Inland Wetlands, Water Courses & Conservation Commission
Regular MeetingNorwich, CT · July 5, 2018
Minutes
Regular Meeting Minutes
July 5, 2018
CITY OF NORWICH
INLAND WETLANDS, WATERCOURSES AND CONSERVATION COMMISSION
Lower-level Conference Room
23 Union Street, Norwich, Connecticut
A. CALL TO ORDER: Chairman Richard Morell called the meeting to order at 7:00 p.m.
B. ROLL CALL and SEATING of ALTERNATES:
Present: Richard Morell, Chairman
Douglas Lee, Vice Chairman
Peter Chalecki
Art Sharron
Brandon Hyde
Absent: David Poore
Michael Lahan, Alternate
Also Present: Linda Lee Smith, Recording Secretary
Richard Morell stated that all members in attendance were to be seated.
C. APPROVAL OF MEETING MINUTES:
A motion was made by Douglas Lee to APPROVE the minutes of the June 7, 2018 regular
meeting. Peter Chalecki second. The motion passed unanimously.
D. COMMUNICATIONS:
1. PGP Notification, 289 New London Turnpike
Richard Morell said the permit would allow them to treat the pond and start around
6/22/18.
2. US Army Corp of Engineers, 445 New London Tpke.
Richard Morell stated it’s quite an extensive report on what the owners need to do to
bring the wetlands back to its original state. He also stated the Army Corp made an offer
and are waiting to hear back from the property owner.
3. Email from Mark Trembley status on timber harvest, 300 Canterbury Tpke.
Richard Morell said that the email from Deanna Rhodes noted that the harvester is using
corduroy and that it looked good in the field. They will be establishing a second crossing
this weekend and she will be checking in with the forester.
E. PUBLIC HEARINGS: None
E. OLD BUSINESS:
1. IWWCC18-05: Sunnyside Street/Yantic Road. Proposed temporary and permanent
land disturbance activities within the wetlands, watercourse, and the 100 foot
wetlands regulated area for repair of the Sunnyside Bridge (#04746) located on
Sunnyside Street crossing the Yantic River. Application of City of Norwich.
Pat McLaughlin, City Engineer stated that he’s been working with Rick Mears of Benesch,
90 National Drive, Glastonbury, CT which is the design firm for the bridge. Pat explained
the proposal as a preservation project for the Sunnyside Bridge which his being funded
through one of the local bridge programs. He stated that they are rebuilding the bridge
exactly like it is today. He further described the project stating that the only wetland
disturbances are the 2 channels to the bridge, the main channel and the overflow channel.
Mr. McLaughlin said there was riprap placed there originally, but it had been disturbed
through flooding events. It will be corrected and is what the actual wetland disturbance
involves.
Rick Mears then gave a brief presentation about the structural bridge and roadway repairs.
He stated they would be tearing up the bridge overlay by putting in new concrete and a
water membrane, repointing masonry, replacing the existing roof and replacing with slate.
The sidewalk will be replaced with stamped concrete. Rick stated the bridge serves as
main access for the residents who are working, and therefore, the contractor would only be
able to close the bridge only from 9 am - 3pm and be open again during lunch time.
Mr. Mears said there are two channels, the main channel and overflow channel. He stated
the riprap that is to be installed has been dislodged and any disturbance being done in the
wetlands would be excavated and that everywhere else would be only a temporary impact.
Rick said there are proposed erosion and sediment controls on both sides of the bridge.
Gravel would be put down and as you approach the wetlands timber mats would be
installed to allow them to remove the retaining wall on either side to access the riprap. The
only permanent impact within the regulated area is in that span.
Brandon Hyde asked if there were any cautions in case of rain events. Rick Mears said the
contractor will monitor 2 weeks out. He added that when they remove the retaining wall is
when it’s most susceptible and that installing planking and a temporary system would retain
the fill. Brandon asked if there would be a temporary bulkhead. Mr. Mears responded no
unless there is a major rain event and that work would probably not start in April.
Art Sharron asked when they would begin and how long it would take to complete the
project. Rick Mears said the project would start by April 2019 and go through November,
but the actual work wouldn't start until June 2019.
Richard Morell asked if he had submitted a total disturbance. Rick Mears said the
permanent impact is 735 sq. ft.; and the temporary impacts estimate to the wetlands is
2800 sq. ft. and the watercourse has been broken out. Richard Morell asked if most of the
project was resetting the granite. Rick Mears said yes and that all the permanent impact is
resetting the granite from the original bridge. Richard Morell asked where it would be
stored. Rich Mears said the contractor will have it stored offsite.
Motion was made by Brandon Hyde to Approve IWWCC18-05. It was determined the first
questions that had to be addressed was if it was a significant impact. Brandon Hyde
withdrew his motion.
Motion was made by Douglas Lee that IWWCC18-05 does not constitute a significant
impact and doesn't require a public hearing. Art Sharron second. Motion carried
unanimously.
2
Brandon Hyde then made a motion to Approve IWWCC18-05 with the following conditions
from the Planner’s memo dated 06/28/18:
• That the approval is valid for FIVE YEARS and will expire on 07/05/2023.
• That a bond, in an amount to be determined by the City Engineer, be submitted for
Erosion and Sediment Control and Site Restoration.
• That all site activities shall be conducted in accordance with the plans, specifications
and documents of record. Any deviation from the approved plans or construction
sequence shall be cause for enforcement action by the Inland Wetlands, Watercourses
and Conservation Commission.
• That the permittee shall notify the Inland Wetlands Agent prior to the commencement of
work and upon its completion.
• That all work and all regulated activities conducted pursuant to this authorization shall
be consistent with the terms and conditions of this approval. Any structures,
excavation, fill, obstructions, encroachments or regulated activities not specifically
identified and authorized herein shall constitute a violation of this approval and may
result in its modification, suspension, or revocation. Upon initiation of the activities
authorized herein, the permittee thereby accepts and agrees to comply with the terms
and conditions of this approval.
• That no equipment or materials including without limitation fill, construction materials, or
debris, shall be deposited, placed, or stored in any wetland or watercourse on or off site
unless specifically authorized by this approval.
• That the General Provisions stated in Section 11.9 of the Inland Wetlands and
Watercourse Regulations are applicable to this permit.
• That the permit shall not be assigned or transferred to another entity without the written
permission of the Commission.
• That all erosion and sediment control measures shall be in accordance with the
Connecticut Guidelines for Erosion and Sediment Control. Erosion and sediment
control measures shall be installed and inspected prior to site disturbance. It is the
permittee's responsibility to schedule the inspection with the Norwich Planning
Department. Additional erosion and sediment control measures shall be installed if
determined to be necessary by the Designated Agent. The permittee shall take such
necessary steps consistent with the terms and conditions of the approval, to control
stormwater discharges and to prevent erosion and sedimentation and to otherwise
prevent pollution of wetlands and watercourses.
• That this permit will be strictly enforced. The Commission may suspend or revoke this
permit, may direct the Commission's Agent to issue a cease and desist order or may
require the applicant to modify, extend, or revise the site work or restore the area to its
original condition if it finds that the applicant has not complied with the conditions set
3
forth in this approval or if the applicant exceeds the scope of this approval as set forth
herein or if the intended use or actual use of the general site is not as represented by
the application or the or the plan of record.
Peter Chalecki second. Motion carried unanimously.
2. IWWCC18-06: 97 Weber Farm Road (aka Chasey Lane). Proposed land disturbance
activities associated with grading, installation of underground electrical and telecom utilities,
drainage system, public water, footing drains, septic systems, guardrail, relocated fire
hydrant, and construction of a portion of a private access road for 6 proposed dwellings to
be located within a conservation residential development. Application of William
Lampe/Chasey Lane LLC. Property of Stony Woods at Weber Farm. Assessor’s Map 99,
Block 2, Lot 2
Pete Parent, CME Associates, 33 Wilbur Cross Way, Mansfield, CT 06268 represented the
applicant.
Richard Morell stated there was a letter from Uncas Health District (UHD) who reviewed the
plans and is requiring additional perk test holes. Douglas Lee asked if the City had received
comments from the City Engineer. Pete Parent responded that there were a couple
comments including the drainage pipe.
Peter Parent gave a brief history of the project and stated that about 12 years ago the
developer came in for an approval of the wetlands plan, then he constructed 3 of the 9
buildings and when the market went south, he went bankrupt. Mr. Lampe purchased the
incomplete development and is the new applicant. Mr. Parent said the proposal is a similar
layout to what was previously approved, but that the loop road had more disturbance than
the new cul-de-sac design with houses closer together which lessens the amount of
disturbance. He stated that they will be dedicating a large area to open space and based on
the Planner’s comments, it should remain with the homeowners association. He stated they
would be extending the underground utilities, adding underground detention chambers and
water quality treatment units to collect pavement and roof runoff while protecting the
wetlands.
Richard Morell asked how far it was from the wetlands to the edge of the pavement. Mr.
Parent responded 65 feet. Pete Parent said he’d answer Pat McLaughlin’s issue with the
discharge being right up to the edge of wetlands and can definitely pull it back.
Pete Parent stated the design includes onsite septic. Douglas Lee responded that there has
been correspondence from the UHD stating there’s insufficient data collected on those
locations. Mr. Lee then inquired whether this was still the case. Mr. Parent stated yes and
that the additional test pits are required to verify the soils.
Mr. Parent stated that there are some steep slopes to deal with from an E&S standpoint, so
there are multiple layers of proposed silt fence, a construction entrance off the edge of
existing pavements and that all new catch basins will have inserts to protect construction
sediment. He doesn't anticipate much stock piling, but there is an opportunity to have a
stock pile on site.
4
Richard Morell asked if the City had received comments from the Fire Marshal's office. Pete
Parent stated no. Mr. Morell stated there are several stockpiles of garbage and debris on
this site. He asked if Deanna Rhodes had spoken to him about cleaning it up. Mr. Parent
said they would be developing the entire hill and would be cleaning it up.
Richard Morell said Deanna’s notes stated there were large outcrops of ledge not identified
on their site plan. She would like it shown and they should remain and be incorporated into
their design, if possible to be left in place.
Richard Morell asked if there was dust control mitigation in place. Pete Parent stated given
the close proximity to the wetlands it would be part of their water application.
Richard Morell asked if the project will go forward in phases. Pete Parent stated yes. They
want to construct the roadway, underground utilities, and rough grade the site and, as the
market allows, construct individual units. Richard Morell stated the City Planner is
recommending a detailed phasing plan. Mr. Parent stated they intend to build one or two of
the houses right away. He clarified that Phase 1 would be the road, utilities, and 2 of the 7
houses. Richard Morell stated that Ms. Rhodes would like this detailed on the plan.
Richard Morell said they need a cost estimate for the erosion and sediment controls so the
City Engineer can determine the amount of the required bond. Pete Parent said that he will
forward his estimate to Ms. Rhodes. He handed out copies to the board showing an erosion
and sediment control bond estimate as $20,570 (tracking pad $1,500, silt fencing $15,200,
inlet protection $2,000).
Douglas Lee stated that because the board hasn't received all comments from all pertinent
departments, he felt that the board is not in a position to render a decision. Douglas Lee
then moved to postpone decision until all permanent information is received from the City
departments.
Brandon Hyde inquired whether the road was a private road. Pete Parent stated that it is
and that the homeowners association that owns the road. Brandon asked if it would meet all
the City's specifications. Mr. Parent stated that it would be built to City specs, but privately
maintained.
Richard Morell asked where they’re collecting rainwater runoff. Pete Parent explained the
drainage, treatment of the water and discharge to the underground detention system which
runs parallel with the road. Brandon Hyde asked if it’s designed for the 100 year storm. Mr.
Parent confirmed that it was.
Richard Morell asked if there was a maintenance schedule for cleaning out the basins. Pete
Parent said the plan was attached. He stated that sometime it’s recorded in the City's Land
Records and other times kept with the homeowners association. Mr. Parent stated that the
catch basins are supposed to be inspected twice a year and maintained once a year if not
more. The board members had concerns about catch basins remaining unchecked for many
years.
Brandon Hyde asked for clarification whether all the proposed disturbance is in the Upland
Review Area and not within the wetlands. Mr. Parent said yes. Brandon Hyde asked what
item was the closest to the wetlands. Mr. Parent stated there is one pipe that comes in feet
5
from the wetlands, otherwise about 45 ft. Brandon asked about silt fencing for protection and
would he foresee wattles once the seeding is actually done and stabilized. Pete said in Plan
A there will be multiple layers of protection on the slope until it is stabilized. Douglas Lee
state concerns relative to the pipe going down a steep slope in a straight line. Mr. Parent
said there will be checks across that slope, but they will include more.
Motion was made by Brandon Hyde that IWWCC18-06 is not a significant activity requiring a
Public Hearing. Art Sharron second. Motion carried unanimously.
Douglas Lee made a motion to restate his motion to Table IWWCC18-06 for any further
decision until comments come back from all the City departments. Art Sharron second.
Motion carried unanimously. Richard Morell stated it will be tabled until next month August
2, 2018 meeting. There will not be a public hearing.
Brandon Hyde stated for the record that the board would be looking for the following items to
be addressed for the next meeting: Pat McLaughlin's comments to be implemented;
approval from Uncas Health District on the new test pits; Deanna's comments from her
memo, verbiage for an important maintenance schedule for filing in the City's Land Records;
the proposal for open space dedication and preservation.
G. NEW BUSINESS:
1. Receipt of New Applications
• IWWCC18-07: Norwich Public Utilities. Installation of waterline on Route 97 with 2 wetland
crossings.
Motion was made by Douglas Lee to TABLE IWWCC18-07 until the next meeting
scheduled for August 2, 2018. Motion was seconded by Brandon Hyde. The motion
passed unanimously.
H. OTHER BUSINESS:
1. Staff Report: None
2. Reminder – POCD PIC Meeting on July 11, 2018
Richard Morell reminded the board of the POCD meeting July 11, 2018.
3. Violations: None
J. ADJOURNMENT:
A motion was made by Art Sharron to adjourn the meeting at 7:42 p.m. Seconded by Peter
Chalecki. Motion carried unanimously.
Respectfully submitted,
Linda Lee-Smith
Recording Secretary
6
Agenda
REGULAR MEETING
INLAND WETLANDS, WATERCOURSES & CONSERVATION COMMISSION
THURSDAY, JULY 5, 2018 - 7:00 P.M.
23 UNION STREET NORWICH CONNECTICUT
LOWER LEVEL CONFERENCE ROOM
AGENDA
A. CALL TO ORDER
B. ROLL CALL and SEATING of ALTERNATES
C. APPROVAL OF MINUTES: June 7, 2018
D. COMMUNICATIONS:
1. PGP Notification, 289 New London Turnpike
2. US Army Corp of Engineers, 445 New London Tpke.
3. Email from Mark Trembley status on timber harvest, 300 Canterbury Tpke.
E. PUBLIC HEARING(S): None
F. OLD BUSINESS:
1. IWWCC18-05: Sunnyside Street/Yantic Road. Proposed temporary and permanent land
disturbance activities within the wetlands, watercourse, and the 100 foot wetlands regulated
area for repair of the Sunnyside Bridge (#04746) located on Sunnyside Street crossing the
Yantic River. Application of City of Norwich.
2. IWWCC18-06: 97 Weber Farm Road (aka Chasey Lane). Proposed land disturbance activities
associated with grading, installation of underground electrical and telecom utilities, drainage
system, public water, footing drains, septic systems, guardrail, relocated fire hydrant, and
construction of a portion of a private access road for 6 proposed dwellings to be located within
a conservation residential development. Application of William Lampe/Chasey Lane LLC.
Property of Stony Woods at Weber Farm. Assessor’s Map 99, Block 2, Lot 2
G. NEW BUSINESS:
1. Receipt of Any New Applications:
.
H. OTHER BUSINESS:
1. Staff Report: None
2. Reminder - POCD PIC Meeting on July 11, 2018
3. Violation: None
J. ADJOURNMENT