Zoning Board of Adjustment
Regular MeetingRidgewood, NJ · March 11, 2025
Minutes
VILLAGE OF RIDGEWOOD
BOARD OF ADJUSTMENT
Meeting Minutes
March 11, 2025
Opening:
The public meeting of the Zoning Board of Adjustment of the Village of Ridgewood was called
to order at 8:00 p.m.
Present: Greg Brown, Diana Ruhl, Jason Curreri, Jonathan Papietro, Jamie Fox, Yelena Raytser
and Matthew Swan. Also present w e re Ally so n K ase tta , E sq ., s ubs titu tin g fo r B ru c e
Wh i t a k e r , E s q . , B o a r d A t to rn e y , J o h n B a r re e , V i l l a g e P l a n n e r ; C h ri s to p h e r
R u ti s h a u s e r , V i l l a g e E n g i n e e r ; B r i a n In ti n d o l a , T ra f fi c E n g i n e e r ; and Jane
Wondergem, Board Secretary. Matthew Bandelt and Khidir Abdalla were absent.
Non-agenda items:
Board member comments: There were no comments at this time.
Members of the public comments – There were no comments at this time.
Public hearings:
Mr. Brown announced that the Fox, 325 Crest Road, application was carried to March 25, 2025
with further notice.
Old Business:
55 NORTH BROAD LLC – An application to seek use along with preliminary and final site plan
approval and bulk variances to demolish the existing two-story structure and construct a new on-
story Chase Bank with drive-through with associated site improvements at 55 North Broad Street,
Block 3804, Lot 2.01, in a B-1 and B-2 Zone. (Continued from February 11, 2025 without further
notice)
Bruce Rosenberg, Esq., present on behalf of the applicant, briefly recapped the prior meeting.
Aaron Chan, civil engineer, was previously sworn and testified regarding the revised site plan he
prepared. Mr. Chan went over the gains and losses in regards to the parking and the soil
movement calculations. Mr. Chan said that the 2 foot overhang for the canopy protection over the
Franklin Avenue side of the building would require a front yard setback variance. The North Broad
Street opening has a small brick wall.
Mr. Rosenberg shared the Historic Preservation Commission (HPC) report with the Board.
Board members asked about the steps in the walkway and Mr. Chan explained that they cannot
be eliminated due to the 5 foot difference in the grade which would make the sidewalk too steep.
Board members asked about existing fiber optic lines in the parking lot. Mr. Chan stated that they
are for an adjacent building and that they will work with the utility authorities. Board members
asked about the existing roof drain which empties into the plantings. Mr. Chan said the PVC pipe
goes into the landscaped area and they are proposing to connect to the underground system.
There were no questions from the public.
James Lalli, architect, was previously sworn and testified regarding the renderings he prepared.
Mr. Lalli explained how they addressed the concerns of the HPC and will continue to work with
them. Mr. Lalli said they cut back the gable roof and revised the signage putting the freestanding
1
sign at the North Broad Street entrance. Mr. Lalli said they will work with HPC and the owner of
the adjacent building in regards to the southern wall of that building.
Mr. Rutishauser asked how the street lights would be powered and if they would be the
responsibility of the town or the bank. Mr. Rosenberg said they would be the responsibility of the
bank. Mr. Rutishauser asked that they pick the same pattern used by the town to match the rest
of the Village.
Board members were concerned about drivers cutting through the parking lot as it is already an
issue. MR. Intindola said that cutting through is an enforceable violation. Mr. Rutishauser said the
applicant would have to work with the Village to address that concern. Board members would like
to see a report from the Police Department. Mr. Rutishauser suggested a six month look back to
address traffic and other concerns.
Board members questioned the need for the pylon sign. Mr. Lalli said it is proposed to be placed
in that location so drivers would not miss the entrance on South Broad Street. There was Board
discussion regarding the pylon sign and the justification for it as it would need a variance.
John Corak, traffic expert, was previously sworn, and testified in regards to the site plan. Mr.
Corak explained how a traffic ‘jog’ was created to slow down the traffic on the site and while cut-
through traffic cannot be prevented entirely, the site was designed to keep speeds low. Board
members asked if they had considered a speed bump. Mr. Corak said they did not consider a
speed bump because the drive-up portion needs to be clear and to avoid conflicts with parking
spaces and driving maneuvers. Board members asked about other alternatives to prevent cut-
throughs. Mr. Corak described how they study the property and the benefits to the proposed
design.
Mr. Intindola said that eliminating the driveway from Franklin Avenue and moving it to a side
street follows State policy. Board members continued to have concerns regarding cut through
traffic. Mr. Intindola pointed out that the applicant created the jog in the traffic and placed a stop
bar in the middle of the site. Board members asked if drivers could be ticketed for cutting through.
Mr. Rutishauser said if the applicant grants authority to the Village to enforce motor vehicle
regulations on the property under Title 39, drivers could be ticketed. Mr. Rosenberg said the
applicant would work with the Village to do that.
Mr. Corak said the applicant would agree to restrict left turns out of the drive-thru and would
review the traffic issues after six months with input from various Village authorities.
Mr. Rosenberg said the applicant would remove the pylon sign from the plans.
There were no questions or comments from the public.
Mr. Rosenberg made closing remarks.
Following Board deliberation, Mr. Brown made a motion to approve the application with the
conditions discussed, Ms. Ruhl seconded and the application was approved, 5 to 2.
Ms. Kasetta left the meeting.
Michael Lubin, Esq., joined the meeting as Board Counsel.
KEVIN & COLLEEN ST. JOHN – An application to permit the construction of a one-story front
addition, one-story front open portico, box window, a two-story rear addition, second story
addition, and modifications to the existing patio, which would result in a front yard setback to the
addition of 37.3 feet, where 40 feet is required, to the portico of 33.8 feet where 35 feet is
required, and coverage by above grade structures within 140 feet of the front lot line of 21.39%,
where 20% is permitted at 199 Spencer Place, Block 2301, Lot 4, in an R-2 Zone.
2
Kevin and Colleen St. John, homeowners, were sworn.
Jeffrey Gasnick was sworn and his credentials as a licensed architect accepted. Mr. Gasnick
testified regarding the plans he prepared, describing the series of additions being proposed. Mr.
Gasnick identified the variances being proposed. Mr. Gasnick described the property hardships,
stating the lot has nonconforming width and area, a nonconforming existing location of the
dwelling and a sub optimum placement of the garage.
Mr. Gasnick described the floor plans and the need for an entry area. Mr. Gasnick said they tried
to keep the coverage by above-grade structures within what is permitted, but the location of the
existing garage within the first 140 feet made it difficult. If the garage had been built back further,
they would not be asking for a coverage variance.
Mr. Gasnick said the rear additions will not be visible from the street and that gross building area
and coverage by improvements conform. Mr. Gasnick said other dwellings on Spencer Place also
encroach into the front yard setback and what is proposed conforms with the character of
Spencer Place. Mr. Gasnick said they had explored other options, but the property hardships
were too imposing for other options to make sense and what is being proposed is necessary to
improve the functionality of the existing home.
Mr. Barree asked if any of the attic space would exceed 7 feet. Mr. Gasnick said the maximum
height in the attic is 6 feet.
Board members asked about the cantilevered addition on the front left side. Mr. Gasnick said the
first story fireplace juts into the space so they proposed the 2 foot cantilever to expand the
second floor space. Board members said that street scape is important and the cantilever throws
off the balance of the house. Mr. Gasnick said there is a tree in front of that part of the house.
Board members suggested a trellis or lattice, or a fake wall or to bring out the lower level to match
the second floor. Board members asked if the windows on the first floor and second floor could
align.
Mr. Gasnick said they would extend the first story portion to match the second floor and the
windows would align.
There were no questions or comments from the public.
Following Board deliberation, Ms. Ruhl made a motion to approve with the condition that the first
floor will match the second floor, the windows will align and they would never enclose the front
porch in any way. Mr. Fox seconded and the application was approved. Mr. Gasnick will submit
revised plans to be reviewed by the site plan committee.
Resolution memorialization: The following resolutions were memorialized:
- Scoccimarro, 225 North Monroe Street, Block 1816, Lot 26
- Jackson, 396 Godwin Avenue, Block 2501, Lot 4
- Pilchik, 309 Windsor Terrace, Block 1813, Lot 10
Discussion – Zoning Board of Adjustment Annual Report. Mr. Brown asked if anyone had any
comments, questions or additions to the Annual report. Mr. Swan asked about the process and
Mr. Barree explained.
Adjournment - The meeting was adjourned at 10:38 p.m.
Minutes submitted by: Jane Wondergem, Board Secretary
Date Approved: April 8, 2025
3
Agenda
VILLAGE OF RIDGEWOOD ZONING BOARD OF ADJUSTMENT
AGENDA
Tuesday, March 11, 2025
Village Hall Court Room – 7:30 P.M.
Call to order
Pledge of Allegiance
Statement required by the Open Public Meeting Act “Adequate notice of this meeting has been
provided by a posting on the bulletin board in the Village Hall, by mail to the Ridgewood News,
The Record and by submission to all persons entitled to same as provided by law of a schedule
including date and time of this meeting”.
Please note: A curfew of 11:00 PM is strictly adhered to by the Zoning Board of Adjustment of
the Village of Ridgewood. No new matter involving an Applicant will be started after 10:30 PM.
At 10:00 PM the Chairman will make a determination and advise Applicants as to whether they
will be heard. If an Applicant cannot be heard because of the lateness of the hour, the matter will
be carried over to a future meeting to be determined by the Board at 10:00 PM.
Roll call
Minutes: February 11, 2025
Non-agenda items:
Board member comments
Members of the public comments
Public hearings
Old Business:
55 NORTH BROAD LLC – An application to seek use along with preliminary and final site plan
approval and bulk variances to demolish the existing two-story structure and construct a new on-
story Chase Bank with drive-through with associated site improvements at 55 North Broad
Street, Block 3804, Lot 2.01, in a B-1 and B-2 Zone. (Continued from February 11, 2025
without further notice)
JUSTIN & GASSIA FOX – An application to permit the construction of a rear and second floor
addition which would result in a building height of 37 feet, where 30 feet is permitted, and gross
building area of 27.2%, and gross building area within 175 feet of the front lot line of 27.9%,
where 20% is the maximum permitted at 325 Crest Road, Block 1909, Lot 24, in an R-110 Zone.
(Continued from January 28, 2025; Carried to March 25, 2025 with notice)
New Business:
KEVIN & COLLEEN ST. JOHN – An application to permit the construction of a one-story
front addition, one-story front open portico, box window, a two-story rear addition, second
story addition, and modifications to the existing patio, which would result in a front yard
setback to the addition of 37.3 feet, where 40 feet is required, to the portico of 33.8 feet
where 35 feet is required, and coverage by above grade structures within 140 feet of the
front lot line of 21.39%, where 20% is permitted at 199 Spencer Place, Block 2301, Lot 4, in
an R-2 Zone.
AGENDA – CONTINUATION March 11, 2025
Resolution memorialization:
- Cohen, 72 Ridge Road, Block 2111, Lot 4
- Scoccimarro, 225 North Monroe Street, Block 1816, Lot 26
- Jackson, 396 Godwin Avenue, Block 2501, Lot 4
- Pilchik, 309 Windsor Terrace, Block 1813, Lot 10
Discussion – Zoning Board of Adjustment Annual Report
Adjournment