HARBOR MANAGEMENT COMMISSION MEETING
The Harbor Management Commission Meeting of October 28, 2008 was held in the City
Manager’s Office. Mr. Aliano called the meeting to order at 5:00 p.m. Attendance was as follows:
MEMBERS PRESENT
Ron Aliano, Chairman
Alderman Mark Bettencourt
Alderman Pete Desaulniers
Alan Bergren, City Manager
James Paulsen
Edward Seder
Richard Benoit
OTHERS PRESENT
Geoff Steadman, Harbor Management Consultant
Thomas Cummings, P.E., CLA Engineers, Inc.
PRA Development & Management Corp. Architects/Engineers
Resident - Mr. Seder’s Grandson
Claire Bessette, The Day
2. Determination of Quorum
It was determined a quorum was present.
3. Approval of Minutes
On a motion by Richard Benoit, seconded by Alderman Desaulniers, the minutes of the
Special Meeting held September 15, 2008 were unanimously approved.
Mr. Aliano requested the agenda be moved to address Item 8c. first so that the PRA
Development Corporation representatives could give their presentation of the proposed
Marina Hotel Hilton Project. All members agreed.
4. Citizen Comment
Mr. Seder introduced his grandson who came to observe the meeting.
5. Correspondence
a. Harbor Management Fund Report
b. RACE Invoice (addressed under New Business)
c. Mr. Aliano’s Letter to Commission on City Plan –Transportation Center
This letter was drafted with the assistance of Geoff Steadman, Harbor Management
Consultant, which included the Commission’s recommendations relative to the
Transportation Center Project.
d. Letter from DEP to City Planner –
Review and recommendations of NCDC’s application for Intermodal Transportation
Center.
Harbor Management Meeting
October 28, 2008
Page 2.
6. Harbor Master Report
Mr. Aliano reported that Mr. Harrison could not be in attendance at this meeting.
7. Old Business
a. Cadle Mill
City Manager Bergren stated that he was aware that the roof had been done but that
the project has considerably slowed down.
b. Community Boathouse/Boat Launch
This item addressed under New Business.
c. Harbor Management Plan Update – Mr. Steadman
Mr. Steadman reported that he has made significant progress with the mapping portion
of the plan. He was able to obtain aerial maps taken from 1990, which were helpful.
d. City Pier/City Dock/Seawall
Mr. Aliano reported that he approved the contractor’s request to remove F & G docks
during the construction phase of this project. The contractor assured him these docks
would be properly reinstalled when the work is completed.
Mr. Seder inquired as to how many coats of paint would be applied to the steel beams or
what means of protection is being taken as this was the main reason for deterioration in
the past. This information will be provided from the Public Works Department.
e. Harbor Condo Project Update
It appears that is project has gone bust.
f. Yantic River Dredging Update
Mr. Steadman reported that Roberge Associates has defined 6 locations where the testing
would be conducted from. The total length of the area is 3800 ft. in length, and the
testing would be done approximately every 600 feet with a cost of $14,000 for this
sampling and testing. Mr. Steadman will be preparing a letter of request to submit to the
DEP outlining the City’s intention to proceed with this testing.
g. Proposed Marinas/Boatyards along the Thames River Basin
This is on hold for the time being.
Harbor Management Meeting
October 28, 2008
Page 3.
8. New Business
a. 2009 Meeting Schedule
Meeting dates for 2009 were reviewed for the fourth Tuesday of each month. There
appeared to be no conflicts, therefore the Commission agreed on a new schedule. On a
motion by Richard Benoit, seconded by City Manager, Alan Bergren, the 2009 Meeting
Schedule was approved.
b. RACE Invoice – Discussion and Action
Mr. Aliano presented an invoice to the Commission from Roberge Associates Coastal
Engineers, LLC in the amount of $720. Mr. Steadman informed the members that this
invoice was for the preparation of revised drawings to display cross-sections of the
proposed dredging areas and for revised calculations in connection with this. On a
motion by Richard Benoit, seconded by Alderman Desaulniers the members unanimously
agreed to have this bill paid.
c. PRA Development/Marina Hotel Project
Mr. Aliano recused himself from the presentation as he is the owner of the Marina at
American Wharf and is involved in the hotel project. Vice Chairman, Richard Benoit
assumed his position for this portion of the meeting.
Tom Cummings, CLA Engineers, gave a brief overview of the proposed full-service
Hilton Hotel to be built on the City’s waterfront at the Marina at American Wharf site.
He introduced Leonard Ciccotello, Architect from PRA Development & Management
Corp., who presented colored drawings displaying the 20-story, 324-room hotel with an
attached parking garage to accommodate 417 cars. There will be 16,000 square feet of
banquet space above the parking garage which can be divided into three sections. An
arched bridge and pedestrian walkway will span across the Yantic River to the Main
Lobby Entrance to be located on the 3rd Floor. The ground floor will host a pool and
exercise room with a service area to the rear of the main building. The 20th Floor will
have 2-floor penthouse suites with sprawling views of the river. The main hotel entrance
will be the existing one coming in from West Main Street. An additional entrance/exit is
planned for the Chelsea Harbor Drive side. The building will have a red brick facade
with pre-cast limestone pillars and accents with a green metal roof. The design is being
developed so that it compliments existing Norwich architectural design. The exterior
facade is being designed such that there are horizontal and vertical separations and
various peaks and levels creating an overall appealing structure. Mr. Ciccotello pointed
out that the back half of the Marina as stands would not be touched.
Alderman Bettencourt voiced concerns whether public access and water dependent use
were taken into consideration as these requirements will be taken into consideration when
going through the DEP permitting process. This will be the same for the Transportation
Center he pointed out. Mr. Ciccotello stated that the hotel being situated on the
waterfront, in general, lends itself to the public and water access availability in addition
Harbor Management Meeting
October 28, 2008
Page 4.
to walking paths around the hotel and intended passage walkway to the Transportation
Center. Mr. Aliano reluctantly interjected that the water-dependent and public access
requirements were satisfied when the initial Marina was built in 1987. This aspect was
satisfied up front and should no longer be an issue on the waterfront. The hotel project
will only enhance existing access. All members expressed enthusiasm towards the
project. Final design plans and a traffic study are being worked on and formal plans
should be forthcoming to the Commission on the City Plan in about one month.
9. Other - FOI Meeting
Mr. Aliano reported that he was unable to make the FOI meeting. The City Manager
reported that he would be hosting another one in early December for those who were
unable to attend the last one.
Shipping Street
Brief discussion took place regarding the Norwich Bulletin’s article regarding Shipping
Street and the prior day’s meeting held by the Norwich Redevelopment Agency which
discussed ideas how this land between West Thames Street and the River could be
developed. It is primarily empty industrial buildings. The RDA is calling this the
Shipping Street Waterfront Redevelopment Study. This study will require extensive
review of zoning laws as some land is owned by the City and the remaining which is
privately owned could be purchased thru eminent domain.
Alderman Bettencourt stated that the Agency must come up with a plan and that
procurement of any property would be the decision of the City Council. City Manager
Bergren clarified that a plan must be assigned to the RDA for them to begin the process.
Mr. Seder suggested that the land be industrially developed in order to create jobs for
Norwich which are so desperately needed. The availability to the water and railroad
would be ideal for industrial development. Mr. Aliano stated that the DEP would be
looking to satisfy a water dependent use and public access requirement within the plan.
The trucking industry has captured the transportation market, and the DEP would not
want to see anymore pollution to the water or land stemming from an industrial
development.
DEP Permits
Mr. Steadman brought to the attention of the members that the DEP has changed their
permitting procedures so that the permits required by the Hilton and Transportation
Center projects will have to come through the review of the Harbor Management
Commission due to their being on the waterfront and for the review of stormwater
requirements. In addition, all project plans must be stamped with the approval from a
licensed engineer.
10. Adjournment
On a motion by Richard Benoit, seconded by Alderman Desaulniers, the Harbor
Management Commission Meeting of October 28, 2008 was adjourned at 6:40 p.m.