Village Board of Trustees Meeting
Regular MeetingNyack, NY · January 22, 2026
Agenda
Village of Nyack
9 North Broadway, Nyack, NY 10960
Meeting of the Village Board of Trustees
January 22, 2026 7:00 pm
YouTube meeting livestream access link (public comment is in-person only):
www.nyack.link/youtube
1. Pledge of Allegiance
2. Mayor Rand’s Remarks and Comments from the Village Board of Trustees
3. Public Comment on Any Topic (1-3 minutes depending on the quantity of speakers)
4. Public Hearing - none
5. Adoption of Minutes – Minutes 1/8/26
6. Presentation: Nyack Tourism Grants – Thomas Schneck
7. Action Items
THE DRAFT RESOLUTIONS SET FORTH BELOW ARE FOR CONSIDERATION BY THE
VILLAGE BOARD OF TRUSTEES (“BOARD”), WHICH RESOLUTIONS MAY BE
APPROVED, OR MAY NOT BE APPROVED, OR MAY BE APPROVED WITH
MODIFICATION(S), OR MAY BE TABLED WITHOUT ANY ACTION BEING TAKEN BY
THE BOARD – THEIR INCLUSION IN THIS AGENDA IS NOT, IN ANY WAY,
DETERMINATIVE OF A DECISION, IF ANY, TO BE MADE BY THE BOARD.
7.1 Resolution No. 2026-14 Resolution of the Nyack Village Board Accepting Audited
Voucher Summary
WHEREAS, the Audited Voucher Summary was presented to the Nyack Village Board of
Trustees at its regularly scheduled meeting of January 22nd, 2026.
RESOLVED, that General Fund Claims set forth on pages 1 through 15 in the below-listed
amounts are approved for payment:
General Fund– $242,158.73
Parking Fund – $8,604.12
Page 1 of 6
Water Fund – $62,940.34
Capital Projects Fund – $258,401.20
Capital Projects Fund – $73,533.01
Water Capital Projects Fund - $452,868.12
Trust and Agency Fund - $1,864.64
7.2 Resolution No. 2026-15 Resolution of the Nyack Village Board Authorizing Changes to
Parking Rules on NYS Rte 9W Between High Ave and Sickles Ave
WHEREAS, the Village of Nyack has received safety guidance from NYS DOT pertaining to snow
plow widths versus lane widths on this section of road, and in the interest of public safety desires
to align the parking rules with the goal of traffic safety, and in the interest of parking turnover and
accessibility for diverse public uses,
RESOLVED, the Board of Trustees of the Village of Nyack hereby authorizes the Village
Administrator to eliminate parking on the west side of 9W in front of houses 92 and 94 (3 spaces),
and update parking signage to convert remaining parking spaces to individually metered spaces
balanced between 15 minute and 3 hour max at the discretion of the Village Administrator.
7.3 Resolution No. 2026-16 Resolution of the Nyack Village Board Authorizing Changes to
Monthly Permit Parking Fee in Marina Parking Lot
RESOLVED, the Board of Trustees of the Village of Nyack hereby authorizes the Village
Administrator to update the Master Fee Schedule to reflect a $20/month fee for monthly parking
permits in the Marina/Spear Street parking lot.
7.4 Resolution No. 2026-17 Resolution of the Nyack Village Board Authorizing Changes to
Permit Parking in the Artopee/Village Lot
RESOLVED, the Board of Trustees of the Village of Nyack hereby authorizes the Village
Administrator to update the monthly parking permit application for the Artopee/Village lot to
require permit holders to park in the southern most portion of the lot, to free up parking spaces at
the front of the lot for hourly access by a diversity of public users.
7.5 Resolution No. 2026-18 Resolution of the Nyack Village Board to Award a
Contract for the Replacement of the Roof at Village Hall
WHEREAS, the Nyack Village Board previously authorized the bidding of a public works project
for the Village Hall roof replacement; and
WHEREAS, bids were opened on January 6, 2026, (a total of 12 bids were received), and the
lowest responsible bid for the project was received from CFF Consulting: Base Bid $256,000,
Alternate 1 (cornice work) $3,000 Alternate 2 (30 year warranty) $8,000, for a total contract sum
of $267,000; and
Page 2 of 6
WHEREAS, the Village Engineer has reviewed the bids, and recommended the award of the
project to CFF Consulting for the Base Bid and all Alternate Work.
NOW, THEREFORE, BE IT RESOLVED BY THE MEMBERS OF THE NYACK VILLAGE
BOARD AS FOLLOWS:
That the Village Administrator is authorized to contract with CFF Consulting for the Village Hall
roof replacement project in the amount of $267,000 for the base bid and all alternate bids, subject
to the approval of the Village Attorney as to the form of the contract.
7.6 Resolution No. 2026-19 Resolution of the Nyack Village Board to Award a
Contract for the Replacement of the Village Hall Second Floor HVAC System
WHEREAS, the Nyack Village Board previously authorized the bidding of a public works project
for the Village Hall roof replacement; and
WHEREAS, bids were opened on January 6, 2026, (a total of 3 bids were received), and the lowest
responsible bid for the project was received from TM Brennan Service, Inc., for a total contract
sum of $518,000; and
WHEREAS, the Village Engineer has reviewed the bids, and recommended the award of the
project to TM Brennan Service, Inc.,
NOW, THEREFORE, BE IT RESOLVED BY THE MEMBERS OF THE NYACK VILLAGE
BOARD AS FOLLOWS:
That the Village Administrator is authorized to contract with TM Brennan Service, In., for the
Village Hall second floor HVAC replacement project in the amount of $518,000 subject to the
approval of the Village Attorney as to the form of the contract.
7.7 Resolution No. 2026-20 Resolution of the Nyack Village Board to Award a
Contract for the Replacement of the Village Hall Second Floor Windows
WHEREAS, the Nyack Village Board previously authorized the bidding of a public works project
for the Village Hall second floor window replacement; and
WHEREAS, bids were opened on January 15, 2026, (a total of 3 bids were received), and the
lowest responsible bid for the project was received from VAD Contractors, Inc., for a total contract
sum of $62,500; and
WHEREAS, the Village Administrator has reviewed the bids, and recommended the award of the
project to VAD Contractors, Inc
NOW, THEREFORE, BE IT RESOLVED BY THE MEMBERS OF THE NYACK VILLAGE
BOARD AS FOLLOWS:
Page 3 of 6
That the Village Administrator is authorized to contract with VAD Contractors, for the Village Hall
second floor window replacement project in the amount of $62,500 subject to the approval of the
Village Attorney as to the form of the contract.
7.8 Resolution No. 2026-21 Resolution of the Nyack Village Board of Trustees Approving
Grants Under the Nyack Hotel Tax Tourism Grant Program
WHEREAS, The Board of Trustees, in recognition of the importance of tourism to local
economic development, recently adopted a local law providing for a Hotel Bed Tax in order to
fund tourism promotion projects, intends to allocate 50% of this tax revenue, minus an
administrative cost of 8%, to tourism promotion projects, and
WHEREAS, The Board of Trustees delegated to the Nyack Business Council the responsibility
to advise the Board of Trustees on funding decisions in response to applications for Nyack
Tourism Grants, and contracted with Visit Nyack to administer the grant program on behalf of
the Village, and the Business Council has received, reviewed and discussed applications,
including presentations by applicants to the Business Council; therefore
RESOLVED, the Board of Trustees of the Village of Nyack allocates $54,800 in funds for the
current round of the Nyack Tourism Grant program, and
RESOLVED, based on advice and recommendation from the Nyack Business Council, the Board
of Trustees approves the following grants for tourism promotion projects, and directs the Village
Administrator to execute all necessary agreements, subject to the review of the Village Attorney,
to fund these projects, with any unused grant funds rolled into the next round of the grant
program:
Company Event FINAL
90 North Marketing as an event venue $1,500
ArtsRock Various performances $3,000
Bridge Musik Bridge Musik Summer Festival $2,000
Children's Shakepeare Theater Various performances $1,750
Ecstatic Dance Ecstatic Dance $2,000
Edward Hopper House Hopper Happens $5,000
Elmwood Various performances $2,000
Eric DiVito Music Nyack Monthly Jazz Concert $1,000
Hope Wade Dogs and Fashion on Broadway $1,000
Kamdyn Moore River Spins-Roller Skating Pop-up $1,250
Laura Graham Shophop $1,500
Long Path Outfitters Hook Mountain Challenge $2,500
Maura's Kitchen Salsa Night at SoBro $1,000
Maureen's Jazz Cellar Dancing in the Streets, Nyack Jazz Festival $2,500
Page 4 of 6
Modern Druid Modern Druid Fest $750
Modern Druid Spirit of SoBro $1,250
Multifix Media Make Something Film Making $1,000
Music for Life Night Out $1,000
Nyack Art Collective First Fridays $800
Nyack International Film Festival Nyack International Film Festival` $4,000
Nyack News & Views Nyack Cook Book $2,000
Nyack News & Views Expand Reach of NN&V $2,000
Nyack Porch Fest Nyack Porch Fest $1,500
Phoenix Festival Phoenix Festival $3,500
Playful Yogi Space Yogafest $2,000
Rivertown Film Film Screening $1,000
Rockland County Jazz&Blues Society Nyack Jazz Week $1,500
The Angel Nyack Uke-a-Palooza $1,500
Trade & Prosper Nayck Arts&Crafts Walk $3,000
TOTAL $54,800
8. Department Reports to the Village Board of Trustees (based on availability).
8.1 – Orangetown Police Department
8.3 – Village Administrator
8.4 - Village Clerk
8. Old Business
8.1 CDBG project memo
8.2 Nyack Memorial Park Shoreline Path Project
8.3 Nyack Rat Control Project
9. New Business
9.1. Marina parking policy
10. Communications
10.1 Frances Pratt – Requests BOT commemorate passing of Jerry Koblin via a street
naming or other means.
10.2 Lighthouse Swim annual event – Sunday, August 30, 2026.
10.3 Oak Hill Cemetery
11. Public Comment
Page 5 of 6
12. Executive Session
13. Adjournment
Page 6 of 6
INTEROFFICE MEMORANDUM
TO: MAYOR RAND AND TRUSTEES
FROM: ANDY STEWART , VILLAGE ADMINISTRATOR
SUBJECT: VILLAGE HALL CAPITAL PROJECTS – ROOF AND HVAC
DATE: JANUARY 22, 2026
This is a summary of the background on two resolutions on the agenda for capital
projects at village hall:
1. Roof project – the roof leaks, damaging ceilings and floors. We have a $140K
NYS grant, that Senator Reichlin- Melnick facilitated several years ago. A
substantial amount has already gone to engineering, as the roof project is made
more complex by the changes in the HVAC system that partially occupies the
roof. We had an excellent response to our bid, with twelve firms competing, and
the low bid is $267,000, which will require gap financing of about $150,000.
2. HVAC – the natural gas fired mechanicals on the roof serving to heat and cool the
second floor are very old, have broken down repeatedly, once during a heat wave
in 2022, and are overdue for replacement. The Sustainability Committee, through
various environmental initiatives, obtained enough points for the Village to
qualify for $375,000 in grant funds for this project. The Village earlier went to bid
with a design that included replacing the boiler in the basement. Bids came in
very high, around $1 million. After re-design, the lowest bid is $518,000,
requiring about $150,000 in gap financing. The roof top HVAC is considered
higher priority than the basement boiler because it is older and more failure prone,
and its replacement coincides with the roof project.
3. Village Hall windows on the second floor – I am working on bid analysis, as three
bids were received on January 15, 2026. The low bid is about $65K and our grant
is about $45K. I need to check references on the low bidder.
4. Village Hall rooftop solar – completely grant funded, this project will go to bid
once the rooftop construction is finished, and will reduce our electricity bills.
5. Once the roof and windows are done we will consider options for interior work in
the court room, as the ceiling is in poor condition, and take a more in depth look
at the windows on the first floor.
1
Weston & Sampson, PE, LS, LA, Architects, PC
74 Lafayette Avenue, Suite 501, Suffern, NY 10901
Tel: 845-357-4411
January 12, 2026
Village of Nyack
Mayor and Trustees
9 North Broadway
Nyack NY 10960
Attn: Andy Stewart – Village Administrator
Re: Village Hall Roof Replacement
NYK 0198
Dear Mayor and Trustees,
Bids were received on January 6, 2026, for the above captioned project. There were twelve bids
returned. A Bid Summary is attached. The bid was structured with a Base Bid and Alternate Bids.
CFF Consulting is the low bidder considering the sum of Alternate 1 – cornice work, and Alternate
2 – roofing with a 30-year warranty for a total contract sum of $267,000.
We have contacted several of the references provided by CFF consulting including roofing projects
they performed for the Gatsby Building at Jones Beach State Park, the Binghampton University
Science Library and various roofs at the Union Free School District. All contacts indicated CFF to
be a reliable roofing contractor with good workmanship and projects completed on time.
Based on the references and subsequent questions to CFF to confirm scope, we can recommend
awarding the project to CFF.
The original bid documents are being returned to the Village Clerk, and bid bonds which shall be
returned to all contractors.
Very truly yours,
John Sharkey, AIA LEED – Director of Design
Weston & Sampson, PE, LS, LA, Architects PC
CC: Linda Donnelly- Village Clerk
Dennis Michaels, Esq.
Y:\VILLAGES\NYK Village of Nyack\NYK0198 VH Roof\Rec of Award letterhead.docx
westonandsampson.com
Nyack Village Hall Roof Reconstruction Re-Bid
January 6, 2026
Bid Summary
Total Base Bid + All
Contract Name Bidder Base Bid Alternate 1 Alternate 2
Alternates
Roofing Work CFF Consulting $256,000 $3,000 $8,000 $267,000
Roofing Work Armortite $274,000 $8,000 $5,000 $287,000
Roofing Work Cornerstone Restoration $258,000 $27,000 $12,000 $297,000
Roofing Work DME Construction $269,226 $16,000 $12,113 $297,339
Roofing Work Sanz Construction $316,000 $5,000 $4,500 $325,500
Roofing Work Page Contracting Corp $324,000 $4,700 $7,500 $336,200
Roofing Work VAD Contractors $343,900 $9,000 $10,000 $362,900
Roofing Work Titan Roofing $349,100 $19,500 $7,060 $375,660
Roofing Work CC Roofing Company $378,800 $5,500 $56,450 $440,750
Roofing Work Kario Construction $588,000 $22,500 $3,000 $613,500
Roofing Work Empire Cloud Construction $610,236 $7,000 $7,500 $624,736
Roofing Work Niko K Construction $672,000 $10,000 $31,500 $713,500
Alternate #1: Replace (1) cornice stone
Alternate #2: Provide 30 year warranty
1
Nyack Village Hall Roof Reconstruction Re-Bid
January 6, 2026
Bid Summary
Total Base Bid + All
Contract Name Bidder Base Bid Alternate 1 Alternate 2
Alternates
Roofing Work CFF Consulting $256,000 $3,000 $8,000 $267,000
Roofing Work Armortite $274,000 $8,000 $5,000 $287,000
Roofing Work Cornerstone Restoration $258,000 $27,000 $12,000 $297,000
Roofing Work DME Construction $269,226 $16,000 $12,113 $297,339
Roofing Work Sanz Construction $316,000 $5,000 $4,500 $325,500
Roofing Work Page Contracting Corp $324,000 $4,700 $7,500 $336,200
Roofing Work VAD Contractors $343,900 $9,000 $10,000 $362,900
Roofing Work Titan Roofing $349,100 $19,500 $7,060 $375,660
Roofing Work CC Roofing Company $378,800 $5,500 $56,450 $440,750
Roofing Work Kario Construction $588,000 $22,500 $3,000 $613,500
Roofing Work Empire Cloud Construction $610,236 $7,000 $7,500 $624,736
Roofing Work Niko K Construction $672,000 $10,000 $31,500 $713,500
Alternate #1: Replace (1) cornice stone
Alternate #2: Provide 30 year warranty
1
VIA E-MAIL: administrator@nyack.gov
January 15, 2026
Andy Stewart
Village Administrator
Nyack Village Hall
9 N Broadway
Nyack, NY 10960
RE: Nyack Village Hall – VRV Project
GCA Project No. 25105.00
Dear Andy:
We have reviewed the bids from ACS System Associates, Inc, C+C Service LLC and TM Brennan
Service, Inc, for the VRV installation project at Nyack Village Hall, and we recommend awarding the
contract to TM Brennan Service Inc. TM Brennan’s bid is the lowest cost bid, and they showed a clear
understanding of project scope. The Electrical work for this project was provided by Fanshawe, Inc, as a
lump sum proposal included within the total bid price below. The bid prices below include the materials,
labor and controls work necessary to complete the work for this project.
Total cost for the complete project will be approximately $518,000.
Please let us know if you have any questions.
Sincerely,
Tristan Schwartzman
Bid Analysis: NYACK VILLAGE HALL VILLAGE
Project: Nyack Village Hall VRV
Bid date: 1/6/2026
Scope: Construction Bid
Bidders: ACS System Associates, Inc C+C Service LLC TM Brennan Service, Inc.
Item #1: Mobilization $30,000 $60,000 $25,000
Item #2: ACCU-2-ACCU-3 $30,000 $32,000 $80,000
Item #3: IDU-1-IDU-5 $30,000 $40,000 $43,000
Item #4: AC-2-1 $115,000 $180,000 $150,000
Item #5: Ductwork and Accessories $40,000 $72,000 $50,000
Item #6: Piping and Piping Accessories $210,000 $110,000 $75,000
Item #7: Panel-Roof $19,000 $32,000 $25,000
Item #8: Electrical Work incl. conduit and feeders $61,000 $88,000 $70,000
Total $535,000 $614,000 $518,000
INTEROFFICE MEMORANDUM
TO: MAYOR RAND AND TRUSTEES
FROM: ANDY STEWART , VILLAGE ADMINISTRATOR
SUBJECT: VILLAGE HALL SECOND FLOOR WINDOWS BID RESULTS
DATE: JANUARY 22, 2026
The Village issued a contract opportunity for replacement of 20 windows on the second
floor of Village Hall. Bids were opened on January 15, 2026. Three bids were received:
VAD Contractors, Inc - $62,500
Maruti Construction, LLC - $74,110
Sky Rise, Inc, - $117,000
I have called two references for VAD Contractors, Inc., and they both spoke very highly
of the company, including having hired VAD for multiple projects, including windows,
and wishing VAD would be their low bidder on more projects.
Given this response, I recommend awarding the window replacement contract to VAD.
Note also, that the Village has a total of $45K+/- from its sustainability grant to apply to
this project, leaving a need for gap financing of about $20,000.
1
I NTEROFFI C E MEMORANDUM
TO: MAYOR RAND AND TRUSTEES
FROM: ANDY STEWART , VILLAGE ADMINISTRATOR
SUBJECT: CDBG APPLICATION FOR VILLAGE PROJECT
DATE: JANUARY 22, 2026
The Village CDBG committee has convened twice to review options for the next Village
CDBG application, and considered a range of projects that would fall within the eligible
census tracts and benefit the community.
ELIGIBLE CENSUS TRACTS:
1
Of the projects considered, there are two that have the group’s support and appear both
feasible and fundable.
PROJECT 1 – RE-PAVE AND ENHANCE ARTOPEE/VILLAGE PARKING LOT
AND HEZEKIAH EASTER SQUARE
The lot serves a wide range of residents and visitors and public transportation. The
project would pave the parking lot, Cedar Street with its bus layover zone, and Artopee
Way, all of which have badly deteriorated asphalt and some drainage concerns. The
project would consider design adjustments to the parking lot that would improve traffic
flow without losing parking spaces, and improve aesthetics and landscaping. The project
would review options for the Square, such as replacing missing trees and improving
aesthetics.
2
PROJECT 2 – SIDEWALK IMPROVEMENTS UPPER AND LOWER HIGH AVE
A. N. Franklin/High Ave/Bridge St/Park St – this project would replace the asphalt
sidewalk on the east side of N Franklin, wrap around onto High Ave heading east,
and fix some badly deteriorated sections and corners by Bridge and Park.
B. Polhemus “extension” up towards the apartments/hotel – this project would build
a new sidewalk on the east side of Polhemus extension, to connect the apartments
to the corner of High Ave where sidewalk into the Village begins. School children
would use the new sidewalk to get to the bus stop on High Ave .
A. N. FRANKLIN ST/HIGH AVE
3
B. POLHEMUS EXTENSION/HIGH AVE
4
PROJECT 3 – SIDEWALK IMPROVEMENTS ON LIBERTY STREET
This project would replace a sinking sidewalk on the west side and repair cracked
concrete on the east side.
PROJECTS CONSIDERED BUT NOT RECOMMENDED:
A. Sidewalk on S. Franklin by community garden. Gardeners have voiced concern
over loss of green space. Committee has concerns about burdening Plaza
management with further maintenance responsibilities on a property they already
donate for the community garden.
B. Nyack Housing Authority playground improvements. The NHA has not
responded to inquiries by committee members. The Committee will approach the
NHA again next year.
PROJECTS ALREADY FUNDED (RECENT):
1. Sidewalks - First Ave/Marion/Jefferson – under construction
2. Senior Center roof, windows, doors, HVAC, etc. – in design
3. Sidewalk on Kilby, between Rte 59 and Upper Depew - funded
NEXT STEPS:
1. Public Hearing on February 12, 2026
2. BOT vote to select which application to submit
5