6. Reports
a. Commissioner Reports
b. Review CCUA RAIL
c. Utility Manager Report
d. Wastewater Treatment Plant Performance
e. Water Treatment Plant Performance
f. Attorney Report
g. Treasurer Report
i. Appropriations
ii. Financial Reports
7. Unfinished Business
a. Receive CCUA Audit for 2025 Financial Statements
8. New Business
a. Consider Task Order CCUA26-000 to Wilson & Co. for general
inquiries that fall within the purchasing limits of the Utility
Manager.
b. Consider Task Order CCUA26-001 to Wilson & Co. for Lime Silo
recommendations and repairs.
c. Discuss section 1.8 of the Cost-of-Service agreements and
consider additional lift station sampling.
d. Consider PO# 7287 to Ray Lindsay for a spare Irrigation pump.
9. Board Training.
10. Executive Session (if needed)
11. Adjournment
Page 1
AGENDA
CHISHOLM CREEK UTILITY AUTHORITY
June 25th, 2026
Bel Aire City Hall, 7651 E Central Park Ave, at 4:30 PM
1. Call to Order
a. Brandi Baily calls the meeting to order at 4:30 PM.
2. Roll Call
a. Terry Osburn calls the roll, members present are Brandi Baily,
Terry Oseburn, Jim Benage, John Welch, and Emily Hamburg.
b. Others present are as follows:
i. Anthony Kientz and John Annen with CCUA.
ii. Reece Hiebert representing CCUA
iii. Ryan Cummins with Park City.
3. Adopt Agenda
a. Jim Benage motions to adopt the agenda as presented. Terry
Osburn seconds the motion, motion passes 4-0-1 with Emily
Hamburg abstaining.
4. Approve Minutes
a. John Welch motions to approve the minutes from the May 28th
Meeting. Jim Benage seconds the motion, motion passes 5-0.
5. Public Forum
a. No members from the public wish to speak.
6. Reports
a. Commissioner Reports
i. Emily Hamburg reports that she sat in on the EPA and
KDHE meeting about the Groundwater Remediation
project going on at the Ripley Well site.
b. Review CCUA RAIL
i. Anthony Kientz and Jim Benage review the Rolling Action
Item Log with the board. Notable updates include:
1. The On-Call Engineer RFP was sent out on June 4th.
2. Waiting on Evergy to drop the power line at well 8 so
Kansas Electric and Sargent Drilling can proceed with
the scheduled work.
Page 2
3. Has a meeting with KDHE and the EPA on June 4th
resulting with the following action items:
a. EPA will look into moving extraction wells out
of the influence of surface water.
b. KDHE will look into considering effluent water
as reuse instead of ground water under the
influence of surface water.
c. CCUA will look into the possibility of upgrading
the treatment plant to a surface water capable
plant.
c. Utility Manager Report
i. Anthony Kientz reviews information in the meeting packet
with the board. Notable updates include:
1. Workers compensation renewal premium came in
about $1,000 less than last year.
2. The new Ford Maverick that was approved will be
arriving later than expected due to NAFG not placing
the order in time. CCUA will receive a 2027 instead at
no additional cost.
d. Wastewater Treatment Plant Performance
i. Anthony Kientz reviews the Wastewater Treatment Plant
Performance report with the board.
e. Water Treatment Plant Performance
i. Anthony Kientz reviews the Water Treatment Plant
Performance report with the board.
f. Attorney Report
i. Reece Hiebert reports that he reviewed the contracts for
the items on the agenda.
g. Treasurer Report
i. Appropriations
1. Nothing to report.
ii. Financial Reports
1. Nothing to report.
7. Unfinished Business
a. Finalize and approve the 2027 CCUA Budget
i. Jim Benage motions to approve the 2027 CCUA Budget.
Terry Osburn seconds the motion, motion passes 5-0.
b. Consider On Call Engineer Proposals
Page 3
i. Anthony Kientz presents the On-Call Engineering
proposals from Wilson & Co. and Burns & McDonnell,
along with a recommendation from the Technical Advisory
Committee (TAC). The TAC recommends Wilson & Co. for
the On-call engineer due to slightly better rates and
familiarity with CCUA treatment facilities.
ii. John Welch motions to approve the proposed Wilson & Co.
agreement for On-Call Engineering services. Terry Osburn
seconds the motion, motion passes 5-0.
c. Consider PO 7278 to Dondlinger for Clarifier Repairs.
i. Emily Hamburg motions to approve Purchase Order 7278
to Dondlinger for the purchase of two sets of Clarifier
Replacement Components and the installation of one set of
components for a price not to exceed $145,009. Terry
Osburn seconds the motion, motion passes 5-0.
8. New Business
a. Consider PO 7277 to Sargent Drilling for Ripley Well repairs
i. Terry Osburn motions to approve Purchase Order 7277 to
Sargent Drilling for the replacement of the well pump and
cleaning of CCUA Ripley Well 1 for a price not to exceed
$36,022. Emily Hamburg seconds the motion, motion
passes 5-0.
b. Consider PO 7276 to USA Bluebook for the purchase of a New All
Weather Sampler
i. Terry Osburn motions to approve Purchase Order 7276
for one Hach All Weather Sampler for a price not to exceed
$10,249.55. Jim Benage seconds the motion, motion passes
5-0.
c. Consider proposal from Gilmore & Bell for post-issuance tax
compliance services.
i. Emily Hamburg motions to engage Gilmore & Bell for post-
issuance tax compliance services described in the letter
dated June 17th, 2026. Terry Osburn seconds the motion,
motion passes 5-0.
9. Executive Session
a. No executive session needed.
10. Adjournment
Page 4
a. Jim Benage motions to adjourn the meeting. Terry Osburn
seconds the motion, motion passes 5-0.
b. The meeting is adjourned at 5:33 PM.
Minutes by Anthony Kientz.
X
Brandi Baily
Chairwoman
Page 5
CCUA Rolling Action Item Log - July 23rd, 2026
Item # Item Assigned to Status Priority
5 Wastewater Expansion Construction Substantially Complete CCUA Due NTL 10-31-2027 per KDHE Moderate
6 Expanded Wastewater Compliant with KDHE limits CCUA Due NLT 05-01-2028 per KDHE Moderate
10B Recommendations for any potable water needed capacity TAC Recommendations for Water capacity issues, if needed. Assigned to TAC Moderate
improvements (Meters issue split to 10A) Including ROI for storage on 9/26/2024.
capacity upgrades 11/6/2024 update - waiting to see how EPA project affects CCUA
Treatment plant.
3/26/26 Added Storage Capacity upgrade ROI
7/17/2026 Adding to list of Task Orders for Wilson & Co.
12 Tracking of EPA mitigation project Tony EPA has started mobilization for their work. EPA Low
expects work to begin in September, starting with the demolition of the
57th and Broadway site.
The pre-construction meeting was held on September 10th at the Park City
Library. Work at the 57th and Broadway site began that same day.
Russ Ewy with Baughman submitted a Conditional Use Permit to the COW
on CCUA's behalf, the Planning commission voted to approve the
conditional use on Decemeber 4th. The District Advisory Board voted to
recommend the conditonal use on Decemeber 8th. The Wichita City
Council meeting is on January 6th for final approval. The Planning
commission is requireing minimal screening for the front of the property,
should be low cost (chain link slats). Meeting on 4/20/26 with
KDHE and EPA about reuse. Meeting on 6/4/26 with
KDHE, CCUA, and EPA about next steps for beneficial reuse of the
remidiation water. Another meeting is
planned for the end of June to discuss the following action items: 1)EPA
looking into moving wells out of the influence of surface water. 2) KDHE to
discuss the possiblility of this water being considered reuse instead of
groundwater. 3) CCUA to look into the possiblity of upgrading Water Plant
to handle groundwater under the influence of surface water.
Bel Aire, Park City, and CCUA sent letters dated July 6th to Kansas Officials
requesting them to review the matter and let us know if there is a path to
reusing this water.
17 EPA start supplying water to CCUA Isabel at EPA Tentative July 2026 Low
18 EPA potential contract(S) with CCUA Isabel at EPA Potential in discussion of July 26, 2024, but need to ask, from time to time, Low
the status with EPA. During pre-construction
meeting Kemron stated that they would be operating the GETS for an
unknown period of time before handing it off to CCUA.
19 Draft RFP for Security System upgrade Tony Added at suggestion of Justin Smith 8/22/2024. 11/6/2024 Low
update - Awaiting for Wastewater upgrade.
OneSource Technology is planning to get us a quote for this once the
onboarding process is complete.
20 See if there is interest in a shared spares agreement among area Tony Added at suggestion of Justin Smith 8/22/2024. Low
utilities
11/6/2024 update - Tony reached out to KMU about the possibility of
sharing our list of obsolete equipment with all KMU members.
21 Begin identifying spare items in inventory that will be obsolete Tony Added by Jim Benage 8/24/2024. Low
once plant upgrade is complete. Look for opportunities to sell the
surplus items 11/6/2024 update - Tony reached out to KMU about the possibility of
sharing our list of obsolete equipment with all KMU members.
02-26-26 update - Tony created list of obsolete equipment with serial
numbers, ready to distribute when project is closer to demo phase.
23 Lime Silo rehabilitation and painting project On-Call Engineer Added by Tony 8/18/2025. RFP was Moderate
unsucsessful in producing proposals. Waiting for On-Call Engineer to
provide recommendation on how to proceed.
07/23/2026 Task Order CCUA26-001 to Wilson & Co. is on the agenda
24 Park City Well #8 Repairs Sargent Drilling Added by Tony 9/15/2025. Moderate
Waiting on Evergy to drop the power line so Sargent Drilling can proceed
with the repairs. Sargent Drilling has completed the pitless unit
replacement and is preparing to pour a new pad.
26 2026 RFP List - Well Maintenance, Insurance, Sludge Hauling Tony Added by Tony 4/17/2026 We need to get High
new contracts for these prior to 2027. Draft versions will be avaliable to the
board prior to the May 28th, 2026 meeting. Sludge Hauling
RFP will be sent on July 27th
Page 6
Utility Manager Report
Chisholm Creek Utility Authority Board Meeting
July 23rd, 2026
Water Treatment Plant:
1. Bel Aire received 25,566,300 gallons of drinking water from CCUA this June and has averaged
486,394 gallons per day in the first weeks of July. Park City received 24,641,700 gallons of
drinking water from CCUA in June and has averaged 1,009,111 gallons per day for the first
weeks of July.
2. The Sodium Hypochlorite scale failed on July 2nd. We use this scale to precisely measure the
amount of disinfectant we use daily. This scale also controls the pump that transfers the Sodium
Hypochlorite from the bulk tanks to the day tanks. When the scale failed, the pump thought the
day tank was empty and it kept pumping until it overflowed. We lost a little product, and it was
sent to the Wastewater digesters, but they were able to handle it without issue. We are still able
to operate the plant just fine, but we must pay close attention to the transfer pump. I already
had a new scale on order since we suspected something was wrong with the old one. It should
be here any day.
Wells:
CATEGORY REMAINING TOTAL AUTHORIZED PERCENT REMAINING
(GALLONS) (GALLONS)
PARK CITY WELLS 167,623,000 317,332,000 52.8%
BEL AIRE WELLS 26,281,000 154,880,000 16.9%
CCUA WELLS 440,902,000 499,000,000 88.3%
TOTAL RIGHTS 634,806,000 971,212,000 65.36%
Distribution System:
1. Mitchell Dickson and I met the Park City crew out at the 85th St. Tower to investigate why it
wasn’t filling on June 30th. We discovered the Cla-Val Valve at the bottom of the tower was not
opening. We determined that the piolet valve for the main valve could be the issue. We had a
spare piolet valve at our shop, so Mitch and I swapped them out and the main valve started
working. We kept the non-functional piolet valve, and Mitch rebuilt it to replace our spare.
Wastewater Treatment Plant:
1. CCUA treated a total of 19,688,000 gallons of wastewater for the city of Bel Aire in the month of
June, for an average of 656,266 gallons per day.
Page 7
2. CCUA treated a total of 22,015,200 gallons of wastewater for the city of Park City in the month
of June, for an average of 733,840 gallons per day.
3. Our primary digester aerator faulted on July 2nd. The fault on the VFD showed undervoltage, so I
verified the voltage going to the VFD and it was indeed much lower than expected. I was able to
trace the voltage drop to an underground pull box. Inside this pull box was a splice in the wires
and water. This was a splice that the electricians did for the expansion project, so I showed them
and let them handle it from there.
4. We are once again having issues with the decant valve on SBR3. Not sure what we can do, as I
have already exhausted all our options aside from taking SBR 3 offline and replacing the valve. I
plan to bring this up to our engineers and see if they have any ideas to aid this issue.
Wastewater Plant Expansion Project:
1. Please see the following pages for the minutes from our progress meetings, the change order
tracking, and the progress tracking.
Collection System:
1. Marty with Bel Aire has brought to my attention that they have nowhere to dump the lift station
cleaning debris. He asked if there was anywhere at the plant they could dump it, and there
really isn’t anywhere that is designed for that. However, we still let them dump through the
grating at the influent wetwell. The grating catches most of the big stuff and we can put that in
the dumpster. Colton with Wilson & Co. is looking into a dump station next to the backwash
holding basin that has a basket strainer built in. We have a great location in mind for this, and it
would certainly be helpful to both cities. Once we have more information on cost, I will bring
this back to the board.
Other:
Significant Purchase Orders since the last meeting:
7280 TEAM Electric $1,180.00 6/22/2026 150 amp breaker
1. Austin Glenn’s last day was July 10th. He is moving about 2 hours away to be closer to family, and
he will no longer be able to travel that distance for work. We had a going away lunch for Austin
on July 10th.
2. I submitted the quarterly report to KDHE for the expansion project on July 14th. Several people
from KDHE are on the email list for weekly updates, and that is the bulk of the quarterly report.
By Anthony Kientz
Page 8
PROGRESS MEETING AGENDA
Chisholm Creek Utility Authority
WASTEWATER TREATMENT FACILITY IMPROVEMENTS
WCI File No: 20-600-514-00
14 July, 2026, 10:00 A.M.
1. Sign-in: Please sign Sign-up sheet.
2. WWTF Improvements
a. Update on status of work completed:
- Electrical pads and hand holes poured and placed.
- Sheet piling removed and cut at UV wetwell.
- Belt filter press pedestal footings poured.
- Baffle wall installed inside splitter box.
- SBR 1 & 2 generator and blowers delivered and placed. SBR 3 & 4
blowers delivered.
- SBR 1 & 2 piping delivered and laid out.
- Handhole rebuilt and secured with flow-able fill near UV building,
- Conveyor frame installed inside belt filter press building.
- Electrical equipment and panels placed inside SBR #1 & #2 electrical
room.
- 20" piping from splitter box placed up to the middle of the lab/office.
- New transformer and switchboard delivered and set.
- 4" relocation of office and lab gravity sewer line.
- Fiber to SBR #3 potholed /located.
- 20" ductile iron piping installed under UV building and starting to form
footings.
Page 9
Progress Meeting Agenda – July 14, 2026
CCUA WWTF Improvements
Page 2
b. Work to be completed in next month:
- SBR 1 & 2 blower air piping to be installed.
- UV building footings and slab concrete work.
- UV building pipe work to continue. Roof to be installed followed by the
sides of PEMB.
- Continue 20" piping north of splitter box to influent wetwell and SBR
#3 influent tie in.
- 16" and 10" pipe installation from UV building to reuse tank and UV
building to willowbend irrigation line.
- Evergy coordination with new equipment.
- Long term storage for electrical equipment that is in standby.
Page 10
Progress Meeting Agenda – July 14, 2026
CCUA WWTF Improvements
Page 3
c. Payment Applications –
i. Previous Payment Application (No. 10 ) Paid by Owner - Y or N
ii. New Payment Application (No. 11 ) Submitted to Engineer- Y or N
- Signed PDF copy attached at end of minutes.
d. Change Orders/Cost Adjustments –
- BRB to give CCUA an hourly rate to remove sludge at backwash holding tank
at WTP.
- Shelley Electric to submit a proposal to clean up the office/lab power feed
from existing SBR 1 & 2 building for consideration. Power feed is shallow and
has been damaged before by heavy equipment. Power feed out of code currently
as it enters sub-panel prior to main panel in office. New potential feed for
office/lab could come from new SBR 1 & 2 building.
- BRB to submit proposal for lime sludge digester platform in lieu of safety
ladders.
- BRB to submit cost to relocate office/lab 4" sanitary sewer line.
e. Other Items –
- Belt filter press building heaters could be raised by the existing belt filter press
and new belt filter press to prevent water damage from when presses need
sprayed down.
- CCUA bought new irrigation pump to be installed in UV building as existing
one will become a spare.
- Mike to get in touch with Eaton regarding electrical coordination study.
Page 11
CCUA Wastewater Expansion
Progress Tracking
Work Completed
Work Completed
and Materials
From Previous % of Work Materials Stored to Date % of Scheduled
Applications This Period Completed to date Currently Stored Value Completed Balance to Finish
Item No. Scheduled Value ($) ($) ($) (%) ($) ($) (%) ($)
General Sitework 6,639,950.00 2,499,193.50 96,800.00 39% 1,093,098.72 3,689,092.22 56% 2,950,857.78
SBR 1 & 2 Facility 5,246,235.00 2,475,061.62 21,350.00 48% 1,930,539.32 4,426,950.94 84% 819,284.06
UV & Filter Building 2,453,995.00 596,578.58 58,160.00 27% 651,284.61 1,306,023.19 53% 1,147,971.81
Influent Splitter Box 492,500.00 199,004.22 28,226.00 46% 69,887.55 297,117.77 60% 195,382.23
Digester Complex 476,500.00 - - 0% 153,944.05 153,944.05 32% 322,555.95
Sludge Building 1,041,350.00 422,184.46 98,458.10 50% 426,418.62 947,061.18 91% 94,288.82
SBR 3&4 Facility 3,264,600.00 - - 0% 1,772,306.33 1,772,306.33 54% 1,492,293.67
Equalization Basin #2 169,700.00 - - 0% - - 0% 169,700.00
Reuse Tank 175,000.00 - - 0% 120,083.20 120,083.20 69% 54,916.80
Lime Thickeners 252,000.00 - - 0% 109,003.20 109,003.20 43% 142,996.80
Odor Control Bldg 36,600.00 - - 0% - - 0% 36,600.00
Headworks/Influent Pump Station 177,000.00 27,757.58 - 16% 24,164.84 51,922.42 29% 125,077.58
Change Orders 221,781.50 59,308.58 105,407.46 164,716.04 74% 57,065.46
Totals 20,425,430.00 6,279,088.54 408,401.56 33% 6,350,730.44 13,038,220.54 64% 7,387,209.46
Days for Completion Current Day % of Days used
Construction Schedule
839 441 53%
Current as of
7/15/2026 Page 12
Wastewater Treatment Expansion 2026-2027
Change Order Tracking
Number Date Price Type Description Approved Notes
Price reduction from the following: Fence was stopped
This is not really a change order,
0 7/30/2025 $25,225.00 Deduction short on the north side, Headworks pump disconnects were Yes
but it is included.
downsized, main generator was downsized.
1 8/29/2026 $45,313.68 Price increase Price increase on several items due to tariffs. Yes
The board voted not to approve
2 8/29/2026 $23,210.10 Adder Relocating the existing gate to the south entrance No this at the September 25th,
2025 Meeting
3 8/29/2026 Adder Troubleshooting the ATS on the Headworks generator Ongoing, waiting on price
The board voted to approve this
Relocating gas line to sludge building so construction on
4 1/12/2026 $28,287.86 Adder Yes at the January 22nd, 2026
pad can continue
meeting
Replace HW fiber optic cable with 50 micron cable so all This change order was
5 1/12/2026 $5,400.19 Adder Yes
FO cable onsite matches approved by the Utility Manager
Approved by the Board on
March 26th, 2026. Progress is
6 2/20/2026 $124,892.17 Adder Electrical service upgrades, Evergy minimum standards Yes
ongoing, waiting for Evergy to
complete their portion.
Ongoing, saving contingency
7 Adder Headworks Grit pump piping
funds
Belt Press sludge pump VFDs, to give sludge speed control
8 2/20/2026 $44,980.10 Adder Yes Ongoing
capability
9 4/15/2026 $4,330.90 Adder Remove the Jib crane ontop of SBR 3 Yes Completed
Page 13
CCUA Influent Loading Report
BOD Loading in lbs TSS Loading in lbs
PC PC
BA 37th BA 53rd BA Total PC Main Primrose PC 53rd PC Total BA 37th BA 53rd BA Total PC Main Primrose PC 53rd PC Total
Jan-26 44208 21412 65621 33753 12600 17422 63775 53691 25195 78886 20820 11716 28213 60750
Feb-26 26379 17473 43852 27052 7580 14318 48950 30899 23059 53958 21235 5306 10767 37307
Mar-26 34477 20930 55407 39691 8278 10686 58656 38860 31751 70610 24385 10302 20406 55093
Apr-26 35018 23642 58660 29585 7059 15605 52249 36919 33400 70319 22954 7165 19305 49425
May-26 27530 14238 41768 52556 6874 11225 70654 39477 23203 62680 60707 7430 18289 86425
Jun-26 31494 17974 49469 67895 8263 10616 86775 47069 32490 79558 115419 6332 50052 171803
Jul-26 0 0 0 0
Aug-26 0 0 0 0
Sep-26 0 0 0 0
Oct-26 0 0 0 0
Nov-26 0 0 0 0
Dec-26 0 0 0 0
Running Total 314776 381059 Running Total 416012 460803
Running Average 45.2% 54.8% Running Average 47.4% 52.6%
Page 14
Wastewater Treatment Plant Performance Report
Influent Sample Results June 2026
BOD Concentration in mg/l Pounds of BOD TSS Concentration in mg/l Pounds of TSS Design
Date Collected Design parameter 239 Design parameter 4305 Design parameter 239 parameter 4305
6/3/2026 232 2569.5 194 2148.7
6/10/2026 178 1778.5 218 2178.1
6/17/2026 225 2904.8 260 3356.7 We are struggling with our effluent TSS. We have
6/24/2026 177 2286.6 255 3294.3 increased our Belt Filter Press runtime, but we
are still not wasteing enough.
Effluent Sample Results June 2026
Nitrogen, Ammonia in Nitrogen Ammonia
Date Collected BOD Concentration in mg/l BOD Permit Limit TSS Concentration in mg/l TSS Permit Limit mg/l Permit Limit
6/3/2026 16.80 53.00 1.22
6/10/2026 11.40 39.00 1.44
6/17/2026 14.50 26.00 0.36
6/24/2026 25.20 Weekly: 35.0 109.00 Weekly: 35.0 0.28 Daily Max: 4.3
Monthly: 20.0 Monthly: 20.0 Monthly: 1.0
Monthly Average 16.98 56.75 0.8
WWTP Performance Report Page 15
June 2026 Finished Water
Turbidity pH
Goal = <0.1 Goal = 8.5
0.5 10
0.4 8
0.3 6
NTUs pH
0.2 4
0.1 2
0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Day of Month Day of Month
0.09 Average 7.87 Average
Temperature Finished Water Chlorine
22 Goal = 3.4 ppm
21.5
4
21
Parts Per Million
20.5
Degrees C
3
20
19.5 2
19
1
18.5
18 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Day of Month Day of Month
19.4 Average 2.66 Average
Alkalinity Hardness
Goal = 100 mg/L CaCO3 Goal = <160 mg/L CaCO3
200 250
200
150
150
mg/L 100 mg/L
100
50 50
0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Day of Month Day of Month
138 Average 212 Average
Page 16
CHISHOLM CREEK UTILITY AUTHORITY
JUNE, 2026 DISBURSEMENT SUMMARY
VENDOR NAME REFERENCE AMOUNT WATER SEWER
Agri Environmental Services Sledge Contract $ 7,666.56 $ 3,296.62 $ 4,369.94
Airgas USA Bulk Carbon Dioxide $ 3,302.40 $ 3,302.40 $ -
LGR Commercial Dehumidifer, 2 Calculators, Nitrile Gloves, Gate
Remote Control, Pressure Washer Nozzle, Pliers Set, Wrench
Amazon Business Set, Seat Cover, OSHA Wirelass Headphones, Earbuds $ 2,209.13 $ 128.82 $ 2,080.31
Blue Cross 1 Month of Premiums $ 12,370.32 $ 6,185.16 $ 6,185.16
Bobcat White Star Air, Fuel & Hydraulic Filters $ 162.54 $ 81.27 $ 81.27
Burn & McDonnell Engineering Services thru 5-31-26 $ 972.00 $ - $ 972.00
Central Power Systems Generator Contract Maintenance $ 550.00 $ 275.00 $ 275.00
City of Park City Stormwater Fees $ 243.75 $ 121.88 $ 121.87
ConnectWise April Contract $ 30.90 $ 15.45 $ 15.45
Cox Phone-Internet $ 340.45 $ 170.23 $ 170.22
Evergy Utilities $ 39,443.91 $ 15,104.11 $ 24,339.80
Grainger Inc Portable Dehumidifier, Magnetic Sweeper, Misc Filters, Impact $ 2,561.39 $ 2,135.65 $ 425.74
Hawkins Aqua Hawk Ferric Chloride, 2 Aqua Ammonia 19% $ 3,413.94 $ 3,413.94 $ -
JCI Industriees Renu Pumphead SEBS Tubing $ 3,134.55 $ 2,089.70 $ 1,044.85
Kansas Gas Service Utilities $ 97.48 $ 48.74 $ 48.74
Kansas One Call Locates $ 35.91 $ 17.95 $ 17.96
KDHE BOW-Ind WW Permit Fee 2026 $ 740.00 $ - $ 740.00
LK Accounting Bookkeeping & Checks $ 925.00 $ 462.50 $ 462.50
Logo Depot Carhartt Shirts & Hoodie, Snapback Caps $ 394.25 $ 197.13 $ 197.12
Meridian Analytical Labs Weekly Testing, Lift Station, $ 9,880.00 $ - $ 9,880.00
Mississippi Lime Quick Lime $ 25,390.93 $ 25,390.93 $ -
Onesource Technology IT Monthly Services $ 441.25 $ 220.63 $ 220.62
Pankratz & Hodge Legal $ 714.00 $ 357.00 $ 357.00
Quick Books Payroll Direct Deposit Fees $ 60.00 $ 30.00 $ 30.00
QuikTrip Fuel $ 590.79 $ 295.39 $ 295.40
Stryv Bank Fees for May $ 15.35 $ 7.68 $ 7.67
T Mobile Phone Service $ 178.85 $ 89.42 $ 89.43
United Rentals Scissor Lift 19' Electric $ 320.00 $ 160.00 $ 160.00
600 GPD Pulsatron Pump, KOPKIT PVCm Teflon & Ceramic,
USA Bluebook EDTA Hardness,Iron Ferrover,Lab Supplies $ 2,828.98 $ 2,828.98 $ -
Toilet Paper, Paper towels, Detergent, Ice, Rubber Matting,
Coffee, Drill Bits & Anchors, Lumber, Extension Cord, Zoom
VISA Subscription $ 1,112.45 $ 770.46 $ 341.99
Waste Connections Trash $ 332.31 $ 166.15 $ 166.16
1/2" FIP Chrm Ball Valves, Misc Bolts & Screws, 32.5" Anvil
Waters Hardware Lopper, 9 Gal Shop Vac, Misc Nipples, Bushing $ 499.22 $ 249.60 $ 249.62
Williams Land Payment Land Payment $ 1,126.00 $ 563.00 $ 563.00
Wichita Tractor Co Filter Elements, Oil, Pre-Cleaner $ 285.15 $ 142.58 $ 142.57
Payroll, Net Earnings Two Pay Periods $ 20,996.61 $ 10,307.32 $ 10,689.29
Payroll Taxes & Benefits Medicare, FICA, KPERS for 2 payrolls $ 13,766.89 $ 6,758.22 $ 7,008.67
Total $ 157,133.26 $ 85,383.91 $ 71,749.35
Please note: On the May disbursement summary, Payroll taxes were underreported by $529.58.
This is included on this June disbursement summary.
Page 17
CHISHOLM CREEK UTILITY AUTHORITY
DISBURSEMENT REQUEST (O&M)
REQUEST DATE: June 30, 2026
VENDOR NAME REFERENCE AMOUNT
Agri Environmental Services Sledge Contract $ 7,666.56
Airgas USA Bulk Carbon Dioxide $ 3,302.40
LGR Commercial Dehumidifer, 2 Calculators,
Nitrile Gloves, Gate Remote Control,
Pressure Washer Nozzle, Pliers Set, Wrench
Set, Seat Cover, OSHA Wirelass
Amazon Business Headphones, Earbuds $ 2,209.13
Blue Cross 1 Month of Premiums $ 12,370.32
Bobcat White Star Air, Fuel & Hydraulic Filters $ 162.54
Burn & McDonnell Engineering Services thru 5-31-26 $ 972.00
Central Power Systems Generator Contract Maintenance $ 550.00
City of Park City Stormwater Fees $ 243.75
ConnectWise April Contract $ 30.90
Cox Phone-Internet $ 340.45
Evergy Utilities $ 39,443.91
Portable Dehumidifier, Magnetic Sweeper,
Grainger Inc Misc Filters, Impact Socket Set $ 2,561.39
Aqua Hawk Ferric Chloride, 2 Aqua Ammonia
Hawkins 19% $ 3,413.94
JCI Industriees Renu Pumphead SEBS Tubing $ 3,134.55
Kansas Gas Service Utilities $ 97.48
Kansas One Call Locates $ 35.91
KDHE BOW-Ind WW Permit Fee 2026 $ 740.00
LK Accounting Bookkeeping & Checks $ 925.00
Logo Depot Carhartt Shirts & Hoodie, Snapback Caps $ 394.25
Meridian Analytical Labs Weekly Testing, Lift Station, $ 9,880.00
Mississippi Lime Quick Lime $ 25,390.93
Onesource Technology IT Monthly Services $ 441.25
Pankratz & Hodge Legal $ 714.00
Quick Books Payroll Direct Deposit Fees $ 60.00
QuikTrip Fuel $ 590.79
Stryv Bank Fees for May $ 15.35
T Mobile Phone Service $ 178.85
United Rentals Scissor Lift 19' Electric $ 320.00
600 GPD Pulsatron Pump, KOPKIT PVCm
Teflon & Ceramic, EDTA Hardness,Iron
USA Bluebook Ferrover,Lab Supplies $ 2,828.98
Toilet Paper, Paper towels, Detergent, Ice,
Rubber Matting, Coffee, Drill Bits & Anchors,
VISA Lumber, Extension Cord, Zoom Subscription $ 1,112.45
Waste Connections Trash $ 332.31
1/2" FIP Chrm Ball Valves, Misc Bolts &
Screws, 32.5" Anvil Lopper, 9 Gal Shop Vac,
Waters Hardware Misc Nipples, Bushing $ 499.22
Williams Land Payment Land Payment $ 1,126.00
Wichita Tractor Co Filter Elements, Oil, Pre-Cleaner $ 285.15
Payroll, Net Earnings Two Pay Periods $ 20,996.61
Payroll Taxes & Benefits Medicare, FICA, KPERS for 2 payrolls $ 13,766.89
Total $ 157,133.26
Page 18
12:36 PM
Chisholm Creek Utility Authority
07/17/26
Cash Basis Profit & Loss Budget Performance
June 2026
Jun 26 Jan - Jun 26 YTD Budget Annual Budget
Ordinary Income/Expense
Income
4210 · O&M Revenue-Bel Aire Water 60,412.79 329,995.70 362,476.98 724,953.96
4220 · O&M Revenue-Bel Aire Sewer 35,254.90 304,837.81 279,803.52 559,607.04
4230 · O&M Rev-Park City Water 60,412.79 329,995.70 362,476.98 724,953.96
4240 · O&M Rev-Park City Sewer 38,666.95 308,249.86 315,523.02 631,046.04
4280 · Upcharge - Water 1,000.00 5,000.00 6,000.00 12,000.00
4290 · Upcharge - Sewer 1,000.00 5,000.00 6,000.00 12,000.00
4310 · Other Income-Water 0.00 0.00 25.02 50.04
4320 · Other Income-Sewer 0.00 0.00 25.02 50.04
Total Income 196,747.43 1,319,690.98 1,332,365.58 2,664,731.16
Gross Profit 196,747.43 1,319,690.98 1,332,365.58 2,664,731.16
Expense
5100 · Attorney Fees - DW 357.00 1,164.00 1,500.00 3,000.00
5110 · Auditors - DW 0.00 0.00 5,162.52 10,325.04
5115 · DW Engineering Services 0.00 2,912.78 10,000.02 20,000.04
5140 · Bank Fees - DW 60.00 1,570.00 3,400.02 6,800.04
5150 · Bookkeeping & Secretarial- DW 350.00 2,458.00 3,250.02 6,500.04
5170 · Chemicals - DW 32,107.27 134,826.44 147,277.02 294,554.04
5180 · Computer Expense - DW 236.08 772.20 1,999.98 3,999.96
5190 · Copier - DW 0.00 352.69 499.98 999.96
5200 · Dues/Subs - DW 0.00 3,679.09 1,500.00 3,000.00
5220 · Equipment Replacement - DW 1,990.15 17,982.23 30,000.00 60,000.00
5230 · Fuel - DW 295.39 1,897.27 1,441.98 2,883.96
5240 · Gilmore/Bell Fees - DW 0.00 700.00 3,000.00 6,000.00
5250 · Insurance - DW 0.00 20,828.00 11,500.02 23,000.04
5260 · Kansas Gas Service - DW 48.74 1,383.55 2,613.00 5,226.00
5270 · Kansas One Call - DW 17.95 85.12 186.00 372.00
5300 · Land Pmt INT Plant Prop - DW 424.16 2,517.09 3,378.00 6,756.00
5330 · Office Supp/Postage - DW 112.50 347.16 400.02 800.04
5340 · Permit Fees (KDHE) - DW 0.00 0.00 92.52 185.04
5360 · Phone - DW 259.64 1,381.50 1,849.98 3,699.96
5370 · Plant Supplies,Repair - DW 7,741.18 28,935.44 30,000.00 60,000.00
5420 · Repair Costs - DW 0.00 101,391.14 172,500.00 345,000.00
5440 · Salaries/Benefits - DW 22,501.11 123,910.07 151,507.50 303,015.00
5445 · Employee Appreciation-DW 0.00 122.62 250.02 500.04
5450 · Sludge Hauling - DW 3,296.62 19,779.72 19,999.98 39,999.96
5460 · SCADA Systems - DW 0.00 0.00 7,500.00 15,000.00
5500 · Testing - DW 0.00 0.00 1,350.00 2,700.00
5510 · Training - DW 0.00 821.44 1,249.98 2,499.96
5520 · Trash - DW 166.15 1,176.42 1,446.00 2,892.00
5530 · Uniforms - DW 197.13 1,009.25 750.00 1,500.00
5550 · Electric-DW 15,104.11 78,622.37 100,849.02 201,698.04
5620 · Contingency 5% - DW 0.00 0.00 7,000.02 14,000.04
5630 · Special Assessments-Water 121.88 609.36 1,500.00 3,000.00
6100 · Attorney Fees - WW 357.00 1,164.00 2,500.02 5,000.04
6110 · Auditors - WW 0.00 0.00 5,162.52 10,325.04
6115 · WW Engineering Services 972.00 22,613.58 22,500.00 45,000.00
6140 · Bank Fees - WW 0.00 1,346.10 3,400.02 6,800.04
6150 · Bookkeeping & Secretarial - WW 350.00 2,458.00 3,250.02 6,500.04
6170 · Chemicals - WW 0.00 24,562.60 40,000.02 80,000.04
6180 · Computer Expense - WW 236.07 772.19 1,249.98 2,499.96
6190 · Copier - WW 0.00 352.68 499.98 999.96
6200 · Dues/Subs - WW 0.00 3,701.64 1,999.98 3,999.96
Page 19
12:36 PM
Chisholm Creek Utility Authority
07/17/26
Cash Basis Profit & Loss Budget Performance
June 2026
Jun 26 Jan - Jun 26 YTD Budget Annual Budget
6220 · Equipment Replacement - WW 0.00 21,311.98 45,000.00 90,000.00
6230 · Fuel - WW 295.40 1,897.27 1,441.98 2,883.96
6240 · Gilmore/Bell Fees - WW 0.00 700.00 4,000.02 8,000.04
6250 · Insurance - WW 0.00 20,828.00 11,500.02 23,000.04
6260 · Kansas Gas Service - WW 48.74 1,383.53 2,613.00 5,226.00
6270 · Kansas One Call - WW 17.96 85.12 186.00 372.00
6300 · Land Pmt INT Plant Prop - WW 424.16 2,517.10 3,378.00 6,756.00
6330 · Office Supp/Postage - WW 112.50 235.61 400.02 800.04
6340 · Permit Fees (KDHE) - WW 740.00 740.00 300.00 600.00
6360 · Phone - WW 259.66 1,381.56 1,849.98 3,699.96
6370 · Plant Supplies,Repair - WW 2,819.63 47,138.59 40,999.98 81,999.96
6420 · Repair Costs - WW 0.00 674.80 36,000.00 72,000.00
6440 · Salaries/Benefits - WW 23,652.97 132,448.48 157,597.02 315,194.04
6445 · Employee Appreciation-WW 0.00 122.62 250.02 500.04
6450 · Sludge Hauling - WW 4,369.94 26,219.64 25,999.98 51,999.96
6460 · SCADA Systems - WW 0.00 0.00 1,249.98 2,499.96
6500 · Testing - WW 9,880.00 48,396.75 28,048.50 56,097.00
6510 · Training - WW 0.00 591.44 1,249.98 2,499.96
6520 · Trash - WW 166.16 1,176.42 1,446.00 2,892.00
6530 · Uniforms - WW 197.12 1,009.21 750.00 1,500.00
6550 · Electric-WW 24,339.80 127,536.21 145,000.02 290,000.04
6620 · Contingency 5% - WW 0.00 0.00 5,500.02 11,000.04
6630 · Special Assessment-Waste 121.87 609.39 3.48 6.96
Total Expense 154,748.04 1,045,209.46 1,320,280.14 2,640,560.28
Net Ordinary Income 41,999.39 274,481.52 12,085.44 24,170.88
Page 20
Memo
To: CCUA Board of Commissioners
From: Anthony Kientz
Date: 7/17/2026
Re: Task Orders for Wilson & Co.
Last month, the Board approved Wilson & Co. as our on-call engineer. To support that role, I
have prepared two task orders based on Exhibit A of the Engineering Agreement.
Task Order CCUA26-000: This Task Order covers general inquires, assistance, and consultation,
with a limit of 40 hours of billable time up to the Utility Managers spending limit. This task
order will be ongoing for the duration of the agreement, and it will be updated annually.
Task Order CCUA26-001: This Task Order focuses specifically on evaluating options for the
Lime Silo at the Water Treatment Plant. Wilson & Co. will assess the silo and provide a cost
analysis comparing rehabilitation and replacement. Because this work will likely exceed 40
hours, it will not fall under Task Order CCUA26-000. I have set a budget cap of $15,000 for this
Task Order, which the Board may amend later if needed. This amount should be sufficient to
begin the work.
Both Task Orders are on the following pages.
Recommended motion:
I motion to approve Task Orders CCUA26-000 and CCUA26-001 to Wilson & Co. to be billed
based on time and materials at the agreed upon rates.
Page 21
EXHIBIT A
Scope of Services
Task Order Scope Description: On-Call Professional Services
Project Location: Water & Wastewater Treatment Facilities
Scope of Work: The scope listed below defines the work to be completed in Task Order
CCUA26-000.
Task Order CCUA26-000 work is defined as: Engineer will designate a representative to
serve as a consultant to the Owner. The entire engineering and architectural capabilities of
the Engineer will be available, through this person, to the Owner.
Engineering, architectural or planning services that are limited to assignments estimated to
require 40 labor hours or less, are of indeterminate scope, or as agreed upon. Examples of
on-call services to be provided under this task order include:
a) General consultation.
b) Engineering studies, reports, and investigations.
c) Utility rate reviews, special assessment calculations, or other financial studies.
d) Property/boundary surveys or topographic surveys, not a part of a specific project
design.
e) Review of construction documents, plans, specifications, preliminary plat, final
plats and maps submitted by consultants other than Wilson & Company.
f) Coordination and supervision of soils investigations and testing by commercial
testing laboratories.
g) Assistance in preparation of federal or state grant applications, permits, or
environmental impact studies or any other technical documents related to city
engineering, architectural or planning functions or intentions.
h) Attend meetings with Owner to discuss reports, comments, or other project-related
topics, as requested by Owner.
i) Site visits as requested by Owner.
j) Provide miscellaneous consultation as requested by the Owner.
On-call services expected to require more than 8 hours, a brief scope shall be drafted and
approved through email. Additional engineering services, beyond the scope and/or budget
of this task order will be completed by mutual agreement, and supplemental Task Orders.
The general budget of this task order will be limited to 40 hours or less, up to the spending
limit of the Utility Manager as outlined in the CCUA Procurement Policy.
Page 22
Schedule: This task order will terminate on 31 December 2026 and will be replaced with
Task Order CCUA27-000, unless Engineer and Owner representatives agree to utilize
remaining budget for this task order.
Engineer Designated Representative(s): Colton Woodard, Client Manager Doug Goetz,
Water/Wastewater Practice Lead
Owner Designated Representative(s): Anthony Kientz, Utility Manager
X
CCUA Chair
X
Wilson & Co. Representative
Page 23
EXHIBIT A
Scope of Services
Task Order Scope Description: Lime Silo Recommendations
Project Location: Water & Wastewater Treatment Facilities
Scope of Work: The scope listed below defines the work to be completed in Task Order
CCUA26-001.
Task Order CCUA26-001 work is defined as: Engineer will designate a representative to
serve as a consultant to the Owner. The entire engineering and architectural capabilities of
the Engineer will be available, through this person, to the Owner.
Examples of on-call services to be provided under this task order include:
1. Work closely with CCUA staff to develop recommendations regarding the
rehabilitation or replacement of the Lime Silo.
2. Assist with coordination of services to member cities (if applicable).
3. Assist with dealing with regulators (if applicable).
4. Inspect, evaluate, and make recommendations regarding the following:
a. Structural integrity of the Lime Silo.
b. Practicality of the continued use of the obsolete/dated equipment inside
Lime Silo.
c. Dust collector and blower motor on top of the silo.
d. All silo related electrical equipment inside and outside the silo.
e. Interior and exterior coating of the Lime Silo.
f. Safety ladder leading to top of silo.
g. Anything else deemed necessary by the firm conducting the inspection.
5. CCUA staff will coordinate with all firms to non-destructively disassemble parts of
the silo for inspection and evaluation.
6. Complete a cost analysis and comparison for the rehabilitation vs. replacement of
the Lime Silo, based on the findings of the evaluation.
7. Attend at least one board meeting upon completion of the cost analysis and
comparison of rehabilitation and replacement for the Lime Silo.
On-call services will be billed hourly at the agreed rates. The general budget of this task
order will be tracked by the owner and revisited/increased at subsequent board meetings if
the board sees fit to do so.
Total budget limit for Task Order CCUA26-001: $15,000
Page 24
Schedule: This task order will terminate on 31 December 2026 and will be replaced with
Task Order CCUA27-001, unless Engineer and Owner representatives agree to utilize
remaining budget for this task order.
Engineer Designated Representative(s): Colton Woodard, Client Manager Doug Goetz,
Water/Wastewater Practice Lead
Owner Designated Representative(s): Anthony Kientz, Utility Manager
X
CCUA Chair
X
Wilson & Co. Representative
Page 25
Memo
To: CCUA Board of Commissioners
From: Anthony Kientz
Date: 7/17/2026
Re: COS Consulting Engineer and Additional Lift Station Sampling
During a meeting with Burns & McDonnell and both City Administrators, I learned that the
Cost-of-Service(COS) agreements require the “Consulting Engineer” to sample the lift stations
with CCUA at least twice per month. It seems this requirement is intended to verify CCUA’s
results. However, this additional sampling has not occurred at any point in 2026, and it would
increase the overall cost of sampling by a significant amount.
After reviewing the Consulting Agreement with Burns & McDonnell I noticed that the
agreement expired June 30th, 2026. We don’t have an extension agreement in place, and I
think everyone was under the impression this agreement would expire next summer.
The board now has some decisions to make regarding the Cost-of-Service Consulting Contract
and the additional sampling requirements in the Cost-of-Service agreements.
• Discussion Item 1 – Cost-of-Service Consulting Engineer
o Renew Burns & McDonnell Contract?
o Have Wilson & Co. take over with new task order?
• Discussion Item 2 – Additional Sampling Requirements
o Direct Consulting Engineer to procure samples and analysis?
o Have CCUA engage third party (UES or ISI) to procure samples and analysis?
I don’t have any proposed motions for these discussion items, however I would like to hear
everyone’s thoughts.
Thanks!
Page 26
Memo
To: CCUA Board of Commissioners
From: Anthony Kientz
Date: 7/17/2026
Re: Irrigation Pump Spare
The Irrigation pump is the pump that provides effluent water to the Willowbend Golf Course. We Currently
don’t have a spare for this pump and BRB is planning to reuse the pump in the new UV building. There
is a very high chance that Willowbend will be taking water from us for the next few months while BRB is
completing the UV building. In order to prevent the loss of effluent water to Willowbend I am proposing
that CCUA purchase a spare pump and have BRB install that so we can maintain service to Willowbend.
This is the first time I have had to purchase equipment for the Irrigation system, so I have been looking
for the original agreement between CCUA and Bel Aire. However, I have not been able to find a signed
copy. According to the unsigned draft version this would be billed to Bel Aire only, and Park City will have
no cost sharing responsibility for this purchase as they receive no revenue from the sale of the effluent
water. I have reached out to the Bel Aire city clerk to see if they have a signed copy of the agreement.
The current pump is a Patterson split case fire pump and the only dealer that we can purchase this from
is Ray Lindsay Company. They quoted us $23,120 for this spare pump.
Recommendation:
I recommend that the board approve PO# 7287 because that will allow us to maintain service to
Willowbend and keep construction of the UV building on track.
Proposed motion:
I motion to approve PO 7287 to Ray Lindsay Company for the purchase of a Patterson Irrigation pump
for a price not to exceed $23,120.
Page 27
Chisholm Creek
Utility Authority PURCHASE
5551 N Broadway
Park City, KS 67219
Phone: 316-838-4748, Fax: 316-838-4640
ORDER
The following P.O. number must appear on all related
correspondence, shipping papers, and invoices:
P.O. NUMBER: 7287
To: Ship To:
Chisholm Creek Utility Authority
Ray Lindsey Company WTP/WWTP
Attn. Joe Augustyn 5551 North Broadway
17221 Bel Ray Place Park City, KS 67219
Belton, MO 64012 Phone: 316-838-4748
Fax: 316-838-4640
P.O. DATE REQUISITIONER SHIPPED VIA F.O.B. POINT TERMS
7/23/2026 Anthony Kientz Best Way CCUA Net-30
QTY UNIT DESCRIPTION UNIT PRICE TOTAL
1 Each Patterson 5x4 MAC Split Case pump $23,120.00 $23,120.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subtotal $23,120.00
SALES TAX ID: KS9WUFMSRD Sales Tax Exempt
Shipping & Handling 500
Other
TOTAL $23,620.00
1. Please send two copies of your invoice.
2. All water treatment chemical MUST be NSF and/or
AWWA certified for this purpose. Expense Account Breakdown Amount
3. Enter this order in accordance with the prices, terms, 6220 - WWTP Equip Replacement $23,620.00
delivery method, and specifications listed above.
4. Please notify us immediately if you are unable to
ship as specified.
Authorized by Action of the Board Date
Page 28
Get email alerts for Park City
A daily email when new agendas and minutes are posted.