Meeting called to order = 7:00pm
Present:
Greg Healey Chair
Laurie Steinhorst Member
Mary Adler Member
Tim Mills Member
Manny Carmona Building Inspector
Dennis Michaels Village Attorney
1. 14 Depew Avenue. Robert Silarski. Application to demolish, reconstruct and add to fire-
damaged residence and construct new 1-car garage, amending previously approved design.
Application presented by: Robert Silarski
Board discussion:
The main reason for the amendment to this previously approved application is a change from keeping
the existing structure that remains after the fire to now demolishing everything down to the foundation
at the ground level and rebuilding the structure. The main building as rebuilt will remain largely the
same as previously approved with changes as outlined as follows. The main building footprint will
remain the same. New structure will be 2’ 10” taller to increase ceiling heights. New foundation from
ground up will be CMU with brick façade. Siding plan is revised to have clapboard throughout 1st story
and shingles above 1st. Architectural details from previous submissions remain. Proposed addition will
be partially reduced to 1 story. Also, the garage will now be for only 1 vehicle with footprint of 24’ x 16’.
Public Comment:
None
Conclusion:
Application approved as submitted.
Motion by member Healey, 2nd by member Steinhorst. Approved by 4-0 vote.
2. 31 Laveta Place. Justine Girard. Application to amend previously approved porch railing design.
Application presented by: Justine Girard
Board discussion:
Updating railing and post design from previously approved plan. New design has shaped posts, and
railing with cathedral prairie balusters. Revised plan is necessitated due to dilapidated condition of
Architectural Review Board
Oct 16, 2024
Minutes
pg. 2
existing materials which need to be replaced as opposed to trying to revamp and keep materials as
previously presented.
Public Comment:
None
Conclusion:
Application accepted as presented.
Motion by member Healey, 2nd by member Steinhorst. Approved by 4-0 vote.
3. 51 North Midland Avenue. Patrick Parietti. Application to renovate front porch.
Application presented by: Patrick Parietti
Board discussion:
Applicant requesting approval to reconstruct porch including decking, railings and beams. Will use Trex
composite materials for decking and railing. Posts will be pressure treated (PT) with PVC / vinyl
covering. Board discussed retaining scroll details at top of posts, with comment that if originals can not
be re-used, replacements should be used. Applicant was in agreement.
Public Comment:
None
Conclusion:
Application approved as submitted with stipulation that scroll details at top of posts are preserved
and/or replaced if damaged during remodeling.
Motion by member Steinhorst, 2nd by member Mills. Approved by 4-0 vote.
Meeting adjourned = 8:25pm
The Chairperson of the Architectural Review Board of the Village of Nyack is hereby authorized,
directed and empowered, by the ARB to sign these Minutes, and to file a copy thereof in the office of
the Village Clerk:
___________________________________
Greg Healey, Chairman, Nyack ARB
Agenda
Architectural Review Board
October 16, 2024
7:00 PM
Agenda
1. 14 Depew Avenue. Robert Silarski. Application to demolish,
reconstruct and add to fire-damaged residence and construct
new 1-car garage, amending previously approved design.
2. 31 Laveta Place. Justine Girard. Application to amend
previously approved porch railing design.
3. 51 North Midland Avenue. Patrick Parietti. Application to
renovate front porch.