Committee of the Whole
Regular MeetingOconomowoc, WI · May 20, 2025
Minutes
City of Oconomowoc
Committee-Of-The-Whole Meeting Minutes
May 20, 2025 - 6:15 PM
Aldermen Present: Erik Jungwirth, Matt Rosek, Jennifer Aultman Kloth, Kevin Ellis, Karen Spiegelberg, Matt Mulder,
Charles Schellpeper, Rusty McConnell
Also Present: Robert Magnus, Stan Riffle, Mark Frye, Gina Kozlik, Eric Boettcher, Robert Duffy, Kevin Kaari, Jason
Gallo, Jason Herzog, James Pfister, Jen Puccini, Tim Reel, Laurie Sullivan-Murray
Mayor Magnus called the Committee-Of-The-Whole Meeting to order and appropriate meeting notice was confirmed
at 6:15 PM.
Committee Business
a. Discussion on Budget Priorities and Strategic Plan Update 2026
Finance Director Sullivan-Murray introduced the Strategic Plan Goals for 2026 and the Alderman
had the opportunity to discuss priorities or ask questions of the Department Directors.
Boettcher discussed the items for the Park: connecting in the northeast corner of the bike and
pedestrian connection over Hwy 67, Chapman Park Barn and planting restoration, and evaluation of
Village Green enhancements and public restrooms. McConnell said, if there are any funds
remaining this year, he would like to see allocation toward the dog park and improvements they
would like to see there. Sullivan added that the Library is also part of the section and asked also if
there were any other things they would like to see added under quality-of-life assets and community
amenities. Puccini discussed space needs and feasibility study for the Library. Rosek asked about
senior area and if that could be incorporated. Mulder said it was not a major focus area, and he is in
favor of it, but he is concerned about using community dollars for it. Ellis asked about parking.
Aultman Kloth would be interested in partnering with the Senior Center and including that in the
fundraising. Spiegelberg said the Senior Center building is falling part, they need the space and she
thinks it would be a good fit. The Mayor said it used to be 30 – 50 seniors coming for lunch and now
it is only a few. Aultman Kloth said there were seniors there that were interested. Mulder was
concerned about community dollars on something not previously funded by the community.
McConnell asked if there is still going to be a combining of reference and circulation desks. Puccini
answered that the combining of those spaces will get them through the next five years until they
have a new building. Mulder said they are still doing research on the remote, unstaffed branch and
there is no major opposition from the Library Board. Rosek said that would increase the amount of
non-residents which increases the value and dollars coming from the County.
Sullivan-Murray went over the Safe and Secure Community priority items in the plan; these are
Police and Fire and Water and Electric Utility also. Spiegelberg asked if they should include the
Post Office safety crosswalk signals under C. Chief Pfister said that it would be for increasing the
safety and visibility for downtown pedestrians. Cpt. Timm added it is proactive with the crosswalks
midblock for pedestrians in the downtown first before moving to Post Office. Ellis asked about a
crosswalk at Silver Lake Street and by Bolson. Herzog said there was some problem with a private
drive there, but they will get a crosswalk in on the project mid-July. Mulder confirmed $10,000 in
this year’s budget for Lake St. Schellpeper has concerns with the flock camera program and he
asked for an update so they can analyze and assess the program. Rosek would like to add getting
an update under providing safe water and the addition of chemicals to the water. The Mayor said it
1
Committee-Of-The-Whole - May 20, 2025
is planned for Committee of the Whole for June. McConnell asked about full tactical kits. Chief
Pfister said they will be meeting on fundraising for that with Aultman Kloth.
Sullivan-Murray went on to the next area of the plan, Improving and Maintaining Infrastructure
facilities. There are a few other things from Wastewater. The Mayor added the Historical Society
will be doing a large capital campaign to renovate the Historical Society Building and they should
look at adding support. Ellis asked about the electric charging stations and if they could give it to
the gas stations. Kaari said that the Utility is taking a pause on this and there is not a high need at
this time and some legislative changes. He said if there is a need and no one is taking it, they
would look at it. Rosek asked about solar panel concepts to run our facilities. Sullivan Murray said
it was on last year, they researched it and it was pulled after the status update. If they wanted it to
be looked at again, they could. Mulder asked about the fleet and new plow truck on every year and
can they look at prolonging the life on fleet. Frye said every year they review it and if it’s not
needed, they won’t bring it forward. Ellis asked about a study for a parking structure and Rosek
supports it also.
Sullivan Murray went on to the area of Community Growth, a lot of them are ongoing with updates.
Spiegelberg asked if after the 150th they could work on tourism destinations and said the Rotary also
wanted to collaborate on that.
Sullivan Murray reviewed the items on Enhancing the Effectiveness of City Government. Rosek
asked about starting work on construction management policies and updating Council Bylaws or
Council policies. Ellis asked if the Sign Ordinance can also be looked at, Gallo said they started
work on it but they can look at putting together a draft.
b. Discussion regarding funding options for long term Street Improvement planning
Sullivan Murray said they have been discussing putting together a 10-year debt financing plan and
other options over the last several years for street improvement funding. They discussed including
a wheel tax over the last two years through transportation utilities and those are not viable, so the
other option is a 10-year debt financing plan; or the other option given by the state is to use levy and
then, with levy limits, the only way to do that would be through a referendum. They asked Ehlers to
put together a comparison of the costs on referendum versus levy. Borrowing is at 1.8 million now
every year and the city is one of the few cities out there that fund their street improvements through
levy under levy limits. The most common way is through debt because with the levy limit law, then
debt service can be added to the levy limit. Jason Herzog has put together a 10-year street plan.
Greg Johnson from Ehlers presented the models. Rosek questioned why the 1.8 million we are
already funding isn’t removed from these numbers. Mulder asked if it is adjusted to inflation, and he
felt it was underfunding what the need and he is not in favor of a referendum. Sullivan Murray
explained that she just wanted them to see both options. Greg Johnson from Ehlers answered that
the levy limit referendums are usually operational in nature, day-to-day services instead of
infrastructure. Spiegelberg said she would be interested in the percentage it would increase debt.
Adjourn
Motion to adjourn made by Ellis and seconded by Aultman Kloth.
Motion carried 3-0-0.
The meeting adjourned at 7:32 PM.
Minutes taken by Gina Kozlik, City Clerk
2
Committee-Of-The-Whole - May 20, 2025
Agenda
City of Oconomowoc
Committee-Of-The-Whole
Tuesday, May 20, 2025 - 6:15 PM
City Hall - Council Chambers
174 E. Wisconsin Ave. Oconomowoc, WI 53066
(Or immediately following Protection & Welfare)
Notice: If a person with a disability requires that the meeting be accessible or that materials at the
meeting be in accessible format, call the City Clerk at least 48 hours prior to the meeting to request
adequate accommodations. Tel: (262) 569-2186.
1. Call to order and confirmation of appropriate meeting notification
2. Committee Business
a. Discussion on Budget Priorities and Strategic Plan Update 2026
b. Discussion regarding funding options for long term Street Improvement planning
3. Adjourn
Gina Kozlik, City Clerk
City of Oconomowoc
Notice is hereby given that a majority of the Common Council will be present at the above scheduled meeting to gather information
about a subject over which they have decision-making responsibility. This constitutes a meeting of the Common Council pursuant to
State ex rel. Badke v. Greendale Village Board, 173Wis. 2d 553, 494 N.W. 2d 408 (1993) and must be noticed as such, although the
Common Council will not take any formal action at this meeting.
1
MEMORANDUM
CLERK’S DEPARTMENT
Date: May 6, 2025
To: Mayor and Committee of the Whole
From: Gina Kozlik, City Clerk
Re: 2026 Clerk’s Department Budget Priorities
RELATES TO THE STRATEGIC PLAN
Strategic Goal- Goal V. Enhance the Effectiveness of City Government
BACKGROUND
The Clerk’s Department provides service to Elected Officials, residents, businesses, City staff, and
visitors daily. With our primary focus on customer service, we handle public inquiries, process alcohol
and related licensing, prepare for and attend official meetings, finalize and maintain city records, and
administer all phases of Elections.
The City’s continued growth and legislative changes affect our responsibilities and place more demands
on the department, particularly in the area of Elections.
BUDGET PRIORITY ANALYSIS
Continuing with the 2025 budget goal related to Badger Books and poll location challenges, I am also
considering options for processing the increased amount of absentee ballots on Election Day. There is
a central count procedure available to Municipalities under Wisconsin law that would allow absentees to
be tabulated here at City Hall under the direction of the Clerk using absentee tabulating election staff.
This processing change would also alleviate the necessity to transport absentee ballots out to the polls.
With no easy solution to finding new poll locations with schools having safety concerns, and most
locations not having sufficient floor space or parking, removing absentee will ease some of the stress at
the polls.
While I would like to continue to evaluate Badger Books, there are software and hardware updates on
the horizon making them more transportable and expanding useability. In considering this, I would also
like to evaluate the ability to run Central Count at City Hall using a Badger Book to log and track the
absentees processed.
Customer Service Area Improvements: I would also like to make improvements to the Clerk’s customer
service front desk area for improved customer experience and service delivery. Staff will be getting
estimates and investigating options for renovation.
1
2
FINANCIAL IMPACT
Initial cost estimate would include a City Hall Badger Book setup for absentee and wages for additional
absentee tabulators. Estimate $20,000 (carry-over from 2025) for the Badger Book, and additional
election absentee tabulating staff wages at an additional $3,000 for an even-year, four election cycle
($1,500 increase for odd-year, two election cycle year).
Cost for Customer Service renovation is not known at this time.
2
3
MEMORANDUM
PUBLIC WORKS
Date: May 6, 2025
To: Mayor and Committee of the Whole
From: Jason Herzog, Department of Public Works
Re: DPW 2026 Budget Priorities
BUDGET PRIORITIES
In preparation of the upcoming 2026 budget cycle, you will find below goals or objectives that will be of
interest for the department of public works. The majority of these projects have been part of long term
plans, strategic planning, or standard City growth solutions.
1. The replacement of the single lane 1950 steel bridge on Lapham Street.
a. A Local Bridge Grant was submitted in 2021 and recently awarded in 2022 to cover most of
the design and construction cost.
b. The proposed plan is to replace this single lane bridge with a full two lane bridge with
sidewalk on the west side.
c. Lapham Street will be widened to accommodate the new bridge width and allow for standard
north and south traffic.
2. Major street replacement projects. Update the 10-year replacement plan
a. 2026
i. Lisbon Rd
ii. Lake Dr
iii. Second St
iv. Parkview Subdivision
v. Glenview Ave
3. Lake Bluff Drive Connection
a. Review Permitting
b. Review Engineering
4. Wisconsin Avenue Improvements
a. Engineering design services for 2026
b. Approximately 300’ of street work to be included with the DOT’s project.
1
4
MEMORANDUM
ECONOMIC DEVELOPMENT & TOURISM
Date: May 6, 2025
To: Mayor and Common Council
From: Bob Duffy, Economic Development & Tourism Director
Re: 2026 Economic Development and Tourism Budget Priorities
TOP BUDGET PRIORITIES
The City of Oconomowoc is becoming the destination of choice for new residents, development, businesses, and
redevelopment opportunities. As this attraction continues the City must enhance areas of our organization to
promote all Oconomowoc has to offer, the growth areas available for new and redevelopment opportunity, as well
as celebrate our past and rich history through upcoming significant milestones. These are the primary elements
the Economic Development & Tourism Department intends to focus on in 2025 and beyond.
Priority #1 Implement East Wisconsin Avenue Redevelopment Master Plan
The City adopted design guidelines for the E. Wisconsin Avenue corridor to encourage development and
redevelopment opportunities. The City has also established a City Strategic Plan goal to Develop Options and plan
for E. Wisconsin Avenue corridor. In 2024, City Staff worked with UWM Community Design Solutions (CDS) the
prepared a market, land use and conceptual based scenario/approach to identify redevelopment projects that are
feasible to pursue within the area.
Implementation will be necessary for the City to realize its vision and strategic plan goal for the E. Wisconsin Avenue
corridor. To proceed with the implementation of the E. Wisconsin Avenue Redevelopment Master plan, staff
recommends that the City Council allow the Community Development Authority to pursue and seek out
redevelopment opportunities within the E. Wisconsin Avenue corridor.
Funding for these initiatives related to environmental concerns, demolition, site development and public/private
partnership opportunities would necessitate the creation of an additional TIF district for the area.
Priority #2 Facilitate & Promote Key Development Areas
The Economic Development Department's vision is for Oconomowoc to successfully compete on the state and
regional stage for various development opportunities, growth of businesses, and attract talented individuals who
fuel them. To make this vision a reality, our strategy is driven by the three goals for the City of Oconomowoc:
• Establish Oconomowoc's competitive edge.
• Become a hub for diverse business opportunities.
• Ensure continued community vitality.
Oconomowoc can position for the future through the facilitation & promotion of several key development areas:
Re-investment and revitalization of the Olde Highlander recreation complex;
1
5
Commercial and mixed-use expansion opportunities at Olympia Fields;
Regional commercial real estate investments in the Pabst Farms area
o Wingspan Mixed-use development
o Pabst Farms Town Centre completion (Eastern & western areas)
Through this key development the City can realize continued tax base expansion, business attraction, and
employment opportunities for our community.
We anticipate any funds needed could be achieved through the budgeted CDA professional services line item.
Priority #3 Attraction/Collaboration through Wingspan & Tech Hub Partnerships
The City of Oconomowoc is attracting considerable investment in Pabst Farms with the large 200,000+ Sq. Ft HSA
building, as well as the four Wingspan Innovation & Incubation buildings totaling 320,000 Sq. Ft. These
developments will serve as a catalyst for employment, enhanced tax base, and long-term sustainable economic
development opportunities. This will also allow Oconomowoc to be a place for fostering innovation,
entrepreneurship, and strategic partnerships across various industry sectors. Recently, SE Wisconsin was identified
by the U.S. Commerce Department as a regional tech hub. Oconomowoc’s strategic location between Milwaukee
and Madison allows direct access to the strength of our state’s bio-health and personalized medicine industry which
can become a leverage asset. Oconomowoc will have the availability of site & building locations to expand
opportunities for the commercialization of medical research, research lab space, computing, engineering, and
advanced technology manufacturing to drive innovation. With City Staff engaged in these efforts the City can
capitalize on this business attraction opportunity and involvement with the key facilitators & decision makers.
Through our collaboration, the City will facilitate the successful partnership to implement the Wingspan Innovation
& Incubation building availability for regional tech hub opportunities. These efforts will serve as a catalyst for
attracting investment, encouraging innovation, as well as drive economic growth and job creation. By engaging in
this strategic initiative, the City can collectively transform our economic landscape. My belief is that as
stakeholders, Oconomowoc should support these endeavors, recognizing its potential to enhance our city’s
competitiveness, diversify our tax base and lead to future prosperity.
2
6
MEMORANDUM
FINANCE DEPARTMENT
Date: May 6, 2025
To: Mayor and Committee of the Whole
From: Laurie Sullivan-Murray, Finance Director
Re: 2026 Finance Department Budget Priorities
RELATES TO THE STRATEGIC PLAN
Strategic Goal- Goal V. E. Maintain/Improve the City’s Financial Sustainability
BUDGET PRIORITY ANALYSIS
Budget Priorities for 2026:
1. Key to the financial stability of the City is planning for Capital Assets and Infrastructure
improvements. The City prepares a 5-year Capital plan annually that is reviewed by
Council. The largest expense in the Capital Plan is Street Improvements. In 2025 the
City budgeted $2.8M for Street Improvements. The funding comes partly from Levy
($1M) and partially from the issuance of Debt. At the May 20th Committee of the Whole
meeting, we will be discussing with Council funding options for a 10-year Street
improvement plan.
2. The City relies on Parks Impact Fees to provide new and improved parks to the City
Residents. With the recent consolidation of the Village of Lac La Belle and the Town of
Oconomowoc, and the border restrictions, now is a good time for Staff to research the
remaining availability of impact fee funds. A study of the remaining land use in the City
and estimating the build out will give Council the information necessary to make
decisions regarding priorities in the future use of impact fees.
FINANCIAL IMPACT
Evaluated through the 2026 Capital Budget process
1
7
MEMORANDUM
LIBRARY DEPARTMENT
Date: May 6, 2025
To: Mayor and Committee of the Whole
From: Jen Puccini, Library Director
Re: 2026 Library Goals and Budget Priorities
TOP BUDGET PRIORITIES
1. Finalize Building Project Goals
Finalize building project goals based on completed Feasibility Goals and initiate appropriate
next steps for project for a potential Capital Campaign.
2. Combining reference and circulation desks into a single service point.
Our goal is to have the new desk purchased by the end of 2025. The installation of the desk
will happen late 2025 or early 2026. Once desk is installed, we may need new flooring,
updated technology, and/or electrical work.
3. Increase our Library of Things Collection
The Library of Things is a collection of non-traditional items that supports creativity, lifelong
learning, and social connection. At this time, we have Explore Passes, Hotspots, Rokus,
Early Learning Kits, and Memory Care Kits. We will gradually add to this collection with
donations and purchases.
4. Financial Impact
The financial impact has yet to be determined.
8
MEMORANDUM
PARKS, RECREATION & FORESTRY
Date: May 6, 2025
To: Mayor and Committee of the Whole
From: Eric Boettcher, Director of Parks, Recreation & Forestry
Re: PRF 2026 Budget Priorities
CAPITAL BUDGET
1. Bike and Pedestrian Plan Updates
a. Addition of amendments to include future expansion
b. Focus on NE quadrant for pedestrian crossway over HWY 67
2. Transitioning Champion Fields to Northeast Regional Park
a. Partnership with OSA and 5 O’s
b. Developing concept plan and cost estimates
c. Provide phased plan for park areas for varied sports areas
3. Lake Country Trail Phase #5 addition
a. Connection from Second Street to Jefferson County portion of trail
b. Additional parking for trail corridor access
OPERATIONAL BUDGET
1. Funding for Rockwell, Boat Launch and Chapman Park Restrooms
a. Restroom Utilities & Maintenance - $TBD annually
2. Oconomowoc Community Center Improvements
a. 2026 Improvements
i. Surfacing Lakeside Porch and Steps
ii. Upgrade Sound System
3. Park and Street Bench Amenities
a. Coordination effort with parks and streets for amenities replacement program
1
9
MEMORANDUM
PLANNING DEPARTMENT
Date: May 6, 2025
To: Mayor and Committee of the Whole
From: Jason Gallo, City Planner / Zoning Administrator
Re: 2026 Planning Department Budget Priorities
BUDGET PRIORITIES
In 2025 / 2026 Planning would like to complete the following items:
1. Subdivision Ordinance Re-write – The ordinance known as Chapter 18 Subdivision and
Platting Ordinance for the City was drafted in 1982 and has had various updates throughout
the years. This can be completed as a joint effort between City Staff and outside consultant
assistance and possible legal review. Staff will be requesting $20,000 in 2026.
1
10
MEMORANDUM
DEPARTMENT – POLICE DEPARTMENT
Date: May 6, 2025
To: Mayor and Committee of the Whole
From: Chief Jim Pfister
Re: Police Department’s Top Budget Priorities for 2026
BUDGET PRIORITIES
The police department would like to prioritize the goals and budget priorities listed below for 2025:
1. Rifle Plates
By supplying officers with 30 rifle plates to use with their body armor at an estimated cost of $14,325,
we greatly enhance their chances of surviving bullet and blunt force trauma. The fire department, which
usually arrives after law enforcement has secured the scene or neutralized a threat, is equipped with
helmets and rifle plate carriers. Officers will wear these lightweight plates daily along with their body
armor. These rifle plates provide increased protection against multiple rifle threats while only adding
about 1.0lb of weight. This gear empowers our officers to confront threats directly and better protect our
community. With the right equipment, our officers can confidently respond to dangerous situations during
active assailant incidents, quickly assist victims, perform life-saving evacuations, and effectively manage
threats, ultimately saving lives and reducing risks.
2. Push Button LED Flashing Crosswalk System
Crosswalk safety downtown is still a major issue with citizens. To increase safety the police
department will be seeking additional resources to promote enhanced crosswalk awareness for
approaching vehicles. The LED Flashing Crosswalk System is a wired/solar LED traffic warning system. With
the push button activation, this system turns on both sides of the road with motion. It is built with an
aluminum alloy board and solar board combined. This crosswalk will increase visibility for drivers on the
road with its bright blinking (flashing) LED lights. The anticipated locations will be the 100 block of E.
Wisconsin crossing by City Hall, the 100 block of E. Wisconsin Avenue between Bootleggers and Fray, the
100 block of S. Main Street around the post office and the 100 block of N. Main Street around Splash Martini
Bar. The estimated amount for each specific location is $15,600.00. Currently the city does not have full
time power to these locations. The police department is working with utilities to solve that problem or
explore a solar/temp power solution.
We would like to purchase two pairs of LED flashing crosswalk systems on 100 block of S. Main Street
around the post office. If this system provides positive feedback, we would like to implement another two
locations in the future. The total cost would be estimated at $31,200.00 for the two locations.
1
11
3. Police Staffing Request
The request is for one full-time officer to be added to the roster of the police department. This
position would be funded with already existing funding in the police budget. The police department has
continuously reviewed staffing in different areas. The review of the Police Support Specialist area has
been completed over the past two years after switching to WCC for dispatching. It is the recommendation
of the Police Department to reduce the Police Support Staffing from 5 to 4. The department would also
eliminate the Part-Time Police Support Specialist position as well. This will be achieved after significant
review of operating hours and workload. The reductions would change the hours of the front office from
24/7 to 6 am to 10 pm Monday through Friday.
The police department has further removed the water patrol from the budget and will only retain
one boat for emergency rescues on the lakes. The reduction in water patrol funds, one Full-Time Police
Support Specialist and Elimination of Part-Time Police Support Specialist would total about $137,00 and
the cost of a lateral transfer officer is about $146,000. This leaves a deficit of $9,000 that would have to
be added to the budget for 1 new full-time officer position for 2026.
4. Ballistic Helmets
By providing officers with 30 ballistic helmets and 30 ballistic face shields, at an estimated cost of
$22,500, we significantly enhance their chances of survival. Ballistic helmets are a vital part of personal
protective equipment (PPE), greatly improving safety for our officers in high-risk situations involving
bullets, shrapnel, and blunt force trauma. This gear empowers our officers to face threats directly and
better protect our community. With the right equipment, our officers can confidently enter dangerous
situations during active assailant incidents, quickly assist victims, carry out life-saving evacuations, and
effectively manage threats, ultimately saving lives and reducing risks. This focused investment is key to
creating a safer environment for everyone. Our community, which includes approximately 940
businesses employing 15,368 people and schools educating nearly 6,000 students, deserves the best
protection possible. Recent events, like those at the Oconomowoc industrial facilities, sadly
underscore the urgent need for advanced gear to keep our officers safe.
5. Mats for Jiu-Jitsu training
The purpose of the mats for jiu-jitsu training would be for defense and arrest tactic training. We
would use the multi-purpose room at the police department for in-house training. The department has
sent a few officers to law enforcement jiu jitsu training (train the trainer) to be able to teach the rest of
the officers. The cost of the mats (30ft x 30ft) is estimated to be between $6,234.51 to $7,000.00. The
mats can be easily rolled out for training and future needs. These training mats can also be used for the
physical agility process for new recruits. We currently go to Oconomowoc High School to use their
wrestling mats when available.
FINANCIAL IMPACT
Evaluated through the 2026 Capital Budget process.
2
12
MEMORANDUM
DEPARTMENT - ELECTRIC, WATER & FLEET UTILITY
Date: May 6, 2025
To: Mayor and Committee of the Whole
From: Kevin Kaari, Utility Manager
Re: Top Priorities for 2026 Budget – Utilities & Fleet
RELATES TO THE STRATEGIC PLAN
Strategic Goal- I. IMPROVE & MAINTAIN EXISTING INFRASTRUCTURE
BACKGROUND
The following goals and objectives are important for the utilities and fleet department as the 2026
budgets are developed. Most of these initiatives are multi-year initiatives to ensure our drinking water
is safe, our electricity stays affordable and reliable, and that our fleet equipment allows our
employees to do their jobs safely and efficiently.
For the electric utility, modelling and load tracking tools have been developed in 2024 and 2025 to
forecast feeder and substation loading at the time of system peak. Each fall, our peak loads are
analyzed and compared to our load projections from the previous year. Based on the outcomes of
our studies, the results are used to develop projects proactively and allows the utility to plan for
capital funded solutions to alleviate the risk of overloading. These tasks are repeated every year.
1) New infrastructure required due to new load growth.
a. New underground lines and equipment installations needed to serve new customers.
2) Conversion of overhead power lines to underground.
a. The city has 95% of its primary feeders and distribution lines buried underground. Each
year we develop projects to convert overhead areas to underground lines.
3) Purchase capital spares for our most important equipment.
a. Lead times for critical equipment remain at 75 to 90 weeks. Spares are required for quick
recovery in case of failure of this equipment.
4) Cable and Equipment Replacement Program - 2026
a. Continue to replace underground cable that is nearing its end-of-life or has had reliability
issues
b. Replace aged equipment on our electrical distribution system that has reached the end of
its useful life.
5) Lead Service Lateral Replacement Program, 2026
a. Apply for safe drinking water grant and loan programs.
i. Historically, Oconomowoc does not qualify for State funding.
b. Alternative funding for options for private side lead laterals include:
i. Low-interest loan (1%) options for residents through Bank Five Nine. Place on tax
roll for 5-year pay back – estimated replacement cost of $5,000 would be
$1000/year.
1
13
ii. Consider a water rate case that could include monies to replace private side lead
laterals. Would add a small fee to water rates to be earmarked for future private
side lead replacements.
c. Utility (public-side) lead service lateral replacements
i. Continue funding replacements through the yearly street projects, as submitted
annually in the 5-year capital plan.
6) New Utility Complex
a. The Parks Department continues to work towards planning the relocation of Champion
Fields baseball facilities to the Northeast Regional Park.
b. A timeline will be developed for a new Utilities complex, when the availability for the
proposed utility land is known.
7) Fleet Software
a. The implementation of Fuel Master software in 2025/2026 will allow for automation of
preventative maintenance service and will allow for better reporting capabilities on our
fleet’s performance.
FINANCIAL IMPACT
Evaluated through the 2026 Capital Budget process.
2
14
MEMORANDUM
WASTEWATER/OWPP
Date: May 6, 2025
To: Mayor and Committee of the Whole
From: Tim Reel, Wastewater Operations Manager/Employee Safety Manager
Re: 2026 Budget Priorities
BUDGET PRIORITIES
1. Assess Facility Planning effort to develop implementation strategy based on recommendations.
A draft of this document will be available mid-2025. After review, this document will be
submitted to WDNR for official approval. Specific items of interest are:
a. Electrical systems upgrade - This most likely will include specific motor control centers
(MCC’s) along with evaluation of feed conductors.
b. Solids Thickening equipment – Evaluation and replacement of 40-year-old solids thickening
equipment
c. Evaluation of RAS suction side piping deficiencies
d. Evaluation of aging infrastructure at the facility – This will include items such as: in-operable
valves, gates, HVAC and hydrant components
2. SCADA system update – This work will be a collaborative effort with consultants, City IT and
Wastewater personnel. This work could be included as part of a larger Facility Planning scoping
project or dealt with as a standalone project.
a. Evaluation and updating of system hardware components
b. Evaluate software licensing balancing economics and needs of the Utility
c. Review and development of software alarm and notification system
d. Review and development of SCADA user interface
3. Sanitary mainline rehab in collaboration with 2026 Street Program - The goal of the program is to
maintain and improve upon the overall condition of buried sanitary infrastructure. This is done
through:
a. Utilization of cured in place pipe (CIPP) technology to line specific pipes, from the inside. By
most accounts this adds 50 years to the lift or the line.
b. Use of pipe televising allows us to prioritize future repairs and to positively identify the root
cause of blockages or troubled locations.
c. Annual inspections assist with asset inventory and aids in condition assessment for manhole
structures while also providing feedback on restoration impacts.
1
15
Memorandum
TO: MAYOR AND COMMON COUNCIL
FROM: BRADLEY R. BOWEN, FIRE CHIEF/EMERGENCY MANAGEMENT
DIRECTOR
SUBJECT: 2026 BUDGET PRIORITIES
DATE: THURSDAY, MAY 1, 2025
CC: FIRE BOARD
Below are the budget priorities for the Western Lakes Fire District for budget year 2026.
Budget Priorities
1. Professional Development Program – Recruit, Retain, Development of Personnel as Succession
Planning Program: Over the past three years, substantial funding has been allocated to ensure that
the District maintains adequate daily staffing levels to meet the needs of the municipalities it serves.
The development of a diverse array of professional development programs is essential for the District
to remain competitive in its recruitment and retention efforts. Investing in the employees who serve
the District is critical to their individual success as well as the overall success of the District. One of
the goals is to establish professional development and training programs tailored to the various
classifications of employees within the District. These programs are designed to provide ongoing
knowledge and skills enhancement, which will contribute to employee retention and effective
succession planning.
2. Centralized and Consolidate WLFD Management Team within Administrative Headquarters
and Training Facility While Reducing Management Positions: Secure and allocate capital
funding over the next two to five years for the purpose of designing, constructing, and
operationalizing a centralized Administrative Headquarters. This facility will integrate leadership,
administrative functions, and essential support services, which will include a comprehensive training
center, a fleet maintenance garage, and an Emergency Operations Center. The establishment of this
centralized facility is intended to enhance operational efficiency, optimize resource allocation, and
improve firefighter competency across the 215 square mile service area.
a. Current Management Offices: The management team of the District is currently distributed
across five separate stations, resulting in inefficiencies and delays in communication,
meetings, and overall operations. In response, the leadership team has formulated a strategy
to decrease the number of management personnel through attrition over the next one to five
years. Consequently, it is imperative that the remaining administrative staff are centralized in
a single location to foster collaboration, enhance team dynamics, and increase operational
efficiency. This consolidation will minimize the necessity for staff to travel across the
District for meetings and facilitate the prompt resolution of issues involving all
administrative personnel.
Pabst Station: 1400 Oconomowoc Parkway; Oconomowoc, WI 53066 – Fax: 262-569-6430
Dousman Station: 107 S. Main Street; Dousman, WI 53118 - Fax: 262-431-4812
Oconomowoc Station: 212 S. Concord Road; Oconomowoc, WI 53066 – Fax: 262-569-3297
Sullivan Station: 912 Front Street; Sullivan, WI 53178 – Fax: 262-593-8123
Okauchee Station: W349 N5060 Shady Lane; Okauchee, WI 53069 – Fax: 262 567-0503
Stone Bank Station: W335 N7107 Stone Bank Road; Oconomowoc, WI 53066 – Fax: 262.966.2831
16
b. Current Facility Challenges: The current fire stations were not designed or constructed to
accommodate today's staffing levels. Through renovations, these stations have integrated
living areas that include kitchens, bedrooms, showers, and offices. However, due to the
limited space in existing facilities, company officers and full-time personnel often utilize
bedrooms that also serve as offices. Furthermore, the lack of adequate storage space hinders
the effective organization and storage of essential station supplies.
c. Fleet Maintenance and Training: Currently, the District lacks a designated location for live
fire training, which impacts both the ISO rating and insurance premiums; however, the more
pressing concern is the training and experience of the District's firefighters. The existing
training facilities are insufficient to accommodate larger training sessions. Establishing a
central training facility would enhance training opportunities significantly. Additionally, the
current fleet maintenance shop comprises two apparatus bays located at the northernmost
station. While this location is functional, it is not centrally situated. As a result, when
apparatus requires maintenance or when a secondary unit needs to be placed in service due to
a failure, it must travel from a more distant location. Centralizing fleet maintenance alongside
the administrative facility will improve the efficiency of apparatus repairs and maintenance
operations.
3. Emergency Operations Center: The District provides Emergency Management Services to seven
municipalities. It is unnecessary for each municipality to establish an Emergency Operations Center
(EOC), as this would incur significant costs for infrequent usage. Currently, Fire Station 51 and the
City of Oconomowoc Police Department are equipped to operate as Emergency Operations Centers.
However, both locations require technological upgrades and enhancements to their operational
capacities. As part of the development of the Administrative Headquarters, a centralized EOC will be
integrated within the training facility. To secure a secondary location, improvements to the City of
Oconomowoc Police Station EOC will also be implemented. Funding for the Fire Station EOC will
be incorporated into the overall building expenses, while in 2028, an allocation of $30,000 is
designated for the joint EOC.
4. Addressing of Properties: During emergency responses conducted by Emergency Medical Services
(EMS), fire departments, and law enforcement agencies, time is of the essence; often, seconds can
make a critical difference. It is essential for all municipalities to enforce ordinances pertaining to the
visibility and proper posting of property addresses. Typically, these requirements specify standards
related to size, color, and legibility. However, the implementation of such standards varies
significantly, resulting in situations where emergency responders are unable to locate addresses
promptly. The objective of the District is to mandate the use of “Fire Numbers” for properties within
municipalities that have not yet established consistent and standardized signage protocols. To this
end, the municipalities that require consideration for implementing these standards include the City
of Oconomowoc, the Village of Dousman, and the Town of Ottawa. Presently, several municipalities
within our service area have adopted these measures, while those that have not will be encouraged to
do so.
5. Capital Improvements
a. Radio Replacement Program (2028/2029): Collaboration is underway with Waukesha
County and its municipalities to implement upgrades to the County Radio System,
Pabst Station: 1400 Oconomowoc Parkway; Oconomowoc, WI 53066 – Fax: 262-569-6430
Dousman Station: 107 S. Main Street; Dousman, WI 53118 - Fax: 262-431-4812
Oconomowoc Station: 212 S. Concord Road; Oconomowoc, WI 53066 – Fax: 262-569-3297
Sullivan Station: 912 Front Street; Sullivan, WI 53178 – Fax: 262-593-8123
Okauchee Station: W349 N5060 Shady Lane; Okauchee, WI 53069 – Fax: 262 567-0503
Stone Bank Station: W335 N7107 Stone Bank Road; Oconomowoc, WI 53066 – Fax: 262.966.2831
17
transitioning to Phase II by the year 2028. This initiative entails the replacement of legacy
radios that exceed ten years of service life, which is consistent with the expected operational
lifespan of such equipment. The project encompasses the coordination of a countywide group
purchasing effort, aimed at negotiating a favorable price reduction with Motorola as part of
this collective acquisition. The successful execution of this upgrade and the subsequent
replacement of equipment will enhance communication capabilities throughout the county,
which is essential for ensuring the safety and efficacy of emergency responders.
b. Apparatus Replacement Program: The District's long-term capital improvement plan
encompasses the replacement of various pieces of equipment and apparatus. This plan has
been structured to span the next 20 years and is subject to ongoing reevaluation. This process
includes assessing the utilization and service life of each piece of equipment and apparatus in
accordance with national, state, and industry standards. The capital improvement plan has
been intentionally designed to minimize fluctuations in annual expenditures. As part of the
yearly evaluation of the capital improvement plan, the usage and consolidation of apparatus
are taken into account. As municipalities evolve and service expectations change, the
requirements for equipment and apparatus also adapt accordingly.
c. Fire Station Future Facilities Needs: In 2025, the District will work with a professional
consultant to conduct a facilities needs assessment and an impact fee study. As various
municipalities undergo growth and development, it is essential to strategically plan for the
future. This assessment will utilize municipal master plans to determine the necessity for
additional or relocated fire stations within the District, thereby ensuring appropriate response
times and optimal services.
Pabst Station: 1400 Oconomowoc Parkway; Oconomowoc, WI 53066 – Fax: 262-569-6430
Dousman Station: 107 S. Main Street; Dousman, WI 53118 - Fax: 262-431-4812
Oconomowoc Station: 212 S. Concord Road; Oconomowoc, WI 53066 – Fax: 262-569-3297
Sullivan Station: 912 Front Street; Sullivan, WI 53178 – Fax: 262-593-8123
Okauchee Station: W349 N5060 Shady Lane; Okauchee, WI 53069 – Fax: 262 567-0503
Stone Bank Station: W335 N7107 Stone Bank Road; Oconomowoc, WI 53066 – Fax: 262.966.2831
18
2025 Strategic Plan update and Budget Priorities
NAME:
COUNCIL NOTES
* USE THIS WITH THE STRATEGIC PLAN UPDATE HANDOUT TO
KEEP TRACK OF NOTES AND IDEAS
Page # 7
19
Strategic Goal Objective Strategies/Tactics
1. Evaluate and implement police strategic staffing plan: create implementation plan and report out (increase police officers per shift on road)
A. Maintain
2. Research AI/Virtual Reality Training Platforms
Quality of Police
3. Evaluate set up and basic requirements for the EOC room at the Police Department. Plan and budget for upgrades.
Services
1. Implementation of the Sustainable Staffing Plan- Phase 3
2. Evaluate Fire District future facilities needs
B. Provide Quality
3. Evaluation of the one or two aerial ladder concept
I.Provide a Safe Fire and EMS
4. Explore additional opportunities to improve ISO rating
Services
and Secure 5. Research federal/state grant opportunities for staffing and capital equipment
Community
Staff Owners:
C.Enhance 1. Investigate options for addressing safety and visibility for downtown pedestrian crosswalks
Utility Director,
Programs for
Police Chief,
Citizen Safety
WWTP Director,
Fire Chief.
Future State: Public 1. Convert overhead power lines to underground – 95% complete – coordinate with street, water and sewer replacements planning
D. Provide Reliable,
safety is paramount in all and funding in annual budget
High Quality, and
of the City’s services Affordable Power
2. Underground Cable and Equipment Replacement
3. Evaluate Peak feeder and substation loading times
1. Continue implementation of the Oconomowoc Watershed Protection Program (OWPP)
2. Implement samplong to monitor residential chloride levels
E. Provide and
3. Evaluate and implement annually State grant funding for private side lead water laterals replacements and adjust Utility program as needed.
Foster Safe and
and continue to replace Utility side lead laterals in conjunction with street program
Clean Water
4. Implement an overall Water Quality improvement plan for water reservoir at wells 4 and 6.
5. Evaluate and address iron filtration options at City Well sites.
Department Notes:
JP New Item for A: Evaluate Police Protective Equipment needs. Ie: Rifle Plates/Ballistic Helmets
BB New Items for B: Implement Professional Development Program/Centralize and Consolidate WLFD Management Team/Investigate mandatory addressing of properties
KK New Item for D: 4. Assure inventory for Equipment Failure: Lead times for some of the key electrical equipment on our distribution system are 75 to 90 weeks long. Failure of this equipment, without
a replacement available could jeopardize the reliability of electical service to our customers.
Council Notes:
20
Strategic Goal Objective Strategies/Tactics
1.Develop a city inventory of major assets and projected replacement schedule
a.City parcels/streets/
b.Water utility – parcels/infrastructure/facilities
c.Electric utility – parcels/infrastructure/facilities
A. Maintain Our
d.WWTP – parcel/infrastructure/facilities
Improve and Maintain Existing
e.Fleet – inventory/develop funding replacement cycle
Our Infrastructure / Infrastructure
2.Accelerate / enhance street improvement/maintenance plan to include water main replacement and Sewer Main rehab program.
Facilities
3.Evaluate cost savings using a hybrid of In-house and Contracted Engineering services.
Staff Owners:
4. Replace existing blowers with NEROS blowers in 2025
Public Works Director,
Utilities Director,
WWTP Director
1.Lake Bluff Drive extension – design and permitting, (2025), possible construction (2026)
Future State: B. Plan and
2. Wisconsin Avenue Improvements in conjunction with the DOT
Oconomowoc has a safe Complete Road
3.Lapham Street Bridge – permitting, design, and construction.
and effective Extensions
4.Oconomowoc Parkway extension – This project needs involvement from Waukesha County
infrastructure that
provides a framework for
1.Complete City Hall space study and remodel - Reconfigure/review space utilization at City Hall.
optimal community
C. Identify Future 2.Evaluate and plan for the future facility needs of the Electric and Water Utility.
enjoyment
New Projects, 3.Research the addition of electric charging stations.
Timeline for 4.Be a leader in renewable energy
Implementation 5.Construction of Outside Waste Receiving Station for Septic and Holding tank at WWTP
and Funding 6.Research energy production from waste
Mechanism
Department Notes:
TR New item for A: Assess and prioritize repairs or replacement of lift station pumps and control panels. Goal is to develop a relaement/repair schedule for future planning.
TR New item for C: Using the WWTP Facility Planning Report, review and prioritieze recommendations based on need and economics
Council Notes:
21
Strategic Goal Objective Strategies/Tactics
1. Explore options and plan for E Wisconsin Ave Corridor
Focus on a. Find funding resources for implementation or RFP
2. Promote the St. Paul/E WI redevelopment area.
Community 3. Promote downtown development.
A.Research
Growth and Plan for 4. Continue working on the development of the NE area.
City 5. Develop options and housing diversity (starter homes, attainable housing, mix ratio) finding regional solutions.
Development 6. Explore providing zoning incentives to developers who provide attainable housing.
Staff Owners: Economic 7. Consider allowing accessory dwelling units and live-work units to provide housing as well as affordable office or workspace for entrepreneurs.
Development Director, 8. Explore grant funding opportunities or TIF district incentives for businesses.
Planning Director 9. Utilize/expand the major façade program funding plan.
1. Establish border agreements with adjacent municipalities.
Future State: B.Plan for Future
2. Encourage development within 67/I94 Corridor – promote corridor not individual areas
Oconomowoc is Growth Areas for
recognized as a premier a. Encourage Pabst Farms area development.
Regional
community in Lake Country b. Facilitate and promote development of the Olympia Fields Proactively promote for business attraction.
Development
by fostering an 3. Maintain existing and evaluate future opportunities for private-public partnerships, where appropriate.
entrepreneurial spirit and
tourism destination, 1. Report on options available for commuter and workforce transportation – internal connections roadway/trails/paths and on-road bike routes.
developing and retaining a Plan for Future 2. Explore connecting the Nature Hill School with Meadowview School with pathway.
diverse mix of employees Transportation 3. Improve alternative transportation options (electric vehicle, ride sharing, bike share, etc.)
and employment
opportunities, and
D.Create Tourism 1. Enhance historic property inventory and education of historic regulations.
revitalizing catalytic
Destination 2. Explore creative ideas for Tourism funds.
development areas
Initiatives 3. Plan and Coordinate Milestone Community Celebrations
Department Notes
RD Attraction/Collaboration through Wingspan & Tech Hub partnerships
Council Notes:
22
Strategic Goal Objective Strategies/Tactics
A.Plan and 1. Reconstruct Lac La Belle Boat Launch - design/engineering, grants, multi-jurisdictional funding, construction.
Implement 2. Evaluate the Champion Fields 5-year Improvement Plan – Compare option of moving ball fields to NE Region Park.
Quality of Life 3. Plan and develop John and Lavinia Rockwell Park phase 2.
Assets and 4. Plan and construct Oz Plaza Improvements.
Community 5. Plan and develop Northeast Regional Park- restrooms, playground, athletic facilities, lighting, other park amenities
IV. Improve Our
Amenities
Quality of Life
Assets B. Review and 1. Research and evaluate alternative schedules for parks mowing.
Staff Owners: Update Parks, 2. Prioritize connectivity throughout the City by updating the Bicycle and Pedestrian Plan to connect neighborhoods to schools, businesses and parks
Parks Director, Recreation and 3. Explore additional uses for the lower level of the Community Center.
Library Director
Future State: 1. Evaluate Village Green enhancements and public restrooms in downtown.
Community members 2. Optimize Library facility and location to meet current and future community needs
are proud of the natural, C. Evaluate i. Library Space Needs Analysis
cultural and recreational Future 1. Secure funding for space needs analysis
assets of the City Community 2. Evaluate identified needs and review options for remodel/expansion
Needs and 3. Work towards combining the reference and circulation desks to create a single service point.
Projects 4. Maximize the use of self-service kiosks at the Library
5. Assess underutilized park property and other city property.
6. Analyze future senior services needs
Department Notes:
EB Plan and develop safe connection in the Northeast Corner of Oconomowoc bike and pedestrian connection over Highway 67
EB Chapman Park Barn Park Planning and Implementation - Barn and Native Planting Restoration
EB Evaluate Village Green enhancements and public restrooms in downtown. *Moves from Objective C (Future) to Objective A
Council Notes:
23
Strategic Goal Objective Strategies/Tactics
1.Implement Badger Books system for Elections- Implement Central Count of Absentee votes with hybrid of Badger Book
Enhance the A.Update City 2.Update Subdivision and Platting Ordinances
effectiveness of Ordinances & 3.Update the Sign Ordinance
our city Elections 4. Research and update Pay for Poll Workers including Training and In Person Voting days
5. Evaluate Polling Locations for size and efficiency, consider new options
government
B.Attract, Motivate 1.Review and recommend updates to the City wage and benefit plan to remain competitive.
and Retain City 2.Replace Applicant Tracking Software
Administration and
Employees 3. Employee Trust Funds New Administration Software
Organizational
Improvement
1.Maintain IT infrastructure and network efficiencies.
C.Improve Our
2.Research and implement software to create efficient workflows for new Development, permitting and licensing.
Technology
3.Conduct IT security and quality audits annually.
Staff Owners:
City Administrator
D.Improve the 1.Implement agenda media software for enhanced public access to recorded City meetings.
Finance Director,
Effectiveness of 2.Continue to develop paperless options for meeting participants.
Human Resources
Our Meetings
Director,
City Clerk E.Maintain/Improv
1.Prepare/fleet and equipment long term replacement plan and policies to fund a reserve.
e the City’s
2.Prepare streets maintenance and replacement plan with sustainable funding options.
Financial
Sustainability
F.Improve Our
Internal 1.Prepare meeting rooms to accommodate virtual meetings
Communication
Future State: Our City is G.Improve Our 1.Continue to improve use of online/social media communication
high-performing, External 2.Improve our access to online services for the public. (Permitting, Licensing)
efficient, effective and Communication 3.Improve City Website and access to Citizens for online services and information gathering.
known for its service
excellence.
1.Strengthen partnership with Waukesha County
H.Increase
2.Strengthen partnerships with Oconomowoc School District.
Partnerships
Department Notes:
GK Add Election Day staffing to include absentee tabulators City Hall
GK Clerk Customer Service Counter improvements
LS Evaluate options available to stabilize funding for ongoing Street Improvements
LS Analyze remaining available Impact Fees as the City is built out.
Council Notes:
24
Council Budget Priorities
Priorit
y Department Funding Source? Description
25
MEMORANDUM
FINANCE DEPARTMENT
Date: May 20, 2025
To: Mayor and Committee of the Whole
From: Laurie Sullivan-Murray, Finance Director
Mark Frye, City Administrator
Re: Funding Options for Long-Term Street Financing Discussion
RELATES TO THE STRATEGIC PLAN
Strategic Goal- 5.E Maintain/Improve the City’s Financial Sustainability
BACKGROUND
Street improvement financing is one of the City’s largest Capital expenditures. The Levy Limit law is a
legal constraint on the amount of financing that can be done through the annual levy. Since the State
has ruled that Transportation Utilities are not legally allowed, there are only two viable options allowed to
provide the additional funding needed.
The first and most common is issuing Debt to finance the annual infrastructure improvements. The
amount of annual Debt service payments is added to the legal levy limit to pay for the Debt Service that
is due in the Budget year.
The second is to perform a Levy Limit increase through Referendum. The State allows for the funding
increase to be added to the base Levy through a successful referendum.
ADDITIONAL ANALYSIS
The following is a summary of the financing options outlined in the Ehlers report. Two primary funding
approaches were analyzed: Levy Limit Referendum or Debt Issuance.
1. Levy Limit Referendum
Under Wis. Stats. §66.0602(4), the City may exceed its state-imposed levy limit with voter approval
through a referendum. This option would generate a dedicated annual levy increase to fund street
projects on a pay-as-you-go basis, avoiding interest costs.
Key Considerations:
- Requires a resolution from the City Council with specific ballot language.
- Eligible for placement on spring or fall general elections, or special elections in odd-numbered years.
Estimated Impact:
1
26
- Levy Increase: $2.8 million annually
- Tax Rate Impact: $0.68 per $1,000 of assessed value
- Annual Cost to Median Home ($430,000): $291
2. Debt Issuance
Alternatively, the City could borrow funds for the street program through phased debt issuance. This
defers some costs over time but results in significant interest payments.
Estimated Impact: - First-Year Tax Rate Impact: $0.06 per $1,000
- Annual Cost to Median Home: $28
- Estimated Interest Cost over 10 Years: $7.5 million
FINANCIAL IMPACT
Option Annual Tax Total Interest Notes
Impact (430K (2027–2036)
Home)
Levy Referendum $291 $0 No borrowing: full
pay-as-you-go
Debt Financing $28 (first year) $7,576.277 million Lower annual cost;
higher long-term
Ramping up to cost
$255
Choosing the levy referendum would avoid approximately $7.5 million in interest payments over 10
years, and $340K in financing costs, but with a higher immediate tax impact. Debt financing spreads
costs but increases total expenditure due to borrowing costs.
The Levy referendum spends a total of $28M over 10 years on street improvements. The Debt
Financing funds $28M of Street improvements, but costs $35.9M over 20 years.
RECOMMENDATION
City Council direction is requested on the preferred financing path.
SUGGESTED MOTION
No motion is required.
2
27
City of Oconomowoc, WI
Street Financing Options
May 20, 2025
28
2
29
3
30
4
31
Levy Limit Referendum
• Wis. Stats 66.0602(4) allows municipality to exceed its allowable levy limit
by referendum
✓ Governing body must adopt a resolution. Resolution must include
➢ Amount of the levy increase
➢ % increase over allowable levy
➢ Whether the increase is for the
• The language of the ballot question is dictated by statute and must be
contained in the resolution
5
32
Levy Limit Referendum: Timeline
• A municipal referendum can be held
✓ In odd-numbered-years as a special election on the same dates used by
a school board
✓ Otherwise, must be held during the spring primary, spring election,
partisan primary or general election
6
33
Proposed 2027-2036 Street Financing Summary
7
34
Debt Payment Summary 2027-2036 Financings
8
35
Debt Model Tax Impact (2027-2036 Financings)
9
36
Annual Impact of $2.8 million levy
10
37
Initial Tax Rate Impact
Tax Rate First year of debt payments projected tax rate increases
$0.06/$1,000 resulting in $28 annual increase for
Debt $430,000 home.
Tax Rate First year of levy referendum projected tax rate increases
$0.68/$1,000 resulting in $291 annual increase for
Referendum $430,000 home.
11
38
Overall Comparison (10 year planning period)
12
39
Important Disclosures
Ehlers is the joint marketing name of the following affiliated businesses (collectively, the “Affiliates”): Ehlers & Associates, Inc.
(“EA”), a municipal advisor registered with the Municipal Securities Rulemaking Board (“MSRB”) and the Securities and Exchange
Commission (“SEC”); Ehlers Investment Partners, LLC (“EIP”), an SEC registered investment adviser; and Bond Trust Services
Corporation (“BTS”), a holder of a limited banking charter issued by the State of Minnesota.
Where an activity requires registration as a municipal advisor pursuant to Section 15B of the Exchange Act of 1934 (Financial
Management Planning and Debt Issuance & Management), such activity is or will be performed by EA; where an activity requires
registration as an investment adviser pursuant to the Investment Advisers Act of 1940 (Investments and Treasury Management),
such activity is or will be performed by EIP; and where an activity requires licensing as a bank pursuant to applicable state law
(paying agent services shown under Debt Issuance & Management), such activity is or will be performed by BTS. Activities not
requiring registration may be performed by any Affiliate.
This communication does not constitute an offer or solicitation for the purchase or sale of any investment (including without
limitation, any municipal financial product, municipal security, or other security) or agreement with respect to any investment
strategy or program. This communication is offered without charge to clients, friends, and prospective clients of the Affiliates as a
source of general information about the services Ehlers provides. This communication is neither advice nor a recommendation by
any Affiliate to any person with respect to any municipal financial product, municipal security, or other security, as such terms are
defined pursuant to Section 15B of the Exchange Act of 1934 and rules of the MSRB. This communication does not constitute
investment advice by any Affiliate that purports to meet the objectives or needs of any person pursuant to the Investment Advisers
Act of 1940 or applicable state law.