Kevin Anders Absent
Member Dave Ballew Absent
Motion Passed
D.7. Financial statements for operating accounts for November 2021, and corresponding Resolution
Treasurer Knotts pointed out this month the Del City Pipeline liability increased by $36,713.80.
The miscalculation of the pumping power on the profit and loss budget vs actual will need to be
corrected.
Ms. Knotts explained that the interest earned varies from month-to-month and said it may be easier
to have a fixed figure for purposes of cash flow planning. Mr. Arthur stated he will visit with the
advisor. Commented [KA2]: We probably need to rework and
simplify this whole section.
Page 6 of 10
Finding the financial statements in good order as presented, Michael Dean made a motion seconded
by Roger Frech to approve the Resolution.
Roll call vote:
President Amanda Nairn Yes
Treasurer Jann Knotts Yes
Secretary Michael Dean Yes
Member William Janacek Yes
Member Roger Frech Yes
Member Kevin Anders Absent
Member Dave Ballew Absent
Motion Passed
D.8. Financial statements for operating accounts for December 2021, and corresponding Resolution
Treasurer Knotts pointed out this month the Del City Pipeline liability increased by $121,939.00.
A credit of $11,630.53 is cost sharing funds from Bureau of Reclamation on the wetland project. The
miscalculation of the pumping power on the profit and loss budget vs actual will need to be
corrected.
Finding the financial statements in good order otherwise as presented, Jann Knotts made a motion
seconded by Michael Dean to approve the Resolution.
Roll call vote:
President Amanda Nairn Yes
Treasurer Jann Knotts Yes
Secretary Michael Dean Yes
Member William Janacek Yes
Member Roger Frech Yes
Member Kevin Anders Absent
Member Dave Ballew Absent
Motion Passed
D.9. Financial statements for operating accounts for January 2022, and corresponding Resolution
Treasurer Knotts pointed out this month the Del City Pipeline liability increased by $16,552.55.
Ms. Knotts noted that she had a question about how interest on the Del City pipeline loan was being
booked. She requested that staff confer with our bookkeeper to discuss the issue.
Roger Frech made a motion seconded by William Janacek to table this item.
Roll call vote:
Page 7 of 10
President Amanda Nairn Yes
Treasurer Jann Knotts Yes
Secretary Michael Dean Yes
Member William Janacek Yes
Member Roger Frech Yes
Member Kevin Anders Absent
Member Dave Ballew Absent
Motion Passed
D.10. Amendment of Intergovernmental Agreement between Central Oklahoma Master
Conservancy District and the Oklahoma Water Resources Board to extend the end date of the Study
of Internal Nutrient Loading in Lake Thunderbird from March 31, 2022, to December 31, 2022, and
corresponding Resolution
Mr. Arthur explained this agreement is only requesting a time extension, not a monetary change.
The original agreement was approved in August 2020. The amended Agreement would extend the
expiration date of the Agreement from ending on March 31, 2022 to December 31, 2022.
Please see document titled as above in the packet.
Michael Dean made a motion seconded by Roger Frech to approve the Resolution.
Roll call vote:
President Amanda Nairn Yes
Treasurer Jann Knotts Yes
Secretary Michael Dean Yes
Member William Janacek Yes
Member Roger Frech Yes
Member Kevin Anders Absent
Member Dave Ballew Absent
Motion Passed
D.12. Districts’ Purchasing Policy, and corresponding Resolution
Mr. Arthur reminded the Board that the proposed policy was a discussion item on the November 4,
2021 agenda. At that time, Mr. Hurt and Mr. Dean suggested language changes. Updated language
was made to the sections on a purchasing threshold less than $25,000 and the $50,001 - $100,000
threshold. Additionally, in Section 5 a sentence was added. Please see document titled “Purchasing
Policy” in the packet.
Roger Frech made a motion seconded by Michael Dean to approve the Resolution.
Roll call vote:
President Amanda Nairn Yes
Treasurer Jann Knotts Yes
Secretary Michael Dean Yes
Page 8 of 10
Member William Janacek Yes
Member Roger Frech Yes
Member Kevin Anders Absent
Member Dave Ballew Absent
Motion Passed
E. Discussion
E.13. Legal Counsel’s Report
Nov. 4, 2021 Attend monthly meeting of board of directors at COMCD office
Dec. 20, 2021 Review draft Memorandum of Agreement between U.S. Bureau of Reclamation
and COMCD relating to Del City pipeline extension and Tinker AFB
Jan. 19, 2022 Initiate review of American Rescue Plan Act to assess uses and purposes of
funding that might be available for the COMCD and possible hurdles to comply
with requirements
Jan. 24, 2022 Review requirements for appointment of new board member and initiate
drafting of petition requesting appointment and draft order for filing with
Cleveland County District Court
Jan. 25, 2022 Review email communication from Kyle concerning appointment process and
possible requirement to wait until end of term before cities can nominate for
appointment or reappointment
Jan. 26, 2022 Review recording of City of Midwest City city council meeting held on January
25 to confirm approval of appointment of Dr. Ballew to replace Casey Hurt
Jan. 26, 2022 Complete review of American Rescue Plan and Infrastructure Investment and
Jobs Act and provide broad summaries and point out possible funding areas that
might apply to COMCD to Kyle Arthur
Jan. 27, 2022 Complete drafting of petition requesting appointment of new board member
and draft order for Judge Balkman, contact Midwest City Don Maisch about
need to document city council’s approval, contact Judge Balkman’s clerk to
schedule meeting with the judge to present draft order appointing Dr. Ballew,
and coordinate with Kyle and Kelley concerning need for Kyle to sign verification
to attach to petition
Jan. 27, 2022 Prepare Legal Counsel report and dispatch to Kelley Metcalf for inclusion in
board packet
Jan. 28, 2022 File Petition requesting appointment of Dr. Ballew with Cleveland County
District Court
Jan. 31, 2022 Obtain Judge Balkman’s signature on Order Appointing Dr. Ballew as member of
COMCD board of directors
Feb. 7, 2022 Review email communication from Kyle Arthur about extending internal loading
study agreement with Oklahoma Water Resources Board and respond
Feb. 18, 2022 Review request for ARPA funds and response to Kyle Arthur
Feb. 25, 2022 Prepare Legal Counsel report for March 3 monthly meeting
Mr. Arthur asked Mr. Couch if he had heard back from Judge Balkman on the Investment Policy
ruling. Mr. Couch stated that he had not.
Page 9 of 10
E.14. General Manager’s Report
Please see document titled “Manager’s Report” in the packet.
E.15. President’s Report
Ms. Nairn stated that there is no Vice President currently, due to Mr. Hurt’s departure. Election of
Officers occurs every two years, this year being an election year. Typically, elections occur in the
summer. Ms. Nairn asked the Board if they were okay with waiting. Hearing no objection, she said
elections will be held later.
Ms. Nairn mentioned that on a recent hike near Clear Bay that she was very pleased with the
cleanliness, new signage, and clean bathrooms. Ms. Nairn encouraged everyone to make a trip out
there. Ms. Nairn emailed Susie Snider, at Parks and Recreation, and thanked her and staff for the
wonderful positive experience.
E.16. New business (any matter not known prior to the meeting, and which could not have been
reasonably foreseen prior to the posting of the agenda
none
F. Adjourn
There being no further business, President Nairn adjourned the meeting at 9:05 P.M.
Page 10 of 10
Agenda
CENTRAL OKLAHOMA MASTER CONSERVANCY DISTRICT
AGENDA FOR REGULAR MEETING
Kyle Arthur, General Manager
12500 Alameda Dr
Norman, OK 73026
TIME: 6:30 P.M.
THURSDAY, March 3, 2022
TO ACCOMMODATE THE PUBLIC, INCLUDING PRESENTERS OF AGENDA ITEMS, WHO WISH TO PARTICIPATE BUT
NOT TO ATTEND THE MEETING IN PERSON, VIDEOCONFERENCE AND TELECONFERENCE CAPABILITY IS BEING
MADE AVAILABLE. ALTHOUGH THIS ACCOMMODATION IS PROVIDED, MEMBERS OF THE PUBLIC INCLUDING
PRESENTERS ARE WELCOME TO ATTEND THE MEETING IN-PERSON.
TO PARTICIPATE AND LISTEN TO THE MEETING BY TELEPHONE, CALL TOLL FREE, 1-866-899-4679. ENTER ACCESS
CODE: 321-461-325.
TO PARTICIPATE AND LISTEN VIA A COMPUTER, SMARTPHONE, OR TABLET, GO TO
HTTPS://MEET.GOTO.COM/321461325.
BOARD MEETING PACKET CAN BE FOUND ON WEBSITE: HTTPS://COMCD.NET. THIS AGENDA WAS POSTED IN THE
NOTICE ENCLOSURE OUTSIDE THE COMCD OFFICE GATE AT 10:00 AM ON FEBRUARY 25, 2022.
FOR ALL THOSE ATTENDING THE MEETING IN PERSON, FACE MASKS ARE OPTIONAL, BUT ENCOURAGED, AND
SOCIAL DISTANCING WILL BE PRACTICED TO THE EXTENT REASONABLY POSSIBLE.
A. CALL TO ORDER AND ROLL CALL
B. STATEMENT OF COMPLIANCE WITH OPEN MEETING ACT
C. ADMINISTRATIVE
1. INTRODUCTION OF NEW COMCD EMPLOYEE DEREK UNDERWOOD
2. DISCUSSION OF INITIAL DRAFT BUDGET FY 2023-2025
3. DISCUSSION REGARDING REPLACEMENT OF DEL CITY PIPELINE SEGMENT WEST OF TINKER AIR FORCE
BASE AT AND NEAR AIR DEPOT BOULEVARD
4. DISCUSSION OF THE ANNOUNCEMENT BY THE OKLAHOMA TURNPIKE AUTHORITY OF A PROPOSED
TURNPIKE NEAR LAKE THUNDERBIRD
D. ACTION: PURSUANT TO 82 OKLA. STATUTES, SECTION 541 (D) (10), THE BOARD OF
DIRECTORS SHALL PERFORM OFFICIAL ACTIONS BY RESOLUTION AND ALL OFFICIAL
ACTIONS INCLUDING FINAL PASSAGE AND ENACTMENT OF ALL RESOLUTIONS MUST BE
APPROVED BY A MAJORITY OF THE BOARD OF DIRECTORS PRESENT, A QUORUM BEING
PRESENT AT A REGULAR OR SPECIAL MEETING. THE FOLLOWING ITEMS MAY BE
DISCUSSED, CONSIDERED AND APPROVED, DISAPPROVED, AMENDED, TABLED OR OTHER
ACTION TAKEN:
5. MINUTES OF THE REGULAR BOARD MEETING HELD ON THURSDAY, NOVEMBER 4, 2021, AND
CORRESPONDING RESOLUTION
6. FINANCIAL STATEMENTS FOR OPERATING ACCOUNT FOR OCTOBER 2021, AND CORRESPONDING
RESOLUTION
7. FINANCIAL STATEMENTS FOR OPERATING ACCOUNT FOR NOVEMBER 2021, AND CORRESPONDING
RESOLUTION
8. FINANCIAL STATEMENTS FOR OPERATING ACCOUNT FOR DECEMBER 2021, AND CORRESPONDING
RESOLUTION
9. FINANCIAL STATEMENTS FOR OPERATING ACCOUNT FOR JANUARY 2022, AND CORRESPONDING
RESOLUTION
10. AMENDMENT OF INTERGOVERNMENTAL AGREEMENT BETWEEN THE CENTRAL OKLAHOMA MASTER
CONSERVANCY DISTRICT AND THE OKLAHOMA WATER RESOURCES BOARD TO EXTEND THE END
DATE OF THE STUDY OF INTERNAL NUTRIENT LOADING IN LAKE THUNDERBIRD FROM MARCH 31, 2022
TO DECEMBER 31, 2022, AND CORRESPONDING RESOLUTION
11. ANNUAL AUDIT REPORT FOR FISCAL YEAR ENDED JUNE 30, 2021, AND CORRESPONDING RESOLUTION
12. DISTRICTS’ PURCHASING POLICY, AND CORRESPONDING RESOLUTION
E. DISCUSSION:
13. LEGAL COUNSEL’S REPORT
14. GENERAL MANAGER’S REPORT
15. PRESIDENT’S REPORT
16. NEW BUSINESS (ANY MATTER NOT KNOWN PRIOR TO THE MEETING AND WHICH COULD NOT HAVE
BEEN RESONABLY FORESEEN PRIOR TO THE POSTING OF THE AGENDA)
F. ADJOURN