Inland Wetlands, Water Courses & Conservation Commission
Regular MeetingNorwich, CT · June 6, 2024
Minutes
Regular Meeting Minutes
June 6, 2024
CITY OF NORWICH INLAND WETLANDS, WATERCOURSES
AND CONSERVATION COMMISSION ZOOM MEETING
A. CALL TO ORDER: Chairman Richard Morell called the meeting to order at 7:00 PM.
B. ROLL CALL and SEATING of ALTERNATES: Chairman Richard Morell stated that all members
present would be seated and voting during the meeting.
Present: Chairman Richard Morell, Douglas Lee (ZOOM), Chris Seery, Peter Chalecki (ZOOM),
Brandon Hyde and Nicholas Fortson.
Absent: None.
Also Present: Walter Schaller; Mike Faenza, CSG; Meghan Fogarty (ZOOM); David Dickson
(ZOOM); James Barrett (ZOOM), Matt Sanford (ZOOM) and Greg Smolley (ZOOM), DRA;
Katherine Rose, Recording Secretary; Deanna Rhodes, Director of Planning and Neighborhood
Development, and Dan Daniska, City Planner/Wetland Agent
C. APPROVAL OF MEETING MINUTES: Douglas Lee put forth a motion to APPROVE the May 2,
2024 regular meeting minutes. Chris Seery seconded. Chairman Richard Morell, Douglas Lee,
Chris Seery, Peter Chalecki and Nicholas Fortson. Brandon Hyde abstained. The motion
passed.
D. COMMUNICATIONS: Dan Daniska reported that Algonquin Gas was putting robotic equipment
in their regional pipeline to inspect it, which would go in and out of the 100 foot upland
review area in the area of the Yantic River. Dan Daniska stated that nothing was being
disturbed but they provided a notification as a courtesy. Dan Daniska stated that the pond at
289 New London Turnpike was treated on or about June 3, 2024. Dan Daniska reported there
was an informational meeting for the Long Island Sound Watershed Outreach Project in
person at Fort Trumbull June 5, 2024 from 2PM to 4PM and virtually on June 18, 2024. Dan
Daniska stated the RSVP was required the next day and he would send the information to
members that night.
E. OLD BUSINESS:
1. SHOW CAUSE HEARING: Unauthorized Land Disturbance 520 Asylum Street Ext. Norwich, CT
Dan Daniska reported that his city office received a call regarding land clearing and filling on
the property at 520 Asylum Street, which he shared with the commission at last month’s
meeting. Richard Morrell stated the photographs provided clearly showed disturbance in the
wetland area that needed to be addressed and redressed. Richard Morrell asked if a wetland
scientist had delineated where the wetlands were located on site. Walter Schaller, property
owner, responded one had not but the entire neighborhood had dumped organic debris in the
area previously before he lived there, and that any heavy equipment was only in place
temporarily. Walter Schaller stated he did remove vegetation such as two dead ash trees, a lot
of bittersweet, grapevine, autumn olive and other invasive species. Walter Schaller stated he
did selectively cut some swamp maples from the area, but he did not clear cut and did leave
stumps. Walter Schaller continued that he added meadow to a quarter of the property that
had been previously mowed.
Andrew Burnett, who keeps bees in the area, stated that aside from the neighbors he had
witnessed City of Norwich vehicles dumping organic debris in the area.
Walter Schaller stated that no more dumping would occur and that he spoke to the neighbors
to make them aware of the cease and desist. Dan Daniska noted that the GIS showed a huge
swathe of wetlands on the property. Douglas Lee stated that the pictures provided showed a
lot of fill and questioned the origin of that fill, as it looked more like there was a gravel pad
which was laid over the wetlands. Walter Schaller responded that the gray spot in the photos
was washout from the road. Richard Morrell asked the property owner if he added any sand
or fill to extend the road, as shown in the pictures. Walter Schaller stated he had not and what
was shown was compacted wood chips, leaves and other materials dumped by neighbors that
had compacted over time. Walter Schaller stated at one point a neighbor had dumped
masonry waste in the area that he had them remove, as he did not feel as though it should be
dumped in that space. Dan Daniska discussed the options listed within the cease and desist
order. Douglas Lee stated he felt the best option was to have a soil scientist map the wetlands
and affected areas, as well as for the homeowner to submit a wetlands application and pay
any associated fees. Douglas Lee stated there clearly had been a disturbance to the wetlands,
and although the history of which was in question, it did not change that the disturbance had
taken place and therefore an application needed to be filled out. Brandon Hyde stated he did
not feel comfortable making a vote without seeing an application put forward, which was a
minimal fee, and without additional history, GIS Mapping and pictures from the previous years
to assist in telling the story of the property. Richard Morrell asked how long the existing
property was owned by the existing owner, to which Walter Schaller responded since 2016.
Richard Morrell agreed that the best course of action would be for the property owner to
submit an application so that the commission can develop a remedial solution by working with
GIS maps and to determine what could be done to remove all dumping from the wetlands
without the use of heavy equipment. Dan Daniska brought up aerial shots of the property
from 2012, 2016 and 2019 on screen for all to view. Discussion ensued. Douglas Lee asked
what the time limitations were for planning a site walk. Dan Daniska suggested members visit
the site individually so a special meeting would not be required, and a vote could be tabled
until the following month.
Brandon Hyde made a motion to table the hearing until an application had been submitted.
Chris Seery seconded. Chairman Richard Morell, Douglas Lee, Chris Seery, Peter Chalecki,
Brandon Hyde and Nicholas Fortson voted in favor. The motion passed unanimously.
2. IWWCC #24-06: 164+165 Golden Street; Boswell Avenue Application for construction of a
new elementary school building and associated development at the site of a former school.
Proposed land disturbance activities within a regulated wetland and associated upland review
area. Application and Property of City of Norwich. Assessor’s Map 86, Block 3, Lot 13, 14. Map
94, Block 1, Lot 23. Zone MF.
Greg Smolley, project manager from DRA, stated that the City of Norwich undertook the
development of a city-wide master plan for the school district a few years prior and
determined that consolidation of the elementary schools was needed to provide a better
learning environment, as well as lessen operational costs. Greg Smolley continued that one of
the sites identified for development was the former Greeneville Elementary School. Greg
Smolley showed a site plan on screen for all to view. Greg Smolley explained that the new
school would be a three story building, minimizing the overall footprint and containing the
storm water flow as much as possible, which would be directed to the southwest corner of
the site.
David Dickson, senior project manager and registered landscape architect for SLR, reported
that the Greeneville site was in a multifamily zone surrounded by residents on all sides. David
Dickson stated that proposed improvements for the site were composed mostly of the
building, parking, circulation, roads and playground areas. David Dickson stated that all of
those improvements were carefully laid out, as the landform was quite challenging with
exposed ledge in several areas. David Dickson stated the wetland area was at a low point of
the site and contained approximately .66 acres of wooded wetlands. David Dickson noted that
the wetland delineation and impact assessment report for the site were submitted within the
application. David Dickson noted the circulation patterns on the site plan and where the
primary access and drop off area for the buses and parents was on Golden Street. David
Dickson stated the storm water quality basins were the low portions of the site aside from the
wetlands, which were lower. David Dickson explained there was a sequence of movement of
the water between the basins before discharging into the wetlands. David Dickson showed the
100-foot upland review area on the site plan for all to view. David Dickson explained that
single, limited disturbance under 5,000 square feet within the wetlands was necessary to
achieve the program required to satisfy the school. David Dickson stated that city
administration was aware of this and requested that wetland mitigation minimally be
provided to represent at least 50 percent of the total disturbed wetland area. David Dickson
continued that DRA was able to accomplish and exceed that request. David Dickson showed
the wetland creation mitigation area on screen for all to view. David Dickson explained the
upper area of the building contained the gym which was at the same elevation as the
playground for students ages five through twelve, which had a paved area and basketball
court. David Dickson showed the existing conditions map on screen for all to view, and noted
the areas of exposed ledge which provided an indication of what would need to be dealt with
in the future. David Dickson noted that ongoing geotechnical investigations were occuring on
site.
Ryan McEvoy, licensed engineer for SLR who was also heading the site utilities and storm
management, showed on the existing conditions map for all to view where the site primarily
drains to; which was a wetland area on the southwest corner of the site and a formal storm
drainage sewer system on Golden Street. Ryan McEvoy stated that the site historically was
served by a combined sanitary sewer system on Golden Street. Ryan McEvoy stated that SLR
was working to accomplish several different features in their utility plan such as collecting and
conveying storm water from improved surfaces; increasing any rates of runoff for major storm
events through the 200-year storm; and aiming to treat and cleanse any stormwater discharge
to the maximum extent possible. Ryan McEvoy continued that SLR was working to direct all
some or all of the runoff from the upper parking lot, portions of the building and parent
dropoff loop to the two stormwater retention basins located in the southwest of the property.
Ryan McEvoy continued that both basins were designed with water quality features in the
lower portion of the pond, which would treat the first 1.3 inches of runoff in accordance with
state DEEP guidelines. Ryan McEvoy stated that discharges from these ponds will enter into
the wetland system in a low velocity manner to prevent erosion. Ryan McEvoy continued that
remaining portions of the site were collected in a portion of the bus loop and parent drop off
area and discharged into the drainage system on Golden Street. Ryan McEvoy stated that
overall this work would decrease the rates of runoff to the wetlands, decrease the rates of
runoff to Golden Street, and by virtue of reducing physical area that drains to existing
properties, it would reduce runoff to properties in the east. Ryan McEvoy continued that the
building would be served by sanitary sewer which would discharge through the combined
system on Golden Street Ryan McEvoy stated that drinking water, public water, and fireflow
would be served by a connection from Golden Street that would run through the building and
come out onto Boswell Avenue. Ryan McEvoy stated that similarly gas and electric would
come from Boswell Avenue to serve the building. Ryan McEvoy discussed the sediment and
erosion controls for the property which included temporary sediment traps, silt fencing and
hay bales.
Matt Sanford, soil scientist and professional wetland scientist with SLR, stated that their first
step was to review the National Wetlands Inventory and the Natural Resources Conservation
Service soil mapping, which did not show the wetlands on site. Matt Sanford continued that
the mapping dictated that the soils on site belong to the Cartland Chatfield and Hollis
Chatfield series. Matt Sanford stated that while on site their team found a pocket of wetlands
at the lowest point of the site, which were fed by brown water breakout from the north and
west as well as an intermittent watercourse to the west. Matt Sanford noted the wetland
itself is a plush and shrub scrub wetland. Matt Sanford stated that the wetland eventually
drains off site through a pair of residential properties into a culvert. Matt Sanford stated the
function of value for the southern wetlands was limited due to being fragmented, isolated and
due to its size. Matt Sanford stated the principal functions provided were nutrient retention,
sediment retention, wildlife habitat and groundwater discharge. Matt Sanford continued that
the direct wetland impact was roughly 4,500 square feet for the construction of a retaining
wall that would support the upper parking lot. Matt Sanford noted the wetland area had been
significantly disturbed in the past and that a lot of the debris still showed signs of impact from
historical disturbance.
Megan Fogarty, environmental scientist and wetlands professional in-training for SLR,
reported that their team developed a comprehensive mitigation plan to offset any wetland
impacts. Megan Fogarty showed on screen for all to view where the wetland creation area
would be situated in the western portion of the property, which was identified as a great area
for mitigation purposes as it is currently a mixture of native and non-native vegetation.
Megan Fogarty continued that 3,000 square foot creation area was proposed in that location
and the plan was to excavate that space down to match the existing grade of the wetland, as
well as carry a bit upslope to intercept ground water that currently feeds the wetland in
addition to storm water and high groundwater that may discharge from the intermittent
watercourse. Megan Fogarty continued that after their team excavates down and spreads
topsoil they would plant a variety of native hydrophytic vegetation.
Brandon Hyde stated he had concerns with the amount of ledge on site and if it could be
excavated. Brandon Hyde asked if the depth of the ledge in the area planned for mitigation
was known. Matt Sanford responded that in the south part of the site there were shallow
ledges with rock outcroppings and further north on site their team augered down
approximately three feet using hand augers. Matt Sanford stated that SLR did not believe the
bedrock would be an issue to achieve the grading needed at the particular location given the
field investigation.
Dan Daniska asked if the applicants could briefly discuss the construction and staging process.
Greg Smolley responded that construction staging would come through the construction
manager in concert with the design team and would be prepared with a set of plans that
would come in for review for building permits, which would overlay on any plans approved by
the wetlands commission or other regulatory boards. Greg Smolley stated any sediment and
erosion controls would be included in that phase and were not a part of the applicant
presented that evening. Discussion ensued. Ryan McEvoy there was a sediment and erosion
control plan included in the presented portion of the package but the final phasing elements
typically came in closer to construction. Ryan McEvoy continued that the ENS plan put before
the committee had to be implemented as part of that phasing plan, and contained protections
for all downgrading areas such as sediment traps, diversion berms, silk fencing, hay bales, etc.
Ryan McEvoy further described the sediments and erosion controls for the site.
Brandon Hyde made a motion to approve IWWCC #24-06 with the following comments and
notes from the plan review memo.
That the approval is valid for FIVE YEARS and will expire on 06/06/2029.
That final revised plans be submitted and reviewed by City Staff.
That the City’s letter of approval be placed on the final revised plan set (cover page
preferred).
That the required bond, if determined to be necessary by the City Engineer, be submitted
for Erosion and Sediment Control and Site Restoration. Bonds must be submitted in a form
acceptable to the City (check or letter of credit) prior to any land disturbance activities
occurring.
That all site activities shall be conducted in accordance with the plans, specifications and
documents of record. Any deviation from the approved plans or construction sequence
shall be cause for enforcement action by the Inland Wetlands, Watercourses and
Conservation Commission.
That the permittee shall notify the Inland Wetlands Agent prior to the commencement of
work and upon its completion.
That all work and all regulated activities conducted pursuant to this authorization shall be
consistent with the terms and conditions of this approval. Any structures, excavation, fill,
obstructions, encroachments or regulated activities not specifically identified and
authorized herein shall constitute a violation of this approval and may result in its
modification, suspension, or revocation. Upon initiation of the activities authorized herein,
the permittee thereby accepts and agrees to comply with the terms and conditions of this
approval.
That no equipment or materials including without limitation fill, construction materials, or
debris, shall be deposited, placed, or stored in any wetland or watercourse on or off site
unless specifically authorized by this approval.
That the General Provisions stated in Section 11.9 of the Inland Wetlands and
Watercourse Regulations are applicable to this permit.
That the permit shall not be assigned or transferred to another entity without the written
permission of the Commission.
That all erosion and sediment control measures shall be in accordance with the
Connecticut Guidelines for Erosion and Sediment Control. Erosion and sediment control
measures shall be installed and inspected prior to site disturbance. It is the permittee’s
responsibility to schedule the inspection with the Norwich Planning Department.
Additional erosion and sediment control measures shall be installed if determined to be
necessary by the Designated Agent. The permittee shall take such necessary steps
consistent with the terms and conditions of the approval, to control stormwater
discharges and to prevent erosion and sedimentation and to otherwise prevent pollution
of wetlands and watercourses.
That this permit will be strictly enforced. The Commission may suspend or revoke this
permit, may direct the
Commission’s Agent to issue a cease and desist order or may require the applicant to
modify, extend, or revise the site work or restore the area to its original condition if it finds
that the applicant has not complied with the conditions set forth in this approval or if the
applicant exceeds the scope of this approval as set forth herein or if the intended use or
actual use of the general site is not as represented by the application or the plan of record.
Douglas Lee seconded. Chairman Richard Morell, Douglas Lee, Chris Seery, Peter Chalecki,
Brandon Hyde and Nicholas Fortson voted in favor. The motion passed unanimously.
3. IWWCC #24-07: 386 New London Turnpike Application for construction of a new elementary
school building and associated development at the site of a current school. Proposed land
disturbance activities within a regulated wetland and associated upland review area.
Application and Property of City of Norwich. Assessor’s Map 108, Block 1, Lot 12, 14. Zone R-
20.
Greg Smolley from DRA showed the site plan on screen for all to view. Greg Smolley stated the
current p;lan was to retain the two existing curb cuts on New London Turnpike for various
entrances. Greg Smolley discussed various aspects of the proposed new building and grounds.
Greg Smolley stated the proposed two-story building, with some single-story structure to the
west, was roughly the same square footage as the one proposed for the Greenville site.
David Dickson stated there were primary constraints on the property, which accounted for the
footprint of the proposed building shown on the plans on screen for all to view. David Dickson
stated the first of which was the wetlands, as there were 3.3 acres overall with some
separation between the areas. David Dickson continued that another constraint was the Ford
Brook which flowed under the existing site in a culvert down to a lower location which
presented certain lines that were unable to be built upon or have the grade of that area
changed. David Dickson stated that additionally there was a 100-year flood plain in place that
goes into the existing building. David Dickson stated that while working with city
administration it was suggested that SLR send a Letter of Map Amendment to FEMA, which
had been granted. David Dickson continued that therefore the 100-year floodplain had been
adjusted accordingly, which benefited the project and insurance purposes for the school.
David Dickson stated that another constraint was the school itself and all the existing
infrastructure that could be utilized, which is why the new building is proposed in the location
shown on the site plan. David Dickson stated that an assessment report for the wetlands was
completed and submitted along with the delineation report. David Disckson discussed traffic
circulation for the proposed site plan. David Dickson noted that the playground was initially in
a different location, but due to the fact above ground structures could not be within the
floodway is why the configuration is as shown. David Dickson stated that unlike at the
Greeneville site, there was not enough area available to take advantage of above-ground
detention and storm water quality, so that would occur below ground. David Dickson noted
on the site plan the 100-foot regulated area as well as the areas of wetland disturbance. David
Dickson stated that the total disturbance was approximately 4,000 square feet. David Dickson
stated that between wetland creation and invasive vegetation control there would be
approximately 1,700 square feet of wetland mitigation on the site.
Ryan McEvoy showed the existing conditions map on screen for all to view. Ryan McEvoy
stated that 99 percent of the site drained either directly or indirectly into Ford Brook, which
was located in about the center of the floodway limits. Ryan McEvoy stated that much of the
offsite runoff drains was diverted through the wetland corridor out to a tributary stream that
enters into Ford Brook offsite. Ryan McEvoy stated the parking areas and building all drain
directly into the culvert itself or indirectly into Ford Brook. Ryan McEvoy stated the existing
building is served by public water off of New London Turnpike and sanitary sewer via a pump
station located in that south portion of the building that pumps via a one-and-a-half inch
horse line up to Will Road. Ryan McEvoy stated the construction of the new building would
occur to the south of the existing building in a phased approach as the existing building would
be demolished. Ryan McEvoy parking and draining would be installed in varying phases as
well. Ryan McEvoy stated the new building would be served by public water from New London
Turnpike and a connection up to Will Road, and sanitary sewer would continue to discharge
out to Will Road, however the new elevation was a higher grade so there would not be a need
for a pump. Ryan McEvoy stated that due to the limited above ground area, the runoff from
the proposed impervious surfaces would be collected and discharged into underground
stormwater systems using Retain-It. Ryan McEvoy noted the three locations proposed would
allow for stormwater to enter, be treated and isolated, and detained through the volume of
storage in the structures themselves. Ryan McEvoy continued that before runoff reaches the
underground structures would first be routed through a water quality proprietary unit. Ryan
McEvoy stated all products are approved by the Connecticut Department of Transportation
for use as water quality treatment systems. Ryan McEvoy stated the discharge from the three
underground systems would be diverted to a level spreader at the far southwest corner of the
site, which was the lowest elevation topographically. Ryan McEvoy stated the level spreader
discharge was designed in a manner to allow storm water velocities to exit the site in low
numbers. Ryan McEvoy stated the northernmost driveway would continue to follow the
bridge patterns that exist today where discharge occurs, but just upgrading to the culvert inlet
at the southernmost edge of the wetlands before it enters into the underground system. Ryan
McEvoy discussed the drainage patterns of the existing wetlands. Ryan McEvoy stated the end
result was that flows would be reduced or match existing conditions; water quality would be
provided through the introduction of proprietary hydrologic separators; the prevention of any
increases in grading or filling within the floodplain; the maintenance of existing drainage
pattern to the maximum extent possible; and a detailed sediment and control plan which
demonstrates how the prevention of any sedimentation occurring in downgrade areas.
Matt Sanford stated that similar to the Greeneville School, the first approach at the Stanton
site was to review the National Wetlands Inventory and the Natural Resources Conservation
Service soil mapping, where again no wetlands were indicated but once on site it was
determined there were extensive wetlands in the central portion of the property. Matt
Sanford stated that the wetland system itself was likely historically connected but now
hydrologically connected by a culvert. Matt Sanford stated that the wetland system in the
northeast was relatively disturbed by a man-made drainage ditch but was still categorized as
forested wetlands. Matt Sanford stated that the area flowed into two different directions.
Matt Sanford noted some flow went west into Ford Brook and south through a pipe into the
water larger wetland area. Matt Sanford stated the larger area was also a forested wetland
but had been historically filled along its northern edge. Matt Sanford stated the wetlands
principal functions of value were nutrient retention, sediment retention, wildlife habitat and
groundwater discharge. Matt Sanford noted that some of the wetlands offsite and to the
southwest had flood flow attenuation as they were located within the floodplain. Matt
Sanford stated there were four impact areas to the wetlands with the direct impact areas
totaling about 4,000 square feet. Matt Sanford noted the impact was along the very edge of
the wetland and not disturbing the interior area. Matt Sanford stated additionally there were
some smaller regulated grading and clearing activities.
Meghan Fogarty stated their team developed three different types of mitigation for the site
totaling 17,540 square feet. Meghan Fogarty explained the first was a wetland bio-swell
creation area that would not be connected to the stormwater system. Meghan Fogarty
continued that the approach was to develop a wet meadow where pollinators would be the
prime educational activity. Meghan Fogarty stated they would first excavate downward, add
top soil and then plant great hydrophilic vegetation such as Boneset, New York Ironweed, and
Joe-Pye Weed. Meghan Fogarty continued that further south from this spot would be the true
wetland creation area, which was in a spot that was likely previously a wetland however there
were currently fill piles which allowed for invasive vegetation to encroach into the wetlands.
Meghan Fogarty stated their goal in that area is to remove the fill piles, restore the space to
what it once was and supplement with native hydrophilic vegetation. Meghan Fogarty stated
that the area would be approximately 3,700 square feet and the smaller area was 3,400
square feet. Meghan Fogarty stated the other areas on the plan above and below the true
creation zone are both in the existing wetland and adjacent to it in the upland review area.
Meghan Fogarty reiterated that because these areas are on the edge of the previously
disturbed wetlands they had been colonized fairly heavily with invasive vegetation that would
be mechanically or hand-pulled, then seeding with a native wetland mix to attempt to restore
those areas and provide additional functions of values.
Chris Seery asked if in regards to the abandoned septic system on site if anything remained
such as tanks that would leach or open up. Ryan McEvoy stated that to their knowledge the
leaching field was abandoned and would need to be removed completely so it could be
replaced with a suitable material for the new school.
Richard Morrell asked if the access road would still bisect wetland areas, to which Ryan
McEvoy responded it would. Matt Sanford stated that one of the reasons the road was
remaining was for emergency purposes and to allow a dry exit out of the east. Matt Sanford
stated the road was more beneficial to leave as a functional access-way and it could also lead
to a future of hiking or educational trails.
Brandon Hyde made a motion to approve IWWCC #24-07 with the following comments and
notes from the plan review memo.
That the approval is valid for FIVE YEARS and will expire on 06/06/2029.
That final revised plans be submitted and reviewed by City Staff.
That the City’s letter of approval be placed on the final revised plan set (cover page
preferred).
That all site activities shall be conducted in accordance with the plans, specifications and
documents of record. Any deviation from the approved plans or construction sequence
shall be cause for enforcement action by the Inland Wetlands, Watercourses and
Conservation Commission.
That the permittee shall notify the Inland Wetlands Agent prior to the commencement of
work and upon its completion.
That all work and all regulated activities conducted pursuant to this authorization shall be
consistent with the terms and conditions of this approval. Any structures, excavation, fill,
obstructions, encroachments or regulated activities not specifically identified and
authorized herein shall constitute a violation of this approval and may result in its
modification, suspension, or revocation. Upon initiation of the activities authorized herein,
the permittee thereby accepts and agrees to comply with the terms and conditions of this
approval.
That no equipment or materials including without limitation fill, construction materials, or
debris, shall be deposited, placed, or stored in any wetland or watercourse on or off site
unless specifically authorized by this approval.
That the General Provisions stated in Section 11.9 of the Inland Wetlands and
Watercourse Regulations are applicable to this permit.
That the permit shall not be assigned or transferred to another entity without the written
permission of the Commission.
That all erosion and sediment control measures shall be in accordance with the
Connecticut Guidelines for Erosion and Sediment Control. Erosion and sediment control
measures shall be installed and inspected prior to site disturbance. It is the permittee’s
responsibility to schedule the inspection with the Norwich Planning Department.
Additional erosion and sediment control measures shall be installed if determined to be
necessary by the Designated Agent. The permittee shall take such necessary steps
consistent with the terms and conditions of the approval, to control stormwater
discharges and to prevent erosion and sedimentation and to otherwise prevent pollution
of wetlands and watercourses.
That this permit will be strictly enforced. The Commission may suspend or revoke this
permit, may direct the Commission’s Agent to issue a cease and desist order or may
require the applicant to modify, extend, or revise the site work or restore the area to its
original condition if it finds that the applicant has not complied with the conditions set
forth in this approval or if the applicant exceeds the scope of this approval as set forth
herein or if the intended use or actual use of the general site is not as represented by the
application or the plan of record.
Chris Seery seconded. Chairman Richard Morell, Douglas Lee, Chris Seery, Peter Chalecki,
Brandon Hyde and Nicholas Fortson voted in favor. The motion passed unanimously.
F. NEW BUSINESS: None.
G. OTHER BUSINESS: None.
H. VIOLATIONS: None.
I. ADJOURNMENT: Brandon Hyde made a motion to adjourn the meeting at 8:24 PM. Chris
Seery seconded. All voted in favor. The motion passed unanimously.
Respectfully submitted, Katherine Rose - Recording Secretary
Agenda
INLAND WETLANDS, WATERCOURSES & CONSERVATION COMMISSION
THURSDAY, June 6, 2024 – 7:00 PM
**** HYBRID REGULAR MEETING ****
ZOOM +
23 Union Street – Lower Level Conference Room
NORWICH, CT
MEETING AGENDA
City of Norwich is inviting you to a scheduled Zoom meeting.
Join Zoom Meeting
https://us02web.zoom.us/j/81357398576?pwd=OVB6cmFkbU82T3R6RzRCNW9vSzhTZz09
Meeting ID: 813 5739 8576
Passcode: 259470
+1 646 876 9923
+1 646 931 3860
Meeting ID: 813 5739 8576
*Please Test your audio & video before joining the meeting*
A. CALL TO ORDER
B. ROLL CALL and SEATING of ALTERNATES
C. APPROVAL OF MINUTES: May 2, 2024 Meeting
D. COMMUNICATIONS
E. OLD BUSINESS:
1. SHOW CAUSE HEARING: Unauthorized Land Disturbance 520 Asylum Street Ext. Norwich, CT
2. IWWCC #24-06: 164+165 Golden Street; Boswell Avenue Application for construction of a
new elementary school building and associated development at the site of a former school.
Proposed land disturbance activities within a regulated wetland and associated upland review
area. Application and Property of City of Norwich. Assessor’s Map 86, Block 3, Lot 13, 14. Map
94, Block 1, Lot 23. Zone MF.
3. IWWCC #24-07: 386 New London Turnpike Application for construction of a new elementary
school building and associated development at the site of a current school. Proposed land
disturbance activities within a regulated wetland and associated upland review area.
Application and Property of City of Norwich. Assessor’s Map 108, Block 1, Lot 12, 14. Zone R-20.
F. NEW BUSINESS: Receipt of New Applications
G. OTHER BUSINESS: None
H. VIOLATIONS:
I. ADJOURNMENT
Copy: City Clerk, Bulletin Board, File
Get email alerts for Norwich
A daily email when new agendas and minutes are posted.