Nyack Water Board Meeting
Regular MeetingNyack, NY · January 15, 2026
Agenda
January 15, 2026
A regular mee ng of the Board of Water Commissioners was held on the above date at 9
North Broadway, Nyack, NY. The mee ng was called to order by Chairman McDowell at 4:30
PM.
The following were present:
William McDowell Chairman
Michelle Bullock Commissioner
Pearl Gray Commissioner
John Phillips Commissioner
Elizabeth Turk Commissioner
Latoya Aguillard Secretary
Thomas Lynch Superintendent
Angela Hamilton 21 Vine Street
Dr. Jonathan Jakus 258 High Avenue
Carmel Pra 259 Main Street
Upon mo on by Chairman McDowell, second by Commissioner Bullock, and carried, the Board
accepted the minutes of December 2025 as wri en.
The Cash Flow Statement for December 2025 was presented to the Board for review.
The Statement of Revenue and Expenditures for December 2025 was presented to the Board for review.
Angela Hamilton- Homeowner of 21 Vine Street, addressed the Board regarding ongoing issues
with her water filtration system becoming clogged following water main breaks and hydrant
flushing. Mrs. Hamilton stated that in 2025 she had both Culligan and Top Notch inspect the
issue approximately three months apart. She reported that she was advised to install a whole-
house filtration system; however, she has had such a system in place since 2005 and noted that
2025 has been the worst year she has experienced regarding this issue. Superintendent Thomas
Lynch acknowledged awareness of the problem and recommended that the Water Department
reimburse Mrs. Hamilton for the first filter replacement as a one-time courtesy. Superintendent
Lynch also referenced the Village of Nyack Water Department Rules and Regulations, Section
#30 – Village and Water Department Not Liable for Damages. Superintendent Lynch suggested
that the Nyack Water Department take water samples from both filtered and non-filtered
stagnant water at Mrs. Hamilton’s residence to determine the cause of the recurring filter
clogging. Upon a motion by Chairman McDowell, seconded by Commissioner Phillips, and
carried, the Board approved reimbursement to Mrs. Hamilton in the amount of $310.
Dr. Jonathan Jakus- Owner of 258 High Avenue appeared before the Board regarding a
high-water bill previously presented to the Village of Nyack Water Board on September 18,
2025. The Board acknowledged and thanked Dr. Jonathan Jakus for paying half of the contested
bill. The Board determined that the water passed through the meter and must therefore be
billed and accounted for. In accordance with Rules and Regulations, Section #35 – states that
“All water supplied through meters shall be charged on the basis of the amount registered on
the meter or meters installed at the premises” Therefore a leak forgiveness cannot be granted.
Dr. Jakus advised that he would speak with his tenant regarding payment of the remaining
balance.
Carmel Pratt- The resident of 259 Main Street appeared before the Board and
advocated for the use of a reverse osmosis system or a water truck to provide access to clean
water during street fairs and other village events. Superintendent Thomas Lynch advised Ms.
Pratt that the Village of Nyack Water Department meets all state and federal safety
requirements, as documented in the Annual Drinking Water Quality Report. Regarding Total
Trihalomethanes (TTHMs) notifications, Superintendent Lynch explained that the issue stems
from a formerly high-usage area that has become low-usage, resulting in stagnant water
conditions, and noted that, by regulation, such notifications are not limited to that area and
must be issued to all Nyack water consumers. Superintendent Lynch outlined ongoing and
planned efforts to address TTHMs, including the proposed installation of automatic flushing
devices in select areas, which are currently in the engineering and approval stages, to improve
water circulation. He also reported that PFOA/PFAS filtration construction is planned, with
groundbreaking anticipation in fall 2026. To address Ms. Pratt’s concerns, Superintendent Lynch
directed Secretary Latoya Aguillard to schedule a full water sampling appointment at the
residence. The sampling is scheduled for Friday, January 23, 2026, with samples to be delivered
directly to Laboratory for testing.
The Board reviewed the Projects Update submi ed by H2M architects + engineers
Presented by
Superintendent Thomas Lynch.
A) Watermain Projects:
a. Phase B:
i. J. Fletcher Creamer (JFC) has completed the construc on associated with Water Main
Improvements.
ii. H2M con nues to prepare the As-Built Drawings for this work.
B) Opera ons Related:
a. Total Trihalomethanes (TTHMs) Exceedance:
i. Next Steps:
1. Regulatory Submission (RCDOH and NYSDOH):
a. RCDOH/NYSDOH has completed its review of the documenta on submi ed by
DN/H2M and issued a formal comment le er. In collabora on with RCDOH, H2M/DN worked
diligently to address several of the ini al comments. However, RCDOH has requested addi onal
installa on-related informa on prior to gran ng approval to commence construc on. At
present, H2M and DN are preparing a formal response to the comment le er, with the goal of
securing approval and scheduling installa on for January/February.
b. H2M has received some further clarifica on/comments from RCDOH and is
currently working with DN / IXOM to address.
b. Total Trihalomethanes (TTHMs) Quarter 4 Viola on:
i. Please note that the Quarter 4 No ce of Viola on (NOV) for TTHM (Total
Trihalomethanes) exceedance remains ac ve. Any future NOVs related to TTHM levels will
con nue to be issued un l the approved TTHM removal system is fully installed, opera onal,
and has demonstrated effec veness over several quarters. The rolling average must be
reduced below the Maximum Contaminant Level (MCL) of 80 μg/L to achieve compliance and
resolve the viola on status.
C) Plant / Pump Sta on Ac ons:
a. South Highland Pump Sta on/College Zone:
i. H2M has performed a 3D Laser Scan of the pump sta on and is currently preparing design
documents and suppor ng documenta on for formal submission to RCDOH. The department
has agreed to priori ze the review of this submission to expedite implementa on.
1. Update: H2M is preparing formal plans for the installa on of addi onal liquid chlorine at
the South Highland Pump Sta on. Dra plans and the accompanying report have already
been developed and are currently undergoing internal QA/QC review.
D) Water Treatment Plant
i. Superintendent Lynch has been inves ga ng a leak at the plant, first iden fied during
the raising of valve boxes on the northeast side. An exploratory excava on revealed that an
undetermined amount of water was flowing beneath the building along the piles and concrete
grade beams. A subsequent excava on on the southwest side confirmed that the water was
origina ng near the raw water line, aerated water line, and se ling water flume.
Further inves ga on suggests that the se ling flume and chemical flume are leaking
through voids in the cold joints. H2M has contacted DN to discuss a more permanent solu on
to address the issue.
1. H2M met with DN Tanks on January 5, 2026, to review the areas of concern.
DN to provide Superintendent Lynch with a proposal for temporary and permanent
fixes.
E) Sludge Lagoon
a. H2M con nues working to prepare a new SPDES permit for the discharge of the
Sludge Lagoon into the Hackensack River. H2M has engaged NYSDEC to obtain clarifica on on
aspects of the permit and on the required sampling of the Sludge Lagoon that is to accompany
the permit submission.
i. On June 30, 2025, H2M submi ed to NYSDEC the Village of Nyack Water Department
SPDES Permit Applica on and associated documents. We note that there will likely be
addi onal back and forth between NWD, H2M and DEC rela ve to the applica on addi onal
sampling required. On June 30, 2025, H2M submi ed to NYSDEC and RCDOH responses to the
NYSDEC No ce of Viola on dated May 19, 2025.
1. H2M and the Nyack Water Department par cipated in a Teams mee ng with the New York
State Department of Environmental Conserva on (NYSDEC) on August 19, 2025, to review
the submi ed SPDES (State Pollutant Discharge Elimina on System) permit and address
specific opera onal inquiries. Following the discussion, H2M and the Nyack Water
Department are awai ng a formal comment le er from NYSDEC. Receipt of this le er is
required to proceed with securing the new SPDES permit.
2. Update: H2M and the Nyack Water Department received comments from NYSDEC on
October 21, 2025. In response, H2M is preparing the necessary documenta on to address
the agency’s feedback. The response will also include required public no fica ons and
water quality sampling to ensure compliance with regulatory requirements.
3. Update: As part of the responses to the NYSDEC, Superintendent Lynch has performed
required water quality sampling to accompany the response to DEC. Nyack Water is
awai ng these results.
ii. Superintendent Lynch has engaged with Joan Roth at Rockland County about
reestablishing wash water and sedimenta on water discharge to the Rockland County Sewer
district. Superintendent Lynch has spoken with Joan and provided data sampling to date.
Addi onal sampling has been obtained from the sludge pit following filter backwashing. Those
results as well as a completed discharge applica on will be provided to Rockland County for
considera on. Superintendent Lynch / H2M are awai ng a follow up mee ng with Rockland
County Sewer District to further discuss.
1. Update: On December 2, 2025, Superintendent Lynch and H2M met with Joan Roth
and Mike Saber of Rockland County Sewer District No. 1 (RCSD) to discuss the poten al
discharge of filter backwash water to the district. The mee ng was produc ve, with RCSD
expressing recep veness to issuing a new permit specifically for the discharge of filter
backwash water. As part of the process, RCSD will conduct laboratory analysis on a composite
sample taken directly from the filters during backwash to iden fy any cons tuents that could
impact the district’s treatment opera ons. If the results are favorable, a formal applica on will
be submi ed to RCSD for approval. Prior to submission, one addi onal step will involve
coordina ng with Chris Wagner at the Town of Clarkstown to confirm that their sewer system
can accommodate a flow of 60,000 gallons per day.
F) Automa c Flushing Devices:
a. At the request of Superintendent Lynch, H2M prepared and submi ed to RCDOH (via
the Tyler System) on November 6, 2025, a le er report along with the necessary submi als and
a markedup distribu on map. These materials were provided for approval to implement and
deploy automa c hydrant flushing devices designed to address stagna on in areas of the
distribu on system, par cularly at system dead ends. H2M and the Water Department await
review and comments on request.
b. Update: Awai ng RCDOH review response/comments.
G) Plant Upgrade for PFAS Removal:
a. H2M received response comments from NYSDOH on January 6, 2025. H2M had
reviewed and issued return responses to NYSDOH on January 27, 2025. H2M is now awai ng
any addi onal comments or approvals to proceed toward bid and sa sfying addi onal
requirements for the grant.
b. On March 24, 2025, H2M received official approval from NYSDOH to move forward to
bidding and construc on.
c. H2M con nues working with the Village/Munistat/Hawkins/EFC to secure an agreement for
the grants and approvals to move forward toward Bid. H2M and the Village have been in
constant communica on with EFC and providing applicable informa on back and forth to
execute (close) the grants. Since this is an EFC base project with BIL-EC and WIAA funding,
Wicks Law will apply. This will be a minimum of four (4) contracts. H2M has spoken with the
Village about u lizing a PLA (Project Labor Agreement) to simply this process. Village
Administrator Stewart has authorized H2M on behalf of the Village to proceed with the PLA
evalua on.
d. H2M has performed a cost analysis to be provided to our subconsultant who will
review and assist in the prepara on of the PLA evalua on.
i. Update: H2M has prepared and delivered the Feasibility Study to both the Village and
the Water Department. At the direc on of Administrator Stewart, the study was forwarded to
the Rockland County Building & Construc on Trades Council for review and acceptance. The
Trades Council has since reviewed and accepted the study, and on December 16, 2025,
provided the Dra Project Labor Agreement. The next step will be for a resolu on to be passed
and for the agreement to be executed by the Mayor during the January 8, 2026, Village Board
Mee ng. Once executed, the agreement will be returned to the Trades Council for their
signature. Following acceptance of the Project Labor Agreement, H2M will revise the bid
documents accordingly, with bidding scheduled for January 2026 pending final review from
NYSDOH / EFC for approval to bid.
ii. Update: Awai ng confirma on from Village Board that the resolu on adop ng the
PLA was adopted before modifying all bid documents.
H) New York State Department of Health (NYSDOH) – Comprehensive Performance
Evalua on
a. During the week of September 15, 2025, representa ves from the New York State
Department of Health (NYSDOH) conducted a Comprehensive Performance Evalua on (CPE)
at the Nyack Treatment Plant. The evalua on focused on reviewing opera onal procedures
and inves ga ng disinfec on byproducts (DBPs), specifically TTHM exceedances. Notably,
this marks the first CPE performed at the facility since the year 2000. NYSDOH will issue a
formal report detailing findings related to filter performance and chlorine contact me,
which will inform future compliance and opera onal improvements.
b. On October 23, 2025, H2M and the Nyack Water Department received a preliminary
findings le er from NYSDOH and are currently awai ng the formal report. Notably, the
preliminary findings mirror the observa ons and recommenda ons previously issued in March
2024, when the filters were evaluated for efficiency. The preliminary findings are summarized
as follows:
i. Gravity Filters – Inspec on / Rehabilita on of the four (4) filters. This would be inclusive
of replacement of le underdrains and filter media. Also suggested the installa on of an air
scour system.
ii. Chlorina on System – It is recommended that the chlorine injec on point for the
finished water clear well be relocated to a posi on upstream of the clear well to increase
chlorine contact me.
Superintendent’s Report:
Service Truck Status- Superintendent Thomas Lynch updated the Board on the status of service
vehicles. The Village of Nyack Water Department is awai ng delivery of two 2025 Ford
Maverick XL AWD trucks, including a achments and accessories Totaling $61,779.30. These
vehicles will be added to the fleet to replace exis ng trucks deemed unsafe to operate.
ii. Superintendent Lynch also presented a diagram for two utility beds with four basket bottoms
to be installed on the two Ford Lightning trucks. The equipment upgrade will allow each
distribution crew member to have a dedicated vehicle.
iii. Superintendent Lynch further advised that the Village of Nyack water vacuum truck
requires replacement. He proposed searching the Auctions International website to obtain a
replacement vehicle through auction. Upon a motion by Commissioner Phillips, seconded by
Commissioner Gray, and carried, the Board authorized Superintendent Lynch to search for a
replacement vacuum truck on Auctions International with a maximum bid limit of $50,000.
Plant Painting Status- Superintendent Thomas Lynch reported that the Water
Department’s water treatment plant operators and distribution crew completed painting work
in the basement and laboratory areas of the plant. Superintendent Lynch commended the
crews for their excellent work.
Operator Training Status- Paul Mitchell, Water Treatment Plant Operator, is scheduled
to complete his laboratory course in March.
ii. Superintendent Thomas Lynch reported that all distribution crew members and water
treatment plant operators have been enrolled in NYMIR Municipal Insurance training modules.
This training ensures consistent instruction and adherence to standardized guidelines outlined
in the modules.
iii. Superintendent Lynch also advised that he has been requested to redraft the Assistant
Grade IIA job description for submission to Rockland County Personnel.
#3 FWP & Check Valve Status- Superintendent Thomas Lynch reports that a new flow meter is
needed, as the current system requires two employees to shut down operations. He is
exploring replacement options that would allow the system to be shut down with the push of a
button.
ii. Superintendent Lynch also reported that a check valve is leaking, allowing water to
flow back into the plant. The blow-off line has been removed from the LSR and is now directed
back to the clear well when the valve is shut down. Currently, the valve cannot close fully and
require replacement. Superintendent Lynch is awaiting a quote for replacement.
At 6:14PM, upon mo on by Commissioner Bullock, second by Commissioner Turk, and
carried, the Board moved into execu ve session. At 6:31 PM upon mo on be Commissioner
Phillips, second by Commissioner Bullock, and carried the Board move out of execu ve session.
Our next mee ng will be Thursday, February 19, 2026
There being no further business, upon mo on by Commissioner Phillips, second by
Commissioner Bullock, and carried, the mee ng was adjourned at 6:35 PM.
Respec ully submi ed,
Latoya Aguillard
Secretary