Public Works & Buildings Committee
Regular MeetingRochester, NH · April 16, 2026
Minutes
Public Works and Buildings Committee
City Hall Council Chambers
Meeting Minutes
April 16, 2026
6:00PM
MEMBERS PRESENT
Chairman - Councilor Larochelle
Vice Chairman-Councilor Fitzpatrick
Councilor Hamann
Councilor Sullivan
MEMBERS ABSENT
Councilor David Walker
OTHERS PRESENT
Peter C. Nourse PE, Director of City Service
Gretchen Young, P.E., Deputy Director – Technical Services
Jenn Marsh, Deputy Director – Operations and Administration
Ian Rohrbacher, Superintendent of the Water Treatment Facility
Andrew Butler, Weston & Sampson
Sam Kenney, Weston & Sampson
Laura McDormand, Admin. Services & Utility Billing Supervisor
MINUTES
Councilor Larochelle called the Public Works and Building Committee to order at 6 PM
1. Roll Call
Ms. McDormand took roll call attendance. Councilor Larochelle, Councilor Fitzpatrick,
Councilor Hamann, Councilor Sullivan and Mayor Grassie were present for roll call.
Councilor Walker was absent from roll call.
2. Approval March 19, 2026, PWC Minutes
Councilor Fitzpatrick made a motion to accept the minutes of March 19, 2026 meeting
as presented. Councilor Hamann seconded the motion. The motion passed
unanimously.
3. Public Input
There was no public present for public input.
4. Compensation Fund for Public Water Systems: Proceeds to Rochester’s Drinking
Water Utility
Mr. Nourse stated on March 20 we received this letter from NHDES stating that a class
action suit of the Aqueous Film Forming Foam Products Liability Litigation of which NH
was a plaintiff has resulted in a settlement with the defendants 3M, DuPont, Tyco and
BASF and that total amount of nationwide payments is 15 billion dollars. Phase 1 claims
will be proceeds to NH for $45M from 3M and Dupont. Phase 2 will be about $10M from
Tyco/BASF.
Public Works & Building Committee Meeting Minutes
April 16, 2026
Eligible communities are any that have any detected level of PFAS in their public water
systems. This has resulted in proceeds to Rochester in amount of $583,227. The award
amount is determined by a formula that is based on PFAS levels and plant flow. Funds are
sent to Drinking and Groundwater Trust Fund and are available until 2029 or 2031 when
the new EPA PFAS standards are in effect.
Mr. Nourse stated that the funds could be used towards some initiatives he is looking at to
reduce the PFAS levels at the Cocheco Well such as dilution and blending to drop the levels
below the EPA standards that will be in effect either 2029 or 2031. He stated that staff
needs to get with NHDES to determine how to apply for the funds and how disbursements
will work and whether a supplemental gross appropriation from the Water Fund may be
needed. More to follow.
5. Grante Ridge Development District Growth: Water and Sewer Capacity Studies
Mr. Nourse stated he commissioned a water and sewer capacity study in 2023 due to his
concerns about mixed-use with residential development which was authorized by the
Council for the Ridge. He stated the delay in this presentation is due to the long-evolving
tenant concept of the Waterstone Phase II development. He stated that the concept was
determined only about a year ago and at that time the water and sewer demands were
known. He stated that this comprehensive study reviewed the utility needs for a complete
Granite Ridge District build out which includes current demands, actual demand numbers
for Phase II and estimated demand numbers for the contemplated Phase III, called
Northgate. It also included conservative estimates of the remaining developable land. He
reminded the Committee that they had been acquainted by the Finance Director in February
on the Northgate project. He stated that the review showed that the density for Phase II and
contemplated density for Phase III Northgate produces very high gallons per day in water
and wastewater needs per acre, even higher than standard engineering references
recommend. As a result of this, a very conservative approach was used for the demands of
future developable lots. He stated this is due to the trend of high-density development.
He stated that without capacity upgrades the Ridge cannot be supported with current
infrastructure. He cited the Rt 11 sewer pump station will be at only 25% capacity
following Phase II coming online and cannot support a full Ridge build out. He stated that
the sewer pipe in Rt 11 is undersized for a full buildout, but it is being upsized as part of
the Rt 11 widening projects required of Waterstone for Phase II and is also in the City’s
project for City’s portion of the widening. New, larger pipe will be installed in each project
to support a full Ridge buildout. He stated that a full buildout will increase flow to the
Wastewater Treatment Facility by 20% and that the Drinking Water Facility will have to
produce more than this amount of flow due to fire and irrigation needs. He stated that
currently neither facility can support this growth and also cited his efforts to increase
drinking water capacity and cited that the new EPA upgrades to the wastewater facility will
have to accommodate this growth. He stated that the existing water booster pump station
on secondary drive does not have the capacity at this time to support Phase II but staff is
working with the developer to augment capacity to accommodate Phase II and any near-
term concurrent development. He reminded the Committee that this pump station had
always been envisioned as eventually servicing an elevated atmospheric storage tank and
Public Works & Building Committee Meeting Minutes
April 16, 2026
such a tank is needed for full build-out. He stated that engineers are currently evaluating
design options for this tank and that there is proposed funding in the pending FY27 CIP
budget to keep this effort going.
Engineers from Weston-Sampson Engineers then provided a detailed presentation on the
water and sewer capacity study (attached).
6. EPA’s Lead and Copper Revisions Rule and Lead and Copper Rule Improvements:
Refresher and Update (please see attached preparatory background)
Regulatory background since 1991 from EPA and NHDES was attached to the agenda to
refresh the Committee. Mr. Nourse provided a summary of where the City is regarding
compliance and interpretation of the Lead and Copper Improvement Rule. The focus is to
identify lead and galvanized service lines and eliminate them in 10 years. He stated that at
this time the City is in compliance and in a good situation. A full review of all nearly 8,000
service lines has been completed, and no lead has been identified on either the utility or
customer sides of services. He stated galvanized lines were identified but proactively
removed from the system. He stated that materials were identified through visual
observations, historic tie-card records, assessing data and as-built records. He said that
regulators require field verification guided by a statistical generator which for Rochester
will provide the addresses of 371 customers which require in-field verification through pot-
holing. Pot-holing means penetrating pavement, sidewalks or earth to visually determine
the pipe material on either side of the curbstop valve. We have until 2034 to do this. He
stated that when there is a protocol from the regulators he will implement this program. He
stated that should verification show lead or galvanized lines that they will be replaced. He
reminded the Committee that they had provided approval for the utility to replace the
customer side. He stated that although not regulated, regulators may provide guidance on
black pipe which depending upon manufacture date may have a lead coating inside. He
stated there was a very small number of these. He stated that the City banned lead pipes in
1982, before the 1986 national and 1989 New Hampshire bans and that the EPA recognizes
this date as a key date to inform efforts. The Water Superintendent provided a summary of
the changes in sampling protocol that the rule requires. The Committee was reminded that
in the City’s drinking water copper is not an issue as sampling has always shown it far
below EPA action levels and that lead has for many years been far below the 10 parts per
billion action level that is in the new rule.
He stated the challenge now is that regulators want utilities to discover and replace lead
and galvanized lines past master meters such as mobile home parks. The utility trade
considers distribution past master meters as premise plumbing and the utility does not have
records or control of it and, that many parks would not have records either. He stated
Rochester has 25 mobile home parks and 2500 mobile homes, half of which are pre-1982.
He stated that American Waterworks Association has brought suit against the EPA as they
feel EPA is conflating access with control. They also cite the large 100-billion-dollar cost
nationwide and the time schedule required. He stated that the City is holding off until a
decision expected later this year and until a directive from regulators. He stated there is
$15 billion dollars available nationwide, but this effort would be extremely large for the
City just to identify materials. He stated that lead
Public Works & Building Committee Meeting Minutes
April 16, 2026
7. Joint NHDOT-Maine DOT Piscataqua Bridge Traffic Management Plan Overview
Mr. Nourse stated on Mar 25 he and City Manager and Fire and Police Chiefs met with
this joint NHDOT, Maine DOT and consultants’ coalition that has a goal to improve traffic
management in communities around the Piscataqua River in the event that the Piscataqua
River bridge goes down for prolonged periods greater than 48 hours. They cited the bridge
going off-line 3 times in the last few years for a total of about 20 hrs. for emergency
response. They are more concerned with prolonged down time. The inspiration for the
effort was the Key Bridge long term closure in Baltimore when a barge struck it.
Their goal is to seek to best manage traffic redistribution in the event of this bridge closure
which carries 80,000 vehicles per day. Travel apps will reroute travelers often in haphazard
ways, seeking any alternative and these re-routes advising thousands of vehicles can
inundate the local highway systems of many communities. Seven bridges including the
Piscataqua, Sara Long, Rt 4 and E. Roch’s Rt 202/Highland St bridge to Lebanon are focus
bridges. They are most interested in the City’s projects that may impact routes. Mr. Nourse
will continue to advise them on ongoing and upcoming transportation projects. They are
currently ½ way thru meeting with local communities to understand their highway and
utility systems. Their study schedule looks to produce a report later this summer.
8. Wastewater Treatment Plant Staffing
Mr. Nourse stated he acquainted the Committee with this issue last year. He stated that the
water utility profession is experiencing a mass retirement of qualified operators. Average
age in water utility trade is 58 and recruitment of young people into the profession is
drastically down nation wide.
He stated that at our plant the Superintendent and Lead operator combined have served the
City about 90 years and within the next 4 years both are likely to be retiring and as close
as 1 year from now one may be retired. The plant is rated for Grade 4 operation, and the
state requires 2 employees have the rated grade. Both of these employees have this grade
of license. The Chief Operator position requires a Grade 4 and remains vacant despite being
advertised for over a year. The Superintendent and Chief Operator positions required a
Grade 4 and our Lead Operator happens to have it.
He stated that if we cannot recruit a Chief Operator when we lose either the Superintendent
or Lead Operator to retirement, we will be out of compliance because we will be losing
one of the two licenses.
He believes from talking with NHDES that if this happens we would likely not be issued a
violation as long as we were actively recruiting or developing an existing employee for
advancement to Grade 4.
Should we lose both in short succession and are unable to fill the Chief Operator position,
we cannot operate the plant leading to large violations. Not having a Chief Operator result
in overburden workload for the Superintendent and ideally we would have this Chief now
as we embark on multi-million dollar upgrades to the facility. He stated he researched
agencies that offer contracted services. But those that are interested have a model where
they provide the operator and the municipal staff becomes their employees.
Public Works & Building Committee Meeting Minutes
April 16, 2026
He felt that is not good for our employees or right for the City. And there is evidence that
profit-centric business models (which are not municipal models) can result in lack of
planning and maintenance neglect. He also checked with headhunting services but there
seem to be too many strings attached to those services. Though a headhunter may find a
candidate, the State does not offer reciprocity for the license so your typical out of state
Grade 4 likely will not retest to get here. He stated he had a meeting with the City Manager
and Human Resources Department to look at some creative ways to solve the challenge
and that they are supportive. Mr. Nourse was asked if wages were a factor in the difficulty
to hire. He stated that Public Works believe it is but that the Human Resources Department
may differ in that opinion. It was suggested that this issue be brought up in the budget
cycle.
9. Other
Mr. Nourse said that he checked with NHDOT on the Labrador Drive traffic signal and
that NHDOT had adjusted the green time exit from 10 to 20 seconds and he is waiting to
hear back as to why they did not set it for a full 30 seconds which it was supposed to be set
at they said.
Mr. Nourse showed a NHDOJ website which stated that the owner of Old Dutch Mustard
would be sent to jail for polluting a river. The City has received acetic acid from them since
2012 to be used at the wastewater plant as an enriched carbon source for denitrification.
He stated the acid is a production waste from the company and has been shipped here each
week since then free of charge. He said he hoped that the company’s legal problems would
not jeopardize future product availability. He said that this possibility had been looked at
and there is a product called Micro-C which is a glycerin-based external carbon source
which is manufactured specifically for denitrification but its cost tracts that of diesel. Years
ago when this was looked at the annual cost to feed the plant could be 300 thousand dollars
and with increases in diesel cost, may be even more now.
Mr. Nourse said that the intersection improvements to Salmon Falls Rd and Milton Rd
intersection had bids coming in on May 7th, 2026.
Mr. Nourse stated that due to current fuel cost increases the City may have to look at fuel
escalation clauses in its construction contracts. One such request has been received on a
project.
Meeting adjourned at 7:14PM
Minutes respectfully submitted by Laura McDormand, Admin. Services & Utility Billing
Supervisor
Public Works & Building Committee Meeting Minutes
April 16, 2026
The State of New Hampshire
DEPARTMENT OF ENVIRONMENTAL SERVICES
Robert R. Scott, Commissioner
March 20, 2026
Peter Nourse
City of Rochester DPW
209 Chestnut Hill Road
Rochester, NH 03867
Via Email: peter.nourse@rochesternh.gov
Subject: PWS ID: 2001010, Rochester Water Department
PFAS Compensation Fund for Public Water Systems – Group 2
Dear Mr. Nourse:
The State of New Hampshire joined four separate class action Aqueous Film-Forming Foam
(AFFF) Products Liability Litigation settlement agreements with 3M, DuPont, Tyco and BASF
designed to resolve claims for per- and polyfluoroalkyl substances (PFAS) contamination of
public drinking water sources. The New Hampshire Department of Justice has and is
submitting claims for PFAS settlements on behalf of eligible water systems.
Pursuant to RSA Ch. 485-H:6, settlement funds will be deposited into the Drinking Water
and Groundwater Trust Fund and the Drinking Water and Groundwater Advisory
Commission is charged with ensuring these funds are distributed directly to public water
systems whose water sources are contaminated by PFAS. The Advisory Commission
authorized the New Hampshire Department of Environmental Services (NHDES) to
administer settlement funds under the PFAS Compensation Fund for Public Water Systems
(Program) to eligible public water systems to compensate for the costs to remediate PFAS
in their supply source. The amount of compensation is established in the national
settlement agreement and based on PFAS concentrations in the source water, water use
data, and source maximum pumping capacity.
Because water systems are at different stages in addressing PFAS contamination, NHDES
has assigned water systems to groups to guide strategic distribution of funds. Based on the
criteria established in the Program, Rochester Water Department is assigned to Group 2,
which represents public water systems that have PFAS detections and may be planning a
PFAS mitigation project in the future.
The amount of compensation for your claim is $583,227.
Compensation funds are available to cover documented costs of PFAS drinking water
remediation projects. Please be aware that the claim amount may only cover a portion of
www.des.nh.gov
29 Hazen Drive • PO Box 95 • Concord, NH 03302-0095
(603) 271-3503 • Fax: (603) 271-2867 • TDD Access: Relay NH 1-800-735-2964
Rochester Water Department
March 20, 2026
Page 2 of 2
the total project cost. NHDES has additional funding sources that may supplement the cost
of a PFAS mitigation project.
To access your compensation claim and/or discuss additional funding options, please
contact Amy Rousseau by phone: (603) 271-8801 or by email: Amy.E.Rousseau@des.nh.gov
for further direction in addition to any questions or concerns you may have on the matter.
Sincerely,
Robert R. Scott
NHDES Commissioner
cc: Ian Rohrbacher, City of Rochester DPW (ian.rohrbacher@rochesternh.gov)
City of Rochester
Granite Ridge
Water & Sewer Systems
INTRODUCTIONS
• Andrew Butler, Weston & Sampson
• Sam Kenney, Weston & Sampson
HISTORY - SEWER
• Route 11 sewer pump station
upgrade 2023
• Granite Ridge Zoning District
recently allowed residential
• Ridge Phase 2 estimated
200+ units
• Concern development would
exceed upgrade capacity
FIRST CAPACITY EVALUATION (2023)
• Review records of
gravity main and
pump station
• Identify properties
with potential for
future development
• Estimated future
flows (+72,000
GPD)
• Gravity main did
exceed capacity
SECOND CAPACITY EVALUATION (2025)
• Finalized sewer usage
from The Ridge Phase 2
(105,000 GPD)
• Only looked at the
impacts of Phase 2 on
sewer infrastructure
• Gravity main was under
80% capacity threshold
• Pump Station uses
~73% of pumping
capacity in peak
conditions
THIRD CAPACITY EVALUATION (2026)
• The Ridge Phase 3 is
estimating 363,000
GPD
• Developments are
much larger
(+2000 GPD/acre)
• Multiple scenarios of
build out that include
THIRD CAPACITY EVALUATION (2026)
• Utilized hydraulic
model to evaluate
from Rt 11 to
WWTF
• Looked at gravity
mains, pump
stations,
forcemains, and
siphons
THIRD CAPACITY EVALUATION (2026)
• Rt 11
gravity
upsizing
• Rt 11 PS
upgrade
• Rt 11 FM
velocity
THIRD CAPACITY EVALUATION (2026)
• Diversion structure
upstream
• River St Siphon
handles most flow
• River St PS typically
sees little flow
• Redundancy
Ri v e r St r e et Di v e r s i on s t r uc ture SMH 2 784
THIRD CAPACITY EVALUATION (2026)
• Old Dover Rd Siphon
• Model shows SSO
during existing peak
conditions
• With increased flows,
SSO is larger
• In practice, hasn’t
been an issue
SEWER CAPACITY EVALUATION RECAP
• Large developments
(105,000 GPD &
363,000 GPD)
• Capital improvements
are required to handle
increased flows
• Ongoing utility
improvements along
Rt 11
City retains Weston & Sampson
• Preliminary study for a new water
storage tank and associated
improvements in the Granite
Ridge District – in progress
– Tank sizing
– Tank styles
– Hydraulic water system modeling
– GR Pump Station analysis
– Continued design development
• Previous effort for Route 11 E x amp l e o f a c o mp o si te e levat ed t ank o pt ion
( C o u rte sy o f Ph o e nix F ab ri c at ors & E re c t o rs, 2 0 2 2) .
Capacity Study
Offices along
the East Coast
Projected Water Demands
• Demands provided by the developer (includes GR Phase 3)
• Estimated projected maximum day demand of 460,000 gallons per day
• Estimated projected average day demand of 270,000 gallons per day
Increase in Average Day Water Demand in
Granite Ridge District Visualization*
300,000
250,000
Gallons per day
200,000
150,000
100,000
50,000
-
Approximate Existing Water Projected Water Demand***
Demand**
*V alues ar e appr oximated to pr esent a visualization of incr ease in water demand within the distr ict. Offices along
**Value does not include projected Phase III demands.
***Value includes projected Phase III demands.
the East Coast
Hydraulic Modeling – Previous Effort 2023
• Hydraulic model utilized to evaluate
the water system’s ability to serve
proposed development within the
Granite Ridge District
– Granite Ridge supplied by gravity
system or boosted pressure zone
– Simulated under multiple system
scenarios
o Cocheco Well online/offline
o Seasonal valve closures
o Existing vs. proposed demands
– Factors evaluated:
o Increase water main capacity?
o Increase pump station capacity?
o Maintain required pressures? Offices along
the East Coast
Granite Ridge Pump Station
• Existing feature (at the Ridge plaza)
• Currently used as a constant pressure
output station
• Original 2014 design intent - fill a future
water storage tank
• Tank not constructed in 2014
– Buildout/turnover considerations
• Planned development as “inflection
point” for infrastructure modification E x i st i ng G ran i t e Ri d ge Pump St atio n
Offices along
the East Coast
Proposed Water Storage Tank Location
• Proposed location behind the Walmart off Route 11
Existing Walmart
Offices along
the East Coast
Proposed Water Storage Tank Sizing
• Estimated tank volume anticipated to be ~0.5 to 1.0
million gallons
• Provides domestic pressure (35 psi minimum)
• Buffer for peak demands
• Determined by ISO
• Provides fire flow (20 psi minimum)
• Water main breaks, equipment failure,
Offices along
raw water contamination
the East Coast
Water Storage Tank Style Options
• Elevated tank styles to be
reviewed and an option
chosen
• Glass-fused-to-steel,
composite elevated, multi-
column elevated, single
pedestal, etc.
• Capital vs. rehabilitation cost E x i st i ng Hi g h l and Tan k l o c at e d o f f
E i se n how er Dri ve i n Ro c h e st er, NH.
Offices along
Th i s t an k st y l e i s a g l ass - f used -t o-
st e e l c o mp o si t e e l e vat ed t an k .
the East Coast
Water Storage Tank Life Cycle Cost Analysis
Est. Est.
Est. Coated Est. Est. 80-Year
Rehabilitation/ Rehabilitation/
Tank Style Surface Capital Lifecycle
Painting Cost Painting Cost
Area (SF)(1) Cost(2) Cost(5)
2055(3) 2085(3)
Multi-Column
Elevated 39,290 $2.80M $1.67M $1.67M $6.14M
Tank(4)
Single
29,243 $3.57M $1.02M $1.02M $5.61M
Pedestal Tank
Fluted Column
66,542 $3.80M $2.33M $2.33M $8.46M
Elevated Tank
Glass-Fused-
to-Steel
Composite 0 $4.38M $0.30M $0.30M $4.98M
Elevated
Tank(7)
Composite
Elevated Tank 19,743 $4.10M $0.69M $0.69M $5.48M
(CET)
Notes:
(1) Estimated coated surface area is an average of the coated surface area provided by each tank
manufacturer.
(2) Capital costs are an average of the costs provided by each manufacturer in March 2026 based on
design criteria provided by Weston & Sampson.
(3) Estimated maintenance painting cost assumes $35/SF in 2026 dollars.
(4) Estimated maintenance painting cost of the multi-column legs and cabling assumes $60/SF in 2026
dollars.
(5) Values presented are estimated present worth of 80-year lifecycle in 2026 dollars.
(6) Estimated costs are for tank life cycle costing only and do not represent total project estimate (including Offices along
the East Coast
site work, engineering and contingency).
(7) Rehabilitation cost for glass-fused-to-steel elevated tank accounts for rehabilitation occurring every 20
years and includes the costs of replacement of sealant and sacrificial anodes in the cathodic protection
system.
Ongoing Efforts
• Hydraulic model further utilized to
evaluate service to proposed
development within the Granite Ridge
District via new tank and retrofitted
pump station
• Finalize Tank Design Criteria
• Deliver Basis of Design to City
Offices along
the East Coast
THANK YOU!
Contact info:
Samuel Kenney Andrew Butler
kenneys@wseinc.com Butler.Andrew@wseinc.com
603-570-6314 603-600-8963
Questions?
ROUTE 11 CORRIDOR OVERVIEW
Offices along
the East Coast
WATER TANK – APPROPRIATION COST
• Estimated cost appropriated for water storage tank, supporting
infrastructure, and system improvements: $15.5 million
Item Cost (in millions)
1.0 Million Gallon Water Storage Tank $5.5
Water Storage Tank Site Work $0.37
Water Storage Tank Access Drive $0.9
Utilities $1.09
Pump Station Modifications $0.67
Subtotal $8.53
Engineering, Design, and Construction
$1.02
(12%)
General Contractor Markup (15%) $1.28
Contingency (30%) $3.25 Offices along
Total Cost $15.5 the East Coast
ESTIMATED STORAGE CALCULATION
Volume
Storage Component
(gallons)
Equalization Requirement
115,192
(25% of MDD)
Fire Flow Requirement(1) 240,000
Emergency Storage
(Volume Equal to 0.5 135,520
ADD)
Total Required Storage 490,712
Total Required Storage
500,000
(Rounded)
(1) Per anticipated ISO/ City standard requirement
(2,000 GPM at 2-hour duration).
Offices along
the East Coast
ESTIMATED COST OF ROUTE 11 PS UPGRADE
Piscataqua River Bridge
Transportation Management Plan
Overview
The Piscataqua River Bridge Transportation Management Plan (TMP) is a coordinated regional effort to
maintain safe, reliable travel during planned or unplanned disruptions to the bridge network between Maine and
New Hampshire. Because closures affect multiple communities, the plan is being developed collaboratively
with municipalities, emergency services, and transportation agencies to ensure strategies reflect local priorities.
Regional Travel Context
90,000 TRIPS. • When the Piscataqua River Bridge travel
ONE CRITICAL CONNECTION. is disrupted, vehicles shift to nearby
bridges and key arterials.
• Many of these routes already experience
frequent congestion.
Local Collaboration
• Early municipal discussions and public
engagement are essential to identifying
Without planning, disruptions fall on local priorities and shaping transportation
plans.
roads and communities.
• Ongoing regional coordination will
continue through an advisory committee
Map of Study Area Crossings of municipal, emergency services, and
transportation partners from Maine and
New Hampshire.
• The TMP’s effectiveness relies on
co-developed approaches and ongoing
coordination.
The Piscataqua River Bridge TMP
is a study in partnership with:
CONTACT US:
Scan the QR code or use the
link below to learn more. Jennifer Grant, MaineDOT
• Email: jennifer.grant@maine.gov
• Phone: (207) 624-3227
Susan Klasen, NHDOT
https://arcg.is/1uCbCC3 • Email:susan.m.klasen@dot.nh.gov
• Phone: (603) 271-1484
Agenda
City of Rochester, New Hampshire
PUBLIC WORKS DEPARTMENT
209 Chestnut Hill Road • Rochester, NH 03867
(603) 332-4096
www.RochesterNH.ngov
MEMO PUBLIC WORKS & BUILDING COMMITTEE AGENDA
TO: PUBLIC WORKS AND BUILDINGS COMMITTEE
FROM: PETER C. NOURSE, PE
DIRECTOR OF CITY SERVICES
DATE: April 9, 2026
SUBJECT: Public Works & Buildings Committee Meeting
Date Thursday April 16, 2026, 6PM
________________________________________________________________________________
There will be a Public Works and Buildings Committee Meeting held on Thursday April 16, 2026, at
6PM. This meeting will be at City Hall in City Council Chambers
AGENDA
1. Roll Call
2. Approval of March 19, 2026, Public Works, and Buildings Committee (PWC) Minutes
3. Public Input
4. Compensation Fund for Public Water Systems: Proceeds to Rochester’s Drinking Water
Utility
5. Granite Ridge Development District Growth: Water and Sewer Capacity Studies
6. EPA’s Lead and Copper Revisions Rule and Lead and Copper Rule Improvements:
Refresher and Update (please see attached preparatory background)
7. Joint NHDOT-Maine DOT Piscataqua Bridge Traffic Management Plan Overview
8. Wastewater Treatment Plant Staffing
9. Other