Planning Board
Regular MeetingNyack, NY · January 8, 2024
Minutes
Village of Nyack Planning Board
January 8, 2024
Members Present: Also Present:______________________________
Laura Rothschild - Chair present Dennis M. Michaels, Esq. Village Attorney - absent
Peter Voletsky – present Manny Carmona – Building Department - absent
Jennifer Knarich - present Bob Galvin – Village Planner
Samuel Hart - present
Matthew Croussouloudis -absent
Taylor Light (Alternate) - absent
COVID-19 PANDEMIC STATUS~ IN PERSON. Meeting opened by the Chair at 7:05pm.
Conflict Check: The Chair polled the members of the Board regarding the issue of possible conflicts of
interest regarding the application. Jennifer Knarich asked to be recused from the 36 S Broadway
application.
Other Business: The Chair stated that the Minutes for the December 4, 2023 meeting were
distributed to Planning Board Members for their review prior to this meeting and at that time
asked if there were any corrections. Hearing none, Jennifer Knarich made a motion to accept the
Minutes as presented. This was seconded by Peter Voletsky and passed with a vote of 4-0.
1. Village Board referral to Planning Board regarding text change for sign ordinance.
Planning Board felt that this new sign ordinance makes complete sense and streamlines the
process. A few minor changes were made to this document by the Planning Board. Please
see attached.
2. 38 Burd Street. Francesca Bozorgomid. Continuation of application for addition of new
conditioned corridor and referral to ZBA.
Jackie Urra, Architect, is representing this application. The Chair states that at the last
meeting in December, Manny Carmona, Building Inspector stated that he had a
conversation with the Nyack Fire Chief about the project and that the Fire Department
had no issues or concerns.
Page -2- January 8, 2024
The Chair asks if there is anyone from the public who wishes to be heard. Hearing none,
the Chair makes a motion to close the public hearing. This is seconded by Jennifer
Knarich.
Jennifer Knarich makes a motion to approve the application under the condition that the
Fire Department is ok with it and the ZBA grants variances necessary. Peter Voletsky
seconds this motion. Vote passed 4-0.
Village Planner Review
The subject property is located on the north side of Burd Street, 68’ to the south of
Piermont Avenue in the TFR zone. The subject property is 3,960 sf and current use is
two-family residential. The construction for the two-family units was completed in 2001.
The Applicant’s architect has provided a revised Bulk Table with clarifications from the
Chief Building Inspector. The first two columns have been outlined in red – these include
Column 1) DISTRICT MINIMUM LOT SETBACK CALCULATIONS and Column 2)
EXISTING NON-CONFORMING LOT SETBACK CALCULATIONS. There are
several variances that need to be re-issued for this application. These include the
proposed lot width which has been reduced to 42.3’ from the exiting 45.7’ and minimum
setbacks for side lot lines (both single and combined) and setback from rear lot line.
These are all noted as existing non-conforming.
After the December meeting, the Chief Building Inspector checked with the Fire
Department which had no questions or comments about the plans.
Plans also confirm the square footage for the following:
• Total existing units 3,168 sf
• Area of proposed corridor 155 sf
• Area of accessory living 737 sf
• Area of existing dwelling unit #2 1,249 sf
• Area of existing dwelling unit # 1 1,027 sf
The applicant received approval from the ARB at their 9/20/23 meeting with no
conditions.
SEQRA – Type II action – no further SEQRA review required.
Recommendation – Unless there are other issues that arise, the Planning Board can
approve the application subject to applicant obtaining the necessary variances from the
ZBA.
3. 55 Catherine Street. Shaban Sinanaj. Continuation of application for subdivision for merger
of two lots and the construction of a two-family dwelling.
Page -3- January 8, 2024
Thomas Haynes, Architect, is representing this application. Discussion began with Village
Engineer Review dated 12/27/23. Thomas Haynes is in agreement with all comments made
by Eve Mancuso. He will revise plans to include all points. Bob Galvin asked him to go over
each point by point which he did. The following comments were made:
- Contours on grade will be shown. There will be no effect of stormwater runoff to
neighbors.
- They will have culvert scoped.
- They will show sizes and materials used on plans. They are using heavy cast iron for
sewer and copper piping.
- Sewer line will also be scoped for adequacy, material and size.
- Cultec units have been added to plans.
- They will add underground electric service to plans.
- A Soil Erosion Plan has been done.
- Concrete Sidewalk details have been added to plans.
- A trench repair detail has been added to plans.
- Tree protection and street trees will be added to plans.
The Chair authorizes Resolution to be drafted as well as Neg Dec.
Hearing no public comment, the Chair holds meeting open until next meeting, February 5, 2024.
Village Planner Review
The Planning Board has established itself as the lead agency for the SEQRA review of
this unlisted action at its October 2, 2023 meeting. The NYSDOT has provided a GML
response dated 9/9/23 for this application indicating that there are anticipated to be no
impacts upon the State highways. We also received a GML review from Rockland
County Planning dated October 2, 2023.
We have received revised plans from the Applicant’s Engineer. These plans have been
reviewed by the Village Engineer (12/27/23). The review has been provided to the
Applicant who will need to address and revise plans as necessary. Village Planner
requested that applicant provide a Narrative describing the changes made to the revised
plans.
Village Engineer Comments
• Spot grades and contours throughout the disturbed areas remain to be shown.
There is an approximate 2 feet differential in grades between that proposed on site
and that existing on the adjacent neighbors’ properties. How will this be addressed
without causing an adverse impact to them from stormwater run-off. Grades or
contours are needed throughout the disturbed area of the property. Cultec
elevations shall also be shown.
Page -4- January 8, 2024
• The offset dimensions from the terraced wall to the side property lines shall be
shown on the plan. The offset is noted as 10- 11 ¾ inch at the southwesterly corner.
The concern remains for sufficient off set distance from the property line to the wall
to ensure access to the rear yard for materials and equipment, including trucks,
and to provide for the long-term maintenance of the culvert.
• Structural integrity of the culvert - The 60-inch culvert located within the rear yard
indicated on the plan conveys the waters of Nyack Creek. Due to the proximity of
the proposed construction of the building structure as well as the need to cross
equipment over the culvert to construct the stormwater management system, we
have concerns for the structural integrity of the culvert, both prior to construction
and after construction is completed. Detailed investigation is needed to confirm the
structural integrity of this culvert.
Recommendation is that culvert be televised both before and after construction, and
submitted to the building department. A note has been added to the plan stating
this. This would be a condition of approval including repair or replacement of
culvert as required. The culvert needs to be televised and condition determined
before SEQRA review can be completed.
• Utility connections including material, size and slope shall be shown for each unit.
Cleanouts shall be shown. The plan indicates water and sewer connections for Unit
2 only. Information shall be provided for both units. The viability of utilizing the
existing sewer line for both units shall be field verified before SEQRA review is
completed.
• Cultec units have been proposed to address the increase in stormwater run-off. The
details of the system design shall include the placement of view ports and clean out
ports to ensure long-term viability and maintenance. These cultec details shall be
added on the Detail Plan SP-02.
• Recommend that electric service to each unit be underground from the existing
pole.
• A Stormwater Maintenance Agreement will be required as a condition of approval.
• Perc tests shall be performed in the location of the proposed units to ensure an
infiltration system is viable in this area. Written results shall be submitted to the
Building Department and Village Engineer.
• A separate Soil Erosion Plan with all details shall be developed and submitted as
part of the plan set.
• The concrete sidewalk detail shall include welded wire fabric.
Page -5- January 8, 2024
• A trench repair detail shall be added to the plan set.
• A tree protection detail is shown on sheet SP.02. The location of these trees to be
protected shall be shown on this plan.
• Street trees shall be planted along the front sidewalk of the property with
approximate size of 3” caliper from the Village’s list of recommended street trees.
4. 112 Main Street. Parkview Nyack LLC. Site Plan application for minor subdivision of two
lots.
Sarah Murray of DR Pilla & Associates is representing this application. They are looking to
subdivide the property 5 feet from the rear of the building at 112 Main Street. The new lot
will front New Street. There will be an easement on rear lot for electrical and stormwater
management. The owner has no narrative for any future plans for new lot. The Chair
states that egress will have to be addressed by the Building Inspector and the Fire
Department.
New plan to come.
This is an unlisted action. No further SEQRA action required. No site improvement. No
drainage.
Sam Hart states the based on the Planning Board’s review of Part 2 of the EAF and the
preliminary plat, reviews by the Village Engineer and Village Planner and comments by the
Building Inspector, the proposed action is not expected to result in any significant adverse
environmental impact that would rise to the level of significance required for a Positive
Declaration.
Jennifer Knarich makes a motion to adopt the Neg Dec. Peter Voletsky seconds. Vote
passed 4-0.
The Chair asks for any public comment. Patrina Koblin owns the property next door.
Former diner, now Bangkok Station Thai Restaurant. She is concerned about what will
happen with new lot. Right now drainage is a problem. Gutters from 6 Park St drain down
on restaurant. They had to put gutters on the restaurant to divert the water. Also, she
states that someone is cooking outside on this property – operating a grill. It was stated
that we will have Manny Carmona look into this.
The Chair states that this application is held open until the next meeting on February 5,
2024. There are no plans proposed for the rear lot. If a proposed use is applied for, it would
be reviewed by the Planning Board and a public hearing would be held for the application.
Page -6- January 8, 2024
Village Planner Review
The property is located on the north side of Main Street in the DMU-1 Zone. It is a
through lot with frontage on New Street as well. There is an existing 1-story commercial
structure with frontage on Main Street, and a gravel parking area on the lot accessed
from New Street. The applicant is seeking to subdivide into two lots. One lot will contain
the existing structure and have frontage on Main Street; the second lot will have frontage
on New Street. New Street is a commercially developer street with the Elmwood
Playhouse on the corner of New Street and Park Street.
A narrative has not been provided to state the purpose of the subdivision, or of any future
development.
The two newly created lots would consist of Lot #1 66.38-1-17.1 and Lot #2 66.38-1-17.2.
Lot #1 would consist of 1,955 sf. It would have 23.5’ frontage on Main Street with depth
of 83.17’. Lot #2 would have 23.5 ‘ frontage on New Street with depth of 59.83’. Applicant
has left a 5’ rear yard setback from the existing structure on Lot 1. Applicant has
provided a bulk table with information on the existing property and Lots # 1 and #2.
There are no existing violations on the property. The following Building Inspector
comments are included on the application:
1) There are no site improvements proposed under this application.
2) Accessory off-street parking (AOSP) is not required for commercial uses within
the DMU-1 district.
3) There are no changes to grades proposed under this application. 4) Corner markers
will be set by a surveyor if required by the Village Engineer.
5) There are no drainage improvements proposed under this application.
6) Subdivision has no effect on the existing drainage facilities outside the area of the
subdivision.
7) Regarding erosion and sediment control – There are no new developments
proposed under this application.
8) Regarding Natural Drainage Patterns – Subdivision has no effect on the existing
drainage patterns.
9) There are no changes to stormwater discharge proposed under this application.
10)There is no increase in impervious areas proposed under this application.
11)Regarding Stormwater discharge – There are no changes to stormwater discharge
proposed under this application.
Page -7- January 8, 2024
12)Regarding amount and velocity of runoff – There are no site developments
proposed under this application.
13)Regarding Drainage System Maintenance – There are no drainage systems
proposed under this application.
14) Final Plat Plan to be submitted after preliminary Plat Plan approval by Planning
Board.
15) No Site Development Plan required since there are no developments proposed
under this application.
SEQRA Determination The proposed action is classified as an Unlisted action. It is a
minor subdivision which would not create a new structure and would not have any
changes to the site based on the Building Inspector’s comments listed above. The Village
Planner has prepared Part 2 of the SEAF to confirm any environmental impacts as well
as Part 3 with a draft Negative Declaration for the Board’s review. The issuance of a
Negative Declaration by the Planning Board would close out SEQRA review.
Village Engineer provided a review dated December 28, 2023 of the subdivision.
See following comments which Applicant will need to address and revise final plat as
needed:
• The Survey performed by Civil Tee Engineering and Surveying, signed and
stamped by licensed surveyor shall be provided as part of the Subdivision
application.
• All utilities servicing the existing structure shall be shown.
• It appears that existing electric service is being provided from New Street. An
easement will be required across the future lot 17.2 to benefit the existing lot 17. 1
• There appears to be a gas meter at the rear of the existing structure. The gas
service line should be shown and an easement granted for the gas line.
• Any roof leaders or other drainage structures discharging to, or draining
from the lot 17.1 to new lot 17.2 shall be shown. The method in which this run-off
will be addressed shall be provided.
• It appears secondary egress from the rear of the existing structure is
currently across the proposed lot. Confirmation is needed from the building
department to confirm egress requirements, and an easement obtained if necessary.
• Concrete curb, concrete sidewalk and concrete apron shall be constructed across
the property frontage on New Street.
Page -8- January 8, 2024
Because the Architect for 28 Route 59 was not here yet, we changed the order of the
last two applications.
5. 36 South Broadway. Snyder & Snyder for Dish Wireless. Application for new rooftop
wireless facility location.
This is for comment and advisory to ZBA only.
Mike Sheridan of Snyder & Snyder is representing this application which is going before the
ZBA. There will be 3 antennas in total. Two will be behind stealth walls on rooftop and one
section will be flush mounted to side of building. The location was chosen to provide for
the gap in coverage between the Mario Cuomo Bridge and Hotel Nyack. This was the best
location for that. No views will be obstructed.
ZBA can include conditions on signage requirements and personnel who can access roof.
Greg Leahy, Engineer for Tectonics spoke about the structure itself.
Planning Board is referring this application to ZBA with the following suggestions:
1) Applicant shall implement the RF Awareness signage plan specified in Appendix C of the
Pinnacle Telecom Group’s RF Compliance Assessment Report dated July 26, 2022.
2) Applicant shall implement strict protocol with respect to RF exposure as per FCC Rules and
ensure that only authorized individuals have access to the roof.
Village Planner Review
The ZBA has the jurisdiction to review special permits for wireless telecommunication
Facilities in the Village of Nyack. The Applicant, Dish Wireless, is in the process of
developing its nationwide 5G network and is required by the FCC to cover at least 70% of
the US population.
The current application is a special permit request by Dish Wireless to install a wireless
telecommunications facility ("Facility") on the roof of the existing building ("Building")
located at 36 South Broadway, a 7-story high senior apartment building in the MFR-3
District. This is a new facility and will consist of three panel antennas, painted to match the
building, with related equipment installed on the roof of the building. The Applicant has
provided an FCC Radio Frequency Compliance Report prepared by Pinnacle for the
Antenna Site. Conclusion is that the proposed facility and proposed warning signage on the
roof complies with FCC requirements. A structural Analysis was also provided by
engineering firm to certify that the roof is structurally sound for the proposed facility. Other
information that is provided includes photosimulations of the panel antennas, site selection
analysis and other technical reports such as: DISH Interference and Certification Letter, RF
Justification and zoning and construction drawings.
Page -9- January 8, 2024
The telecommunication standards state that the wireless communications facilities including
antennas shall be the least obtrusive and the most appropriate to the proposed site. The Board
can limit its visibility from public ways. The Applicant has indicated that he will paint the
three panel antennas to match the building. The Board can review the photosimulations and
location of the equipment and panel antennas on the roof for visual impact on surrounding
properties and South Broadway. if the Board is not satisfied, they can request alternate
stealth techniques from the applicant to be considered.
It appears that there is sufficient documentation to justify a new personal wireless facility in
the general vicinity, and that Dish Wireless has provided sufficient substantiation of need.
The selected building is an appropriate location for the new facility which would alleviate
the described coverage gap and eventual capacity overloading. The Applicant appears to
have applied due diligence in their search for a “best” location. It appears that the proposed
new facility is reasonably in concert with the Village’s Ordinance.
Suggested Conditions the ZBA may wish to consider (see above).
6. 28 Route 59. Seth Marks d/b/a Treehouse Cannabis. Site Plan application and Special
Permit application to operate an adult-use retail Cannabis Dispensary.
Robert Silarsky, Architect, is representing this application. They had previously been
granted a Special Permit for a delivery only facility. The injunction with the lawsuit against
NYS moved much quicker than expected and they are back to request a Special Permit for
a full retail Cannabis Dispensary. They have received the GML responses from NYS DOT
and Rockland County Planning. They will fully comply. Peter Voletsky is concerned about
the line of trees along Rt 59 that they may cause traffic sight problems. The Applicant has
agreed to remove the two tree closest to eastern driveway (exit only) and put a low
planter there instead. This will reduce the number of trees to six with two low planters.
Also discussed was that Board would like a sign installed prohibiting making a left turn
onto Route 59 and the possibility of curving the exit like Walgreens did.
The sidewalk will be ADA compliant. The sidewalk is currently 48 inches wide which is
ADA compliant. Because the building is not handicap accessible, there will be “runners”
who will deliver orders to cars in the handicapped parking spot. The car dealership will be
removed before the start of business. Two parking spaces for Delivery Vehicles Only will
be designated on west side of the building in rear by back door.
No public comment.
Page -10- January 8, 2024
The Chair asks Bob to draft Resolution for next meeting. The application remains open
until the next meeting on Monday, February 5, 2024 at 7:00 pm.
The Chair moves to close meeting at 8:55 pm. This is seconded by Samuel Hart.
Agenda
Village of Nyack
Planning Board
Agenda
January 8, 2024
7:00pm
1. Village Board referral to Planning Board regarding text change for sign
ordinance.
For comment to Village Board only.
2. 38 Burd Street. Franchesca Bozorgomid. Continuation of application for
addition of new conditioned corridor.
3. 55 Catherine Street. Shaban Sinanaj. Continuation of application for
subdivision for merger of two lots and the construction of a two-family
dwelling.
4. 112 Main Street. Parkview Nyack LLC. Site plan application for minor
subdivision of two lots.
5. 28 Route 59. Seth Marks d/b/a/ Treehouse Cannabis. Site Plan application and
Special Permit application to operate an adult-use retail Cannabis Dispensary.
6. 36 South Broadway. Snyder & Snyder for Dish Wireless. Application for
new rooftop wireless facility location.
For comment and advisory to ZBA only.
Get email alerts for Nyack
A daily email when new agendas and minutes are posted.