President Elling called the meeting to order at 4:33 pm.
Members present: Commissioner Niemann, Commissioner Nold, Commissioner Riley, President Elling and Vice
President Frye
Others present: Brian Pehl (SEH), Stan Sugden (R & M) and Tina Wallace (City of Oconomowoc)
2. Approve Minutes of December 7, 2016 Meeting: Motion by Nold to approve the minutes from the 12/7/16 meeting;
second by Frye. Motion carried 5-0.
3. Comments from Audience: None.
4. Reports of Staff: None.
5. Election of Officers: Elling opened the floor for nominations.
Motion made by Frye to re-elect President Elling, Vice President Frye, Secretary Nold; second Nold. Motion carried
unanimously.
6. Discussion and action on the stormwater management plan for Lake Country Village Subdivision, including
255 acres of land along Sawyer Road south of Valley Road: Kevin Anderson, from Neumann Developments, Inc.,
stated they had taken the comments from the staff review meeting and made some changes. He stated they are looking
to build phase 1 of this project this summer. Elling handed out materials from Neumann Developments, Inc., including the
Stormwater Facilities Exhibit, a Typical Stormwater Details sheet, Phase 1 Proposed Drainage Area Map and the Large
Area Proposed Drainage Area Map.
Josh Pudelko, from Trio Engineering, explained the stormwater plan. There will be a total of 331 lots, 26 lots on the east
side of Sawyer Road and 305 lots on the west side. For Phase 1, they are looking to implement all the stormwater needed
to service the Phase 1 development. They design this project so that these neighborhood stormwater facilities, which is a
combination of wet ponds connected with infiltration basins, handle a 100% of the water coming to them. This allowed
them to keep it within the neighborhood and let it be an open space amenity for the neighborhood and make the grading
work. They were strategic in how they implemented Phase 1 both on access and on open space interconnection and
interconnection of the stormwater facilities so that every pond that goes in has an overflow to the next pond. Pudelko
stated that a large portion of this property, which will be for a future phase, will be farmed this year.
Elling, referring to the Proposed Drainage Area Map, asked what section is going to be Phase 1? Are they looking for
approval of the entire plan or only Phase 1? Anderson stated they are looking for approval of Phase 1 and it is marked on
the map in red. Commissioners discussed the grading limits for Phase 1. Pudelko explained the grading plan.
Nold asked how many phases do they envision and what the time frame is? Anderson stated they are proposing this
project in 2 phases. He stated they don’t expect to build Phase 2 as one complete phase. They will come back to the
Village of Summit next year and further break down the phasing. Anderson stated there will be approximately 4 or 5
phases over the next 6 to 8 years.
Elling stated the other segment to this is on the east side of Sawyer Road and that will be 2 phases. He stated on the
east side of Sawyer Road is a standalone stormwater project. It does not migrate west of Sawyer Road. Pudelko stated
they did two additional soil testing’s and confirmed the groundwater elevation. Elling stated Brian Pehl, the Village
Engineer, put together a letter a couple of days ago and asked if they had a chance to look at it. Pehl reported that he
received the stormwater report from the developer. He stated most of the comments in the letter are just clarifying how is
this going to work. He stated most questions are still valid. Pehl stated more clarification is needed on how does Phase 1
work with some of the over flow features. How does some of the temporary features that aren’t spelled out in the
S:\Committees - Commissions\Pabst Farms Joint Stormwater District\Minutes\2017\PFJSD 3-15-17.doc
stormwater management plan but are in the erosion control plan work? He asked how do they work and how does it work
with timing if you are not going to be installing some of these infiltration basins at the beginning? Pudelko stated the
details of the infiltration basins and ponds are addressed in the engineering plans.
Elling asked if the Village of Summit will be given a list of the elevations for each of the building pads? Pudelko stated
they will add the following verbiage on the plans: “lot 50 – 79 lowest exposed ground elevation should be—“. Frye stated
he is concerned with someone getting too close to the groundwater. Pudelko stated every basement is higher than the
infiltration basin bottom.
Motion made by Niemann to approve the stormwater management plan for Lake Country Village Subdivision Phase 1,
subject to the technical requirements contained in Mr. Pehl’s March 13, 2017 letter being completed; second by Nold.
Motion carried unanimously.
Nold left at 4:58 PM
7. Discussion and action on stormwater management plan for new commercial development south of Pabst
Farms Boulevard and east of Summit Avenue (STH 67): Item #7 was removed from the agenda. No Discussion or
action was taken.
8. Comments from Commissioners: None.
9. Set Meeting Dates: The next meeting of the Pabst Farms Joint Stormwater District is to be held at 4:30 p.m. at the
Summit Village Hall on Wednesday, April 19, 2017.
Motion by Frye to adjourn at 5:02 pm; second by Riley. Motion carried 4-0.
________________________________
Tina Wallace
City of Oconomowoc Deputy Clerk
S:\Committees - Commissions\Pabst Farms Joint Stormwater District\Minutes\2017\PFJSD 3-15-17.doc
Agenda
PABST FARMS JOINT STORMWATER DISTRICT
C/O 174 East Wisconsin Avenue, Oconomowoc, Wisconsin 53066
(262) 569-2175 (262) 569-3238 Fax
REGULAR COMMISSION MEETING
March 15, 2017 @ 4:30 p.m. At the Oconomowoc City Hall
174 East Wisconsin Avenue
NOTICE: If a person with a disability requires that the meeting be accessible or that
materials at the meeting be in an accessible format, call the City Clerk’s office, (262) 569-
2175, at least 48 hours in advance to request adequate accommodations.
Agenda:
1. Call to order, confirmation of meeting notification and roll call
2. Approve minutes of December 7, 2016 regular meeting
3. Comments from Audience
4. Reports of Staff
5. Election of officers for 2017
6. Discussion and action on the stormwater management plan for Lake Country Village
Subdivision, including 255 acres of land along Sawyer Road south of Valley Road
7. Discussion and action on stormwater management plan for new commercial
development south of Pabst Farms Boulevard and east of Summit Avenue (STH 67)
8. Comments from Commissioners
9. Set meeting date for next meeting (April 19, 2017 at Village Hall)
10. Adjourn
__________________________________
Diane Coenen, City Clerk
City of Oconomowoc
“Members of other City or Village governmental bodies (boards, commissions, committees, council, etc) may
attend the above noticed meeting of the Pabst Farms Joint Stormwater District in order to gather
information. The only action to be taken at the above noticed meeting will be action by the Pabst Farms Joint
Stormwater District.”
Get email alerts for Oconomowoc
A daily email when new agendas and minutes are posted.