City Council
Regular MeetingOdessa, TX · October 19, 2021
Minutes
CITY COUNCIL WORK SESSION MINUTES
CITY OF ODESSA, TEXAS
October 19, 2021
On October 19, 2021, a work session meeting of the Odessa City Council was held at 3:00
p.m., Council Chamber, City Hall, 411 W. 8th St., Odessa, Texas.
City Council present: Mayor Javier Joven; Council members: Mark Matta, District One;
Steven P. Thompson, District Two; Detra White, District Three; Tom Sprawls, District Four;
Mari Willis, District Five; and Denise Swanner, At-Large.
Others present: Michael Marrero, City Manager; Norma Aguilar-Grimaldo, City Secretary;
Natasha Brooks, City Attorney; Cindy Muncy, Assistant City Manager; Phillip Urrutia,
Assistant City Manager; and other members of City staff.
A quorum being present, Mayor Joven called the meeting to order, and the following
proceedings were held:
Council member Matta gave the invocation.
Discover Odessa quarterly report. Monica Tschauner, Discover Odessa Director, provided
a quarterly report from June 2021 – September 2021 for Discover Odessa. She provided
statistical information including the total economic impact as $4,177,797 and total room
nights as 2,757. She stated that there were 51 hotel properties and 4,616 rooms in the
community. She reviewed the groups assisted, upcoming events and activities.
City’s vaccine clinic report. Rodd Huber, Assistant Fire Chief, stated that the City’s vaccine
clinic provided over 1,000 vaccinations. There were many other opportunities to get
vaccinated at pharmacies and clinics. The regeneron infusion center was going well. In
eight weeks, there were 1,800 therapies. The clinic was busy but efficient. Information
could not be provided on patients outside the community but most were local patients. The
State recognized the clinic as one of the top 12 sites in the State.
Discuss the transfer of Rochester property. Jill Miller, Odessa Housing Finance
Corporation (OHFC) Executive Director, reported that the OHFC partnered with the City for
over 20 years in building successful housing. The partnership worked well with over 200
homes built throughout the community. The Rochester property was platted but needed to
be replatted for homes. There were four local banks interested in participating in the project.
She stated that the project would stimulate activity and bring revitalization. The goal was to
contract with Rhodes USA to build 33 homes. OHFC would pay the cost up front and get
reimbursed for infrastructure. Emanual Papas, Rhodes USA, stated that the engineer was
contracted out by either of two Texas based engineers. Council member Thompson asked
about the $84,800 additional cost for site supervision. Mr. Papas would verify the cost.
Council member Thompson asked about the $30,000 per lot. Ms. Miller reported that the
cost could be lower depending on bids. She stated that the cost per square foot had a
narrow margin. Scott Turner, Rhodes USA, stated that the galvanized metal was already
purchased. Ms. Miller reported that there was no application for tax credit as it was difficult
to receive with single family homes. Council member Sprawls stated that the City was
working with OHFC and had nothing to do with the builder. He stated that there was an
advantage of obtaining a new employer in the community. Ms. Miller reviewed the process
for the land transfer of 7.69 acres. Ms. Brooks stated that there was a draft agreement with a
Council Work Session Minutes
October 19, 2021
Page 2
reverter clause. Ms. Miller stated that the homes would be completed less than five years
and no issues in selling the homes.
Purchase traffic signal equipment. Hal Feldman, Traffic Engineer, stated that the
purchase of traffic signal equipment would be for 20 traffic cabinets with 13 replacements
and seven spares. The cost was $263,800. If the traffic boxes were wrapped with art, they
would be rewrapped.
Renew contract with Weaver and Tidwell, LLP., to provide professional auditing
services. Mrs. Muncy stated that the audit services was with Weaver and Tidwell to provide
auditing services. An RFP was done several years ago but would like to continue with
Weaver due to the City’s system conversion process. The cost was $118,000 plus additional
fee of $9,000 for additional services, if needed.
Motion was made by Council member Sprawls and seconded by Council member Swanner
to adjourn the meeting. The motion was approved by the following vote:
Aye: Joven, Matta, Thompson, White, Sprawls, Willis, and Swanner
Nay: None
The meeting adjourned at 3:35 p.m.
ATTEST: APPROVED:
Norma Aguilar-Grimaldo, TRMC, CMC Javier Joven
City Secretary Mayor
Agenda
PUBLIC NOTICE
City Council Work Session Agenda
City Hall, City Council Chambers – 5th Floor
411 W. 8th Street
Odessa, TX
Tuesday, October 19th, 2021
3:00 p.m.
In accordance with the Open Meetings Act, Chapter 551 of the Government Code of Texas, notice is hereby given to
all interested persons that the Odessa City Council will have a Work Session at 3:00 p.m. on Tuesday, October 19th,
2021 in the 5th Floor Council Chambers, City Hall, 411 W. 8th St, Odessa, Texas for the following purposes:
Call to Order
SEE ATTACHED AGENDA
Adjourn
This Notice is being posted on the bulletin board located outside the south entrance of the City Hall building and on
the bulletin board of the first floor of City Hall, Odessa, Texas the _______ day of October 2021 at ________, ___. m.
It is also posted on the City of Odessa’s website www.odessa-tx.gov. The said time being more then seventy-two (72)
hours prior to the time at which the subject meeting will be convened and called to order.
The Work Session meeting is available to all persons regardless of disability. Individuals with disabilities who require
assistance should contact the City Secretary’s Office at (432) 335-3276, or 411 West 8th Street, First Floor, Odessa,
Texas, during normal business hours at least twenty-four (24) hours in advance of the meeting.
___________________________________
Norma Aguilar-Grimaldo
City Secretary, TRMC, CMC
City Council Work Session Agenda
City Hall, City Council Chambers – 5th Floor
411 W. 8th Street
Odessa, TX.
Tuesday, October 19th, 2021
3:00 p.m.
Call to Order
Invocation – Councilmember Mark Matta
1. Discover Odessa Quarterly Report to Council Monica Tschauner
2. Report on City’s Vaccine Clinic Rodd Huber
3. Discussion on the transfer of Rochester Property Jill Miller
4. Consider the purchase of traffic signal equipment Hal Feldman
5. Consider renewal of contract with Weaver and Tidwell, LLP., Cindy Muncy
to provide Professional Auditing Services.
Adjourn
ROCHESTER AVENUE, ODESSA
PRESENTATION
EXISTING SITE - LOCATION
PROPOSED SITE LAYOUT
PROPOSED COMMUNITY PARK CONCEPT
Key scopes
• Park size to take up 2 lots estimated size 8000 sf in
total lot size.
• HOA will need to be established within community
and run by outside management team. This will add
an additional yearly cost to the Homeowner’s but will
also allow the development to be maintained at a
higher quality.
• Park to be maintained by HOA dues.
INTRODUCTION- DEVELOPER
● OHFC was founded on October 10, 1979and is organized for the purpose of benefiting and accomplishing public purpose of, and on behalf of, the
City, by financing the cost of residential ownership and development that will provide decent, safe and sanitary housing for residents of the City
at prices they can afford.
● The Corporation is managed by a seven-member board of directors, which is appointed by the City Council. The activities of the
corporation are directed by its Executive Director, Jill Miller. Based under statue the Corporation serves low to moderate income families,
however the board of directors has restricted the income limit to not exceed 150% of median income.
● The Corporation participated in the acquisition of a Senior Retirement Facility, known as Lincoln Towers in downtown Odessa, which
was in foreclosure. It was renovated and eventually sold to the management company that continues to manage it today. They also developed
the first 64- bed student Housing on the campus of the University of Texas of the Permian Basin, which allowed the campus to grow into the
large university that it has become.
● The Corporation has participated in the development of approximately 300 homes in Odessa for low to moderate income families. These
developments have meant that families that could not find affordable housing have been given the opportunity to experience the American
Dream. One of the best parts of almost all of these developments is that they have been done in partnership with the City Of Odessa that has
helped with providing the land and the infrastructure cost to help keep the homes affordable. Without this partnership, these developments are
not possible.
● The Corporation currently is developing a 48-acre tract of land in North Odessa that includes a 181-unit LIHTC apartment complex called
eighty-seventh apartments, a Second Work-Force apartment complex and single-family mixed income use housing along with a small retail
space. It will be the first time that affordable housing has been offered to low-income clients in this growing part of the community.
● The Corporation is currently building Vera in Odessa off of Highway 191. It is a 288-unit LIHTC that is located in Midland County but the
City limits of Odessa. The Cities are rapidly growing together and soon it will be hard to tell where one ends and the other begins, however this
complex will be a shining star as you enter Odessa heading west from Midland.
● The Corporation is also working on a project across the Highway to the South that will be known as the Cove in Odessa and will be 200-
units for LIHTC for Seniors. There are currently only 3 other income based senior developments in Odessa and they are desperately needed. We
look forward to providing a wonderful product to our seniors at an affordable rate.
INTRODUCTION- RHODES GROUP
● Rhodes Group –Corporate Profile
○ Rhodes Group Management team
■ Emanuel Papas –Lifetime experience in construction and development –Group CEO
■ Andrew Avenell –Lifetime experience in engineering,general contracting and infrastructure development -Co-Owner Rhodes Group
■ Michael Van-Beek –CFO for Rhodes Group international
○ Current Operational Locations
■ Australia, NTH Australia, PNG, Philippines, Fiji, Hong Kong and USA
■ 600 employees employed throughout group
○ Founded in 2010
○ Project Experience
■ 70 Primary Schools and housing,Federal Contracts (AUS) –Pacific region
■ 23 homes (employee housing), pension funded –Pacific Region
■ 223 houses & 40 community buildings,mining company –Pacific Region
■ 72 vocational training school buildings and housing, federal contract (EU) –Pacific Region
■ 49 multi-family townhomes, private developer –Australia
○ It’s not only the buildings RHODES leaves behind for its communitiesbut the Rhodes legacy of new skills, new knowledge and new capabilities for cities in need of local manufacturing
and local employment.
INTRODUCTION- DEVELOPER
● Rhodes USA, LLC – Lead CFS Manufacture / Building product provider
○ Emanuel Papas – Non-Executive Director / Group CEO
○ Scott Turner – Local Managing Director / Local Partner / Sales Director
○ Design and manufacture of CFS prefabricated metal framing and housing in Texas.
○ Manufacturing plant operational in Lubbock (Reese Technology Center).
○ Part of the wider Rhodes Group operating in the Pacific with CFS for over 10 years.
○ Manufacturing plant setup in Odessa – in talks with ODC – (See slide 8)
● NEO General Construction – Lead General Contractor
○ Scott Turner CEO – Architect & Builder
○ Odessa construction experience – 2 years (7 homes, 6 town-homes)
○ National construction experience - 20 years (multi-family, Government, multifamily and residential)
○ Expansion to Odessa in discussion as subsidiary of Rhodes USA – (See slide 8)
RHODES USA EXPANSION
● Current application for expansion to Odessa Texas
○ Odessa Development Corporation (ODC)
■ Application has been submitted to ODC for review and currently waiting on feedback from ODC
ComplianceCommittee.
■ Once approved by ODC Board the application will be reviewed and approved by City of Odessa Council
■ Rhodes USA and NEO General Construction will operate from premises in Odessa which will require warehouse
space, laydown yard, office space and approximately 50,000 SF building
○ Why Odessa
■ Local employment / Manufacturing opportunities to city of Odessa which is not associated with the oil industry
■ Odessa faces ongoing high demand of housing and related construction project supply
■ The Ultimate Goal is to efficiently increase the available supply of housing and housing components, especially for
affordable workforce housing as well as bring a Global Company to West Texas to STAY!
INTRODUCTION- DEVELOPMENT
● Project scope
○ Develop affordable housing for low- and moderate-income buyers on a 7.65-acre site at Rochester Avenue, Odessa.
● Design and planning
○ Design for compact, affordable lots – 53 lots proposed.
○ Community park being considered within development.
○ Designs in accordance with Odessa planning department guidelines and aims.
● Site development
○ Standard site development supported by City of Odessa council.
○ ODC Lot credits to be applied for after each house is complete.
● Construction
○ CFS framing prefabricated and delivered to site
○ Energy efficient housing, fittings and appliances.
PROJECT STRUCTURE
Odessa City Council Landowner
and Principal
City of Odessa
Lot Infrastructure Contribution
Odessa Housing Finance
NEO General Construction, Rhodes USA, LLC
Corporation
LLC Lead
– Land transfer –
Lead CFS Manufacture/Building Products
Funding Partner/Sales/Take-
General Contractor Provider
out
Realtor/s – Sales Contracts
Engineers, Consultants
(If required)
ESTIMATED COST BREAKDOWN
Water and Sewer Bid Tabulation
Rhodes USA/ NEO
Project #21-005
Option 1 Option 2
BID ITEM QTY & UNIT DESCRIPTION UNIT PRICE TOTAL AMOUNT UNIT PRICE TOTAL AMOUNT
1 1080 L.F. Furnishing, laying, and backfilling 6" C900 PVC DR-18 Water Line $ 47.46 $ 51,256.80 $ 42.26 $ 45,640.80
2 1080 L.F. Furnishing, laying and installing Metallic Locating Tape $ 1.00 $ 1,080.00 $ 0.59 $ 637.20
3 2 EA. Furnishing and installing 6"x8" Tapping Sleeve & Valve $ 5,006.00 $ 10,012.00 $ 5,916.75 $ 11,833.50
4 1 TON Furnishing and Installing Ductile Iron Fittings $ 15,142.45 $ 15,142.45 $ 11,712.75 $ 11,712.75
5 925 L.F. Furnishing, laying, and backfilling 6" SDR-35 PVC Sewer Pipe $ 64.34 $ 59,514.50 $ 57.96 $ 53,613.00
6 7 EA. Furnishing and Installing 48" Manhole $ 5,680.08 $ 39,760.56 $ 4,805.85 $ 33,640.95
7 1180 L.F. Furnishing, laying, and backfilling 6" C900 PVC DR-18 Fire Line $ 48.64 $ 57,395.20 $ 54.33 $ 64,109.40
8 2 EA. Furnishing and installing Standard Fire Hydrant Assembly with 6" Gate Valve & Valve Box $ 5,013.54 $ 10,027.08 $ 6,520.50 $ 13,041.00
9 3 EA. Standard Sewer Cleanout $ 462.73 $ 1,388.19 $ 664.12 $ 1,992.36
10 53 EA. Furnishing and installing 4" Sewer Service Connection & Box $ 1,376.55 $ 72,957.15 $ 978.05 $ 51,836.65
11 53 EA. Furnishing and installing 1" Water Service and Connection Box $ 1,761.65 $ 93,367.45 $ 1,328.25 $ 70,397.25
12 380 SY Furnishing material, equipment and labor to Repair Pavement $ 150.17 $ 57,064.60 $ 138.86 $ 52,766.80
13 2 LS Furnishing, installing, and maintaining Traffic Control $ 1,449.00 $ 2,898.00 $ 6,641.25 $ 13,282.50
14 6 EA. Furnsihing material, equipment, and labor to contruct TCEQ Crossing $ 1,551.63 $ 9,309.78 $ 5,017.50 $ 30,105.00
TOTAL BASE BID FOR WATER AND SEWER $ 481,173.76 $ 454,609.16
Paving and Drainage Bid Tabulation
Rhodes USA/NEO
Project #21-005
Option 1 Option 2
Bid Item Qty & Unit Project Name Unit Price Total Amount Unit Price Total Amount
1 7.65 Acre Furnish material, equipment and labor to clear and grub full right-of-way $ 16,656.12 $ 127,419.32 $ 18,435.62 $ 141,032.49
2 6800 S.Y. Furnish material, equipment, and labor for final roadway shaping $ 29.57 $ 201,076.00 $ 24.63 $ 167,484.00
3 6900 S.Y. Furnish flexible base (crushed caliche) 6" compacted thickness $ 31.52 $ 217,488.00 $ 27.23 $ 187,887.00
4 800 S.Y. Furnish and place 1 1/2 Hot Mix Asphaltic Concrete Surfacing $ 43.79 $ 35,032.00 $ 41.08 $ 32,864.00
5 4500 LF Furnish material and labor to construct 6" Standard Curb and Gutter $ 31.46 $ 141,570.00 $ 43.03 $ 193,635.00
6 120 LF Furnish material and labor to construct Modified Curb and Gutter $ 31.46 $ 3,775.20 $ 65.78 $ 7,893.60
7 12 EA. Furnish material, equipment and labor to install A.D.A Complaint Type A Ramps $ 2,230.80 $ 26,769.60 $ 3,308.50 $ 39,702.00
8 7 EA. Furnish material and labor to adjust Manhole to finished grade $ 2,230.80 $ 15,615.60 $ 2,535.00 $ 17,745.00
9 6 EA. Furnish material and labor to adjust Water Valve boxes finished grade $ 1,092.52 $ 6,555.12 $ 1,033.50 $ 6,201.00
10 6 EA. Furnish material and labor to to adjust Cleanout to finished grade $ 1,358.50 $ 8,151.00 $ 1,007.50 $ 6,045.00
11 525 S.Y. Furnish material and labor to construct 4" concrete side walk 4' wide $ 127.27 $ 66,816.75 $ 104.19 $ 54,699.75
12 300 S.Y. Furnish material and labor to construct Concrete Fillets & Valley $ 163.02 $ 48,906.00 $ 135.26 $ 40,578.00
13 1 LS Furnish materials, equipment, and labor to install SWP3 controls $ 10,335.00 $ 10,335.00 $ 29,256.50 $ 29,256.50
14 2 LS Furnish all signs, barricades, and traffic control $ 2,145.00 $ 4,290.00 $ 3,868.54 $ 7,737.08
15 120 LF Furnish materials, equipment, and labor to remove existing curb $ 8.58 $ 1,029.60 $ 61.81 $ 7,417.20
TOTAL BID BASE FOR PAVING AND DRAINAGE $ 914,829.19 $ 940,177.62
ESTIMATED COST BREAKDOWN
Engineering/Site Supervsion
Rhodes USA/NEO
Project #21-005
Bid Item Qty & Unit Project Name Unit Price Total Amount
1 53 EA Civil Engineering $ 1,000.00 $ 53,000.00 $ 53,000.00
2 53 EA Site Supervsion $ 1,600.00 $ 84,800.00 $ 84,800.00
$ - $ -
TOTAL BID BASE FOR ENGINEERING/SITE SUPERVSION/PLAYGROUND $ 137,800.00 $ 137,800.00
ESTIMATED GRAND TOTAL $ 1,533,802.95 $ 1,532,586.78
Bid Item Qty & Unit Project Name Unit Price Total Amount
1 53 EA CITY OF ODESSA INFRASTRUCTURE CONTRIBUTION $ 28,939.68 $ 1,533,802.95 $ 28,916.73 $ 1,532,586.78
DESIGN & SITE DEVELOPMENT
● Key scopes
○ Planning and approvals – Process and timelines with Odessa council
○ Surveying and road layouts
○ Site clearing and excavation
○ Water, sewer, power and communications to be installed
● Key issues for project feasibility
○ Discuss with City of Odessa on infrastructure contribution per lot: $28,939.68 x53
○ Minimized water tapping fee to each lot (city rate)
○ Key inspection stages and priority timelines – To avoid schedule delays – (Discuss with local inspection
office and setup overall project timelines)
KEY STAKEHOLDER GOALS
● To deliver affordable, well designed and good quality low to moderate income workforce housing in the City
of Odessa through this Opportunity.
● Delivering mixed income housing to support the backbone of the community – Firefighters, nurses, doctors,
teachers, police and other first responders. By providing these housing options to qualified purchasers,
Odessa can retain this important section of the community where it is needed most.
● Implementing prefabricated metal framed housing and related materials to enhance efficiency, sustainability
and long-term durability for infill development in Odessa’s core neighborhoods.
HOUSING DESIGNS
● Key design principles
○ Lot size generally 87’ x 47’ – Approx. 4,000 SF
■ Most residents want a low maintenance
■ Lots that focus to the street to embrace community interaction Xeriscape Landscape example
○ Zero lot line for garages – Designs to be adjusted for compact lots.
○ Setbacks - 15’ front setback, zero lot lines on side setbacks, 15’ rear setback
■ Xeriscape on all lots.
○ Modern designs, constructability and affordability – CFS technology
○ Energy efficiency principles – Insulation, approved fittings and appliances
HOUSING DESIGNS
Model 1177 – Rendering is concept only
HOUSING DESIGNS
Design 1343 - Rendering is concept only
HOUSING DESIGNS
Design 1537 - Rendering is concept only
MANUFACTURING PHOTOS
MANUFACTURING PHOTOS
SITE PHOTOS
SITE PHOTOS
CONSTRUCITON COST BREAKDOWN
Current Pricing for the first 12 lots with Odessa Housing Finance Corporation
Typical Development Cost Breakdown
Estimated Total Build
18% 5% Developer Developer Fee Aprasial/Sales Sales Cost Per
Models SF QTY Direct Build Cost Per SF Construction 25% GC Fee Lot Cost Cost w/
Contengency GC upcharge 10% Cost SF
Budget Land
1358 Model 1358 1 $100.00 $135,800.00 $24,444.00 $33,950.00 $1,697.50 $25,000.00 $220,891.50 $22,089.15 $242,980.65 $178.93
1400 Model 1400 1 $100.00 $140,000.00 $25,200.00 $35,000.00 $1,750.00 $25,000.00 $226,950.00 $22,695.00 $249,645.00 $178.32
1450 Model 1450 1 $100.00 $145,000.00 $26,100.00 $36,250.00 $1,812.50 $25,000.00 $234,162.50 $23,416.25 $257,578.75 $177.64
1651 Model 1651 1 $100.00 $165,100.00 $29,718.00 $41,275.00 $2,063.75 $25,000.00 $263,156.75 $26,315.68 $289,472.43 $175.33
1751 Model 1751 1 $100.00 $175,100.00 $31,518.00 $43,775.00 $2,188.75 $25,000.00 $277,581.75 $27,758.18 $305,339.93 $174.38
NEO/OHFC Cost Breakdown
OHFC, City of
Estimated Total Build Additional
8% 0% Developer Odessa and Aprasial/Sales Sales Cost Per
Models SF QTY Direct Build Cost Per SF Construction 15% GC Fee Cost w/ OHFC Fee 5% incentives to 225k mark
Contengency GC upcharge Grow Odessa Cost SF
Budget Land home owner
Cost
1358 Model 1358 1 $95.00 $129,010.00 $10,320.80 $19,351.50 $0.00 $25,000.00 $183,682.30 $9,184.12 $192,866.42 $142.02 $20,000.00 $172,866.42
1400 Model 1400 1 $95.00 $133,000.00 $10,640.00 $19,950.00 $0.00 $25,000.00 $188,590.00 $9,429.50 $198,019.50 $141.44 $20,000.00 $178,019.50
1450 Model 1450 1 $95.00 $137,750.00 $11,020.00 $20,662.50 $0.00 $25,000.00 $194,432.50 $9,721.63 $204,154.13 $140.80 $20,000.00 $184,154.13
1651 Model 1651 1 $95.00 $156,845.00 $12,547.60 $23,526.75 $0.00 $25,000.00 $217,919.35 $10,895.97 $228,815.32 $138.59 $20,000.00 $208,815.32
1751 Model 1751 1 $95.00 $166,345.00 $13,307.60 $24,951.75 $0.00 $25,000.00 $229,604.35 $11,480.22 $241,084.57 $137.68 $20,000.00 $221,084.57
ESTIMATED CONSTRUCITON COST
Estimated construction cost breakdown for typical models for Rochester
Estimated Sales
18% 5% Developer Total Build Cost w/ Developer Fee Aprasial/Sale
SF QTY Build Cos Construction 25% GC Fee Lot Cost Cost
Contengency GC upcharge Land 10% s Cost
Budget Per SF
1128 1 $100.00 $112,800.00 $20,304.00 $28,200.00 $1,410.00 $30,000.00 $192,714.00 $19,271.40 $211,985.40 $187.93
1343 1 $100.00 $134,300.00 $24,174.00 $33,575.00 $1,678.75 $30,000.00 $223,727.75 $22,372.78 $246,100.53 $183.25
1537 1 $100.00 $153,700.00 $27,666.00 $38,425.00 $1,921.25 $30,000.00 $251,712.25 $25,171.23 $276,883.48 $180.15
OHFC, City of
Estimated Sales Additional
0% Developer Odessa and Total Build Cost w/ Aprasial/Sale
SF QTY Build Cos Construction 8% Contengency 15% GC Fee OHFC Fee 5% Cost incentives to 225k mark
GC upcharge Grow Odessa Land s Cost
Budget Per SF home owner
Cost
1128 1 $95.00 $107,160.00 $8,572.80 $16,074.00 $0.00 $30,000.00 $161,806.80 $8,090.34 $169,897.14 $150.62 $20,000.00 $149,897.14
1343 1 $95.00 $127,585.00 $10,206.80 $19,137.75 $0.00 $30,000.00 $186,929.55 $9,346.48 $196,276.03 $146.15 $20,000.00 $176,276.03
1537 1 $95.00 $146,015.00 $11,681.20 $21,902.25 $0.00 $30,000.00 $209,598.45 $10,479.92 $220,078.37 $143.19 $20,000.00 $200,078.37
NEXT STEPS
o City Council to vote and approve land transfer to OHFC immediately
o City to transfer land to OHFC
○ Finalize site design and submit for city approval
○ Start Site Development in phases
○ Build a Great New Development for the Working Citizens of Our Community and continue
the Great Partnership that has been established with the collaborative of many
partnerships!
CITY OF ODESSA
CITY COUNCIL AGENDA ITEM
Meeting Date Contact Department Fiscal Impact?
10/26/2021 Hal Feldman Traffic Engineering Yes
Work Session? Contacted Legal? Item Type
Yes No Consent Other,
CAPTION
Consider purchase of traffic signal equipment
SUMMARY
This purchase is replacing traffic signal cabinets that have served their expected useful life. These
cabinets will be replaced at 13 intersections throughout the city maintained network. Also being purchased
is 7 cabinets for spares. The equipment is being purchased utilizing the BuyBoard state contract.
This purchase will be funded from the additional money allocated to street maintenance for the traffic
signal system.
FISCAL IMPACT
Fiscal Year Fund Type Cost or Revenue? Fiscal Note Attached?
2022 General Cost No
Available Funds Budget Est/Actual Cost Difference
This Agenda Item: $263800.00 $263800.00 $0.00
ACTION NEEDED TO AMEND THE BUDGET
Appropriation Amount: $ Transfer Amount: $
Appropriation By:
Comments/Other Departments, Boards, Commissions or Agencies
Supporting Documents
quote.pdf,
P.O. Box 5508 – Arlington – Texas – 76005-5508
817.831.9406 – fax 817.831.9407
www.paradigmtraffic.com
QUOTATION
TO: City of Odessa RFQ: BuyBoard Contract # 603-20
PO Box 4398 Public Safety, Fire House Supply& Equipment &
Odessa, TX 79760 Traffic Signals
attn: Hal Feldman 512-467-0222 pn
ph: 432-335-4189 1-800-211-5454 fax
fax: 432-335-3225
DATE SLSMN DELIVERY FREIGHT SHIP VIA F.O.B. TERMS QUOTE #
10/6/21 MH 90-120 Days ARO PPD & Allowed Best Way Destination Net 30 Q28872MH
ITEM QTY DESCRIPTION PRICE TOTAL
1 20 Cabinet, Traffic Signal, NEMA TS/2, TY 1, $15,200.00 $304,000.00
Size 6, Double Door, 16 Position, No Base Mount, No Timer,
With 4ea Oracle Loop Detectors,meeting TxDOT Departmental
Specification TO-4048, latest revision and shall be listed on TxDOT
Prequalified Products List (QPL) TO-4048, latest revision.
NOTE: 13ea To Be Installed In The Field, 7ea For Spares.
2 20 Customer Discount For Cabinet ($3,050.00) ($61,000.00)
$12,150.00 $243,000.00
3 13 Install Henke Cabinet $1,600.00 $20,800.00
NOTE: PURCHASE ORDER MUST BE PROCESSED THROUGH
WWW.BUYBOARD.COM
TOTAL $263,800.00
Thank you for the opportunity to submit a proposal to you on this
equipment. Please reference this quotation (by QTE number) when OFFERED BY:
placing order. If you have any questions please call or send a fax to Matt Hendricks
Paradigm Traffic Systems, Inc.
me. Federal ID# 75-2520341
This quote is valid for 60 days. Thereafter it is subject to change
without notice.
28872MH, Quote
CITY OF ODESSA
CITY COUNCIL AGENDA ITEM
Meeting Date Contact Department Fiscal Impact?
10/26/2021 Cindy Muncy City Manager's Office Yes
Work Session? Contacted Legal? Item Type
Yes Yes Consent
CAPTION
Consider renewal of contract with Weaver and Tidwell, LLP., to provide Professional Auditing Services.
SUMMARY
In July 2014, an RFP was issued to accept proposals for the Audit of City Financial Statements. City
Council approved a three (3) year contract with Weaver and Tidwell, LLP with the option of two, two year
renewals which carried through fiscal year ended 2020. At the May 18, 2021 work session, discussion was
held with Council to proceed with engaging Weaver again for the fiscal year 2021 audit.
This contract will provide auditing services for the City of Odessa and an engagement for the City to meet
TCEQ requirements for financial reporting of landfill related activity.
FISCAL IMPACT
Fiscal Year Fund Type Cost or Revenue? Fiscal Note Attached?
Available Funds Budget Est/Actual Cost Difference
This Agenda Item: $143120.00 $118000.00 $25120.00
ACTION NEEDED TO AMEND THE BUDGET
Appropriation Amount: $ Transfer Amount: $
Appropriation By: