A. CALL TO ORDER
B. PLEDGE OF ALLEGIANCE
C. ROLL CALL
D. APPEARANCES AND PRESENTATIONS
E. OLD BUSINESS
1. Undergrounding Project Update – Mr. Porter attending
F. NEW BUSINESS
1. Recording Meetings
2. Building Department / Town Hall Hours
3. Building Permits – Discussion
4. Penalty/Deadline for Post-Storm Permitting
5. Prioritize CIP Projects
6. Town Administrator Role – Discussion
7. Library Board Chair and Backup Chair
8. Pier Property
G. MISCELLANEOUS
Regular Meeting- Wednesday, February 12, 2025 – 6:00 P.M.
Workshop Meeting- Wednesday, February 26, 2025 – 6:00 P.M.
H. ADJOURNMENT
Pursuant to Florida Statutes § 286.0105, if any person or entity decides to appeal any decision made on any matter considered at any meeting or hearing of any
Redington Shores Board or Commission, he, she or it will need a record of the proceedings and, for such purpose, he, she or it may need to ensure that a verbatim
record of the proceedings is made, which record includes the legal arguments, testimony, and evidence upon which the appeal is to be based.
ITEM F.1.
Date: January 29, 2025
To: Board of Commissioners
From: Margaret Carey, Town Clerk
Re: Recording Commission Meetings
Traditionally, we have audio recorded our Commission meetings. Since the hurricanes, there have
been requests by Commissioners and residents to video tape and livestream the meetings so that
displaced residents are able to “see” the meeting. Staff would like direction from the Commission
about the topic.
Discussion points:
• Which meetings are video recorded?
• Livestream versus prerecorded video
• Technology issues
ITEM F.2.
ITEM F.3.
Date: January 29, 2025
To: Board of Commissioners
From: Margaret Carey, Town Clerk
Re: Building Permits Discussion
Commissioner Kapper requested this discussion item be placed on the agenda.
ITEM F.4.
Date: January 24, 2025
To: Board of Commissioners
From: Rob Peebles, Building Official
Re: Storm-Related Permitting Cut-offs/ Fee Review
Commissioners:
The Building Department suspended penalties for homeowners and contractors doing work without a
permit for the purposes of storm related clean-up. We allowed residents to apply for permits after the work
was completed. This eliminated delays that may have increased damage to homes by allowing residents
to make their homes Safe, Secure, and Sanitary immediately after the storms.
FEMA regulations require that all work related to storms be documented as part of the NFIP. To remain
NFIP compliant, we must ensure that all residents affected by the storms receive permits. The FEMA
guideline is vague, “within a reasonable timeframe”.
I recommend the following:
1. The deadline to apply for Storm-Related (after the fact) permits without penalty be extended until
April 9, 2025.
2. On April 10, 2025 Storm-Related (after the fact) permit fees will be charged in accordance with our
Town fee schedule and ordinances.
3. On June 9, 2025 Any resident affected by the storms who has not pulled a permit to make repairs
will be pursued by Code Compliance for work not done or done without a permit.
4. Redington Beach has approved the above recommendations
5. On April 10th the following fess will apply to all after the fact storm-related permit applications per
the published fee schedule:
Redington Beach: 2x permit fees
Redington Shores 5x permit fees
gDOÿADDgÿg]DhlD
ÿÿÿÿ 0123
4567895
SINI^X^ÿFGU^IJÿdGG[ÿ[fMLLÿiGÿZaaBaaÿFGUÿUGWXIUGHÿJUMHGÿIN[FG_JIVNÿUGTMUHLG[[ÿVdÿPMLXGÿXNLG[[ÿLI[JGH
INÿ[_fGHXLGBÿÿAGG[ÿdVUÿFGU^IJ[ÿVUÿ[GUPI_G[ÿNVJÿ[FG_IdIGHÿINÿJfGÿdGGÿ[_fGHXLGÿ[fMLLÿiGÿiM[GHÿVNÿZaaBaa
FGUÿIN[FG_JIVN[ÿMNHÿZ\bBaaÿ^INÿFLMNÿUGPIGQÿdGGB
eLLÿiXILHINTÿFGU^IJÿMUGÿ[XijG_JÿJVÿJfGÿALVUIHMÿ̀XILHINTÿKGU^IJÿgXU_fMUTG[ÿKGUBÿAgÿbbÿMNHÿAgÿ
R\BbÿVdÿFGU^IJÿdGG[ÿPMLXGÿVUÿBaaÿ^INI^X^YÿMNHÿMÿpG_fNVLVTkÿAGGÿÿFGUÿ[_fGHXLGB
~VUÿGEG^FJÿdUV^ÿ̀XILHINTÿKGU^IJ[B
eÿ̀XILHINTÿKGU^IJÿI[ÿNVJÿUGWXIUGHÿdVUÿ^INVUÿUGFMIU[ÿÿQfGUGÿJfGÿPMLXMJIVNÿHVG[ÿNVJÿGE_GGHÿbaaBaac
XNLG[[ÿJfGUGÿI[ÿMÿ[JUX_JXUMLÿ_V^FVNGNJcÿVUÿIN_LXHG[ÿGLG_JUI_MLcÿ^G_fMNI_MLÿcÿVUÿFLX^iINTÿJUMHG[BÿÿRgGG
A`]ÿZabB\B\Y
mVÿiXILHINTÿÿFGU^IJÿI[ÿUGWXIUGHÿdVUÿdGN_G[ÿVdÿ_fMINÿLINcÿPINkLÿVUÿQVVHÿqÿVUÿLG[[ÿINÿfGITfJcÿFMPINTc
hUIPGQMk[cÿdLMJQVUcÿQVUÿVdÿMÿ[JUI_JLkÿ_V[^GJI_ÿNMJXUGÿRFMINJINTcÿQMLLFMFGUINTcÿJUI^cÿIJ_fGNÿ_MiINGJ[c
GJ_BYcÿÿiXJÿ^MkÿUGWXIUGÿ{VNINTÿ]LGMUMN_GcÿDNPIUVN^GNJMLMiIJMJÿMNHÿOGTXLMJVUkÿgGUPI_G[OITfJÿVdÿQMkÿ
FGU^IJ[B
gGGÿ]fMFJGUÿZÿ[G_JIVNÿZabB\cÿÿVdÿJfGÿALVUIHMÿ̀XILHINTÿ]VHGÿQIJfÿKINGLLM[ÿ]VXNJkÿe^GNH^GNJ[ÿMNHÿJfG
KINGLLM[ÿ_VXNJkÿQGi[IJGÿÿdVUÿ^VUGÿINdVU^MJIVNB
]VNJUM_Jÿ]V^^XNIJIG[ÿzNLk
KINGLLM[ÿ]VXNJkÿ̀XILHINTÿgGUPI_G[ÿFGUdVU^[ÿ̀XILHINTÿzddI_IMLcÿKLMNÿOGPIGQcÿ{VNINTÿÿ|GUIdI_MJIVNcÿ
KGU^IJJINTÿMNHÿ]VN[JUX_JIVNÿIN[FG_JIVN[ÿikÿ?NJGULV_MLÿeTUGG^GNJÿdVUÿMÿNX^iGUÿVdÿIN_VUFVUMJGHÿ
SXNI_IFMLIJIG[BÿpfG[Gÿ^XNI_IFMLIJIG[ÿfMPGÿLV_MLÿVUHINMN_G[ÿUGTXLMJIVN[cÿMNHÿ}VNINTÿJfMJÿHIddGUÿdUV^ÿJfGÿ
XNIN_VUFVUMJGHÿFVUJIVNÿVdÿJfGÿ]VXNJkBÿ?Nÿ[V^Gÿ_M[G[cÿIJG^[ÿGEG^FJGHÿdUV^ÿFGU^IJJINTÿikÿJfGÿ
XNIN_VUFVUMJGHÿVUHINMN_G[ÿMNHÿUGTXLMJIVN[ÿQILLÿUGWXIUGÿFGU^IJ[ÿMNHÿIN[FG_JIVNÿINÿJfGÿ^XNI_IFMLIJIG[B
~fGNÿINÿHVXiJÿMiVXJÿQfGJfGUÿMÿFGU^IJÿI[ÿUGWXIUGHÿINÿJfG[Gÿ^XNI_IFMLIJIG[cÿFLGM[Gÿ_VNJM_JÿVXUÿVddI_GÿMJÿ
\@@ÿVUÿ_fG_ÿJfGÿ̀XILHINTÿgGUPI_G[ÿQGi[IJGÿMJÿfJJFQQQBFINGLLM[_VXNJkBVUTiXILHB
DEFUG[[ÿKGU^IJ[ÿRzN@lINGYÿfJJFQQQBFINGLLM[_VXNJkBVUTiXILHFGU^IJJINTBfJ^
ellÿKDOS?pgÿg`D]pÿpzÿhD|DlzKSDmpÿOD|?D~ÿgDO|?]DgÿRhOgYÿADDgcÿ{zm?mcÿ
e`?pepcÿO?pÿzAÿ~ecÿp?l?p?Dgcÿg?pDÿKlemcÿ?SKe]pgBÿgDDÿhOgÿADDÿg]DhlDÿAzOÿ
SzODÿ?mAzOSep?zmB
q
!r ÿxÿy
??@eBÿKGU^IJÿAGGÿSINI^X^ÿRKGUÿJUMHGÿdVUÿ[INTLGÿJUIFÿIN[FG_JIVN[ÿQfGNÿJfGUGÿI[ÿNVÿ[FG_IdI_ÿFGU^IJÿdGG[ "#$$%$$
[FG_IdIGHÿQIJfINÿJfGÿdGGÿ[_fGHXLGY
??@`BÿnedJGU@JfG@AM_JnÿFGU^IJÿdGG[
??@`@ZBÿgfMLLÿiGÿJQVÿR\YÿJI^G[ÿJfGÿNVU^MLÿFGU^IJÿdGG[B
??@`@\BÿeNkÿ[Xi[GWXGNJÿnedJGU@JfG@AM_JnÿFGU^IJÿI[[XGHÿJVÿJfGÿ[M^GÿLI_GN[GHÿ_VNJUM_JVUÿQIJfINÿJfG
dVLLVQINTÿJQGLPGÿRZ\Yÿ^VNJf[ÿ[fMLLÿiGÿJGNÿRZaYÿJI^G[ÿJfGÿNVU^MLÿFGU^IJÿdGG[B
oAIEGHÿAGGÿKGU^IJ[ÿMUGÿ_ML_XLMJGHÿVNÿJfGÿÿfI[JVUI_MLÿMPGUMTGÿNX^iGUÿVdÿGEFG_JGHÿIN[FG_JIVN[BÿpfG
]VXNJkÿUG[GUPG[ÿJfGÿUITfJÿJVÿLI^IJÿVUÿIN_UGM[GÿJfGÿNX^iGUÿVdÿIN[FG_JIVN[ÿMNHÿMHjX[JÿdGG[ÿM__VUHINTLkB
omVÿ_UGHIJÿVUÿdGGÿUGHX_JIVNÿdVUÿnSM[JGUÿKLMNnÿFGU^IJ[B
q
!rÿÿstÿÿutvw
???@eBÿKLMNÿOGPIGQÿ]V^^GU_IMLÿR]fMUTG[ÿVNÿVUITINMLÿFLMNÿUGPIGQcÿUGPI[IVN[cÿMNHÿINJGUIVU[YB &'%$(ÿ*+ÿ,-./01ÿ+--2ÿ304%ÿ
"#&'%$$
???@`BÿKLMNÿOGPIGQÿOG[IHGNJIMLÿR]fMUTG[ÿVNÿVUITINMLÿFLMNÿUGPIGQcÿUGPI[IVN[cÿMNHÿINJGUIVU[YB &'%$(ÿ*+ÿ,-./01ÿ+--2ÿ304%ÿ
"#&'%$$
???@]BÿKLMNÿOGPIGQÿOGPI[IVN[ÿMNHÿgXFFLG^GNJ[cÿOG[IHGNJIMLÿMNHÿ]V^^GU_IML "'$%$$ÿ50.61ÿ,78-2ÿ"#'%$$ÿ-79:ÿ
7;;ÿ,78-
???@hBÿKLMNÿOGPIGQÿAGGÿ[XijG_JÿJVÿMNÿ?NJGULV_MLÿeTUGG^GNJÿQfGUGÿMÿ̀XILHINTÿKGU^IJÿI[ÿNVJÿI[[XGHÿikÿ <;;010*47=ÿ#$%$(
KINGLLM[ÿ]VXNJkÿ̀XILHINTÿgGUPI_G[ÿÿR]fMUTG[ÿVNÿVUITINMLÿFLMNÿUGPIGQcÿUGPI[IVN[cÿMNHÿINJGUIVU[YB
???@DBÿ̀XILHINTÿlIdGÿgMdGJkÿAIUGÿOG[I[JMN_GÿOGPIGQÿ]fMUTG[ÿJVÿMLLÿ]V^^GU_IMLÿÿmGQcÿOG^VHGLÿMNH "#&'%$$
eHHIJIVNÿFGU^IJ[B
???@ABÿDEFGHIJGHÿKLMNÿOGPIGQÿRSMNMTGUÿMFFUVPMLÿUGWXIUGHY
???@A@ZBÿOG[IHGNJIML ">$$%$$
???@A@\Bÿ]V^^GU_IML
???@A@\@MBÿ̀GJQGGNÿa@bcaaaÿ[WBÿdJB "'$$%$$
ÿÿ ÿ¡¢£ ¤¥¦ÿ§¨ÿ©
TOWN OF REDINGTON SHORES
PERMIT FEE CALCULATIONS SCHEDULE
Application Fee: $35.00 for every Permit
All fees to the set by the Town Commission
Building $35 + See Fee Schedule Attached
Mechanical $35 + 0.40/K if part of new construction (Total Project Cost) Plumbing $35 + 1.30/K if part of
new construction (Total Project Cost) Electrical $35 + 1.50/K if part of new construction (Total Project Cost)
Building & misc. $35 + $10.00/K (NOT new construction project) Renovation, Addition, or Remodel.
Mechanical, Plumbing, & Electrical $35 + $10.00/K of sub-contract, if a separate project
Docks: ($35 + $10.00/K)
Sitework: Grubbing, landscape: ($35 + $10.00/K) Swimming Pool, ($35 +
$10.00/K)
Paving: $35 + $10.00/K)
Sprinkler System(fire): ($35 + $10.00/K) Demolition: ($35 + $10.00/K)
PENALTIES:
Work started without a permit: Penalty is Five Times the above subtotal. Second Offense is Ten Times the above
subtotal.
Re-inspection Fee: $45.00
Plan Review Fee:
If the project is over $5,000.00, or requires a plan or product approval, add nonrefundable 20% of above
subtotal, due at time of submission.
Right of Way Fee (ROW) $45.00
Building Code Surcharge Fees:
2.5% of permit total or $4.00 minimum.
Transportation Impact Fee: Per Pinellas County Ordinance
LDU for new residential and new and improved commercial construction Ord. 90-120*
Fire Safety Fee – New construction or replacement: Multi-family $25 per unit; Single family $100 per unit
Sewer Tap-In Fee - $400.00 per Unit
Business Occupancy & Fire Inspection Fee - $45.00 per unit
PERMITS EXPIRE AFTER 6 MONTHS; OVER $25,000 EXPIRE AFTER 9 MONTHS
90 DAY 1 TIME EXTENSION MINIMUM FEE $45.00
NEW CONSTRUCTION FEE SCHEDULE
Project Range Permit Fee Project Range Permit Fee
From To Rate Per From To Rate Per
$1000 $1000
$0 $500,000 $10.00 $13,000,001 $14,000,000 $6.50
$500,001 $10,000,000 $7.50 $14,000,001 $15,000,000 $6.25
$10,000,001 $11,000,000 $7.25 $15,000,001 $16,000,000 $6.00
$11,000,001 $12,000,000 $7.00 $16,000,001 >>>> $5.75
$12,000,001 $13,000,000 $6.75
* Land cost + Construction cost ÷ 50,000 = LDU’s
F;/User/Forms/Permit Fee Calculations Schedule LDU’s x $500 ea. = Total Fee
From: Ata Tursucu <ata.tursucu@gmail.com>
Sent: Wednesday, January 15, 2025 10:13 PM
To: Commissioner Dist. 2 <comdist2@redshoresfl.com>; Ata Tursucu
<ata.tursucu@gmail.com>
Subject: Flood
Hi CJ,
Yesterday I ended up having a stent installed in one of my heart arteries. I came back home
last night and I feel good now. It was 95% clogged. I dodged a big bullet. I could have had a
heart attack.
I sincerely appreciate your offering me help with my home flooding problem at the
Redington Shores City hall meeting last Saturday.
That meeting was full of distraught elderly folks who are confused about the whole
process.
I believe most of them want to stay in their homes but do not exactly know how to proceed.
The presenter, Mr Robert Peebles did his best in trying to explain the procedure.
The bottom line is THE HOMEOWNERS NEED TO APPEAL THE "SUBSTANTIALLY DAMAGED"
letters.
Mr Peebles told the audience that "THE APPEAL MUST BE DONE BEFORE April 9, 2025".
I believe this is too soon of a deadline for the elderly confused folks.
LET'S SLOWDOWN FOR GOD'S SAKE.
Mr Peebles also said that the decision for the 'SUBSTANTIALLY DAMAGED" letters was
based on the data Tidal Basin data and that data 'WAS GARBAGE".
Well, if the data is garbage then why are we, the elderly folks, being forced to spend
our limited funds on Private Appraisers to appeal?
In our specific situation, like other elderly folks, we do not know whether to sell or repair
yet.
We are leaning towards selling however it may take time and we may miss the April 9, 2025
deadline.
WE FEEL THIS APRIL 9, 2025 DEADLINE SHOULD BE EXTENDED.
Best regards.
Ata Tursucu
ata.tursucu@gmail.com
727 417-2228 mobile
ITEM F.5.
■IUIK1ltw...ul.....
--------------------------·----- ---------------------------------••111ia1m1UHUl�I Ul■IUUIQIWJ...._..
Five-Year Capital Improvement Plan - Town of Redington Shores, Florida
Please see the below drafted projects, with allocation projections through budget year FY 2028-29 to be completed during workshop(s), for consideration to be
included in the FY2024-25 budget year. Capital projects identified are those that exceed total costs of $24,999.
Project Description Funding Source Cost of Project 2024 2025 2026 2027 2028
Parks ..
Public Beach Access Point Park Improvements $ 25,000.00 $ 25,000.00 -------
Nature Park Sign Project i Park Improvements $ 25,000.00 $ 25,000.00
County Parking Lot Improvements i Park Improvements $ 25,000.00 $ 25,000.00
Constitution Park Parking Lot Park Improvements $ 40,000.00 $ 40,000.00
Public Works
UTV w/Beach Maintenance Machinery & Equip. $ 30,000.00 $ 30,000.00
Public Works Vehicle Machinery & Equip. $ 50,000.00 $ 50,000.00
Town Hall Lighting Enhancements Improvements $ 45,000.00 $ 45,000.00
Tractor & Beach Rake Machinery & Equip. $ 75,000.00 $ 75,000.00
Administration
Town Merchandising Project Advertising $ 25,000.00 $ 25,000.00 -�-
Town Hall Parking Lot Resurfacing Improvements $ 35,000.00 $ 35,000.00 :
:
Stormwater
Stormwater Infrastructure Stormwater System $ 2,000,000.00 $ 500,000.00 $ 500,000.00 $ 500,000.00 $ 500,000.00
Sewer .
Lift Station Generator Acquisition Improvements $ 150,000.00 $ 150,000.00
Sewer System Improvements Improvements $ 4,000,000.00 $ 500,000.00 $ 500,000.00 $ 500,000.00 $ 500,000.00 $ 500,000.00
.. ..
Streets ··-· -·---- - ..
Street Lighting Project Improvements .. $ 166,500.00 $ 83,250.00 $ ·---- 83,250.00
Street/Sidewalk Imp. Project Improvements $ 83,250.00 $ 83,250.00 ----· �-
--- --- -----··
Utilities
r
Utilities Undergrounding Project i Improvements $ 2,500,000.00 $ 2,500,000.00 . ..
!Totals $ 9,274,750.00 $ 4,191,500.00 $ 1,083,250.00 $ 1,000,000.00 $ 1,000,000.00 $ soo,000.00 I
17
ITEM F.6.
Date: January 29, 2025
To: Board of Commissioners
From: Margaret Carey, Town Clerk
Re: Town Administrator Role Discussion
Commissioner Kapper requested this discussion item be placed on the agenda.
ITEM F.7.
Date: January 29, 2025
To: Board of Commissioners
From: Lisa Hendrickson, Mayor
Re: Library Board Representation
In compliance with the guidelines outlined in the Commissioners Procedural Manual, I am
recommending Commissioner Schoos be assigned to represent the Town on the Library Board
moving forward.
Commissioner Schoos is a regular patron of the library and has exhibited great support for its
initiatives over the past year. Her familiarity with the library’s programs and commitment to its
success make her an excellent choice for this role.
Additionally, I will continue to serve as Commissioner Schoos' alternate to ensure consistent
representation and support for the Board's initiatives.
Thank you,
Lisa
ITEM F.8.