Muyni
← Back to Nyack

Village Board of Trustees Meeting

Regular Meeting

Nyack, NY · January 22, 2026

AgendaMinutes

Agenda

Village of Nyack 9 North Broadway, Nyack, NY 10960 Meeting of the Village Board of Trustees January 22, 2026 7:00 pm YouTube meeting livestream access link (public comment is in-person only): www.nyack.link/youtube 1. Pledge of Allegiance 2. Mayor Rand’s Remarks and Comments from the Village Board of Trustees 3. Public Comment on Any Topic (1-3 minutes depending on the quantity of speakers) 4. Public Hearing - none 5. Adoption of Minutes – Minutes 1/8/26 6. Presentation: Nyack Tourism Grants – Thomas Schneck 7. Action Items THE DRAFT RESOLUTIONS SET FORTH BELOW ARE FOR CONSIDERATION BY THE VILLAGE BOARD OF TRUSTEES (“BOARD”), WHICH RESOLUTIONS MAY BE APPROVED, OR MAY NOT BE APPROVED, OR MAY BE APPROVED WITH MODIFICATION(S), OR MAY BE TABLED WITHOUT ANY ACTION BEING TAKEN BY THE BOARD – THEIR INCLUSION IN THIS AGENDA IS NOT, IN ANY WAY, DETERMINATIVE OF A DECISION, IF ANY, TO BE MADE BY THE BOARD. 7.1 Resolution No. 2026-14 Resolution of the Nyack Village Board Accepting Audited Voucher Summary WHEREAS, the Audited Voucher Summary was presented to the Nyack Village Board of Trustees at its regularly scheduled meeting of January 22nd, 2026. RESOLVED, that General Fund Claims set forth on pages 1 through 15 in the below-listed amounts are approved for payment: General Fund– $242,158.73 Parking Fund – $8,604.12 Page 1 of 6 Water Fund – $62,940.34 Capital Projects Fund – $258,401.20 Capital Projects Fund – $73,533.01 Water Capital Projects Fund - $452,868.12 Trust and Agency Fund - $1,864.64 7.2 Resolution No. 2026-15 Resolution of the Nyack Village Board Authorizing Changes to Parking Rules on NYS Rte 9W Between High Ave and Sickles Ave WHEREAS, the Village of Nyack has received safety guidance from NYS DOT pertaining to snow plow widths versus lane widths on this section of road, and in the interest of public safety desires to align the parking rules with the goal of traffic safety, and in the interest of parking turnover and accessibility for diverse public uses, RESOLVED, the Board of Trustees of the Village of Nyack hereby authorizes the Village Administrator to eliminate parking on the west side of 9W in front of houses 92 and 94 (3 spaces), and update parking signage to convert remaining parking spaces to individually metered spaces balanced between 15 minute and 3 hour max at the discretion of the Village Administrator. 7.3 Resolution No. 2026-16 Resolution of the Nyack Village Board Authorizing Changes to Monthly Permit Parking Fee in Marina Parking Lot RESOLVED, the Board of Trustees of the Village of Nyack hereby authorizes the Village Administrator to update the Master Fee Schedule to reflect a $20/month fee for monthly parking permits in the Marina/Spear Street parking lot. 7.4 Resolution No. 2026-17 Resolution of the Nyack Village Board Authorizing Changes to Permit Parking in the Artopee/Village Lot RESOLVED, the Board of Trustees of the Village of Nyack hereby authorizes the Village Administrator to update the monthly parking permit application for the Artopee/Village lot to require permit holders to park in the southern most portion of the lot, to free up parking spaces at the front of the lot for hourly access by a diversity of public users. 7.5 Resolution No. 2026-18 Resolution of the Nyack Village Board to Award a Contract for the Replacement of the Roof at Village Hall WHEREAS, the Nyack Village Board previously authorized the bidding of a public works project for the Village Hall roof replacement; and WHEREAS, bids were opened on January 6, 2026, (a total of 12 bids were received), and the lowest responsible bid for the project was received from CFF Consulting: Base Bid $256,000, Alternate 1 (cornice work) $3,000 Alternate 2 (30 year warranty) $8,000, for a total contract sum of $267,000; and Page 2 of 6 WHEREAS, the Village Engineer has reviewed the bids, and recommended the award of the project to CFF Consulting for the Base Bid and all Alternate Work. NOW, THEREFORE, BE IT RESOLVED BY THE MEMBERS OF THE NYACK VILLAGE BOARD AS FOLLOWS: That the Village Administrator is authorized to contract with CFF Consulting for the Village Hall roof replacement project in the amount of $267,000 for the base bid and all alternate bids, subject to the approval of the Village Attorney as to the form of the contract. 7.6 Resolution No. 2026-19 Resolution of the Nyack Village Board to Award a Contract for the Replacement of the Village Hall Second Floor HVAC System WHEREAS, the Nyack Village Board previously authorized the bidding of a public works project for the Village Hall roof replacement; and WHEREAS, bids were opened on January 6, 2026, (a total of 3 bids were received), and the lowest responsible bid for the project was received from TM Brennan Service, Inc., for a total contract sum of $518,000; and WHEREAS, the Village Engineer has reviewed the bids, and recommended the award of the project to TM Brennan Service, Inc., NOW, THEREFORE, BE IT RESOLVED BY THE MEMBERS OF THE NYACK VILLAGE BOARD AS FOLLOWS: That the Village Administrator is authorized to contract with TM Brennan Service, In., for the Village Hall second floor HVAC replacement project in the amount of $518,000 subject to the approval of the Village Attorney as to the form of the contract. 7.7 Resolution No. 2026-20 Resolution of the Nyack Village Board to Award a Contract for the Replacement of the Village Hall Second Floor Windows WHEREAS, the Nyack Village Board previously authorized the bidding of a public works project for the Village Hall second floor window replacement; and WHEREAS, bids were opened on January 15, 2026, (a total of 3 bids were received), and the lowest responsible bid for the project was received from VAD Contractors, Inc., for a total contract sum of $62,500; and WHEREAS, the Village Administrator has reviewed the bids, and recommended the award of the project to VAD Contractors, Inc NOW, THEREFORE, BE IT RESOLVED BY THE MEMBERS OF THE NYACK VILLAGE BOARD AS FOLLOWS: Page 3 of 6 That the Village Administrator is authorized to contract with VAD Contractors, for the Village Hall second floor window replacement project in the amount of $62,500 subject to the approval of the Village Attorney as to the form of the contract. 7.8 Resolution No. 2026-21 Resolution of the Nyack Village Board of Trustees Approving Grants Under the Nyack Hotel Tax Tourism Grant Program WHEREAS, The Board of Trustees, in recognition of the importance of tourism to local economic development, recently adopted a local law providing for a Hotel Bed Tax in order to fund tourism promotion projects, intends to allocate 50% of this tax revenue, minus an administrative cost of 8%, to tourism promotion projects, and WHEREAS, The Board of Trustees delegated to the Nyack Business Council the responsibility to advise the Board of Trustees on funding decisions in response to applications for Nyack Tourism Grants, and contracted with Visit Nyack to administer the grant program on behalf of the Village, and the Business Council has received, reviewed and discussed applications, including presentations by applicants to the Business Council; therefore RESOLVED, the Board of Trustees of the Village of Nyack allocates $54,800 in funds for the current round of the Nyack Tourism Grant program, and RESOLVED, based on advice and recommendation from the Nyack Business Council, the Board of Trustees approves the following grants for tourism promotion projects, and directs the Village Administrator to execute all necessary agreements, subject to the review of the Village Attorney, to fund these projects, with any unused grant funds rolled into the next round of the grant program: Company Event FINAL 90 North Marketing as an event venue $1,500 ArtsRock Various performances $3,000 Bridge Musik Bridge Musik Summer Festival $2,000 Children's Shakepeare Theater Various performances $1,750 Ecstatic Dance Ecstatic Dance $2,000 Edward Hopper House Hopper Happens $5,000 Elmwood Various performances $2,000 Eric DiVito Music Nyack Monthly Jazz Concert $1,000 Hope Wade Dogs and Fashion on Broadway $1,000 Kamdyn Moore River Spins-Roller Skating Pop-up $1,250 Laura Graham Shophop $1,500 Long Path Outfitters Hook Mountain Challenge $2,500 Maura's Kitchen Salsa Night at SoBro $1,000 Maureen's Jazz Cellar Dancing in the Streets, Nyack Jazz Festival $2,500 Page 4 of 6 Modern Druid Modern Druid Fest $750 Modern Druid Spirit of SoBro $1,250 Multifix Media Make Something Film Making $1,000 Music for Life Night Out $1,000 Nyack Art Collective First Fridays $800 Nyack International Film Festival Nyack International Film Festival` $4,000 Nyack News & Views Nyack Cook Book $2,000 Nyack News & Views Expand Reach of NN&V $2,000 Nyack Porch Fest Nyack Porch Fest $1,500 Phoenix Festival Phoenix Festival $3,500 Playful Yogi Space Yogafest $2,000 Rivertown Film Film Screening $1,000 Rockland County Jazz&Blues Society Nyack Jazz Week $1,500 The Angel Nyack Uke-a-Palooza $1,500 Trade & Prosper Nayck Arts&Crafts Walk $3,000 TOTAL $54,800 8. Department Reports to the Village Board of Trustees (based on availability). 8.1 – Orangetown Police Department 8.3 – Village Administrator 8.4 - Village Clerk 8. Old Business 8.1 CDBG project memo 8.2 Nyack Memorial Park Shoreline Path Project 8.3 Nyack Rat Control Project 9. New Business 9.1. Marina parking policy 10. Communications 10.1 Frances Pratt – Requests BOT commemorate passing of Jerry Koblin via a street naming or other means. 10.2 Lighthouse Swim annual event – Sunday, August 30, 2026. 10.3 Oak Hill Cemetery 11. Public Comment Page 5 of 6 12. Executive Session 13. Adjournment Page 6 of 6 INTEROFFICE MEMORANDUM TO: MAYOR RAND AND TRUSTEES FROM: ANDY STEWART , VILLAGE ADMINISTRATOR SUBJECT: VILLAGE HALL CAPITAL PROJECTS – ROOF AND HVAC DATE: JANUARY 22, 2026 This is a summary of the background on two resolutions on the agenda for capital projects at village hall: 1. Roof project – the roof leaks, damaging ceilings and floors. We have a $140K NYS grant, that Senator Reichlin- Melnick facilitated several years ago. A substantial amount has already gone to engineering, as the roof project is made more complex by the changes in the HVAC system that partially occupies the roof. We had an excellent response to our bid, with twelve firms competing, and the low bid is $267,000, which will require gap financing of about $150,000. 2. HVAC – the natural gas fired mechanicals on the roof serving to heat and cool the second floor are very old, have broken down repeatedly, once during a heat wave in 2022, and are overdue for replacement. The Sustainability Committee, through various environmental initiatives, obtained enough points for the Village to qualify for $375,000 in grant funds for this project. The Village earlier went to bid with a design that included replacing the boiler in the basement. Bids came in very high, around $1 million. After re-design, the lowest bid is $518,000, requiring about $150,000 in gap financing. The roof top HVAC is considered higher priority than the basement boiler because it is older and more failure prone, and its replacement coincides with the roof project. 3. Village Hall windows on the second floor – I am working on bid analysis, as three bids were received on January 15, 2026. The low bid is about $65K and our grant is about $45K. I need to check references on the low bidder. 4. Village Hall rooftop solar – completely grant funded, this project will go to bid once the rooftop construction is finished, and will reduce our electricity bills. 5. Once the roof and windows are done we will consider options for interior work in the court room, as the ceiling is in poor condition, and take a more in depth look at the windows on the first floor. 1 Weston & Sampson, PE, LS, LA, Architects, PC 74 Lafayette Avenue, Suite 501, Suffern, NY 10901 Tel: 845-357-4411 January 12, 2026 Village of Nyack Mayor and Trustees 9 North Broadway Nyack NY 10960 Attn: Andy Stewart – Village Administrator Re: Village Hall Roof Replacement NYK 0198 Dear Mayor and Trustees, Bids were received on January 6, 2026, for the above captioned project. There were twelve bids returned. A Bid Summary is attached. The bid was structured with a Base Bid and Alternate Bids. CFF Consulting is the low bidder considering the sum of Alternate 1 – cornice work, and Alternate 2 – roofing with a 30-year warranty for a total contract sum of $267,000. We have contacted several of the references provided by CFF consulting including roofing projects they performed for the Gatsby Building at Jones Beach State Park, the Binghampton University Science Library and various roofs at the Union Free School District. All contacts indicated CFF to be a reliable roofing contractor with good workmanship and projects completed on time. Based on the references and subsequent questions to CFF to confirm scope, we can recommend awarding the project to CFF. The original bid documents are being returned to the Village Clerk, and bid bonds which shall be returned to all contractors. Very truly yours, John Sharkey, AIA LEED – Director of Design Weston & Sampson, PE, LS, LA, Architects PC CC: Linda Donnelly- Village Clerk Dennis Michaels, Esq. Y:\VILLAGES\NYK Village of Nyack\NYK0198 VH Roof\Rec of Award letterhead.docx westonandsampson.com Nyack Village Hall Roof Reconstruction Re-Bid January 6, 2026 Bid Summary Total Base Bid + All Contract Name Bidder Base Bid Alternate 1 Alternate 2 Alternates Roofing Work CFF Consulting $256,000 $3,000 $8,000 $267,000 Roofing Work Armortite $274,000 $8,000 $5,000 $287,000 Roofing Work Cornerstone Restoration $258,000 $27,000 $12,000 $297,000 Roofing Work DME Construction $269,226 $16,000 $12,113 $297,339 Roofing Work Sanz Construction $316,000 $5,000 $4,500 $325,500 Roofing Work Page Contracting Corp $324,000 $4,700 $7,500 $336,200 Roofing Work VAD Contractors $343,900 $9,000 $10,000 $362,900 Roofing Work Titan Roofing $349,100 $19,500 $7,060 $375,660 Roofing Work CC Roofing Company $378,800 $5,500 $56,450 $440,750 Roofing Work Kario Construction $588,000 $22,500 $3,000 $613,500 Roofing Work Empire Cloud Construction $610,236 $7,000 $7,500 $624,736 Roofing Work Niko K Construction $672,000 $10,000 $31,500 $713,500 Alternate #1: Replace (1) cornice stone Alternate #2: Provide 30 year warranty 1 Nyack Village Hall Roof Reconstruction Re-Bid January 6, 2026 Bid Summary Total Base Bid + All Contract Name Bidder Base Bid Alternate 1 Alternate 2 Alternates Roofing Work CFF Consulting $256,000 $3,000 $8,000 $267,000 Roofing Work Armortite $274,000 $8,000 $5,000 $287,000 Roofing Work Cornerstone Restoration $258,000 $27,000 $12,000 $297,000 Roofing Work DME Construction $269,226 $16,000 $12,113 $297,339 Roofing Work Sanz Construction $316,000 $5,000 $4,500 $325,500 Roofing Work Page Contracting Corp $324,000 $4,700 $7,500 $336,200 Roofing Work VAD Contractors $343,900 $9,000 $10,000 $362,900 Roofing Work Titan Roofing $349,100 $19,500 $7,060 $375,660 Roofing Work CC Roofing Company $378,800 $5,500 $56,450 $440,750 Roofing Work Kario Construction $588,000 $22,500 $3,000 $613,500 Roofing Work Empire Cloud Construction $610,236 $7,000 $7,500 $624,736 Roofing Work Niko K Construction $672,000 $10,000 $31,500 $713,500 Alternate #1: Replace (1) cornice stone Alternate #2: Provide 30 year warranty 1 VIA E-MAIL: administrator@nyack.gov January 15, 2026 Andy Stewart Village Administrator Nyack Village Hall 9 N Broadway Nyack, NY 10960 RE: Nyack Village Hall – VRV Project GCA Project No. 25105.00 Dear Andy: We have reviewed the bids from ACS System Associates, Inc, C+C Service LLC and TM Brennan Service, Inc, for the VRV installation project at Nyack Village Hall, and we recommend awarding the contract to TM Brennan Service Inc. TM Brennan’s bid is the lowest cost bid, and they showed a clear understanding of project scope. The Electrical work for this project was provided by Fanshawe, Inc, as a lump sum proposal included within the total bid price below. The bid prices below include the materials, labor and controls work necessary to complete the work for this project. Total cost for the complete project will be approximately $518,000. Please let us know if you have any questions. Sincerely, Tristan Schwartzman Bid Analysis: NYACK VILLAGE HALL VILLAGE Project: Nyack Village Hall VRV Bid date: 1/6/2026 Scope: Construction Bid Bidders: ACS System Associates, Inc C+C Service LLC TM Brennan Service, Inc. Item #1: Mobilization $30,000 $60,000 $25,000 Item #2: ACCU-2-ACCU-3 $30,000 $32,000 $80,000 Item #3: IDU-1-IDU-5 $30,000 $40,000 $43,000 Item #4: AC-2-1 $115,000 $180,000 $150,000 Item #5: Ductwork and Accessories $40,000 $72,000 $50,000 Item #6: Piping and Piping Accessories $210,000 $110,000 $75,000 Item #7: Panel-Roof $19,000 $32,000 $25,000 Item #8: Electrical Work incl. conduit and feeders $61,000 $88,000 $70,000 Total $535,000 $614,000 $518,000 INTEROFFICE MEMORANDUM TO: MAYOR RAND AND TRUSTEES FROM: ANDY STEWART , VILLAGE ADMINISTRATOR SUBJECT: VILLAGE HALL SECOND FLOOR WINDOWS BID RESULTS DATE: JANUARY 22, 2026 The Village issued a contract opportunity for replacement of 20 windows on the second floor of Village Hall. Bids were opened on January 15, 2026. Three bids were received: VAD Contractors, Inc - $62,500 Maruti Construction, LLC - $74,110 Sky Rise, Inc, - $117,000 I have called two references for VAD Contractors, Inc., and they both spoke very highly of the company, including having hired VAD for multiple projects, including windows, and wishing VAD would be their low bidder on more projects. Given this response, I recommend awarding the window replacement contract to VAD. Note also, that the Village has a total of $45K+/- from its sustainability grant to apply to this project, leaving a need for gap financing of about $20,000. 1 I NTEROFFI C E MEMORANDUM TO: MAYOR RAND AND TRUSTEES FROM: ANDY STEWART , VILLAGE ADMINISTRATOR SUBJECT: CDBG APPLICATION FOR VILLAGE PROJECT DATE: JANUARY 22, 2026 The Village CDBG committee has convened twice to review options for the next Village CDBG application, and considered a range of projects that would fall within the eligible census tracts and benefit the community. ELIGIBLE CENSUS TRACTS: 1 Of the projects considered, there are two that have the group’s support and appear both feasible and fundable. PROJECT 1 – RE-PAVE AND ENHANCE ARTOPEE/VILLAGE PARKING LOT AND HEZEKIAH EASTER SQUARE The lot serves a wide range of residents and visitors and public transportation. The project would pave the parking lot, Cedar Street with its bus layover zone, and Artopee Way, all of which have badly deteriorated asphalt and some drainage concerns. The project would consider design adjustments to the parking lot that would improve traffic flow without losing parking spaces, and improve aesthetics and landscaping. The project would review options for the Square, such as replacing missing trees and improving aesthetics. 2 PROJECT 2 – SIDEWALK IMPROVEMENTS UPPER AND LOWER HIGH AVE A. N. Franklin/High Ave/Bridge St/Park St – this project would replace the asphalt sidewalk on the east side of N Franklin, wrap around onto High Ave heading east, and fix some badly deteriorated sections and corners by Bridge and Park. B. Polhemus “extension” up towards the apartments/hotel – this project would build a new sidewalk on the east side of Polhemus extension, to connect the apartments to the corner of High Ave where sidewalk into the Village begins. School children would use the new sidewalk to get to the bus stop on High Ave . A. N. FRANKLIN ST/HIGH AVE 3 B. POLHEMUS EXTENSION/HIGH AVE 4 PROJECT 3 – SIDEWALK IMPROVEMENTS ON LIBERTY STREET This project would replace a sinking sidewalk on the west side and repair cracked concrete on the east side. PROJECTS CONSIDERED BUT NOT RECOMMENDED: A. Sidewalk on S. Franklin by community garden. Gardeners have voiced concern over loss of green space. Committee has concerns about burdening Plaza management with further maintenance responsibilities on a property they already donate for the community garden. B. Nyack Housing Authority playground improvements. The NHA has not responded to inquiries by committee members. The Committee will approach the NHA again next year. PROJECTS ALREADY FUNDED (RECENT): 1. Sidewalks - First Ave/Marion/Jefferson – under construction 2. Senior Center roof, windows, doors, HVAC, etc. – in design 3. Sidewalk on Kilby, between Rte 59 and Upper Depew - funded NEXT STEPS: 1. Public Hearing on February 12, 2026 2. BOT vote to select which application to submit 5

Get email alerts for Nyack

A daily email when new agendas and minutes are posted.

Report an issue with this meeting