The Russellville Planning Commission will hold its Regular Meeting on
Monday, September 23, 2013, at 5:30 p.m., in the City Hall Council Chambers.
PLANNING COMMISSION AGENDA
Welcome Visitors
1. A request to review and approve the minutes of the August 26, 2013 Regular
Meeting.
2. Tabled at the August 26, 2013 meeting, Tabled at July 22, 2013 meeting, and
Tabled at May 20, 2013 meeting. A Public Hearing requesting to review and a
recommendation of approval to the City Council to rezone property from C-2
(Highway Commercial) to R-3 (Medium/High Density Residential), for property
located in the 3000 Block of East 17th Street, submitted by Dave Garza of Barrett &
Associates on behalf of Scott Sanders. (Z0.13.05.170)
3. Tabled at the August 26, 2013 meeting. A request to review and approve Overland
Park to the City of Russellville Preliminary Plat, located between Brookside
Addition to the north, Brookview Estates to the east, Camelot along the west, and
West 12th Street along the south of the property, submitted by Dave Garza of
Barrett & Associates on behalf of Overland Park Developer, LLC. (SD.13.08.266)
4. A Public Hearing requesting to review and a recommendation of approval to the
City Council to rezone property from C-2 (Highway Commercial) to M-2 (Heavy
Industrial Manufacturing), for property located 503 East 3rd Street, submitted by
Michael Miller owner of Cooling & Applied Technology, Inc. (C.A.T.).
(ZO.13.09.173)
5. 5a. A request for a variance from the LS&DC Section 9. G8 for an additional
length of 40 feet from the maximum 200-feet requirement, property located off
Barborek Lane, submitted by Dave Garza of Barrett & Associates on behalf of R.T.
Brown. (SD.13.099.267)
5b. A request to review and approve a Minor Subdivision/R.T. Brown Addition,
located on Barborek Lane, submitted by Dave Garza of Barrett & Associates on
behalf of R.T. Brown. (SD.13.09.267)
5c. A request that the Planning Commission grant the authority of the Public
Works Director to sign the Minor Plat for recording upon approval, property
located off Barborek Lane, submitted by Dave Garza of Barrett & Associates on
behalf of R.T. Brown. (SD.13.099.267)
1
Russellville Planning Commission Minutes
September 23, 2013 @ 5:30 p.m.
The Russellville Planning Commission met in its regular meeting on Monday,
September 23, 2013, at 5:30 p.m. in the Russellville City Hall Council Chambers.
Members Present
Chairman Dennis Boyd Vice-Chair Nick Patel
Secretary Aldona Standridge Jimmy Davenport
Richard Perkins Richard Harris, Council Liaison
Members Absent
Jimmy Sims Herschell Hargus
Eric Westcott Gaylon Smith (resigned)
Also present: City Planner David Harris, City Attorney Trey Smith, Planning Assistant
Lequitta A. Jones, Building Official Brian Holstein, Fire Marshall Richard Setian, Jim
Lynch/City Corp, Morgan Barrett and Dave Garza of Barrett & Associates, Jim Lee,
Tony Jetton, Todd & Michelle Brown, Whitney Snipes, Duane and Shirley Noyes,
Donnie Elliott, John and Joanna L/N/U, Bob Weibler, Robert K. and Becca Campbell,
and Ed and Sharon France.
Chairman Boyd began the meeting by noting that Thursday evening the City Council
referred an item back to the Planning Commission in regard to RV Parks. However, the
commission had not yet received any information regarding that item, so it will be on
next month’s agenda. He stated that if there were those in attendance to discuss that
item, they could feel free to leave, though they were welcome to stay.
The First Order of Business was a request to review and approve the minutes of the
August 26, 2013 Regular Meeting.
Secretary Standridge made the motion to approve the minutes as written. The motion
was seconded by Commissioner Davenport and passed unanimously.
The Second Order of Business was Tabled at the August 26, 2013 meeting,
Tabled at July 22, 2013 meeting, and at May 20, 2013 meeting. A Public Hearing
requesting to review and a recommendation of approval to the City Council to rezone
property from C-2 (Highway Commercial) to R-3 (Medium/High Density Residential), for
property located in the 3000 Block of East 17th Street, submitted by Dave Garza of
Barrett & Associates on behalf of Scott Sanders. (Z0.13.05.170)
Chairman Boyd asked City Planner Harris if the applicant was requesting for this item to
be withdrawn, not requesting that it be tabled. Mr. Harris said yes and Mr. Garza
confirmed.
The Third Order of Business wasTabled at the August 26, 2013 meeting. A request
to review and recommend approval of the preliminary plat for Overland Park, located
between Brookside Addition to the north, Brookview Estates to the east, Camelot to the
west, and West 12th Street along the south of the property, submitted by Dave Garza of
Barrett & Associates on behalf of Overland Park Developer, LLC. (SD.13.08.266)
City Planner Harris gave a staff report outlining issues raised at the Technical Review
Meeting. Issues included: 1) the connection between Overland Park and Camelot at the
northwest corner of Overland Park, and 2) a proposed open drainage swale along the
north edge of the property. Mr. Harris said he and City Engineer Michael Oakes are in
favor of the connection to the existing Camelot stub to enhance connectivity. In regard
to the drainage, Harris stated that Mr. Oakes in his written comments had advocated
underground drainage.
Following the City planner's remarks, Chairman Boyd pointed out that this is not a public
hearing, but it is a public meeting so anybody who wishes to speak in favor or against
the proposal is welcome to speak.
Morgan Barrett said he had not seen comments from Mr. Oakes or the staff report and
they were still requesting approval as submitted. Mr. Barrett said he understands the
City staff has requested a connection to Camelot. Mr. Barrett said their position was
that Camelot is a well-established subdivision, and that introduction of additional traffic
to it at this time would not benefit Camelot and would not benefit Overland Park. The
City's new detention pond cuts off two possible connections to a recently developed
subdivision to the east and north. If those connections were available we might
consider tying into those, but we are requesting that we not be required to make the
connection to Camelot. Mr. Barrett said he understands there are several people here
from Camelot Subdivision that do not want the connection. We have the two
connections required by the fire code. The other issue is the open ditch along the north
side of the property. Mr. Barrett said our position on that is enclosed drainage systems
are required within the right-of-way. This existing ditch is at the back of the proposed
lots, with developed lots already draining into the open ditch. Mr. Barrett said he is
concerned about impeding drainage from the developed lots. There have been
numerous subdivisions approved with open ditches, including one recently.
Mr. Tony Jetton said the covenants will require minimum 2,000sf homes. The last
phase of Brookside just north of Overland Park was 2,200sf. Our minimum would be
slightly smaller.
Mr. Barrett answered questions from Sharon France (audience) in regard to lot sizes.
The minimum lot is one quarter of an acre. Mr. Jetton said the houses will be a
minimum of 2,000sf for a single-story, with 2,000 to 2,400sf for a two-story. Mr. Jetton
2
said he is following what was done in Brookside. The Brookside and Brookview
covenants are the model they were using. The development will include underground
utilities, nicer street lighting throughout that neighborhood, sidewalks on both sides of all
streets. There will be a nice entrance off of 12th Street. We are looking at something
that is upscale here for the price of the lots. We don’t see putting houses in here at less
than $225,000.
Noma Kellner, of 2710 Camelot, said her house borders the now-open field and she is
directly affected by the proposed connection. She asked if the minimum floor area was
for just the heated and cooled area, or if it included the garage. Referring to the plat,
Ms. Kellner said the new lots would be approximately half the size of the lots in Camelot
and she could not see how 2,200sf houses would fit. Mr. Jetton replied that garages
and porches are not included in the area requirement. Mr. Jetton said there are 82 lots.
Chairman Boyd asked City Planner Harris if this subdivision met the requirements of the
zoning code. Mr. Harris said yes.
Duane Norris, who lives on Lancelot Drive, asked if a stormwater management plan had
been submitted. He said he was worried about houses on Lancelot Drive. He wanted
to know if the plan had been approved by the Planning Commission.
Morgan Barrett said the detention pond is a City project. Once the Overland Park
preliminary plat is approved, a stormwater plan will be created. Mr. Norris asked if this
work had been approved by Planning Commission. Chairman Boyd said it is reviewed
by the City Engineer. Mr. Norris asked if approval had been given. Chairman Boyd
said it has not come through the Planning Commission. Commissioner Perkins said the
City Engineer approves drainage plans, not the commission.
City Planner Harris said this step of the subdivision process is called Preliminary Plat
review, in which basic aspects of the subdivision, like how big the lots are, how many
lots, basic street layout, etc. are reviewed. The preliminary approval is to let developers
know, before they commit lots of money, whether their development has a shot at
getting final approval or not. It is part of a multi-step process, so they don’t sink tons of
money into something that has no hope of being approved. Fully addressing technical
questions like drainage is not required of the developers at the preliminary plat stage.
Morgan Barrett said he hoped that all could see the benefit of this subdivision to the
City. There is not much residential development happening other than some subsidized
housing. This is not subsidized housing, this is private investment and high quality
development. It is a very high expense to the developer. This is the first subdivision
that has been submitted since the City Council passed the regulation requiring
underground utilities in every subdivision, with sidewalks on both sides of the street. I
don’t understand some of the issues. This is going to be a high quality development.
Chairman Boyd asked for some discussion in regard to connectivity and underground
drainage. He said he would like to hear from City Engineer Oakes.
3
City Engineer Oakes said we have already responded to comments that “the connection
does not benefit anyone.” Connectivity is one of the benefits of a grid-street system that
distributes traffic throughout an area instead of creating congestion by concentrating it
on a few collectors and major roads. Cities with finely-grained gridded street systems
have fewer traffic congestion problems. Importantly, we can all see that the developer -
when they looked at the property - saw two stub streets coming into this piece of land.
They had to have been well aware the stubs were there. I think we can all understand
that those stubs are there because a previous Planning Commission and previous City
Council voted to have them there as a part of the previous development. I doubt that
they were volunteered by the developer. They would not have been much benefit to the
developer of the previous development. They only benefit the new development.
Mr. Oakes continued by stating that this was a classic conflict he had witnessed over his
entire career. Sometimes the connectivity comes 20 or 30 years later, but it is up to us
to be consistent with that policy so that we wind up with a finally-gained grid network
which disperses traffic, keeps neighborhoods safer, and slows traffic. The 2020
Comphensive Development Plan for Russellville Arkansas Goal 4, Objective 3 states,
"Where appropriate, continue to extend the grid-pattern street network to interconnect
streets throughout the City." That is a mandate. It also goes on to say, "Require
internal street systems within multi-family development to enhance circulation." Another
objective in the same section of the Plan states, "Develop a system of bike trails,
bikeways and pedestrian ways and ensure accessibility issues are addressed for
person with disabilities." So, the more connectivity we have, the better it is for all of us,
including those with disabilities.
Mr. Oakes said he respectively suggests that, first of all, good planning and good
transportation require good connections of the streets. The extension of stubs is always
problematic for the reasons we have before us right now. If we want the future of our
City to be well-connected and to have a good transportation system and not be
congested, then this is the kind of thing that we need to do. To cause that to happen in
an orderly manner and to provide for everybody’s needs in every neighborhood is what
creates strong neighborhoods. It will be good for neighborhoods that are out there, and
it will be good for new neighborhoods that come along. So, I respectively suggest that
we shouldn’t make 100-year decisions based on each individual development. This is a
100 to 200-year decision and that is why we have developed the Master Plan to help
guide us through the process.
Commissioner Perkins asked City Engineer Oakes to comment on his requirement that
the developer replace the ditch along the north property line with an urban
(underground) system. Mr. Oakes said we are talking about trying to deal with basically
what is rural drainage in an urban situation. What comes off the end of Camelot Street
is a tail-ditch. Whenever you do a development and you get to an edge and the water is
still going, you are not expected to go ahead and take it out to some place off your
development site. You just drop it off and let the flow move to some watercourse
waiting for future development to pick it up. This is an urban development with properly
4
sized lots, but not huge lots. The results of having an open drainage ditch running
through these lots will be demands made on Public Works. They may not be made by
the first residents or maybe by the second residents, but sooner or later one of those
families will be wondering why it is that they have that drainage through their yard, and
they will want Public Works to come out and maintain it.
Mr. Oakes said it’s not a big thing to ask that the street be connected and the drainage
be connected at the same time. Mr. Oakes said he had a call from an individual that
lives in the development just to the north and they are concerned about drainage, and
whether that ditch would possibly be smaller than it is right now, or possibly would be
put on their property. With our regulations and with our principles, I don’t see that he
has a problem. The main thing is to be able to pick up the water and run it across the
lot in 3 x 3 or 4 x 4 drains. It is a very common practice and everybody that has done
this work knows how to do that. We are not going to impede their drainage by requiring
that it be underground.
Commissioner Patel asked about the drainage that runs east-west across the center of
the property. Is it going to be underground, too? Mr. Oakes said that drainage goes
into the pipe, then into the detention pond.
Commissioner Perkins asked City Engineer Oakes to comment on whether developers
should be required to add pavement, sidewalks and curb/gutter on 12th Street to match
the final cross section. Mr. Perkins asked the developer's representatives if they had
objections to that. Mr. Jetton said they planned to put in curbs and sidewalks within the
subdivision. Mr. Perkins said he recommended that the City extend the sidewalk east to
connect with existing sidewalks so there would be a sidewalk from Overland Park all the
way to the east side of the City. It would be a really nice addition to your subdivision to
be able to do that. There are sidewalks within 300 feet east of there.
Morgan Barrett said that existing right-of-ways are not subject to the subdivision
regulations. Commissioner Perkins said he was suggesting that the City continue the
sidewalks from Overland Park to the east. If the developer were to install the sidewalk
across the subdivision, then the City should extend it from there to the east, or at least
include it in their Capital Planning.
Mr. Oakes said he agrees that if the developer and the Planning Commission agree that
sidewalks should be built along 12th Street by the developer, then the City should put it
in the 2014 Plan to make the connection, even though it may not be approved.
Mr. Oakes said the other conditions talked about are appropriate with our regulations,
but the sidewalks, while they would be in the neighborhood's and the City’s interest, are
not a condition. I am not recommending that as a condition as with the other items.
Alderman Richard Harris said an individual that lives in the adjoining neighborhood had
asked him a question about traffic flow studies for this particular development. Has a
study been done? Mr. Oakes answered no.
5
Morgan Barrett restated the developer's position that the connections to Brookside and
12th Street are more than adequate. The connection to Camelot does not make sense.
It will not connect to the east. There was an opportunity to connect to the east but the
City's detention facility blocked off two potential connections for grid street development.
This development lends itself to a non-grid street development because South Waco
was blocked by the City’s detention project, as was an east-west street. Because the
City did not extend those streets, we cannot continue the grid development. The only
benefit of the connection with Camelot would be to connect to Inglewood, which is 400
or 500 feet away, but a connection will be made to 12th Street, so traffic can go that
way.
Mr. Barrett stated that regarding the ditch, the Code requirement that it must be an
underground system only pertains to drainage within the right-of-way. The proposed
ditch is not in the right-of-way. We followed the regulations and tried to come up with
cost estimates for the developer to look at based on the regulations. For us to introduce
requirements at this time that are not consistent with the regulations is difficult at best
and does not send a good message to developers in my opinion. There have been
developments approved with open ditches. There is a recent development with an open
ditch in the right-of-way on Fairway. I don’t understand the issue with the ditch. It is an
existing ditch and when people buy the lots we will have an option to enclose segments
of it. We plan on doing a design for an underground drainage system so that if builders,
developers or owners want to enclose it, they will be told the appropriate pipe size and
where to locate inlets. But at this time, we request that we be allowed to follow the
regulations and install the storm drainage as submitted.
Chairman Boyd asked the City Planner for his recommendation on connecting to
Camelot. City Planner Harris voiced his opinion that Mr. Oakes' comments on the
importance of connectivity reflect widely accepted views. Greater connectivity means
there are routing options, so that you avoid an overwhelming amount of traffic winding
up on just two or three streets. You avoid the creation of long uninterrupted blocks
where you must drive the equivalent of several blocks to visit somebody who lives 200
feet away. I don't think a study has been done, but if you look at how the connection fits
into the existing street pattern, it seems apparent there would be additional traffic using
Camelot, but it would not be a large increase. The connection would not offer a shortcut
for through traffic, but would disperse the traffic that otherwise would mostly use Durant.
I agree with the City Engineer that this connection is worthwhile.
Chairman Boyd asked Mr. Harris for his opinion about the drainage issue. Mr. Harris
said he deferred to Mr. Oakes on drainage questions. Mr. Harris offered his opinion that
sidewalks are required within the subdivision, but not along 12th Street.
Commissioner Perkins asked Mr. Oakes if the developer installed curb and gutter along
12th Street, would the City pave that segment. Morgan Barrett said curb/gutter along
12th would be part of this project. Mr. Perkins asked if that included doing curb/gutter
and asphalt to connect all the way across the street. Mr. Barrett said no.
6
Commissioner Perkins then asked Mr. Oakes what the City would do. Mr. Oakes said
street improvements are in Phase II of a project under consideration, but he could not
comment on completion of South Inglewood and 12th Street at this time. Mr. Perkins
asked if the developers would pave to the top of the curb, or would they leave it a
couple of inches below and the City could pave the rest. Mr. Oakes said when the City
did the other side of the street; paving was brought all the way up, thinking in terms of
Phase II. Mr. Oakes said Phase II would include milling existing pavement to create the
proper surface. Commissioner Perkins asked if that meant milling the street when you
are ready to pave it. Mr. Oakes said it probably would include milling, but he did not
know when it would happen.
Mr. Oakes said there was a comment earlier that the City built a detention basin to keep
a neighborhood from flooding, and to cut a 25-year storm in half. The impact the basin
will have on drainage will render adequate three bridges that are currently undersized
by half. The only place available to create the basin was the large open tract of land
just east of Overland Park. That land happened to have two stub streets from adjoining
developments. We considered the requirements and the needs and decided that the
benefits of building a drainage facility that would create those benefits would be worth
losing the ability to connect with those stub streets.
There are no benefits to the City for not connecting the Camelot stub. If the stub is built
the City gets an additional connection. A connectivity analysis shows the area is about
a 1.2/1.3 rating now. A perfect rating is 2.5, with the minimum requirement typically 1.4.
They are close to minimum. If they provide the connection they will be at 1.5 and thus
over minimum. Connectivity is well recognized as a plus for any City. This is not rural
development. They know from working with me on rural developments that I made
some suggestions to help on those. This is a different kind of development.
Ms. Noma Kellner, who lives at the corner lot at 2710 Camelot right by the open field,
said her house would be directly affected by opening Camelot. Ms. Kellner stated her
neighbors do not want to connect. We understand they are talking about connectivity
and increasing access to the area, but we are talking about a neighborhood that has
been established for 40 years. Camelot goes downhill and is almost a straightaway.
We are already the main entrance and exit for Ridgewood, Tanglewood, Lancelot, and
Camelot. The dead-end stub is the only thing that slows traffic. Drivers slow because
the stub does not connect. If it is opened you will have a straightaway similar to
Inglewood, where cars speed all the time. This is a quiet neighborhood with older
people and a few young families with kids. Cars will zoom down the connection to the
new neighborhood. We are concerned with traffic, safety and noise. We are now
getting the detention drainage and we are in the middle of that ditch. We have bad
drainage problems, and it would really decrease the quality of our lives to connect that
stub.
Morgan Barrett said what the developers are asking to do makes sense. Planning
principles change. I think Mr. Harris can tell you that planning principles regarding what
is best have gone back and forth in 20-year cycles. The situation we are being put in
7
makes no sense and I think when you look at the big picture regarding connectivity, the
connection does not make sense. We ask you to approve the plat as submitted.
Mr. Jim Lee said he called Mr. Oakes to talk about drainage concerns. Mr. Lee asked if
open drainage would be allowed along the north side of this new subdivision. Mr.
Oakes said his recommendation was to use a culvert. Mr. Lee asked for clarification of
the comments about homeowners developing the drainage system themselves. Mr.
Lee said he had a problem with that. Mr. Lee said he preferred the underground culvert.
If you have open drainage the homeowners can cover it up or develop some type of
drainage system. Then where is the water going to go?
Commissioner Patel said it will go to the detention pond. Morgan Barrett said it will be a
design for underground drainage system that homeowners could follow. Mr. Lee asked
if it would be open. Mr. Barrett said it is open now. Mr. Lee said the drainage is on their
property. He asked if developers were going to move that drainage to the property line.
Mr. Barrett said the trees that are on the property will have to be removed and fenced to
put the drainage underground on the north side. We will do just like it is now.
Morgan Barrett said if the drainage stays on the back property line and they put it
underground they would have to dig holes and have side slopes and go back and
probably take all the trees out. Mr. Oakes said I’m recommending that the drainage be
an urban system in culverts going out through Camelot and down that street. So it
would not take out any of those trees. We could put this drainage in a culvert and not
touch those trees on the property line. Mr. Oakes also challenged Mr. Barrett's
statement that planning principles change every 20 years. Some things change and
some things don’t. These regulations, or these policies, that I referred to earlier are
over 10 years old and they are part of the 2020 Comprehensive Plan. They have been
around for a long time. This City was built on policies favoring connectivity except
during the period when sprawl, suburban development and cul-de-sacs were popular.
We lost sight of that, but we are coming back to it, because we obviously are looking to
enhance sustainability. We are looking at neighborhood safety, sustainability, and
property values. It is well recognized that connectivity, walk-ability, and bike-ability are
seen as assets. Mr. Oakes said he was reading a book right now that talks about $83 a
square foot increase for every point of walk-ability you gain. It is really good for property
values to have good connectivity and that does not change every 20 years.
Tony Jetton said he had offered to install a hard-surfaced pedestrian/biking path from
the Camelot stub into Overland Park. Mr. Jetton said he would be happy to do that so
people in Camelot would have access to the walking path. Mr. Jetton also stated that
the open ditch running east-west through the center of the property would be redirected
into a culvert and a hard-surface walking path would be provided down the center of
Overland Park so that people could either go around the circle or walk straight down the
center. That would provide access to the park from many of those areas.
Morgan Barrett stated again that requirements being discussed for underground storm
drainage are only required within the right-of-way. This is not in the right-of-way.
8
Surface drainage has been done at other recent developments. I don’t know why this
development is being singled-out. We have submitted plans that are consistent with the
regulations on storm drainage. Everything you see within the right-of-way is going to be
underground and consistent with the code.
Chairman Boyd stated that he was inferring from the discussion that leeway was more
likely to be offered in more rural developments such as Riverstone than in subdivisions
like Overland Park located in the middle of town. Mr. Boyd ventured that perhaps the
City Engineer believes this subdivision needs to be as high-end as it can.
Mr. Barrett said there is an open ditch in the right-of-way at a development on Fairway.
In our development we utilize an existing ditch. We will decrease the runoff going to this
ditch. We are intercepting it and decreasing how much water will be going to the ditch.
Mr. Ken Campbell (1015 Lancelot) said his was the second lot off 12th Street. Mr.
Campbell said putting two entrances/exits right together (Durant and Camelot) did not
seem feasible. Mr. Campbell also stated that much of the rainwater that comes off
Skyline in heavy rain does not go down 12th Street as much it comes down Lancelot.
He said he had had as much as two inches of water running through his backyard going
to the property where Overland Park is being developed. There was a ditch back there
off 12th Street that we covered up, but I’m concerned that the level of the new lots is
higher than existing yards in Camelot. There probably are going to be water problems.
Morgan Barrett said none of the drainage will be directed toward Camelot. The water
will continue moving east even though dirt has been moved around. The lots will still
slope to the east, especially the ones right up against the east property line of Camelot.
Mr. Leon Anderson (1012 Lancelot Drive) stated that most of the people were at the
meeting with concerns about the water issue. This past year we have had downpours
lasting 2 to 3 hours. Mr. Anderson said he had water in the crawlspace underneath his
house, and he lived on the high side of Camelot. The issue is the railroad, but we
cannot move the railroad. The issue is water getting to a location too quickly and then
backing up. That is when the flash-flooding takes place. I don’t know which way it
works best to get the flow out of the developed area without preventing a beautiful area
from being developed, but we should take care of those houses that are already there.
Chairman Boyd asked City Engineer Oakes to speak about the issue of drainage, and
to illuminate the review process on drainage issues. Mr. Oakes said staff had not seen
the drainage plan. Construction plans will be submitted and we will review them. Mr.
Oakes said he had worked with Mr. Barrett and knew he understood drainage. We
understand your concerns and I think we can take of them. We are not going to make
anything worse where you live as far as drainage is concerned with this development.
Mr. Oakes also noted that he did not think there was any open drainage on Fairway that
ran through any lots.
9
Morgan Barrett answered a question from someone in the audience about the lot sizes.
Mr. Barrett said he encouraged neighbors to visit cities where small lot development has
occurred. There is a market for nice houses on smaller lots. Chairman Boyd said this is
beyond our discussion here. Chairman Boyd asked if the commissioners had any
questions or comments.
Commissioner Perkins moved to grant preliminary approval to the plat subject to
provision of a connection to Camelot Drive and replacement of the ditch along the north
line with an underground system with manholes at a maximum spacing of 400 feet.
Commissioner Patel seconded. Mr. Barrett said before a vote is taken he wanted to
make clear that the approval with conditions is not what was being asked for. The
developer may not want the motion with conditions approved. Tony Jetton needs to
think that over and determine if he will move forward with this if the conditions are part
of the approval. Mr. Perkins said that is his prerogative. Mr. Barrett said you are
amending the request. Mr. Perkins said I am going along with the City Engineer’s
recommendation. Mr. Barrett said that is not what the developer asked for. Mr. Perkins
held to his motion. Mr. Barrett said approval of the petition as submitted was what they
were requesting. Mr. Perkins said if that was it, then he would recommend disapproval
of the subdivision. Mr. Barrett said if that is the motion. Mr. Perkins said I had made a
motion and I am sticking with my first motion. Mr. Barrett said I think you are sending a
pretty poor message to developers. The request is for approval as submitted.
Chairman Boyd asked City Attorney Smith to confirm his understanding that if there was
a motion on the floor then the commission needed to deal with that motion. Mr. Smith
asked if there was a second. Chairman Boyd said yes. Mr. Smith said the motion
should be dealt with. Chairman Boyd asked if there was any further discussion before
the motion was put to a vote. Chairman Boyd repeated the motion to make sure it was
clear: We have a motion and second to approve the Preliminary Plat with the caveats
that the connection to Camelot Drive is provided and that the drainage be handled
utilizing an urban, underground system. On a voice roll call vote, Patel and Perkins
voted yes, with Davenport and Standridge voting no. Without the necessary five votes,
the motion failed.
Morgan Barrett said it dies here at the Planning Commission. A development of 26
acres in the City limits with 82 lots, and it is going to die at Planning Commission.
Chairman Boyd told Mr. Barrett said he could appeal the decision directly to the City
Council. Mr. Barrett asked City Attorney Smith if that was accurate. Mr. Smith said yes.
Mr. Barrett asked where that verbiage was because he had not been able to find it. Mr.
Smith said it was State law. Mr. Barrett said okay because it is not in the Land
Subdivision & Development Code.
The Fourth Order of Business was a Public Hearing requesting to review and
recommend approval to the City Council to rezone property at 503 East 3rd Street from
C-2 (Highway Commercial) to M-2 (Heavy Industrial Manufacturing), submitted by
Michael Miller owner of Cooling & Applied Technology, Inc. (C.A.T.). (ZO.13.09.173)
10
City Planner Harris stated this was an existing industrial concern (CAT). They have a
fairly large property there. All except one little corner right where East 3rd crosses Erie
is zoned M-2. It is an unusual intersection with four very different uses occupying the
corners. That is an existing circumstance. The existing use on the property they are
asking to rezone actually should not be taking place in C-2. The rezoning will bring the
existing use into compliance. Mr. Harris said his recommendation was for approval.
Commissioner Perkins made the motion to approve as requested. The motion was
seconded by Commissioner Patel and passed unanimously with five votes.
The Fifth Order of Business (5a). A request for a variance from LS&DC 9.1.G (8) to
allow an additional 40 feet over the maximum 200-foot stem length for pipe-stem lots,
for property located off Barborek Lane, submitted by Dave Garza of Barrett &
Associates on behalf of R.T. Brown. (SD.13.099.267)
(5b). A request to review and approve a Minor Subdivision/R.T. Brown Addition,
located on Barborek Lane, submitted by Dave Garza of Barrett & Associates on
behalf of R.T. Brown. (SD.13.09.267)
(5c). A request that the Planning Commission grant authority to the Public
Works Director to sign the Minor Plat for recording upon approval, for property
located off Barborek Lane, submitted by Dave Garza of Barrett & Associates on
behalf of R.T. Brown. (SD.13.099.267)
City Planner Harris said when considering a request on an existing street that does not
conform to the LS&DC in numerous ways, flexibility is the order of the day. In such
circumstances, if the City requires absolute compliance to the LS&DC and Zoning
Code, it may stifle any hope of the land being developed, so flexibility is in order. How
much is up to the commissioners. Mr. Harris then suggested the lot labeled 'Ron Knost'
on the submitted plat be given a lot number. Mr. Harris suggested that the subdivider
add 10 feet to the street easement across the Knost parcel as was done with the pipe-
stem for the other lot. This would allow room if street improvements were done in the
future, but would not require the current subdivider to bring all of Barborek Lane up to
standards, which would be unreasonable and a prohibitively expensive requirement for
a 2-lot subdivision. Mr. Harris further stated he did not believe this met the
requirements for consideration as a minor subdivision because of the need for
variances and dedication of additional right-of-way. I do think it requires Planning
Commission approval and the PC Chair's signature rather than just the Public Works
Director's signature. That is just a procedural point and does not change any facts of
the matter. There is no way they can justify the expense of bringing Barborek up to
snuff with a two lot subdivision. Commissioner Perkins said none of Barborek Lane was
more than 15 feet wide. It would be massively expensive to bring it up to City
standards. Mr. Harris agreed.
Mr. Garza said Mr. Knost has already agreed to giving his parcel a lot number. Mr.
Garza said he could change the plat and make sure the Chairman’s signature block is
added. We will just go though the regular process. Commissioner Perkins made the
11
motion to approve 5a and 5b and not 5c. The motion was seconded by Commissioner
Patel and passed unanimously with 5 votes.
Meeting Adjourned