Inland Wetlands, Water Courses & Conservation Commission
Regular MeetingNorwich, CT · December 5, 2019
Minutes
Regular Meeting Minutes December 5, 2019
CITY OF NORWICH INLAND WETLANDS, WATERCOURSES AND
CONSERVATION COMMISSION
Lower-level Conference Room 23 Union Street, Norwich, Connecticut
A. CALL TO ORDER: Chairman Richard Morell called the meeting to order at 7:00 p.m.
B. ROLL CALL and SEATING of ALTERNATES:
Present: Richard Morell, Chairman
Douglas Lee, Vice Chairman
Peter Chalecki
David Poore
Brandon Hyde
Robert McCoy
Absent: Swarnjit Singh Bhatia
Also Present: Dan Daniska, Assistant City Planner and Katherine Rose, Recording Secretary
C. APPROVAL OF MEETING MINUTES:
Douglas Lee put forth a motion to APPROVE the November 7, 2019 minutes with the
amendment that David Poore was not present. David Poore seconded. The motion passed
unanimously.
Douglas Lee put forth a motion to APPROVE the November 23, 2019 special meeting minutes
with the revision of ‘comments and comments’ to ‘comments and questions’ in the third
paragraph of Section C. Peter Chalecki seconded. The motion passed unanimously.
D. COMMUNICATIONS: None.
E. PUBLIC HEARINGS: None.
F. OLD BUSINESS:
1. IWWCC #19-17: 33 Wisconsin Avenue. Application for land disturbance activities within a
regulated wetland and associated upland review area for preparation of a development pad
for future construction of business/professional offices. Application and property of Prime
Enterprises LLC. Assessor’s Map 334, Block 1, Lot 4. Zone – BP
Frank Blanchard, property owner of 33 Wisconsin Avenue, and engineer David McKay of
Boundaries LLC introduced themselves. Mr. McKay reported the proposed project is the
development of a building pad for future offices. Mr. McKay stated between the gravel parking
area and the office building, located on a higher elevation on the property; exists an isolated
wetland area that drains out through a 24-inch culvert under the property driveway. Mr. McKay
stated to create a usable developable area they are proposing to fill 4,840 square feet of the
wetland area to create a gravel building pad that will extend from the existing gravel parking
lot. Mr. McKay stated the development will result in a filling in of a section of the wetlands
which their soil scientist reported only functions to serve for ground water recharge. Mr. McKay
reported their plan is to recreate that function of the wetland using their storm water quality
basin that will wrap around the proposed gravel building pad so that everything from the pad
will drain back into the water quality basin.
Douglas Lee questioned if the soil scientist had noted or looked for evidence of standing water
in the spring as the portion of the site to be filled does not have the look of a normal vernal
pool. Mr. McKay responded he had not been there in the spring but in the wetlands report it
was noted there are several large cobbles and rocks that make up the ground cover and likely
prevented any standing water from rapid infiltration. Richard Morrell asked in total how much
fill would be used to which Mr. McKay responded they intend to use what they excavate from
the slope to create the building pad which will be composed of gravel top dressing. Discussion
ensued on the function of the water quality basin and how water flows through the area. At the
request of David Poore, Mr. McKay further explained the storm water controls within the basin
which contains two parts, one being a small shallow concrete structure with a low flow control
orifice (6”), located 1.75 feet above the bottom, where the basin would fill to in storm events
and then release the water through the 6” hole. Mr. McKay stated during extreme storm events
the basin will continue to fill up until it gets to the rip rap spillway which will have a concrete
curb set across to control the flow thru the spillway and prevent erosion. Mr. McKay stated
from the spill way the water discharges to the outlet control structure directly into the cobbled
wetland area.
David Poore asked if there was any consideration to the volume of the swale in order to
replicate the piece of wetlands that would be filled in. Mr. McKay responded the storage area is
set based on the water recharge volume and water quality volume set by DEEP. Douglas Lee
questioned the reasoning as to why the erosion control calls for seeding with a grass mixture
opposed to something more natural or reflective to an upland review area. Mr. McKay stated
the seeding selected is low maintenance and requires no mowing so it would expand and fill in
the slope once stabilized. David Poore asked in the event of a huge rain would the wetlands
area to the south flood out as the plan proposes a diversion swale discharging into the southern
part of the wetlands which would add a significant amount of water to the area. Mr. McKay
responded that the detention provided by the basin would slow the flow and the diversion
swale would gather water from offsite before getting to the detention basin. Mr. Poore asked
about the 24” RCP’s ability to handle a 100-year flood. Mr. McKay responded that calculations
have shown that it will be able to handle an event with excess capacity. Mr. Poore asked if the
plans received earlier in the day had addressed the comments of the City Engineer, to which
Mr. McKay replied that they had.
Brandon Hyde made a motion that IWWCC #19-17 is not a significant activity and does not
require a public hearing. Douglas Lee seconded. The motion passed unanimously.
Brandon Hyde made a motion TO APPROVE IWWCC #19-17 with comments and notes from the
City Engineer’s and Assistant City Planner’s memos be addressed, along with the following
conditions:
That the approval is valid for FIVE YEARS and will expire on 12/05/2024.
That a bond, in an amount satisfactory to the City Engineer, be submitted for Erosion and
Sediment Control and Site Restoration.
That the Review Comments from the City Engineer and Zoning Enforcement Officer in
emails dated 12/02/2019 be addressed before the final revised plans be submitted and
reviewed by City Staff.
That all site activities shall be conducted in accordance with the plans, specifications and
documents of record. Any deviation from the approved plans or construction sequence shall
be cause for enforcement action by the Inland Wetlands, Watercourses and Conservation
Commission.
That the permittee shall notify the Inland Wetlands Agent prior to the commencement of
work and upon its completion.
That all work and all regulated activities conducted pursuant to this authorization shall be
consistent with the terms and conditions of this approval. Any structures, excavation, fill,
obstructions, encroachments or regulated activities not specifically identified and authorized
herein shall constitute a violation of this approval and may result in its modification,
suspension, or revocation. Upon initiation of the activities authorized herein, the permittee
thereby accepts and agrees to comply with the terms and conditions of this approval.
That no equipment or materials including without limitation fill, construction materials, or
debris, shall be deposited, placed, or stored in any wetland or watercourse on or off site
unless specifically authorized by this approval.
That the General Provisions stated in Section 11.9 of the Inland Wetlands and Watercourse
Regulations are applicable to this permit.
That the permit shall not be assigned or transferred to another entity without the written
permission of the Commission.
That all erosion and sediment control measures shall be in accordance with the Connecticut
Guidelines for Erosion and Sediment Control. Erosion and sediment control measures shall be
installed and inspected prior to site disturbance. It is the permittee's responsibility to
schedule the inspection with the Norwich Planning Department. Additional erosion and
sediment control measures shall be installed if determined to be necessary by the Designated
Agent. The permittee shall take such necessary steps consistent with the terms and
conditions of the approval, to control stormwater discharges and to prevent erosion and
sedimentation and to otherwise prevent pollution of wetlands and watercourses.
That this permit will be strictly enforced. The Commission may suspend or revoke this
permit, may direct the Commission's Agent to issue a cease and desist order or may require
the applicant to modify, extend, or revise the site work or restore the area to its original
condition if it finds that the applicant has not complied with the conditions set forth in this
approval or if the applicant exceeds the scope of this approval as set forth herein or if the
intended use or actual use of the general site is not as represented by the application or the
plan of record.
Dave Poore raised a question as to if the applicant would have to reappear before the
Commission when the second phase of the development was going to take place. Richard
Morell replied that this approval is only for the first phase, and the applicant would have to
come back when the buildings are developed.
Douglas Lee seconded. The motion passed unanimously.
G. NEW BUSINESS:
1. IWWCC #19-18(JR): Baltic Road Rear aka Lot 46R Atlantic Avenue. Request for a two (2)
lot subdivision on a 2.71 acre parcel. Jurisdictional Ruling required by IWWCC. Property
of Kevin Mellor, Application of Hatch Construction, LLC. Assessor’s Map 6, Block 1, Lot
46B. Zone R-40
Douglas Lee made a motion IWWCC does not have jurisdiction on Application IWWCC
#19-18(JR): Baltic Road Rear AKA Lot 46B Atlantic Ave due to the fact that no activity is
proposed within the 100 ft. Upland Review Area of any surrounding wetlands. Brandon
Hyde seconded. The motion passed unanimously.
2. IWWCC #19-19: 177 Otrobando Avenue. Request for a building addition and parking
area within an Upland Review Area.
Peter Chalecki made a motion to table Application IWWCC #19-19 until the next regular
meeting. Brandon Hyde seconded. The motion passed unanimously.
H. OTHER BUSINESS:
1. Staff Report: Dan Daniska reported there was one agent issued permit for Disturbance
within the Upland Review Area in regards to a backup generator for Chelsea Groton
Bank; IWWCC#19-16A: 444 West Main Street.
I. VIOLATIONS: None.
J. ADJOURNMENT: Robert McCoy made a motion to adjourn the meeting at 7:23PM. Peter
Chalecki seconded. The motion carried unanimously.
Respectfully submitted, Katherine
Rose, Recording Secretary
Agenda
INLAND WETLANDS, WATERCOURSES & CONSERVATION COMMISSION
THURSDAY, December 5, 2019 - 7:00 P.M.
23 UNION STREET NORWICH CONNECTICUT
LOWER LEVEL CONFERENCE ROOM
AGENDA
A. CALL TO ORDER
B. ROLL CALL and SEATING of ALTERNATES
C. APPROVAL OF MINUTES: November 7, 2019 Regular Meeting; November 23, 2019 Special
Meeting
D. COMMUNICATIONS:
E. PUBLIC HEARING(S): None
F. OLD BUSINESS:
1. IWWCC #19-17: 33 Wisconsin Avenue Application for land disturbance activities within
a regulated wetland and associated upland review area for preparation of a
development pad for future construction of business/professional offices. Application
and property of Prime Enterprises LLC. Assessor’s Map 334, Block 1, Lot 4. Zone - BP
G. NEW BUSINESS:
1. IWWCC #19-18(JR): Baltic Road Rear aka Lot 46R Atlantic Avenue Request for a two (2)
lot subdivision on a 2.71 acre parcel. Jurisdictional Ruling required by IWWCC. Property
of Kevin Mellor, Application of Hatch Construction, LLC. Assessor’s Map 6, Block 1, Lot
46B. Zone R-40.
H. OTHER BUSINESS:
Staff Report – IWWCC Permit Issued by Agent for Disturbance within the Upland Review
Area: IWWCC #19-16A – 444 West Main Street (Back-up Generator)
I. VIOLATIONS
J. ADJOURNMENT
Copy: City Clerk, Bulletin Board, File
Get email alerts for Norwich
A daily email when new agendas and minutes are posted.