Town Stormwater Master Plan Public Educational Meeting
Regular MeetingRedington Shores, FL · August 15, 2022
Agenda
Town of Redington Shores SWMP
Public Education Workshop
Presented by: Cardno now Stantec
Date: August 15, 2022
Agenda
– Introductions & Project Background
– Project Schedule
– Scope of Work
– Public Workshops & Comment Cards
– Q&A
Cardno now Stantec History
– Engineer of Record since early 90’s
– Founded 1945
– Full Service Civil and Environmental Engineering Firm
– International Firm with Local Community Focus
– Over 80% of Work is Public Sector
– Joined Stantec in December 2021
– Over 200 Staff Locally
Project Team
Rick Bowers, PE | Senior Drainage Engineer / GIS /
Quality Assurance/Quality Control
– 30+ years of experience
– Drainage Design / Stormwater Management / Watershed
Management/ Asset Management / GIS
Representative Project Experience
Jumper Creek Watershed, SWFWMD Town of Redington Shores
– Watershed Master Plan – Stormwater Needs Analysis
Bushnell Watershed, SWFWMD Town of North Redington Beach
– Watershed Master Plan – Stormwater Needs Analysis
Blue Sink Watershed, SWFWMD University of Florida
– Watershed Master Plan – Stormwater Master Plan
Basin C-51, SFWMD
– Watershed Master Plan
Project Team
Tanya Camacho, GISP | GIS
– 15 years of experience
– Water Resources / NPDES / Asset Management / GIS / Utilities
Representative Project Experience
Jumper Creek Watershed Blue Sink Watershed, SWFWMD
– Watershed Master Plan – Watershed Master Plan
Bushnell Watershed Wiscon Watershed, SWFWMD
– Watershed Master Plan – Watershed Master Plan
Hernando County Map Modernization Project,
SWFWMD
Roosevelt Creek Watershed Management Plan
Update, Pinellas County
Project Team
Chris Knox, PE | Project Manager, Senior Drainage Engineer
– 20+ years of experience
– Drainage Design / Stormwater Management / Watershed
Management
Representative Project Experience
Jumper Creek Watershed South Wabash Avenue Extention form
– Watershed Master Plan Harden Blvd. (SR 563) to Ariana Street,
Lakeland, FL
Bushnell Watershed
Edgewood Drive from South Florida
Watershed Master Plan Avenue to Harden Blvd, Florida
Bee Branch Creek Channel Restoration Town of Redington Shores
Analysis
– Stormwater Needs Analysis
62nd Avenue North Sidewalk Improvements –
Pinellas County, FL Town of North Redington Beach
Starkey Road Sidewalks, Pinellas County, FL – Stormwater Needs Analysis
District-wide Stormwater Program
Management – FDOT District 7 Florida
Project Background and Schedule
Project Location
– 220 ac. with 1.19 mi of shoreline
and a total of 6.22 miles of road
– Situated on Sand Key in West-
Central Pinellas County
– Bound by the Gulf of Mexico to the
west and by Boca Ciega Bay, a
protected aquatic preserve, to the
east
Scope of Work
> Development of a project management plan (PMP) that includes a list of
deliverables, schedules, communication protocols, and a quality
assurance/quality control (QA/QC) plan.
> An existing conditions watershed evaluation, which will include field evaluations of
the stormwater management system asset inventory.
> Inundation analyses.
> Level of Service (LOS) Analysis.
> Develop responses to Town’s Review of the stormwater model and deliverables.
> Best Management Practices (BMPs) alternatives to minimize flooding and
address sea level rise (SLR).
Model Development
> Drainage Data Collection
– SWFWMD Permit Reviews
– LiDAR (Light Detection and Ranging)
– Aerial Photographs
– Landuse / Land Cover
– Groundwater, Soils, Pervious &
Impervious land features
– Current / Future Tailwater Elevations
Citation: Streamline Technologies
20140611_Migrating_from_ICPR3_to_ICPR4_Streamline_Technologies.pptx
LiDAR
> 2017 Pinellas County
LiDAR
Landuse
> 2020 Landuse
– Residential High
Density
– Recreational
– Commercial and
Services
Model Development
> Existing Drainage
Structure Inventory
– Catch Basins
– Outfalls
– Pipes
> Closed-circuit TV
(CCTV)
– Review Video
– Inspection Reports
Model Development
> Existing Drainage Structure Inventory
– Staff will verify locations of existing
stormwater inventory and add
missing structure locations if
needed.
– Visual condition observations
captured
– Survey if needed
Source: Google Maps, 2022
> Design / Update the GIS
Storm Pipe Systems
> 284 Pipes in Database
> 8 inch and larger pipes to be modeled
> Upstream and Downstream Inverts provided. Missing data to be estimated from
Digital Elevation Model (DEM, from LiDAR) or Upstream / Downstream Culverts
Upstream
Upstream Initial
Initial Stage
Stage
at
at Pipe Invert
Pipe Invert
Downstream
Downstream at
at Low
Low
Point
Point of
of Basin
Basin
Source: Google Maps, 2022
Structures
51 Outfalls
236 Catch Basins
Weirs
Water Control Structures
Overland Discharge from Source: Google Maps, 2022
Closed Catchments
Hydrologic and Hydraulic Model Development / Analysis
> Develop an ICPR4
model of the existing
drainage conditions of
the Town
> Town Review
> BMPs Alternatives
Analysis and
Recommendations
– 8 conceptual BMPs to
alleviate inundation
Citation: Streamline Technologies
20140611_Migrating_from_ICPR3_to_ICPR4_Streamline_Technologies.pptx
Hydrologic and Hydraulic Model Development / Analysis
> Development of an ICPR4 model Storm Duration
of the existing drainage 2.33 mean-annual 24hr
conditions for the Town of
10yr 24hr
Redington Shores
25yr 24hr
> Town Review 50yr 24hr
100yr 24hr
> BMP Alternatives Analysis and
Recommendations
– 8 conceptual BMPs to alleviate
flooding
Citation: Google Maps
Inundation Analysis / Mapping (Existing Condition & SLR
Assessment)
> Evaluate overall
performance and capacity of
the stormwater system
> Identify potential flooding
problems and create town-
wide flood inundation maps
(current and future)
Citation: Pinellas County SLR Map Application
Sea Level Rise (arcgis.com)
Level of Service
> Roadway Level of Service to
determine roads affected by flooding
> BMP Analysis to provide solutions for
affected areas identified by FPLOS
determination
Citation: Hernando County LOS SWRA BMP Approach 20131017.pdf
Level of Service
> Roadway Level of Service to
determine roads affected by
flooding
> BMP Analysis to provide
solutions for affected areas
identified by FPLOS
determination
Public Outreach Meetings
> Public Outreach Meetings
– Educational Workshop and
gather historical flood data
– Stormwater Master Plan
Results Workshop
Citation: SWFWMD Public Review & Comment Cards
Jumper Creek Watershed
Public Comment Cards
> Public Comment Cards –
submit by Oct 17th to
Town Hall or
helpdesk@redshoresfl.com
> Leave comment cards
with Town Hall
receptionist
> Provide as much
information as possible,
specifically dates, event
names, and photographs,
if available.
Questions
Seawall Ordinance
> Sec. 63-15.4. - Seawalls: construction specifications.
C.Cap. The seawall cap shall be poured in place and shall have a minimum
width of 22 inches and a minimum depth of 16 inches. Embedment of sheet
pilings into the cap shall be six-eighths inches. Finished seawall cap
elevations shall be between seven and one-half feet and eight and one-half
feet N.G.V.D. Expansion joints between one-half inch and three-fourths
inch shall be provided at spacings not to exceed 40 feet. Expansion joints
shall be located no less than one foot from slab joints, and expansion joints
shall be filled with proper expansion material. Seawall caps shall contain
four longitudinal reinforcing bars not less than No. 6 size and No. 5 stirrups
not more than nine inches on center within a quarter span of anchor rods
and 18 inches on center for the remaining span.
Benefit to Cost Analysis
Each proposed BMP requires a planning level cost estimate and an analysis of
the benefit to cost ratio.
Costs associated with implementing a BMP may include:
• Construction cost based on quantities
• Mobilization
• Maintenance of traffic
• Contingency
• Surveying and testing
• Design
• Permitting
• Construction administration and observation
• Anticipated maintenance costs
Benefit to Cost Analysis
For flood protection BMPs, the benefit to cost ratio measures how well the
proposed improvements will reduce flood damage over a predetermined time
period (usually the project life). A value above 1 indicates the cost can be well
justified by the benefit through BMP implementation. A value of 1 is the
“breakeven” point while a value below 1 indicates the implementation is likely
more costly than the expected benefit (e.g., reduced flood damage).
𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹 𝒊𝒊𝒊𝒊 𝒕𝒕𝒕𝒕𝒕𝒕𝒕𝒕𝒕𝒕 𝒅𝒅𝒅𝒅𝒅𝒅𝒅𝒅𝒅𝒅𝒅𝒅 𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄 𝒐𝒐𝒐𝒐𝒐𝒐𝒐𝒐 𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆 𝒑𝒑𝒑𝒑𝒑𝒑𝒑𝒑𝒑𝒑𝒑𝒑
𝑩𝑩𝑩𝑩𝑩𝑩𝑩𝑩𝑩𝑩𝑩𝑩𝑩𝑩 𝒕𝒕𝒕𝒕 𝑪𝑪𝑪𝑪𝑪𝑪𝑪𝑪 𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹𝑹 =
𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻𝑻 𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄 𝒊𝒊𝒊𝒊𝒊𝒊𝒊𝒊𝒊𝒊𝒊𝒊𝒊𝒊𝒊𝒊 (𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄 𝒂𝒂𝒂𝒂𝒂𝒂 𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎𝒎) 𝒐𝒐𝒐𝒐𝒐𝒐𝒐𝒐 𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆𝒆 𝒑𝒑𝒑𝒑𝒑𝒑𝒑𝒑𝒑𝒑𝒑𝒑
BMPs are ranked and evaluated by staff.
Inundation Analysis / Mapping (Existing Condition & SLR
Assessment)
> Evaluate overall
performance and capacity of
the stormwater system
> Identify potential flooding
problems and create town-
wide flood inundation maps
(current and future)
Citation: Pinellas County SLR Map Application
Sea Level Rise (arcgis.com)
Surface Water and Groundwater
Precipitation
Sea Level Land
Groundwater Lens
Gulf of
Intercoastal
Mexico
Soil Saturated with Sea Water