Owasso Joint Meeting (Owasso City Council, OPWA, and OPGA)
Regular MeetingOwasso, OK · July 14, 2015
Agenda
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Bronce L. Stephenson
Director of Community Development
SUBJECT: Final Plat—Coffee Creek Play Park
DATE: July 10, 2015
BACKGROUND:
The City of Owasso received an application for review and approval of a final plat for Coffee
Creek Play Park. The subject property is located on the east side of the US-169 frontage road just
north of the Lanes at Coffee Creek Bowling Alley.
SURROUNDING ZONING AND LAND USE:
Direction Zoning Use Land Use Plan Jurisdiction
CS
City of
North (Commercial Undeveloped Commercial
Owasso
Shopping)
CS
City of
South (Commercial Bowling Alley Commercial
Owasso
Shopping)
OM (Office Professional City of
East Commercial
Medium) Offices Owasso
City of
West N/A Highway N/A
Owasso
SUBJECT PROPERTY/PROJECT DATA:
Property Size 1.97 acres
Current Zoning CS – Commercial Shopping
Proposed Use Commercial
Lots/Blocks 1 lot in 1 block
Number of Reserve Areas N/A
Within PUD? PUD 18
Within Overlay District? Yes, US-169
Water Provider Washington RWD #3
Storm siren fee of $35/acre;
Applicable Paybacks Elm Creek Sanitary Sewer
Payback $1580.00/acre
Streets (public or private) N/A
ANALYSIS:
The final plat for Coffee Creek Play Park proposes one (1) lot on one (1) block. The property is
situated just north of the Lanes at Coffee Creek Bowling Alley on the east side of the US-169
Service Road. The property is part of the Coffee Creek PUD (PUD 18) and this site was identified
for commercial type uses.
The final plat proposes one 24-foot wide off site mutual access easement (MAE) to the south
connecting the bowling alley parking lot and another internal MAE that will also have a stub
connection to the north lot. This will not only provide good internal connectivity, but reduce the
need for another curb cut. Additionally, fire access will be enhanced when the subject property
develops as well as benefiting the properties to the south and north. A 17 ½ foot perimeter utility
easement has been provided and there is an existing recoded 20-foot utility easement along
the front of the property. These will allow utility companies adequate access to provide service
and maintain service to the proposed development.
The City of Owasso will provide sanitary sewer and water service will be provided by Washington
County Rural #3. Any development that occurs on the subject property must adhere to all
subdivision, zoning, and engineering requirements including but not limited to paved streets,
landscaping, and sidewalks. The property also lies within the US-169 overlay district and any site
plan submitted on the subject parcel shall adhere to the requirements of this overlay district as
well as those outlined in PUD 18. The proposed commercial use for the property conforms to the
land use prescribed under the 2030 Owasso Land Use Master Plan and with the existing zoning
on the property. The property is subject to all applicable paybacks as described in the above
table.
PLANNING COMMISSION:
The Owasso Planning Commission will review this item at their regular meeting on July 13, 2015.
ATTACHMENTS:
Final Plat, Coffee Creek Play Park
Area Map
Aerial Map
R 14 E
EAST 106TH STREET NORTH
NORTH 129TH EAST AVENUE NORTH 145TH EAST AVENUE
T
21
16
N
11.26'
4.24'
.00
'
55 .82 EAST 96TH STREET NORTH
'
24
N Location Map
SCALE: 1"=2000'
'
.50 24
15 .00
'
. 50
'
39
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Bronce L. Stephenson
Director of Community Development
SUBJECT: Final Plat—Cottages at Tallgrass Point
DATE: July 10, 2015
BACKGROUND:
The Community Development Department received an application for review and approval of
a final plat for the Cottages at Tallgrass Point, which is located near the northwest corner of E.
86th St. N. and N. Mingo Rd. The property is 13.37 acres in size and the proposed use is for
apartment homes. The property is bounded to the west by the railroad and to the east by
Mingo Road. There has been right-of-way dedicated along the southern portion of the property
along Mingo Road as part of the Mingo and 86th St. N. intersection improvements that occurred
several years ago. The final plat will dedicate right-of-way along the remaining portion of Mingo
Road. Ordinance1050 annexed the property into the City Limits of Owasso and Ordinance 1052
rezoned the property to RM with a PUD overlay (OPUD 15-01).
SUMMARY TABLE:
Direction Zoning Use Land Use Plan Jurisdiction
AG
North Residential Transitional Tulsa County
(Agriculture)
AG City of
South Undeveloped Commercial
(Agriculture) Owasso
RM (Residential City of
East Apartments Transitional
Multi-Family) Owasso
AG
West Railroad Residential Tulsa County
(Agriculture)
SUBJECT PROPERTY/PROJECT DATA:
Property Size 13.37 acres
Current Zoning RM (OPUD 15-01)
Proposed Use None specified
Lots/Blocks N/A
Land Use Plan Transitional and Commercial
Number of Reserve Areas N/A
Within PUD? N/A
Within Overlay District? N/A
Water Provider City of Owasso
Storm siren fee of $35/acre;
Applicable Paybacks Ranch Creek Sewer Payback
of $610.33/Acre
Streets (public or private) N/A
ANALYSIS:
The final plat for Cottages at Tallgrass Point provides one lot for the development of a 266-unit
apartment home complex in 18 buildings on 13.37 acres. An offsite sanitary sewer easement is
necessary on the property to service the development and the developer is in the process of
securing the required documents for recording this easement. The plat has established limits of
access and no access along Mingo Road, with the southern access point aligning with the
driveway across the street that serves the Villas at Coffee Creek Apartment. A northern access
point has been shown which will be for emergency use only. Along the northern portions of the
property is a large 100-foot PSO Utility easement, which will restrict vertical construction of
housing units. Perimeter and interior utility easements have been provided allowing utility
companies adequate access to provide service and maintain service to the proposed
development.
The City of Owasso will provide sanitary sewer and water service. Any development that occurs
on the subject property must adhere to all subdivision, zoning, and engineering requirements
including but not limited to paved streets, landscaping, and sidewalks. Any site plan submitted
on the subject parcel shall adhere to the requirements outlined in OPUD 15-01. The proposed
commercial use for the property conforms to the land use prescribed under the 2030 Owasso
Land Use Master Plan. The property is subject to all applicable paybacks as defined in the
above table.
PLANNING COMMISSION:
The Owasso Planning Commission will review this item at their regular meeting on July 13, 2015.
ATTACHMENTS:
Final Plat, Cottages at Tallgrass Point
Area Map
Aerial Map
N Mingo Rd
E 86th St N
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Bronce L. Stephenson
Director of Community Development
SUBJECT: PUD Amendment (PUD-05-02A) Morrow Place
DATE: July 10, 2015
BACKGROUND:
The City of Owasso received a Planned Unit Development (PUD) application for review and
approval of an amendment to a development called Morrow Place. The subject property is
located between E 116th St N and E 126th St N, and between N 129th E Ave and US-169. The
original PUD called for a mixture of uses: single-family residential, commercial, school and multi-
family. Originally, this PUD was approved as PUD-05-02 in 2005.
Portions of the development have begun with commercial properties along E 116th St N
(McDonalds, Discount Tire, Walgreen’s and Taco Bell), but the larger part of the development
has remained untouched. A large reason for the delay in developing the majority of the Morrow
Place was the economic slowdown that caused a lull in development for many years.
After 10 years, the applicant has requested to amend the PUD in order to keep up with market
demands and to be as attractive as possible for investors and new commercial ventures. A lot
has changed in Owasso over the past 10 years, so the PUD is being amended in order to
respond to this change.
SURROUNDING ZONING:
Direction Zoning Use Land Use Plan Jurisdiction
Tulsa
North N/A - Collinsville Residential N/A
County/Collinsville
CS (Commercial
Commercial,
Shopping) & RS-3 Residential &
South Residential & City of Owasso
(Single-Family Commercial
Transitional
Residential)
US-169 &
East AG (Agriculture) Residential City of Owasso
Residential
Residential,
Residential & City of Owasso &
West AG (Agriculture) Transitional &
Commercial Tulsa County
Commercial
SUBJECT PROPERTY/PROJECT DATA:
Property Size 237.73
Current Zoning AG, CS, RS-3
Commercial, Residential, Multi-
Proposed Use
Family, School
Lots/Blocks N/A
Transitional, Residential, Public and
Land Use Plan
Commercial
Number of Reserve Areas N/A
Area A – 3.16 Units/Acre
Area B – 4.09 Units/Acre
Residential Dwelling Units per Acre
Areas C,D,G – Max 25 Units/Acre
Multi-Family
Within PUD? PUD-05-02
Within Overlay District? US-169
Washington County Rural Water
Water Provider
District #3
Storm siren fee of $35/acre; Ranch
Applicable Paybacks Creek Sewer Payback of
$610.33/acre
Streets (public or private) N/A
CONCEPT OF A PUD:
The concept of a Planned Unit Development is to provide a creative alternative to conventional
development where a particular tract is under common ownership or control and where a
detailed development plan, outlining the development of the tract as a unit is proposed and
submitted for public review. The use of a PUD technique is a way to amend a zoning ordinance
in accordance with a complete and coordinated plan of development for a larger parcel,
rather than piecemeal individual changes using the variance process. Additionally, a PUD
typically produces a higher quality product with better amenities, architecture, landscaping and
buffering.
ANALYSIS:
The original PUD-05-02 called for a mixture of single-family home densities, commercial areas,
recreation areas and new elementary school. The amended PUD calls for the same uses, but
has moved some densities to other areas and has amended the commercial spaces to allow for
multi-family development as well. The attached exhibits show the major changes to the overall
PUD.
Regarding the single-family areas, the densities were simply moved around, resulting in an area
with 52-foot wide minimum lots (similar to Lake Valley) and larger lots that are a minimum of 60
feet in width. An area of high-density residential development is now removed from the original
plan and spread into the single-family areas, resulting in more smaller lots than were originally
proposed. The neighborhoods are designed with amenities, will have trails and paths to access
the commercial areas, the park areas and the elementary school, creating a truly walkable
neighborhood.
The development proposes a park and recreation area for the use of the residents in the area.
Pools are also planned for the neighborhood areas which should provide the homeowners with
ample recreational opportunities.
City of Owasso recommendations for the PUD: On lots smaller than 75 feet in width, no A/C
condensers shall be allowed to be built into the required 5 foot sideyard setback. Additionally,
front yard setbacks shall be at least 25 feet.
If the PUD is approved, the applicant will provide final development plans for administrative
review and approval by City staff. PUD applications presented to the Planning Commission and
City Council are for approval of the uses, the overall plan as it relates to the immediate area,
and the concept for the development.
Legal notices of the PUD request were published in the Owasso Reporter and notices were
mailed to property owners within a 300’ radius of the subject property.
COMPREHENSIVE PLAN CONSISTENCY:
The subject property where the PUD is proposed is denoted with transitional, residential, public
and commercial in the GrOwasso 2030 Land Use Master Plan. Given this, staff believes that the
proposed project is in conformance with 2030 GrOwasso Land Use Master Plan.
HARMONY WITH THE EXISTING AND EXPECTED DEVELOPMENT:
This proposal appears to be consistent with the current and expected development of the area.
This PUD proposes uses that will be compatible and will create a needed mixed-use
development. Great care was given to the layout of the different land uses, providing buffers
between the uses and also providing adequate multi-modal access. The uses of the PUD will fit
in with the surrounding uses, though the majority of the development is separated from
surrounding uses by arterial roadways.
PLANNING ISSUES:
Future planning issues must still be considered if the PUD is approved. If approved, the applicant
will be required to adhere to all City of Owasso subdivision regulations and engineering
requirements.
According to the Owasso Zoning Code, the Planning Commission and City Council shall hold a
public hearing on any PUD application and determine the following:
1. Whether the PUD is consistent with the Comprehensive Plan.
2. Whether the PUD is in harmony with the existing and expected development of surrounding
areas.
3. Whether the PUD is a unified treatment of the development possibilities of the project site.
4. Whether the PUD is consistent with the stated purpose and standards of the PUD ordinance.
a. To permit innovative land development while maintaining appropriate limitation on
the character and intensity of use assuring compatibility with adjoining and
proximate properties;
b. To permit flexibility within the development to best utilize the unique physical
features of the particular site;
c. To provide and preserve meaningful open space; and
d. To achieve a continuity of function and design within the development.
PLANNING COMMISSION:
This item is being taken to the regular meeting of the Planning Commission on July 13, 2015.
ATTACHMENTS:
Area Map
Aerial Map
Zoning Map
PUD-05-02A Site Plan
Development Plan
Original PUD-05-02 Plan
E 128 ST N
N 124 E PL
N 135 E AVE
N 129th E AVE
N 139 E AVE
N 132 E AVE
E 127 PL N
N 131 E AVE
N 130 E AVE
N
7 ST Subject Tract
E 12
N
6 PL E 126 PL N
E 12
E 126th ST N
169
E 122 ST N E 122 ST N
£
¤ E 122 ST N
169
£
¤
N 125 E AVE
E 120 ST N
N 126 E AVE
N 135 E AV
E
E 116th ST N
N 135 E
EA
N 131 E AVE N 132 E AVE
VE
40
N1
AVE
E 114 ST N Note: Graphic overlays may
Subject
OPUD 05-02-A
not precisely align with physical 0 200 400 800
Tract features on the ground. 04 21-14
Aerial Photo Date: March 2014 Feet
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Bronce L. Stephenson
Director of Community Development
SUBJECT: Tax-Credit Senior Housing
DATE: July 10, 2015
BACKGROUND:
With a goal of improving the housing stock in Oklahoma, The Oklahoma Housing Finance
Agency (OHFA) was created by Executive Order by Governor David Boren in 1975. The Agency
is a non-profit, tax exempt entity, with the State of Oklahoma as the beneficiary of the Trust. In
1976, OHFA opened its doors with 12 district field agents hired to implement a rental assistance
program.
The Affordable Housing Tax Credits (AHTC) Program offsets the high cost of rental housing
construction and rehabilitation and provides affordable rent rates for low-income families. Tax
Credits provide a 10-year reduction in tax liability for developers who construct or rehabilitate
affordable rental housing. Developers sell Tax Credits to Fortune 500 companies and other
investors. The money obtained from the sale is used to lower financing costs. The end result is
lower rent for families. The AHTC Program can be used for new construction and rehabilitation of
rental housing for those with limited incomes. Tax credits create partnerships between OHFA and
developers who build or rehabilitate affordable apartments or homes.
The purpose of the Oklahoma Affordable Housing Tax Credit (AHTC), also known as Low Income
Housing Tax Credit (LIHTC) Program is to expand the supply of new affordable rental units and
rehabilitate existing rental housing for Qualifying Households by stimulating private investment.
AHTC applications are made through the Oklahoma Housing Finance Authority (OHFA), with
applications being considered in January and July of each year. The money given out to
developers and to those qualifying for assistance is provided federally by the Department of
Housing and Urban Development (HUD).
Shown here are the income limitations on eligibility for Low-Income Housing:
ANALYSIS:
An application has been submitted to the City of Owasso asking for a resolution of support for
Tax-Credit Senior Housing Project. The subject property is located along N 145th E Ave, just east
of Friendship Baptist and across the street from Hodson Elementary.
A request for a resolution of support was received from Cornerstone Associates, LLC for the
subject property. They are requesting the resolution of support in advance of the January 2016
deadline. The Tax-Credit Housing application process would be as follows:
• Resolution of support requested from the local jurisdiction.
• Other documentation and data is collected by the applicant.
• The application and supporting materials are submitted to OHFA and the Authority
makes a decision on each application.
• If the application is successful, the applicant will notify us and start preparing
development documents (site plans, civil engineering plans, etc.).
• Because this project involves multifamily development, the applicant would have to
prepare a PUD document and take the project though the PUD process.
• If the PUD is approved, the applicant would prepare construction documents to be
submitted to the City for review and approval.
• Once all approvals are given, the work on the property would commence.
Owasso has a real need for affordable senior housing in the same way that we need any type of
senior housing and general affordable housing. Having a mixture of housing types and having a
City that has housing options for varying socioeconomic backgrounds makes for a complete
community. The City receives calls quite often from seniors and their families looking for housing
opportunities in Owasso and have to be turned away to other communities. Owasso currently
has only two properties that have connections to OHFA or allow OHFA vouchers, Wildwood
Apartments at 11611 E 80th St N and Prairie Village at 12877 E 116th St N.
This item will be brought back to the August 10, 2015 Council Worksession for further discussion of
the project specifics, with a vote at the August 17, 2015 meeting on a Resolution of Support.
ATTACHMENTS:
Area Map
Aerial Map
TO: The Honorable Mayor and
City Council
FROM: H. Dwayne Henderson, P.E.
City Engineer
SUBJECT: South Sports Park Regional Detention Pond
Engineering Service Agreement
DATE: July 10, 2015
BACKGROUND:
The South Sports Park is an area that has developed as the North Sports Park has reached
playing capacity. It currently houses a few baseball fields, unimproved parking areas and a
restroom facility. In addition, the park has a master plan that calls for additional lighted ball
fields, paved parking, a splash pad, walking trail and additional soccer fields. Lastly, the park
property is also the location for a planned regional detention pond.
Two (2) creeks used to converge on the property near E 106th St N and cause flooding during
heavy rain. Both streams are shown to be “blue-lines” on a U.S.G.S. Topography map for the
area, which indicates a United States Army Corps of Engineers (USACE) regulated streams. The
northern stream drainage comes from Hale Acres Subdivision and the southern stream from
Meadowcrest Subdivision. (See exhibit A)
However, in the last few years, staff realigned the northern stream, with USACE permission, to
flow along the eastern edge of the park and converge with the southern stream on the eastern
boundary. As a result, this modification opened up a large area for future growth within the
southern section of the sports park.
In 2014, with the Vision 2025 funds becoming available to provide additional amenities to the
southern section of the Sports Park and concurrent development of Abbott Farms Subdivision
immediately west of the South Sports Park, staff felt a public/private partnership should be
attempted to help fund the regional detention pond. With Abbott Farms directly adjacent to the
proposed regional detention pond, the developer would have the opportunity to use the
regional detention pond. Therefore on-site detention would not be necessary. In return, the
developer would provide the cost savings to the City for the engineering and construction of the
on-site detention. With this proposal in mind, staff approached the developer of Abbott Farms
and has made a tentative agreement to the terms mentioned above.
ENGINEERING SERVICES AGREEMENT:
In May 2015, staff requested a proposal from Meshek and Associates, PLC, Tulsa, Oklahoma.
Based upon past knowledge of the Owasso Master Drainage Plan and fee negotiations, Meshek
and Associates is being recommended as the design engineer for the project.
The proposed work includes the following:
1) Update Hydraulics and Hydrology (H&H) Data in Model
2) Preliminary/Final H&H Design/Alternatives
3) Conceptual/Preliminary/Final Plan Development
4) R/W Plan Preparation
5) QA/QC
6) Project Meetings
7) Prepare Bid documents in accordance with Owasso standards.
8) Attend Project Bid Meetings
9) Attend Construction Meetings
10) Material specifications review.
11) Provide Construction Assistance and As-built Drawings
Preparation of the 404 application for a USACE Nation Wide Permit and the topographic survey
of existing storm drains, detention ponds and utilities will be provided by the City.
FUNDING:
Funding was included in the FY 2014-2015 Stormwater Fund Budget for the engineering services
for the South Sports Park Regional Detention Pond. As a result, a budget amendment will be
recommended for approval to allow a carryover over funds.
PROPOSED ACTION:
An item has been included on the July 14th Council Work Session in order to discuss this project.
Unless Councilors express concern, staff will be proposing an engineering services agreement
with Meshek and Associates, PLC, in the amount of $57,330 for the South Sports Park Regional
Detention Project.
ATTACHMENTS:
Location Map
Agreement for Engineering Services
MINGO RD
E 106TH ST N
N
CITY OF OWASSO
P.O. 180 SPORTS PARK SOUTH
Owasso, OK 74055
918.272.4959 DETENTION POND W E
www.cityofowasso.com
PROJECT
S
LOCATION MAP
AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO, OK
OWASSO SPORTS PARK DETENTION POND
THIS AGREEMENT, made and entered into this ______ day of _____________, 2015 between
the City of Owasso, Oklahoma, a Municipal Corporation, of Oklahoma, hereinafter referred
to as CITY, and Meshek & Associates, PLC, hereinafter referred to as ENGINEER;
WITNESSETH:
WHEREAS, CITY intends to construct a detention facility at the Owasso Sports Park
hereinafter referred to as the PROJECT; and,
WHEREAS, CITY requires certain professional services in connection with the PROJECT,
hereinafter referred to as the SERVICES; and,
WHEREAS, ENGINEER, is prepared to provide such SERVICES;
WHEREAS, funding is available for the PROJECT;
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto
agree as follows:
1. SCOPE OF PROJECT. The scope of the PROJECT is described in Attachment A,
SCOPE OF PROJECT, which is attached hereto and incorporated by reference as part
of this AGREEMENT.
2. SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the
SERVICES described in Attachment B, SCOPE OF SERVICES, which is attached
hereto and incorporated by reference as part of this AGREEMENT.
3. CITY'S RESPONSIBILITIES. CITY shall be responsible for all matters described in
Attachment C, RESPONSIBILITIES OF THE CITY, which is attached hereto and
incorporated by reference as part of this AGREEMENT.
4. COMPENSATION. CITY shall pay ENGINEER in accordance with Attachment D,
which are attached hereto and incorporated by reference as part of this
AGREEMENT.
5. STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES
undertaken in a manner consistent with the prevailing accepted standard for similar
services with respect to projects of comparable function and complexity and with the
applicable laws and regulations published and in effect at the time of performance of
the SERVICES. The PROJECT shall be designed and engineered in a good and
workmanlike manner and in strict accordance with this AGREEMENT. All
engineering work shall be performed by or under the supervision of Professional
Engineers licensed in the State of Oklahoma, and properly qualified to perform such
engineering services, which qualification shall be subject to review by CITY. Other
than the obligation of the ENGINEER to perform in accordance with the foregoing
standards, no warranty, either express or implied, shall apply to the SERVICES to be
performed by the ENGINEER pursuant to this AGREEMENT or the suitability of
ENGINEER'S work product.
6. LIMITATION OF RESPONSIBILITY.
PAGE 1 OF 9
6.1. ENGINEER shall not be responsible for construction means, methods,
techniques, sequences, procedures, or safety precautions and programs in
connection with the PROJECT.
6.2. ENGINEER’s deliverables, shall include plans for construction signed by a
registered engineer.
7. LIABILITY AND INDEMNIFICATION.
7.1. ENGINEER shall defend and indemnify CITY from and against legal liability
for damages arising out of the performance of the SERVICES for CITY,
including but not limited to any claims, costs, attorney fees, or other expenses
of whatever nature where such liability is caused by the negligent act, error,
or omission of ENGINEER, or any employee for whom ENGINEER is legally
liable. Nothing in this paragraph shall make the ENGINEER liable for any
damages caused by the CITY or any other contractor or consultant of the
CITY.
7.2. ENGINEER shall not be liable to CITY for any special, indirect or
consequential damages, such as, but not limited to, loss of revenue, or loss of
anticipated profits.
8. COMPLIANCE WITH LAWS. In performance of the SERVICES, ENGINEER shall
comply with applicable regulatory requirements including federal, state, and local
laws, rules, regulations, orders, codes, criteria and standards. ENGINEER shall
procure the permits, certificates, and licenses necessary to allow ENGINEER to
perform the SERVICES. ENGINEER shall not be responsible for procuring permits,
certificates, and licenses required for any activities unless such responsibilities are
specifically assigned to ENGINEER in Attachment B, SCOPE OF SERVICES.
9. INSURANCE.
9.1. During the performance of the SERVICES under this AGREEMENT,
ENGINEER shall maintain the following insurance:
9.1.1. General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the aggregate,
and with property damage limits of not less than $100,000 for each
occurrence and not less than $100,000 in the aggregate.
9.1.2. Automobile Liability Insurance with bodily injury limits of not less
than $1,000,000 for each person and not less than $1,000,000 for each accident
and with property damage limits of not less than $100,000 for each accident.
9.1.3. Worker's Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance with limits of not less than
$100,000 for each occurrence.
9.1.4. Errors and Omissions Insurance to remain in effect during the
PROJECT and the term of any legal liability. Errors and Omissions coverage
to be for a minimum of $1,000,000.
9.2. ENGINEER shall furnish CITY certificates of insurance which shall include a
provision that such insurance shall not be canceled without at least 30 days
written notice to the CITY.
PAGE 2 OF 9
10. OWNERSHIP AND REUSE OF DOCUMENTS.
10.1. All documents, including reports, field notes and data shall become and
remain the property of the CITY.
10.2. CITY'S reuse of such documents without written verification or adaptation
by ENGINEER for the specific purpose intended shall be at CITY'S risk.
11. TERMINATION OF AGREEMENT.
11.1. The obligation to continue SERVICES under this AGREEMENT may be
terminated by either party upon fifteen days written notice in the event of
substantial failure by the other party to perform in accordance with the terms
hereof through no fault of the terminating party.
11.2. CITY shall have the right to terminate this AGREEMENT, or suspend
performance thereof, for CITY'S convenience upon written notice to
ENGINEER; and ENGINEER shall terminate or suspend performance of
SERVICES on a schedule acceptable to CITY. In the event of termination or
suspension for CITY'S convenience, CITY shall pay ENGINEER for all
SERVICES performed to the date of termination in accordance with
provisions of Attachment D, COMPENSATION. Upon restart of a suspended
project, ENGINEER’s contract price and schedule shall be equitably adjusted.
12. NOTICE.
Any notice, demand, or request required by or made pursuant to this AGREEMENT
shall be deemed properly made if personally delivered in writing or deposited in the
United States mail, postage prepaid, to the address specified below.
To ENGINEER: Meshek & Associates, PLC
1437 S. Boulder Ave. Suite 1550
Tulsa, OK 74119
Attention: Benjamin W. Fletcher, PE, LSI
To CITY: CITY OF OWASSO
301 W 2nd Avenue
Owasso, Oklahoma 74055
Attention: Roger Stevens, Public Works Director
12.1. Nothing contained in this Article shall be construed to restrict the
transmission of routine communications between representatives of
ENGINEER and CITY.
13. UNCONTROLLABLE FORCES. Neither CITY nor ENGINEER shall be considered to
be in default of this AGREEMENT if delays in or failure of performance shall be due
to forces which are beyond the control of the parties; including, but not limited to:
fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance,
sabotage; inability to procure permits, licenses, or authorizations from any state,
local, or federal agency or person for any of the supplies, materials, accesses, or
services required to be provided by either CITY or ENGINEER under this
PAGE 3 OF 9
AGREEMENT; strikes, work slowdowns or other labor disturbances, and judicial
restraint.
14. SEVERABILITY. If any portion of this AGREEMENT shall be construed by a court
of competent jurisdiction as unenforceable, such portion shall be severed herefrom,
and the balance of this AGREEMENT shall remain in full force and effect.
15. INTEGRATION AND MODIFICATION. This AGREEMENT includes
ATTACHMENTS A, B, C, and D and represents the entire and integrated
AGREEMENT between the parties; and supersedes all prior negotiations,
representations, or agreements pertaining to the SCOPE OF SERVICES herein, either
written or oral. CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect ENGINEER’s cost of or time
required for performance of the services, an equitable adjustment will be made
through an amendment to this AGREEMENT. This AGREEMENT may be amended
only by written instrument signed by each of the Parties.
16. DISPUTE RESOLUTION PROCEDURE. In the event of a dispute between the
ENGINEER and the CITY over the interpretation or application of the terms of this
AGREEMENT, the matter shall be referred to the City's Director of Public Works for
resolution. If the Director of Public Works is unable to resolve the dispute, the matter
may, in the Director's discretion, be referred to the City Manager for resolution.
Regardless of these procedures, neither party shall be precluded from exercising any
rights, privileges or opportunities permitted by law to resolve any dispute.
17. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to
this AGREEMENT, provided that nothing contained in this paragraph shall prevent
ENGINEER from employing such independent consultants, associates, and
subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the
performance of the SERVICES hereunder.
18. APPROVAL. It is understood and agreed that all work performed under this
AGREEMENT shall be subject to inspection and approval by the Public Works
Department of the City of Owasso.
PAGE 4 OF 9
IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies
on the respective dates herein below reflected to be effective on the date executed by the
Mayor of the City of Owasso.
Meshek & Associates, PLC
_______________________________________
Benjamin W. Fletcher, PE, LSI
Date ____/____/2015
APPROVED: CITY OF OWASSO, OKLAHOMA
City Clerk Mayor
Date ____/____/2015
APPROVED AS TO FORM:
City Attorney
PAGE 5 OF 9
AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO, OK
OWASSO SPORTS PARK DETENTION POND
Scope of Project
Attachment A
SCOPE OF PROJECT. The PROJECT shall consist of civil engineering services for the
following categories of assignments:
1. Prepare construction plans for the Owasso Sports Park Detention Pond.
2. Services not included in this contract: Topography, platting, preparation of legal
descriptions, public utility installations or relocations, coordination with franchise
utilities, paving design, or construction inspections.
PAGE 6 OF 9
AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO, OK
OWASSO SPORTS PARK DETENTION POND
Scope of Services
Attachment B
The services to be performed by the ENGINEER, Meshek & Associates, PLC, under this
AGREEMENT will consist of providing civil engineering services for the categories of
assignments presented in Attachment A, as directed individually by the City by a work
order.
Further, it is understood and agreed that the date of beginning, rate of progress, and the
time of completion of the work to be done hereunder for each assignment are essential
provisions of this AGREEMENT; and it is further understood and agreed that the work
embraced in this AGREEMENT shall commence upon execution of this AGREEMENT and
receipt of Notice to Proceed for each assignment. It is further understood that all reviews
and conceptual designs will be prepared in accordance with the OWRB and City of Owasso
guidelines.
A.1. Basic Services of ENGINEER. The basic services of the ENGINEER shall
include, but are not limited to the following tasks:
A.1.a Provide a Preliminary Design
A.1.a) 1. Provide preliminary hydrologic and hydraulic design for the
PROJECT
A.1.a) 2. Prepare preliminary construction plans for the PROJECT
A.1.a) 3. Prepare a preliminary construction estimate
A.1.b Provide a Final Design
A.1.b) 1. Provide final hydrologic and hydraulic design for the
PROJECT
A.1.b) 2. Prepare final construction plans for the PROJECT
A.1.b) 3. Prepare a final construction estimate
A.1.c Provide Contruction Services
A.1.c) 1. Assist in the preparation of bidding documents
A.1.c) 2. Provide responses to all Requests for Information
A.1.c) 3. Review all submittals
A.1.c) 4. Provide assistance during construction as needed
PAGE 7 OF 9
AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO, OK
OWASSO SPORTS PARK DETENTION POND
Responsibilities of the City
Attachment C
RESPONSIBILITIES OF THE CITY. The CITY agrees:
C.1 Reports, Records, etc. To furnish, as required by the work, at no expense to the
ENGINEER:
C.1.1 Records, reports, studies, plans, drawings, and other data available in the
files of the CITY that may be useful in the work involved under this
AGREEMENT.
C.1.2 Property ownership and documentation shall be provided.
C.1.3 ENGINEER will reasonably rely upon the accuracy, timeliness, and
completeness of the information provided by CITY.
C.2 Access. To assist in providing access to public and private property when required
in performance of ENGINEER's services.
C.3 Staff Assistance. Designate the individual to act as its representative in respect to the
work to be performed under this AGREEMENT, and such person shall have
complete authority to transmit instructions, receive information, interpret and define
CITY'S policies and decisions with respect to materials, equipment, elements and
systems pertinent to the services covered by this AGREEMENT.
C.3.1 Furnish staff assistance in locating, and operating any structures pertinent to
said PROJECT.
C.4 Review. Examine all studies, reports, sketches, estimates, specifications, drawings,
proposals and other documents presented by ENGINEER and render in writing
decisions pertaining thereto within a reasonable time so as not to delay the services
of ENGINEER.
PAGE 8 OF 9
AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO, OK
OWASSO SPORTS PARK DETENTION POND
Compensation
Attachment D
COMPENSATION. The CITY agrees to pay, as compensation for services set forth in
Attachment B, the following fees, payable monthly as each Phase of the work progresses;
and within 30 calendar days of receipt of invoice. ENGINEER shall submit monthly
invoices based upon percent of work completed. Invoices shall be accompanied by such
documentation as the CITY may require in substantiation of the amount billed.
D.1 Total Compensation.
D.1.1 For the work under this project the total maximum billing including direct
costs and subconsultant services shall be Fifty-Seven Thousand Three-
Hundred Thirty and no cents ($57,330.00) which amount shall not be
exceeded without further written authorization by CITY.
D.2 Conditions of Payment.
D.2.1 Payment shall be made based on a lump sum basis.
PAGE 9 OF 9
TO: The Honorable Mayor and
City Council
FROM: H. Dwayne Henderson, P.E.
City Engineer
SUBJECT: Central Park Drainage Improvements
Engineering Service Agreement
DATE: July 10, 2015
BACKGROUND:
The Central Park drainage channel is located between East 86th Street North and Owasso Mid-
High School. The channel commences northwest of the East 86th Street North/North 123rd East
Ave Intersection at the bridge and traverses northwesterly between the commercial property
housing State Farm Insurance and the Lake Ridge Subdivision. The channel continues toward the
new SAHO building and enters the property owned by residents in Central Park II. Lastly, the
channel turns into the Owasso Public School property and connects with the Central Park
detention pond outlet.
This project was listed as a priority project in the 2005 Master Drainage Plan (MDP). Funds from
the stormwater fund have been budgeted to provide the initial survey and engineering design
for the project. The purpose of this project is to realign the channel into the existing drainage
easement with the use of an articulated concrete bottom and Recon block wall, similar to what
was used at the Three Lakes Channel Project in 2013, (See appendix for pictures of that project.
Public Works is proposing to proceed with project design this fiscal year with construction in FY
2016-2017, if funding is available.
ENGINEERING SERVICES AGREEMENT:
In June 2015, staff requested a proposal from Meshek and Associates, PLC, Tulsa, Oklahoma.
Based upon past knowledge of the Owasso Master Drainage Plan and fee negotiations, Meshek
and Associates is being recommended as the design engineer for the project.
The proposed work includes the following:
1) Update Hydraulics and Hydrology (H&H) Data in Model
2) Preliminary/Final H&H Design/Alternatives
3) Conceptual/Preliminary/Final Plan Development
4) R/W Plan Preparation
5) QA/QC
6) Project Meetings
7) Prepare Bid documents in accordance with Owasso standards.
8) Attend Project Bid Meetings
9) Attend Construction Meetings
10) Material specifications review.
11) Provide Construction Assistance and As-built Drawings
PROPOSED WORK BY CITY OF OWASSSO ENGINEERING STAFF:
12) - Prepare 404 application to USACE for a Nation Wide Permit
13) - Provide topographic survey of existing storm drains, detention ponds and utilities
FUNDING:
Funding was included in the FY 2014-2015 Stormwater Fund Budget for the engineering services
for the Central Park Drainage Project. As a result, a budget amendment will be recommended
for approval to allow a carryover over funds.
PROPOSED ACTION:
An item has been included on the July 14th Council Work Session in order to discuss this project.
Unless Councilors express concern, staff will be proposing an engineering services agreement
with Meshek and Associates, PLC, in the amount of $66,760.00 for the Central Park Drainage
Project.
ATTACHMENTS:
A. Location Map
B. Agreement for Engineering Services
N 129TH E AVE
L
A
R
T K
N R D
E A N
C P O
P
PROJECT
LOCATION
M
I
S D-
C H
H IG
O H
O
L
E 86TH ST N
N
CITY OF OWASSO
P.O. 180 CENTRAL PARK
Owasso, OK 74055
918.272.4959 DRAINAGE CHANNEL W E
www.cityofowasso.com
PROJECT
S
LOCATION MAP
AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO, OK
CENTRAL PARK CHANNEL IMPROVEMENTS
THIS AGREEMENT, made and entered into this ______ day of _____________, 2015 between
the City of Owasso, Oklahoma, a Municipal Corporation, of Oklahoma, hereinafter referred
to as CITY, and Meshek & Associates, PLC, hereinafter referred to as ENGINEER;
WITNESSETH:
WHEREAS, CITY intends to construct improvements to the Central Park Channel
hereinafter referred to as the PROJECT; and,
WHEREAS, CITY requires certain professional services in connection with the PROJECT,
hereinafter referred to as the SERVICES; and,
WHEREAS, ENGINEER, is prepared to provide such SERVICES;
WHEREAS, funding is available for the PROJECT;
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto
agree as follows:
1. SCOPE OF PROJECT. The scope of the PROJECT is described in Attachment
A, SCOPE OF PROJECT, which is attached hereto and incorporated by reference as
part of this AGREEMENT.
2. SERVICES TO BE PERFORMED BY ENGINEER. ENGINEER shall perform the
SERVICES described in Attachment B, SCOPE OF SERVICES, which is attached
hereto and incorporated by reference as part of this AGREEMENT.
3. CITY'S RESPONSIBILITIES. CITY shall be responsible for all matters described in
Attachment C, RESPONSIBILITIES OF THE CITY, which is attached hereto and
incorporated by reference as part of this AGREEMENT.
4. COMPENSATION. CITY shall pay ENGINEER in accordance with Attachment D,
which are attached hereto and incorporated by reference as part of this
AGREEMENT.
5. STANDARD OF PERFORMANCE. ENGINEER shall perform the SERVICES
undertaken in a manner consistent with the prevailing accepted standard for similar
services with respect to projects of comparable function and complexity and with the
applicable laws and regulations published and in effect at the time of performance of
the SERVICES. The PROJECT shall be designed and engineered in a good and
workmanlike manner and in strict accordance with this AGREEMENT. All
engineering work shall be performed by or under the supervision of Professional
Engineers licensed in the State of Oklahoma, and properly qualified to perform such
engineering services, which qualification shall be subject to review by CITY. Other
than the obligation of the ENGINEER to perform in accordance with the foregoing
standards, no warranty, either express or implied, shall apply to the SERVICES to be
performed by the ENGINEER pursuant to this AGREEMENT or the suitability of
ENGINEER'S work product.
6. LIMITATION OF RESPONSIBILITY.
PAGE 1 OF 10
6.1. ENGINEER shall not be responsible for construction means, methods,
techniques, sequences, procedures, or safety precautions and programs in
connection with the PROJECT.
6.2. ENGINEER’s deliverables, shall include plans for construction signed by a
registered engineer.
7. LIABILITY AND INDEMNIFICATION.
7.1. ENGINEER shall defend and indemnify CITY from and against legal liability
for damages arising out of the performance of the SERVICES for CITY,
including but not limited to any claims, costs, attorney fees, or other expenses
of whatever nature where such liability is caused by the negligent act, error,
or omission of ENGINEER, or any employee for whom ENGINEER is legally
liable. Nothing in this paragraph shall make the ENGINEER liable for any
damages caused by the CITY or any other contractor or consultant of the
CITY.
7.2. ENGINEER shall not be liable to CITY for any special, indirect or
consequential damages, such as, but not limited to, loss of revenue, or loss of
anticipated profits.
8. COMPLIANCE WITH LAWS. In performance of the SERVICES, ENGINEER shall
comply with applicable regulatory requirements including federal, state, and local
laws, rules, regulations, orders, codes, criteria and standards. ENGINEER shall
procure the permits, certificates, and licenses necessary to allow ENGINEER to
perform the SERVICES. ENGINEER shall not be responsible for procuring permits,
certificates, and licenses required for any activities unless such responsibilities are
specifically assigned to ENGINEER in Attachment B, SCOPE OF SERVICES.
9. INSURANCE.
9.1. During the performance of the SERVICES under this AGREEMENT,
ENGINEER shall maintain the following insurance:
9.1.1. General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $1,000,000 in the aggregate,
and with property damage limits of not less than $100,000 for each
occurrence and not less than $100,000 in the aggregate.
9.1.2. Automobile Liability Insurance with bodily injury limits of not less
than $1,000,000 for each person and not less than $1,000,000 for each accident
and with property damage limits of not less than $100,000 for each accident.
9.1.3. Worker's Compensation Insurance in accordance with statutory
requirements and Employers' Liability Insurance with limits of not less than
$100,000 for each occurrence.
9.1.4. Errors and Omissions Insurance to remain in effect during the
PROJECT and the term of any legal liability. Errors and Omissions coverage
to be for a minimum of $1,000,000.
9.2. ENGINEER shall furnish CITY certificates of insurance which shall include a
provision that such insurance shall not be canceled without at least 30 days
written notice to the CITY.
PAGE 2 OF 10
10. OWNERSHIP AND REUSE OF DOCUMENTS.
10.1. All documents, including reports, field notes and data shall become and
remain the property of the CITY.
10.2. CITY'S reuse of such documents without written verification or adaptation
by ENGINEER for the specific purpose intended shall be at CITY'S risk.
11. TERMINATION OF AGREEMENT.
11.1. The obligation to continue SERVICES under this AGREEMENT may be
terminated by either party upon fifteen days written notice in the event of
substantial failure by the other party to perform in accordance with the terms
hereof through no fault of the terminating party.
11.2. CITY shall have the right to terminate this AGREEMENT, or suspend
performance thereof, for CITY'S convenience upon written notice to
ENGINEER; and ENGINEER shall terminate or suspend performance of
SERVICES on a schedule acceptable to CITY. In the event of termination or
suspension for CITY'S convenience, CITY shall pay ENGINEER for all
SERVICES performed to the date of termination in accordance with
provisions of Attachment D, COMPENSATION. Upon restart of a suspended
project, ENGINEER’s contract price and schedule shall be equitably adjusted.
12. NOTICE.
Any notice, demand, or request required by or made pursuant to this AGREEMENT
shall be deemed properly made if personally delivered in writing or deposited in the
United States mail, postage prepaid, to the address specified below.
To ENGINEER: Meshek & Associates, PLC
1437 S. Boulder Ave. Suite 1550
Tulsa, OK 74119
Attention: Benjamin W. Fletcher, PE, LSI
To CITY: CITY OF OWASSO
301 W 2nd Avenue
Owasso, Oklahoma 74055
Attention: Roger Stevens, Public Works Director
12.1. Nothing contained in this Article shall be construed to restrict the
transmission of routine communications between representatives of
ENGINEER and CITY.
13. UNCONTROLLABLE FORCES. Neither CITY nor ENGINEER shall be considered to
be in default of this AGREEMENT if delays in or failure of performance shall be due
to forces which are beyond the control of the parties; including, but not limited to:
fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance,
sabotage; inability to procure permits, licenses, or authorizations from any state,
local, or federal agency or person for any of the supplies, materials, accesses, or
services required to be provided by either CITY or ENGINEER under this
PAGE 3 OF 10
AGREEMENT; strikes, work slowdowns or other labor disturbances, and judicial
restraint.
14. SEVERABILITY. If any portion of this AGREEMENT shall be construed by a court
of competent jurisdiction as unenforceable, such portion shall be severed herefrom,
and the balance of this AGREEMENT shall remain in full force and effect.
15. INTEGRATION AND MODIFICATION. This AGREEMENT includes
ATTACHMENTS A, B, C, and D and represents the entire and integrated
AGREEMENT between the parties; and supersedes all prior negotiations,
representations, or agreements pertaining to the SCOPE OF SERVICES herein, either
written or oral. CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect ENGINEER’s cost of or time
required for performance of the services, an equitable adjustment will be made
through an amendment to this AGREEMENT. This AGREEMENT may be amended
only by written instrument signed by each of the Parties.
16. DISPUTE RESOLUTION PROCEDURE. In the event of a dispute between the
ENGINEER and the CITY over the interpretation or application of the terms of this
AGREEMENT, the matter shall be referred to the City's Director of Public Works for
resolution. If the Director of Public Works is unable to resolve the dispute, the matter
may, in the Director's discretion, be referred to the City Manager for resolution.
Regardless of these procedures, neither party shall be precluded from exercising any
rights, privileges or opportunities permitted by law to resolve any dispute.
17. ASSIGNMENT. ENGINEER shall not assign its obligations undertaken pursuant to
this AGREEMENT, provided that nothing contained in this paragraph shall prevent
ENGINEER from employing such independent consultants, associates, and
subcontractors as ENGINEER may deem appropriate to assist ENGINEER in the
performance of the SERVICES hereunder.
18. APPROVAL. It is understood and agreed that all work performed under this
AGREEMENT shall be subject to inspection and approval by the Public Works
Department of the City of Owasso.
PAGE 4 OF 10
IN WITNESS WHEREOF, the parties have executed this AGREEMENT in multiple copies
on the respective dates herein below reflected to be effective on the date executed by the
Mayor of the City of Owasso.
Meshek & Associates, PLC
_______________________________________
Benjamin W. Fletcher, PE, LSI
Date ____/____/2015
APPROVED: CITY OF OWASSO, OKLAHOMA
City Clerk Mayor
Date ____/____/2015
APPROVED AS TO FORM:
City Attorney
PAGE 5 OF 10
AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO, OK
CENTRAL PARK CHANNEL IMPROVEMENTS
Scope of Project
Attachment A
SCOPE OF PROJECT. The PROJECT shall consist of civil engineering services for the
following categories of assignments:
1. Prepare construction plans for the Central Park Channel Improvements.
PAGE 6 OF 10
AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO, OK
CENTRAL PARK CHANNEL IMPROVEMENTS
Scope of Services
Attachment B
The services to be performed by the ENGINEER, Meshek & Associates, PLC, under this
AGREEMENT will consist of providing civil engineering services for the categories of
assignments presented in Attachment A, as directed individually by the City by a work
order.
Further, it is understood and agreed that the date of beginning, rate of progress, and the
time of completion of the work to be done hereunder for each assignment are essential
provisions of this AGREEMENT; and it is further understood and agreed that the work
embraced in this AGREEMENT shall commence upon execution of this AGREEMENT and
receipt of Notice to Proceed for each assignment. It is further understood that all reviews
and conceptual designs will be prepared in accordance with the OWRB and City of Owasso
guidelines.
A.1. Basic Services of ENGINEER. The basic services of the ENGINEER shall
include, but are not limited to the following tasks:
A.1.a Provide a Conceptual Design Report
A.1.a) 1. Provide topographic survey for the PROJECT area
A.1.a) 2. Update existing hydrologic and hydraulic model for the
PROJECT
A.1.a) 3. Prepare conceptual report for the PROJECT detailing
alternative analysis
A.1.a) 4. Prepare a conceptual construction estimates
A.1.b Provide a Preliminary Design
A.1.a) 2. Provide preliminary hydrologic and hydraulic design for the
PROJECT
A.1.a) 3. Prepare preliminary construction plans for the PROJECT
A.1.a) 4. Prepare a preliminary construction estimate
A.1.c Provide a Final Design
A.1.b) 1. Provide final hydrologic and hydraulic design for the
PROJECT
A.1.b) 2. Prepare final construction plans for the PROJECT
A.1.b) 3. Prepare a final construction estimate
PAGE 7 OF 10
A.1.d Provide Contruction Services
A.1.c) 1. Assist in the preparation of bidding documents
A.1.c) 2. Provide responses to all Requests for Information
A.1.c) 3. Review all submittals
A.1.c) 4. Provide assistance during construction as needed
PAGE 8 OF 10
AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO, OK
CENTRAL PARK CHANNEL IMPROVEMENTS
Responsibilities of the City
Attachment C
RESPONSIBILITIES OF THE CITY. The CITY agrees:
C.1 Reports, Records, etc. To furnish, as required by the work, at no expense to the
ENGINEER:
C.1.1 Records, reports, studies, plans, drawings, and other data available in the
files of the CITY that may be useful in the work involved under this
AGREEMENT.
C.1.2 Property ownership and documentation shall be provided.
C.1.3 ENGINEER will reasonably rely upon the accuracy, timeliness, and
completeness of the information provided by CITY.
C.2 Access. To assist in providing access to public and private property when required
in performance of ENGINEER's services.
C.3 Staff Assistance. Designate the individual to act as its representative in respect to the
work to be performed under this AGREEMENT, and such person shall have
complete authority to transmit instructions, receive information, interpret and define
CITY'S policies and decisions with respect to materials, equipment, elements and
systems pertinent to the services covered by this AGREEMENT.
C.3.1 Furnish staff assistance in locating, and operating any structures pertinent to
said PROJECT.
C.4 Review. Examine all studies, reports, sketches, estimates, specifications, drawings,
proposals and other documents presented by ENGINEER and render in writing
decisions pertaining thereto within a reasonable time so as not to delay the services
of ENGINEER.
PAGE 9 OF 10
AGREEMENT FOR ENGINEERING SERVICES
FOR THE CITY OF OWASSO, OK
CENTRAL PARK CHANNEL IMPROVEMENTS
Compensation
Attachment D
COMPENSATION. The CITY agrees to pay, as compensation for services set forth in
Attachment B, the following fees, payable monthly as each Phase of the work progresses;
and within 30 calendar days of receipt of invoice. ENGINEER shall submit monthly
invoices based upon percent of work completed. Invoices shall be accompanied by such
documentation as the CITY may require in substantiation of the amount billed.
D.1 Total Compensation.
D.1.1 For the work under this project the total maximum billing including direct
costs and subconsultant services shall be Sixty Six Thousand Seven Hundred
Sixty Dollars and no cents ($66,760.00) which amount shall not be exceeded
without further written authorization by CITY.
D.2 Conditions of Payment.
D.2.1 Payment shall be made based on a lump sum basis.
PAGE 10 OF 10
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Roger Stevens
Public Works Director
SUBJECT: FY 2015-2016 Street Rehabilitation Program
Proposed Project Listing
DATE: July 10, 2015
BACKGROUND:
Annually, street rehabilitation sites are evaluated and selected based on a comprehensive
assessment of roadway conditions. The selection process is aimed at maximizing the taxpayer’s
return on investment by increasing roadway lifecycle and minimizing future maintenance costs
while enhancing overall roadway driving conditions and public safety.
PRIORITY STREET REPAIRS/MAINTENANCE IDENTIFIED:
In June 2015, the Public Works staff completed an update to the city’s street inventory. The data
collected for the model was adjusted to reflect changes in segment conditions and a new
priority listing was generated. A map depicting the location of the proposed priority sites is
attached for review. The estimated cost for the base project $1,762,699. In the event the bid
comes in considerably less than the engineering estimate, staff has included four alternate sites
as part of the proposed priority sites.
PROJECT FUNDING:
Funding for this project in the amount of $1,000,000 is included in the FY 2015-2016 Capital
Improvements Fund budget. In addition, fund 39 (1/2 penny sales tax initiative) has $765,975
allocated for this fiscal year’s street repair program. As a result, total funding available for FY
2015-2016 Street Rehabilitation Program is $1,765,975.
PROPOSED ACTION:
This item will be placed on the July 14, 2015, City Council worksession agenda for discussion.
Upon City Council approval of the FY 2015-2016 Street Rehabilitation Priority Projects, the Public
Work’s Engineering Division will proceed to complete the design and bid documents for the
Street Repair project. Staff anticipates this project could be advertised in January, awarded in
February, and completed by September 2016.
ATTACHMENTS:
A. Recommended FY 2015-2016 Street Repair Location Map
B. Priority Site List
106th ST N
96th ST N
86th ST N
145th E AVENUE
MINGO ROAD
US HWY 169 129th E AVE
76th ST N
FY 2015-16 STREET REHABILITATION PROGRAM CITY OF OWASSO
PROJECT LOCATION MAP
BASE BID PROJECTS 111 N. Main Street
P.O. Box 180
ALTERNATE BID PROJECTS Owasso, OK 74055
7/2/15 North
918.376.1500
FY 2015-2016 Street Rehabilitation Project List (Base Bid)
STREET FROM TO SUBDIVISION REPAIR TYPE OCI
1 N 126TH E AVE E 76th ST N E 76th PL N ELM CREEK EST. BASE REPAIR, OVERLAY 52.96
2 N 126TH E AVE E 76th PL N E 77th ST N ELM CREEK EST. BASE REPAIR, OVERLAY 51.84
3 N 126TH E AVE E 77th ST N E 77th PL N ELM CREEK EST. BASE REPAIR, OVERLAY 61.22
4 E 77TH PL N N 123rd E AVE N 126TH E AVE ELM CREEK EST. BASE REPAIR, OVERLAY 58.83
5 E 81ST ST N N 118TH E AVE N 119TH E AVE ELM CREEK I BASE REPAIR, OVERLAY 67.22
6 N 129TH E AVE E 80TH CT N E 81ST ST N ELM CREEK I BASE REPAIR, OVERLAY 67.58
7 E 80TH CT N N 118TH E AVE N 119TH E AVE ELM CREEK I BASE REPAIR, OVERLAY 70.81
8 N 124TH E AVE E 81ST ST N E 81ST PL N ELM CREEK EST. BASE REPAIR, OVERLAY 51.69
9 N 124TH E AVE E 81ST PL N E 82ND ST N ELM CREEK EST. BASE REPAIR, OVERLAY 57.56
10 N 124TH E AVE E 82ND ST N E 83RD ST N ELM CREEK EST. BASE REPAIR, OVERLAY 57.83
11 N 124TH E AVE E 83RD ST N N 124TH E AVE ELM CREEK EST. BASE REPAIR, OVERLAY 58.08
12 E 83RD ST N N 122ND E AVE N 124TH E AVE ELM CREEK EST. BASE REPAIR, OVERLAY 56.01
13 ALLEY #1 E 76TH ST N E 1ST AVE ORIGINAL TOWN RECONSTRUCT 40.01
14 ALLEY #2 ATLANTA MAIN ST ORIGINAL TOWN RECONSTRUCT 39.78
15 ATLANTA E 76TH ST N W 1ST AVE ORIGINAL TOWN BASE REPAIR, OVERLAY 57.97
16 ATLANTA W 1ST AVE BROADWAY ORIGINAL TOWN BASE REPAIR, OVERLAY 63.42
17 ATLANTA BROADWAY W 1ST ST ORIGINAL TOWN BASE REPAIR, OVERLAY 61.72
18 ATLANTA W 1ST ST W 2ND ST ORIGINAL TOWN BASE REPAIR, OVERLAY 59.06
19 ATLANTA W 2ND ST W 3RD ST ORIGINAL TOWN BASE REPAIR, OVERLAY 61.86
20 W 1ST ST ATLANTA DEAD END ORIGINAL TOWN RECONSTRUCT 40.08
21 BROADWAY ATLANTA DEAD END ORIGINAL TOWN RECONSTRUCT 46.39
22 CARLSBAD W 5TH ST DEAD END HALE ADDITION RECONSTRUCT 40.00
23 E 99TH ST N N 116TH E AVE N 117TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 84.23
24 E 99TH ST N N 117TH E AVE N 117TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 82.36
25 E 99TH ST N N 117TH E AVE N 118TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 83.15
26 E 99TH ST N N 118TH E AVE N 119TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 84.22
FY 2015-2016 Street Rehabilitation Project List (Base Bid)
STREET FROM TO SUBDIVISION REPAIR TYPE OCI
27 E 99TH ST N N 119TH E AVE N 120TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 80.67
28 N 117TH E AVE E 99TH ST N E 100TH ST N BAILEY RANCH EST II CRACK SEAL, FOG SEAL 83.28
29 N 118TH E AVE E 99TH ST N E 100TH ST N BAILEY RANCH EST II CRACK SEAL, FOG SEAL 80.18
30 N 119TH E AVE E 99TH ST N E 100TH ST N BAILEY RANCH EST II CRACK SEAL, FOG SEAL 83.39
31 N 120TH E AVE E 99TH ST N E 100TH ST N BAILEY RANCH EST II CRACK SEAL, FOG SEAL 82.89
32 E 100TH ST N N 116TH E AVE N 117TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 81.22
33 E 100TH ST N N 117TH E AVE N 117TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 80.78
34 E 100TH ST N N 117TH E AVE N 118TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 78.53
35 E 100TH ST N N 118TH E AVE N 118TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 77.69
36 E 100TH ST N N 118TH E AVE N 119TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 80.67
37 E 100TH ST N N 119TH E AVE N 120TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 80.64
38 E 100TH ST N N 120TH E AVE DEAD END BAILEY RANCH EST II CRACK SEAL, FOG SEAL 81.42
39 N 117TH E AVE E 100TH ST N E 101ST ST N BAILEY RANCH EST II CRACK SEAL, FOG SEAL 82.72
40 N 114TH E AVE E 101ST ST N E 102ND ST N BAILEY RANCH EST II CRACK SEAL, FOG SEAL 83.19
41 E 101ST ST N N 114TH E AVE N 117TH E AVE BAILEY RANCH EST II CRACK SEAL, FOG SEAL 82.36
42 N 114TH E AVE E 101ST ST N E 102ND ST N BAILEY RANCH EST II CRACK SEAL, FOG SEAL 80.72
43 E 102ND ST N GARNETT RD N 114TH E AVE SAWGRASS PARK I CRACK SEAL, FOG SEAL 86.86
44 E 102ND ST N N 114TH E AVE N 115TH E AVE SAWGRASS PARK I CRACK SEAL, FOG SEAL 83.58
45 N 114TH E AVE E 101ST ST N E 102ND ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.36
46 E 102ND ST N N 115TH E AVE E 102TH ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.11
47 E 102ND ST N E 102TH ST N E 103RD ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.28
48 N 115TH E AVE E 102ND ST N E 103RD ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 83.19
49 E 103RD ST N N 115TH E AVE N 116TH CT E SAWGRASS PARK I CRACK SEAL, FOG SEAL 82.19
50 E 103RD ST N N 116TH CT E E 102ND ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 82.67
51 N 116TH CT E E 103RD ST N CUL-DE-SAC SAWGRASS PARK I CRACK SEAL, FOG SEAL 82.03
52 E 102ND ST N E 103RD ST N N 117TH E AVE SAWGRASS PARK I CRACK SEAL, FOG SEAL 83.81
FY 2015-2016 Street Rehabilitation Project List (Base Bid)
STREET FROM TO SUBDIVISION REPAIR TYPE OCI
53 N 117TH E AVE E 101ST ST N N 102ND ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 82.06
54 E 102ND ST N N 117TH E AVE N 118TH E AVE SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.42
55 N 118TH E AVE E 100TH ST N E 102ND ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 81.11
56 N 118TH E AVE E 102ND ST N E 104TH ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 83.11
57 E 104TH ST N N 118TH E AVE N 117TH E AVE SAWGRASS PARK I CRACK SEAL, FOG SEAL 82.64
58 E 104TH ST N N 117TH E AVE N 116TH E AVE SAWGRASS PARK I CRACK SEAL, FOG SEAL 81.58
59 N 116TH E AVE E 104TH ST N E 105TH ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 83.22
60 N 117TH E AVE E 104TH ST N E 105TH ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 83.56
61 N 114TH E AVE E 102ND ST N E 105TH ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.78
62 E 105TH ST N N 114TH E AVE N 115TH E AVE SAWGRASS PARK I CRACK SEAL, FOG SEAL 82.22
63 N 115TH E AVE E 103RD ST N E 104TH ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.33
64 E 104TH ST N N 115TH E AVE N 115TH PL E SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.51
65 N 115TH PL E E 104TH ST N E 105TH ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.42
66 E 105TH ST N N 115TH PL E N 116TH E AVE SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.92
67 E 105TH ST N N 116TH E AVE N 117TH E AVE SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.86
68 E 105TH ST N N 117TH E AVE N 118TH E AVE SAWGRASS PARK I CRACK SEAL, FOG SEAL 85.01
69 N 115TH E AVE E 104TH ST N E 105TH ST N SAWGRASS PARK I CRACK SEAL, FOG SEAL 84.61
FY 2015-2016 Street Rehabilitation Project List (Alternate Bid)
STREET FROM TO SUBDIVISION REPAIR TYPE OCI
70 E 91st ST N N 138TH E AVE N 139TH E AVE NOTTINGHAM V CRACK SEAL, FOG SEAL 81.89
71 N 139TH E AVE E 91ST ST N E 92ND CIR N NOTTINGHAM V CRACK SEAL, FOG SEAL 83.47
72 E 92ND CIR N N 139TH E AVE CUL-DE-SAC NOTTINGHAM V CRACK SEAL, FOG SEAL 82.89
73 N 139TH E AVE E 92ND CIR N E 93RD CIR N NOTTINGHAM V CRACK SEAL, FOG SEAL 81.69
74 E 93RD CIR N N 139TH E AVE CUL-DE-SAC NOTTINGHAM V CRACK SEAL, FOG SEAL 81.97
75 N 139TH E AVE E 93RD CIR N E 94TH ST N NOTTINGHAM V CRACK SEAL, FOG SEAL 78.42
76 E 94TH ST N N 139TH E AVE N 138TH E AVE NOTTINGHAM V CRACK SEAL, FOG SEAL 83.03
77 N 138TH E AVE E 94TH ST N N 137TH CT E NOTTINGHAM IV CRACK SEAL, FOG SEAL 80.47
78 N 138TH E AVE N 137TH CT E E 96TH ST N NOTTINGHAM IV CRACK SEAL, FOG SEAL 80.22
79 N 137TH CT E N 138TH E AVE CUL-DE-SAC NOTTINGHAM IV CRACK SEAL, FOG SEAL 83.06
80 N 139TH CT E N 138TH E AVE CUL-DE-SAC NOTTINGHAM IV CRACK SEAL, FOG SEAL 83.03
81 E 102TH ST N N 118TH E AVE N 119TH E AVE SAWGRASS PARK II CRACK SEAL, FOG SEAL 86.02
82 E 102TH ST N N 119TH E AVE N 120TH E AVE SAWGRASS PARK II CRACK SEAL, FOG SEAL 86.56
83 N 118TH E AVE E 104TH ST N E 105TH ST N SAWGRASS PARK II CRACK SEAL, FOG SEAL 85.69
84 E 105TH ST N N 118TH E AVE N 119TH E AVE SAWGRASS PARK II CRACK SEAL, FOG SEAL 84.28
85 E 105TH ST N N 119TH E AVE N 120TH E AVE SAWGRASS PARK II CRACK SEAL, FOG SEAL 85.22
86 N 119TH E AVE E 102ND ST N E 105TH ST N SAWGRASS PARK II CRACK SEAL, FOG SEAL 84.53
87 N 120TH E AVE E 102ND ST N E 105TH ST N SAWGRASS PARK II CRACK SEAL, FOG SEAL 86.16
88 E 105TH ST N N 118TH E AVE N 118TH E AVE SAWGRASS PARK II CRACK SEAL, FOG SEAL 85.39
89 E 101ST ST N N 100TH E AVE N 102ND E AVE HONEY CREEK II CRACK SEAL, FOG SEAL 89.56
90 N 102ND E AVE E 101ST ST N DEAD END HONEY CREEK II CRACK SEAL, FOG SEAL 88.86
91 E 101ST ST N N 102ND E AVE N 103RD E AVE HONEY CREEK II CRACK SEAL, FOG SEAL 87.08
92 N 100TH E AVE E 100TH PL N E 101TH ST N HONEY CREEK II CRACK SEAL, FOG SEAL 88.72
93 N 101ST E AVE E 100TH ST N CUL-DE-SAC HONEY CREEK II CRACK SEAL, FOG SEAL 87.69
94 E 100TH ST N N 101ST E AVE N 102ND E AVE HONEY CREEK II CRACK SEAL, FOG SEAL 86.03
95 N 102ND E AVE E 99TH ST N E 100TH PL HONEY CREEK II CRACK SEAL, FOG SEAL 86.97
FY 2015-2016 Street Rehabilitation Project List (Alternate Bid)
STREET FROM TO SUBDIVISION REPAIR TYPE OCI
96 E 100TH PL N N 102ND E AVE CUL-DE-SAC HONEY CREEK II CRACK SEAL, FOG SEAL 85.25
97 E 99TH ST N N 102ND E AVE N 103RD E AVE HONEY CREEK II CRACK SEAL, FOG SEAL 88.64
98 N 102ND E AVE E 100TH PL N E 100TH ST N HONEY CREEK II CRACK SEAL, FOG SEAL 87.89
99 N 103RD E AVE E 99TH ST N E 100TH ST N HONEY CREEK II CRACK SEAL, FOG SEAL 89.36
100 N 103RD E AVE E 100TH ST N E 101ST ST N HONEY CREEK II CRACK SEAL, FOG SEAL 88.03
101 E 101ST CT N N 102ND E AVE CUL-DE-SAC HONEY CREEK II CRACK SEAL, FOG SEAL 89.75
102 N 102ND E AVE E 101ST CT N E 101ST ST N HONEY CREEK II CRACK SEAL, FOG SEAL 89.44
103 N 102ND E AVE E 100TH ST N E 101TH CT N HONEY CREEK II CRACK SEAL, FOG SEAL 87.85
104 E 100TH ST N N 103RD E AVE N 107TH E AVE HONEY CREEK II CRACK SEAL, FOG SEAL 82.22
TO: The Honorable Mayor and City Council
City of Owasso
FROM: Linda Jones, Finance Director
SUBJECT: Proposed OPWA Rate Increases
DATE: July 10, 2015
BACKGROUND:
The Owasso Public Works Authority provides water, sewer, and refuse for the City of Owasso.
While the cost of providing service has increased annually, the sewer rates charged to
customers have not increased since 2012. Increased costs such as labor and capital have not
been recovered by the City. As a result, on an accrual basis, the City of Owasso averaged a
$338,000 (10%) net operating loss in sewer operations over the past three years.
In order for the City to begin the process of recovering increased costs, staff proposes effective
October 1, 2015, a fifty-cent monthly sewer base increase plus an additional thirty cents per
thousand gallons. The proposed average increase to residential sewer customers would be $2
per month or $24 per year. The rate increase is estimated to generate an additional $250,000
annually.
Additionally, the Owasso Public Works Authority purchases treated water from the City of Tulsa.
On March 31, 2015, the City of Tulsa notified Owasso of a water rate increase effective October
1, 2015. Rates for water purchased by the OPWA from the City of Tulsa will increase by 7% again
this year. This is the sixth consecutive annual 7% rate increase by the City of Tulsa. While the past
five years, the City of Owasso has only passed on the increased cost of water to customers,
other increased costs of labor, supplies, and capital have been absorbed by the OPWA. As a
result, the OPWA fund balance is being depleted.
In order for the OPWA to recover increased costs, staff proposes a rate increase of forty-four
cents per thousand gallons of water usage to customers inside the city limits plus the respective
monthly increase based on the size of meter effective October 1, 2015. Staff further proposes
that rates for customers outside the city limits continue to be 20% more than rates for customers
within the city limits in accordance with the previous OPWA resolution establishing the different
rate structures for customers outside the city limits.
Staff further recommends doing a more comprehensive rate study prior to adoption of next
year’s budget to enable preparation of a recommendation to bring all utility services into a net
positive cash flow position over the next three years.
ATTACHMENTS:
Utility Bill Comparison
OPWA
Total Utility Bills
Single Family Residential Customers
2,000 gals. sewer 5,000 gals. sewer 8,000 gals. sewer
3,000 gals. water 7,000 gals. water 12,000 gals. water
Low Usage: Avg Usage: High Usage:
Usage:
Water gallons 3,000 7,000 12,000
Sewer gallons 2,000 5,000 8,000
Current Rate Billing:
Water $ 21.54 $ 41.97 $ 67.77
Sewer 12.87 21.72 30.57
Refuse 13.95 13.95 13.95
Ambulance 4.00 4.00 4.00
Total $ 52.36 $ 81.64 $ 116.29
Proposed Rate Billing:
Water $ 22.86 $ 45.05 $ 73.05
Sewer 13.97 23.72 33.47
Refuse 13.95 13.95 13.95
Ambulance 4.00 4.00 4.00
Total $ 54.78 $ 86.72 $ 124.47
Percentage increase 4.62% 6.22% 7.03%
Utility Bill Comparison
$140
$120 $124.47
$116.29
$100
$80 $86.72
$81.64
$60
$52.36 $54.78
$40
$20
$0
Low Usage: Avg Usage: High Usage:
3,000 gals. water 7,000 gals. water 12,000 gals. water
2,000 gals. sewer 5,000 gals. sewer 8,000 gals. sewer
Total monthly bill for city single-family residential customers
Current Rate Proposed Rate
Get email alerts for Owasso
A daily email when new agendas and minutes are posted.