Inland Wetlands, Water Courses & Conservation Commission
Regular MeetingNorwich, CT · August 7, 2014
Minutes
August 7, 2014 Regular Meeting Minutes
CITY OF NORWICH
INLAND WETLANDS, WATERCOURSES AND CONSERVATION COMMISSION
Lower-level Conference Room, 23 Union Street, Norwich, Connecticut
Agenda Items A, B & C – Call To Order, Roll Call, Determination Of Quorum:
Chairman Raymond Baribeault called the meeting to order at 7:00 p.m.
Present: Raymond Baribeault, Chairman
Richard Morell, Vice-Chairman
Ralph Page
Douglas S. Lee
Barbara Rothstein
Robert McCoy, Alternate
Absent: Philip Kiley
Jeremiah Lowney
Brandon Hyde
Art Sharron, Alternate
Also Present: Linda Lee Smith, Recording Secretary
It was determined there was a quorum.
D. APPROVAL OF MEETING MINUTES:
Upon motion by Richard Morell and second by Robert McCoy the
Commission voted unanimously to APPROVE the minutes of the July 10,
2014 regular meeting.
E. COMMUNICATIONS: None
F. PUBLIC HEARINGS: None
G. OLD BUSINESS:
1. IWWCC #14-02 – Connecticut Avenue and adjacent storm water
easement areas – Application from DPW to stabilize existing storm
drain outlets.
Raymond Baribeault stated the Commission had received a written report
from Peter Davis because he couldn’t be in attendance.
Pat McLaughlin, City Engineer presented. Mr. McLaughlin stated they would
be reconstruction/repaving about 3,000 ft from the beginning of Connecticut
Ave. to Wisconsin Ave. with 4 locations of existing storm drain outlets to be
repaired. The project would include the removal of pavement and adding 6"
of new asphalt. Mr. McLaughlin stated the drainage outlets were in pretty bad
condition with the erosion and a lot of scour at the drainage outlets. There
are (2) 24' and (1) 48' outlet on one side and another area of scour with
another 48' pipe. Mr. McLaughlin stated the water has washed out everything
away from the outlets and they would install up to 30" large riprap with 75% of
it would be more than 15", and it would be grouted in place. Mr. McLaughlin
stated between the four different areas there is about 1,000 sq. ft. of
disturbance, and it’s all to fill in the scour holes and no additional roadways
would be installed. It’s more of a maintenance measure.
Ralph Page asked if the work was going from Connecticut Ave. up to the
intersection. Pat McLaughlin stated yes beginning at Connecticut Ave to the
intersection of Wisconsin Ave.
Pat McLaughlin stated he will be receiving $685,000 through a new grant
program from DOT federal highway funding which represents 100% of the
cost of construction.
Ralph Page asked who would do the inspections on the project. Pat
McLaughlin stated the City does its own inspections.
Doug Lee asked if he had drawings showing examples of how they plan on
rebuilding the scour holes. Pat McLaughlin stated yes the plan showed the
30” bed of standard riprap.
Ralph Page asked if it was going to be mortared. Pat McLaughlin stated yes
they will grout it in place with rapid set mortar.
Doug Lee wanted to make sure there was enough engineering work done to
the riprap that Mr. McLaughlin felt confident there would be enough
percolation and flowing with a 100 year storm and it simply would go over the
top of it. Mr. Lee was concerned there would be a large volume of water
coming in and would end up with sheet flow because it couldn't run down fast
enough. Pat McLaughlin stated it all flows over the top of it. The purpose of
the riprap is to slow the velocity by the roughness of it. Pat McLaughlin
explained with the 100 year storm the water probably wouldn't make it into the
pipe because the pipe would only accommodate up to a 10 year storm. Mr.
McLaughlin stated it’s the largest riprap they make and he was confident it
would do the job.
Ray Baribeault asked when project would be started. Mr. McLaughlin stated
he’d like to get it done this construction season but may not be done until next
spring. The project would need to be out to bid for three weeks. Mr.
McLaughlin didn’t want to start the project late this construction season and
not be able to finish the project until next spring.
The Commission members after reading Peter Davis’s report thought there
was urgency to getting the project done.
Upon motion by Ralph Page and second by Douglas Lee it was determined
there was not a significant activity for IWWCC #14-02. The Commission
voted unanimously.
2
Upon motion by Richard Morell and seconded by Ralph Page the
Commission voted unanimously to APPROVE application IWWCC #14-02
with the condition that the work be done during a period of low flow.
H. NEW BUSINESS: None
I. New Business items submitted after agenda preparation and prior to
the submission deadline: None
J. Other Business: None
K. Violations: None
L. Adjournment
Motion was made by Douglas Lee and seconded by Ralph Page to adjourn
the meeting at 7:21 p.m.
Respectfully submitted,
Linda Lee Smith
Recording Secretary
3
Agenda
City of Norwich
Inland Wetlands, Watercourses & Conservation Commission
Regular Meeting
Lower Level Conference Room
23 Union Street, Norwich, CT
August 7, 2014 – 7:00 pm
Agenda
A. Call to Order
B. Roll Call
C. Determination of Quorum
D. Approval of July 10, 2014 regular meeting minutes
E. Communications:
F. Public Hearings: None
G. Old Business:
1. IWWCC #14-02 – Connecticut Avenue and adjacent storm water
easement areas – Application from DPW to stabilize existing storm
drain outlets.
H. New Business:
I. New Business items submitted after agenda preparation and prior to
the submission deadline:
J. Other Business:
K. Violations: None
L. Adjournment
Get email alerts for Norwich
A daily email when new agendas and minutes are posted.