Golf Course Authority
Regular MeetingNorwich, CT · February 14, 2019
Minutes
To: NGCA Members
From: Barney Caulfield, Chairman NGCA
Re: Minutes of NGCA special meeting of February 14, 2019
Members Present
Richard Strouse
J.P. Mereen
Michael Driscoll
Bob Malouf
Richard Podurgiel
Charles Whitty
David DiBattista
Angelo Yeitz
Others Present
Mike Svab, Pro Manager
Bruce Morse, Superintendent
Rob Good, of WSP
Ray Lathrop, Member’s Club
Call to Order
• In the absence of Chairman Caulfield, Vice Chairman Strouse called the February
14, 2019 special meeting of the Norwich Golf Course Authority to order at
5:30p.m.
Minutes
• Rob Good addressed the Authority and presented information with respect to the
alternate water conservation project. Two test wells have been developed at the
course, each producing in excess of 250 gallons per minute flow. The required
flow for the project is at least 175 gallons per minute to produce a daily
production of 250,000 gallons. Water production at the course should easily
meet this goal.
In order to receive a diversion permit allowing a draw-down of such a quantity of
water the DEEP requires a test consisting of continuous pumping for 72 hours
during seasonal low flow conditions. A primary concern is the effect of the
diversion of water will have on Trading Cove Brook, and gauges have been
installed there to quantify flow.
The excessively wet conditions in 2019 have prevented the required 72 hours
testing and appear likely to do so for some time yet. At the present time, the
water flow in the brook is approximately 10 times that necessary to perform the
test required for diversion permit.
Modeling has been completed showing any effects on ground waters but the
modeling will not show the direct impact on river flow. Either of the two test
wells can either be used for the test necessary to obtain the diversion permit and
the determination of satisfactory results at one will qualify both for use in
connection with this project.
The inability to complete the test will delay the project and it is most unlikely to
be completed any sooner than late in 2019, more likely the spring of 2020.
Should wet conditions persist the DEEP will, in 2019, likely allow a wet season
test which, together with the modeling already performed will be satisfactory to
the DEEP if the results are acceptable.
Mr. Good noted that the Authority can, without a diversion permit, draw down
50,000 gallons per day but given the size of the pond and the demands for water
during hot weather it is probably an inadequate amount of water.
Mr. Good discussed efforts to obtain permits required by the City of Norwich for
the work which will be needed to be done in connection with this project. He
distributed an agenda for the regular meeting of the Inland Wetlands
Watercourses and Conservation Commission of the City of Norwich to be held on
February 14, 2019 at 7:00 p.m. to consider this project, identified as No. 19-01,
the agenda including input to the Inland Wetlands Commission from the city
engineer and the assistant city planner.
Mr. Good also presented sketches and plans showing the outline of the proposed
pond including an embankment to protect against overflows onto the course and
establishing an outlet through which water could be released as required.
Mr. Good answered questions from members of the Authority.
Adjournment
A motion to adjourn the meeting was made at 6:20p.m. by Mr. Mereen, seconded
by Mr. DiBattista, and approved unanimously.
Agenda
Norwich Golf Course Authority Special Meeting Notice and Agenda
Thursday, February 14, 2019
5:30 p.m.
Conference Room
Call to Order
Presentation by Rob Good, WSP, review and discussion on the Alternate Water
Conservation Project
Adjournment
cc: Norwich City Clerk
Pro Manager
Course Superintendent
Accountant
Get email alerts for Norwich
A daily email when new agendas and minutes are posted.