City Council
Regular MeetingSalem, MA · March 7, 2022
Minutes
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
A Joint Public Hearing of the City Council and Planning Board was held remotely on
Monday, March 7, 2022 at 6:30 P.M. for the purpose of discussing two (2) Zoning
Ordinance Amendment relative to Buffer Zones for Marijuana Establishments and
Green Infrastructure via remote participation in accordance with Chapter 40A, SS 5, of
the Massachusetts General Laws and in accordance with Chapter 20 of the Acts of
2021. The complete text of the proposed amendments to the Zoning Ordinance is noted
below and on file and available for inspection by calling or emailing the City Clerk’s
Office, 93 Washington Street, Salem, MA at 978-619-5610 or isimons@salem.com or
the Department of Planning & Community Development, 2nd floor, City Hall Annex, 98
Washington Street, Salem, MA. 978-619-5685.
Notice of this meeting was posted on February 24, 2022, at 1:19 P.M. and advertised in
the Salem News on February 21, 2022 & February 28, 2022.
All Councillors were present.
Councillor Patricia Morsillo Presiding.
Planning Board Present: Chair Bill Griset, Zach Caunter, Sarah Tarbet, Helen Sides,
Kirt Rieder, Carole Hamilton, and Tom Furey.
Also in attendance were the following: Elena Eimert, Amanda Chiancola, Cassie Moskos,
Hannah Martin.
(#17) - ZONING ORDINANCE AMENDMENT RELATIVE TO BUFFER ZONES FOR
MARIJUANA ESTABLISHMENTS (SEE BELOW FOR COMPLETE TEXT)
Dominick Pangallo: Discussed the Ordinance that the city currently follows, and
recommended adjustments the buffer zone around Marijuana establishments. 500ft
from schools, places of worship, 1000ft from Salem State. Having these strict buffer
zones causes establishments to be concentrated in certain areas, as well as having the
city match the State Guidelines.
Councillor McCarthy: Agrees, the City should change to match the State guidelines as
we were one of the first cities that entertained the idea to have these establishments
and we have not seen any issues yet, and hopefully this will provide more opportunity.
Councillor Dominguez: Agrees, looking back at when this Ordinance was passed there
was a lot of involvement and with our large and active religious community as well as
many schools in the city maybe it would make sense to have them involved in the
discussion.
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
Councillor Prosniewski: Could Dominick describe the differences between what we as
the City are doing now vs what the state is doing?
Dominick Pangallo: Buffer zone around schools would remain up to 500ft and buffer
zone around funeral homes, places of worship and 1000ft buffer zone around Salem
State would be removed.
Councillor McClain: Can Dominick talk a little about the scope that is being discussed,
also what are we not considering? In agreement with that we need to follow state
guidelines, but I think what we have now is pretty spread out.
Dominick Pangallo: Doesn’t address special permits, and only changes the number of
properties that are in the district. It also reduces the areas by 1/3.
Public Comment:
Jared Melanson, Salem State journalism student. Asking the board, regarding the
buffer zone, why this was brought up in the first place?
Councillor Morsillo: As mentioned previously, this was originally brought up to bring in
line with the state's standards.
Scott Hunt, Salem State Student. No questions or comments at this time.
Councillor Riccardi Moved to close the Public Hearing, Motion passes by RCV 11-0-0
Councillor Riccardi moved to refer the matter to the Planning Board for
recommendation; passes by RCV 11-0-0
(#18) - ZONING ORDINANCE AMENDMENT RELATIVE TO GREEN
INFRASTRUCTURE (SEE BELOW FOR COMPLETE TEXT)
Cassie Moskos Planning Dept: Presentation to add language to prepare the city for
greener developments. The purpose is to add language to prepare the city for greened
developments, Solar is a state exempt use and the Ordinance provides application and
review process and EV chargers and bike parking being reviewed by the Planning
Board. Section 3.1 Use Table for Commercial and Accessory Uses.
Sec. 4.1.2 Roof Mounted Solar Energy systems are exempt from height. Accessory
small and medium scale ground mounted systems should be at least 10 feet from
property line, and will not count towards building coverage. Sec 5.4 Bicycle parking.
Intended result required for new developments to include bicycle parking. Sec. 5.5
Electric Vehicle Charging Stations. New developments of 5,000 sq. feet or larger 25% of
parking spaces and the remailing 74% shall be EV ready for future installation. Sec.
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
6.12 Solar Energy Facilities. To accommodate solar energy facilities in appropriate
locations, while minimizing adverse visual, safety and environmental impacts of the
facilities, siting preferences and special permits. Monitoring and maintenance,
abandonment and decommissioning, roof mounted, small scale ground mounted solar
energy systems and pre-existing non-conforming uses and structures. Sec. 8.4.15 North
River Canal Corridor site plan review. Sec. 9.4.2 Special permits and criteria. Sec. 9.5
Amendments to site plan review. Sec. 9.5.2 Applicability for Lg. scale ground mounted
in R#, B2, B4, B5, BPD, NRCC, or I district. Med. Scale ground mounted RC, R1, R2, or
R3 districts. Sec. 9.5.3 Application Process. Sec 9.5.4 Narrative & 9.5.5 Distribution.
Sec. 9.5.6 Review Criteria Planning Board finding adequacy of plans submitted. Sec.
10.0 Definitions.
Councillor Cohen: Historical perspective co-chair of the Sustainability, Energy and
Resiliency Committee, they had reservations on the solar portion, but went through it line
by line and are happy with what is remaining. Also thinks the bike parking and EV
charging portion needs more than than1 sentence. Hopes the Planning Board will omit
the bike parking and EV charging portion of this Ordinance change when sending back
to the Council for approval.
Councillor McClain: Agree with Councilor Cohen. Doesn’t seen well thought through or
make a lot of sense. Not just bike racks, but covered sheds and internal facilities. The
ground mounted solar system is concerning by the appearance of property it would be
on. Maybe need to work on what it means to have ground mounted solar in a residential
area would look like. Agrees with the medium and large-scale solar areas.
Councillor Merkl: Pleased with all the “Green Initiatives that have been presented to the
Council but does have concerns and questions on the financial impact of the EV
charging stations. Appreciate all of the green initiatives that have been coming through
the council. Concerns are not only for the proposed 25% that are going on but what
about the 75% in the future?
Councillor Varela: Recommendation there is a more thoughtful discussion and to omit
the bike parking and EV charging part of the Ordinance. There should be more
discussion around the bike parking and EV charging, and to involve the Bicycling
Advisory Committee.
Councillor Cohen: Addressing Councillor Merkl, many people in Salem have 100 amp
power and can accommodate a car charger. 100 amp is 33 hours to full charge. If it was
upgraded to A Level 2 would power a car in about 8 hours and cost thousands of dollars
to upgrade. For example, for 4 condos, each one with a car charge, would have to
upgrade to 4000 amp, would be 10-15k. Very much for the transition to electric cars. But
this is not the approach we should be taking. Should be talking to experts.
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
Kirt Rieder: 3 points of discussion 1. EV infrastructure: great to have good intentions,
but is another thing to actually implement, if we are going to be EV ready, we need to
have extensive language around that. 2. Regarding bikes, need a lot more conversation
around that, agrees that The City of Cambridge has a fantastic bike ordinance, but
Salem needs to discuss more. Agrees that it needs to be pulled out of this Ordinance
and possibly a stand alone Ordinance. 3. Solar Language impact on the city purchased
and protected street trees? Will our green natural infrastructure be affected by green
infrastructure placed?
Public comment:
Eric Papetti, 11 Simon St, unit 1: Would like to see the public Hearing be kept
open to continue the conversation of bike parking and EV charging stations. How
to act collectively to make easy choices and would love to see bicycles as a
“normal” mode of transportation rather than something that isn’t so normal. Need
to make it more affordable all around.
John Wathne, 33 Boardman St: Chair of Bicycle Advisory Committee. Excited
about building useful infrastructure. Taking babysteps to build it correctly. Driving
to him is a novelty. He bikes and uses public transportation. Feels keeping public
hearing open to have more discussion, as 3 paragraphs are not enough
information.
Councillor Cohen: Says had a great conversation with Eric Papetti recently. Now knows
way more about bicycles, would like to remove EV and Bicycles and close hearing, so
we can vote on Solar.
Councillor Morsillo: Questioned City Council on keeping the Public Hearing Open or
Close it?
Councillor McCarthy: We should close and refer to the Planning Board.
Councilior Watson-Felt: Agrees
Councillor Riccardi: Agrees with all that has been said. The way this has been
presented, concerned about clock ticking once hearing closed.
Councillor Varela: Makes a motion to close the Public Hearing
Councillor Morsillo: Councillor Riccardi, can you make a motion?
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
Councillor Riccardi: Moved to close the Public Hearing, Motion passes by RCV 11-0-0
Councillor Riccardi: Moves to refer the matter to the Planning Board for
recommendation passes by RCV 11-0-0
Councillor McCarthy: Motion to adjourn
The meeting adjourned at 7:36 p.m.
ATTEST: ILENE SIMONS
CITY CLERK
SEE BELOW FOR COMPLETE TEXT OF THE TWO ZONING ORDINANCES
(#17) - ZONING ORDINANCE AMENDMENT RELATIVE TO BUFFER ZONES FOR
MARIJUANA ESTABLISHEMENTS
An Ordinance to amend the zoning ordinance regarding buffer zones relative to
marijuana establishments.
Section 1. Section 6.10.6 of the Code of Zoning Ordinances is amended by
replacing (5) in its entirety with the following:
“5. Pursuant to M.G.L.A. c. 94G, § 5(b)(3), a marijuana establishment shall not
be located within five hundred (500) feet of a pre-existing public or private school
providing education in kindergarten or any of grades 1 through 12.”
Section 2. This Ordinance shall take effect as provided by City Charter.
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
(#18) - ZONING ORDINANCE AMENDMENT RELATIVE TO GREEN
INFRASTRUCTURE
An Ordinance to amend an ordinance relative to zoning.
Section 1. Amend Section 3.1 Table of Principal and Accessory Use Regulations
by inserting the following uses within C. Commercial Uses and E. Accessory
Uses:
C. Commercial Uses RC R1 R2 R3 B1 B2 B4 B5 BPD NRCC I
Medium-Scale Ground Y Y Y Y Y Y Y Y Y Y Y
Mounted Solar Energy
System
Large-Scale Ground PB PB N Y Y Y Y Y Y Y Y
Mounted Solar Energy
System
E. Accessory Uses
Roof-Mounted Solar Energy Y Y Y Y Y Y Y Y Y Y Y
System
Small-Scale Ground Y Y Y Y Y Y Y Y Y Y Y
Mounted Energy System
Medium-Scale Ground Y Y Y Y Y Y Y Y Y Y Y
Mounted Solar Energy
System
Section 2. Amend Section 4.1.2 Notes to Table of Dimensional Requirements by
inserting the phrase “roof-mounted solar energy systems” immediately
following the word “ventilators” as it appears in paragraph 7 and further amend
this Section by inserting the following new paragraphs:
“8. Small- and medium-scale ground mounted solar energy systems accessory to
principal use may be located no closer than ten (10) feet from the front, side, or
rear lot line.
9. Lot Coverage-Ground mounted solar energy systems shall not count towards
building coverage as defined in Section 10.0 definitions.”
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
Section 3. Amend Section 5 General Regulations by adding the following new
sections:
“5.4. BICYCLE PARKING
5.4.1 Purposes. Bicycling infrastructure in Salem is a basic necessity to residents,
visitors, and employers and can provide a key “last mile” connection to destinations
throughout the city. The purpose of this section is to provide specific guidelines to
project proponents to determine the type, location, and amount of bicycle parking
required for each development project. The intended result is to require development
projects to include bicycle parking that enhances the project’s value and helps to make
Salem a more desirable place to live, work, and visit.
5.4.2. Requirements.
The required minimum quantity of bicycle parking spaces is as outlined below.
Additional bicycle spaces are encouraged but are not required beyond the minimum
stated.
Single-family and two-family residential: none
Residential with three or more units: 1 long-term bicycle space per unit, 1 short-
term space per 4 units
Commercial/Industrial/Exempt or Institutional: 1 long-term space per 4
employees. Number of short-term spaces to be determined by the Planning
Board, but shall not be less than 2.
5.4.3 Additional Notes. Fractions of spaces shall be rounded up to a whole number.
Minimum bicycle storage consists of one double-sided rack. Total employees for this
purpose is the maximum number of employees present on premises at one time.
Section 5.5 ELECTRIC VEHICLE CHARGING STATIONS
5.5.1 Purposes. In line with the Massachusetts Decarbonization Roadmap to reduce
carbon emissions by at least 85% by 2050 and the City of Salem’s Resilient Together
Mobility Goals, the City will encourage use of electric vehicles by further enabling
electric vehicle charging. As of 2017, the transportation sector accounted for 42% of
greenhouse gas emissions in the Commonwealth and 43% of greenhouse gas
emissions in the City of Salem. Electric Vehicles offer the most promising option for
replacing internal combustion engine vehicles.
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
5.5.2 Requirements. New developments of 5,000-square-feet or larger shall have 25%
of parking spaces be installed with Electric Vehicle Supply Equipment; and
the remaining 75% of parking spaces shall be Electric Vehicle-Ready for future
installation.”
Section 4. Amend Section 6 Special Regulations by adding the following new
section:
“Section 6.12-Solar Energy Facilities
6.12.1 Purpose. The purpose of this section is to accommodate solar energy facilities in
appropriate locations, while minimizing any adverse visual, safety, and environmental
impacts of the facilities.
6.12.2 Applicability. This section applies to all uses identified as requiring a site plan
review per Section 9.5.2 or a special permit for ground mounted solar energy facilities
per Section 3.1, Table of Uses.
6.12.3 Siting Preferences. Where a solar facility is sited, as well as placement on the
site once selected, is an important consideration. The City strongly discourages
locations that result in significant loss of land and natural resources, including farm and
forest land, and encourages rooftop siting, as well as locations in industrial and
commercial districts, or on vacant, disturbed land. Significant tree cutting is problematic
because of the important water management, cooling, and climate benefits trees
provide.
6.12.4 Dimensional Regulations
1. Height- For primary uses see Section 4, Table 4.1.1. For accessory uses see
Section 4.1.2.7
2. Setbacks- For primary uses see Section 4, Table 4.1.1. For small- and
medium-scale ground mounted solar energy systems accessory to principal use
may be located no closer than ten (10) feet from the front, side, or rear lot line.
All ground-mounted solar energy systems in residential districts shall be installed
either in the side yard or rear yard to the extent practicable.
3. Lot Coverage-Ground mounted solar energy systems shall not count towards
building coverage as defined in Section 10.0 definitions.
6.12.5 Special Permit.
1. The Planning Board is hereby designated the Special Permit Granting
Authority (SPGA) for solar energy systems. The SPGA shall adopt rules
relative to the application for special permits for ground mounted solar plan
approval and file a copy with the City Clerk. After notice and public hearing
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
and after due consideration of the reports and recommendations of other city
boards, commissions and or departments, the SPGA may grant such a permit.
The SPGA shall also impose, in addition to any applicable conditions specified
in this section, such applicable conditions as the SPGA finds reasonably
appropriate to improve the site design to serve the purposes of this section.
2. The Planning Board shall include as part of its special permit review and
proceedings all the provisions and requirements of the Site Plan Review
standards applicable to large-scale ground-mounted solar energy systems.
See Section 9.4 for additional Special Permit Requirements.
6.12.6 Large and Medium Scale Ground Mounted Solar Energy System Site Plan
Review
1. Site Plan Documentation Required. In addition to the requirements of Section
9.5, the following items shall be included:
(a) Blueprints or drawings of the solar energy system showing the proposed
layout of the system, any potential shading from nearby structures, the
distance between the proposed solar collector and all property lines and
existing on-site buildings and structures, and the tallest finished height of the
solar collector;
(b) Documentation of the major system components to be used, including the
panels, mounting system, and inverter(s);
(c) Additional requirements for large scale ground mounted solar energy
systems
(i) One or three line electrical diagram detailing the solar photovoltaic
installation, associated components, and electrical interconnection methods,
with all Massachusetts Electric Code (527 CMR 12.00) compliant
disconnects and overcurrent devices;
(ii) Documentation of actual or prospective access and control of the project
site (see also Solar Design Guideline Document);
(iii) An operation and maintenance plan (see Solar Design Guideline
Document);
(iv) Proof of liability insurance; and
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
6.12.7 Large and Medium Scale Ground Mounted Solar Energy System
Maintenance, Removal, and Abandonment
1. Monitoring and Maintenance.
(a) Solar Energy System Installation Conditions - The ground-mounted solar
energy system owner or operator shall maintain the facility in good condition.
Maintenance shall include, but not be limited to, painting, structural repairs,
and integrity of security measures. Site access shall be maintained to a level
acceptable to the Building Commissioner. The owner or operator shall be
responsible for the cost of maintaining the solar energy system and any
access road(s), unless accepted as a public way.
(b) Modifications - All material modifications to a ground-mounted solar energy
system made after issuance of the required building permit shall require
approval by the Site Plan Review Authority.
2. Abandonment or Decommissioning
(a) Removal Requirements-Any ground-mounted solar energy system which
has reached the end of its useful life or has been abandoned consistent with
Subsection (b), below of this ordinance shall be removed. The owner or
operator shall physically remove the installation no more than 150 days after
the date of discontinued operations. The owner or operator shall notify the
Site Plan Review Authority by certified mail of the proposed date of
discontinued operations and plans for removal.
Decommissioning shall consist of:
(i) Physical removal of all solar energy systems, structures, equipment,
security barriers and transmission lines from the site.
(ii) Disposal of all solid and hazardous waste in accordance with local,
state, and federal waste disposal regulations.
(iii) Stabilization or re-vegetation of the site as necessary to minimize
erosion. The Site Plan Review Authority may allow the owner or operator to
leave landscaping or designated below-grade foundations in order to
minimize erosion and disruption to vegetation.
(b) Abandonment-Absent notice of a proposed date of decommissioning or
written notice of extenuating circumstances, the large-scale ground-mounted
solar energy system shall be considered abandoned when it fails to operate
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
for more than one year without the written consent of the Site Plan Review
Authority. If the owner or operator of the solar energy system fails to remove
the installation in accordance with the requirements of this section within 150
days of abandonment or the proposed date of decommissioning, the town
retains the right, after the receipt of an appropriate court order, to enter and
remove an abandoned, hazardous, or decommissioned large-scale ground-
mounted solar energy system. As a condition of Site Plan approval, the
applicant and landowner shall agree to allow entry to remove an abandoned
or decommissioned installation.
6.12.8 Site Plan Review-Roof-mounted and Small-scale Ground-Mounted Solar
Energy Systems
1. Applicability-Where these solar energy systems may be accessory to a use
allowed through Site Plan Review, the Site Plan Review shall include review of their
adequacy, location, arrangement, size, design, and general site compatibility.
6.12.9 Pre-Existing Non-Conforming Uses and Structures
Improvements that do not change the use or the basic exterior
characteristics of the building or structure are allowed. Such improvements
include but are not limited to the installation or replacement of solar energy
systems.”
Section 5. Amend Section 8.4.15 Site Plan Review of Section 8.4 North River Canal
Corridor Neighborhood Mixed Use District by inserting the following additional site plan
requirement as the fourth requirement and renumbering the requirements to a total of
five:
“4. Adequate net-zero-energy plan;”
Section 6. Amend Section 9.4.2 Criteria of Section 9.4 Special Permits within Section 9
Administration and Procedures by deleting the following:
“5.Impacts on the natural environment including view; and”
and replacing it with the following:
“5.Impacts on the natural environment including greenhouse gas emissions and
view; and”
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
Section 7. Amend Section 9.5.2 Applicability of Section 9.5 Site Plan Review within
Section 9 Administration and Procedures by adding the following at the end of paragraph
number 2:
“; or
3. Large scale ground mounted solar energy system in the R3, B2, B4, B5,
BPD, NRCC, or I district; or
4. Medium scale ground mounted solar energy system in the RC, R1, R2, or R3
district.”
Section 8. Amend Section 9.5.3 Application of Section 9.5 Site Plan Review within
Section 9 Administration and Procedures by deleting the phrases “fifteen (15) copies of”
and “include fifteen (15) copies of” as they appear in the first paragraph and further amend
this Section by adding the following to the end of this Section:
“11. Plans depicting the property lines and physical features, including roads, for the
project site;
12. Proposed changes to the landscape of the site, grading, vegetation clearing and
planting, exterior lighting, screening vegetation or structures;
13. Locations of active farmland, wetlands, permanently protected open space,
Priority Habitat Areas and BioMap 2 Critical Natural Landscape Core Habitat
mapped by the Natural Heritage & Endangered Species Program (NHESP) and
“Important Wildlife Habitat” mapped by the DEP.
14. Locations of floodplains or inundation areas for moderate or high hazard dams;
and
15. Locations of local or National Historic Districts.
16. Location, arrangement, size, and design of roof mounted and small-scale ground
mounted solar energy systems.”
Section 9. Amend Section 9.5.4 Narrative of Section 9.5 Site Plan Review within
Section 9 Administration and Procedures by inserting the Phrase “, including parking
with electric vehicle charging stations and parking for bicycles;” at the end of paragraph
number 2 and further amending this Section by inserting the following after paragraph
number 8 and renumbering the requirements to a total of 10:
“9. Sustainability and resiliency, including energy planning and alignment with local
climate mitigation goals;”
Section 10. Amend Section 9.5.5 Distribution of Section 9.5 Site Plan Review within
Section 9 Administration and Procedures by replacing the words “his” with “their” as
they appear in the first paragraph and further amending the first paragraph of this
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
Section by inserting the phrase “Head of the Sustainability Department or their
designee,” immediately preceding the phrases “Board of Health”.
Section 11. Amend Section 9.5.6 Review Criteria of Section 9.5 Site Plan Review
within Section 9 Administration and Procedures by adding the following to the end of
this Section:
“14. Adequacy of bicycle parking facilities and number of bicycle parking spaces
proposed for each development;
15. Adequacy of electric vehicle charging station;
16. Adequacy and general site compatibility of roof mounted and small-scale ground
mounted solar energy systems; and
17. Adequacy of a net-zero-energy plan to outline site energy uptake, creation, and
consumption.”
Section 12. Amend Section 10 Definitions by adding the following new definitions:
“Electric Vehicle (EV): Any vehicle that is licensed and registered for operation on public
and private highways, roads, and streets and that operates exclusively on electrical
energy from an off-board source that is stored in the vehicle’s batteries, producing zero
tailpipe emissions or pollution when stationary or operating.
Electric Vehicle Supply Equipment (EVSE): Equipment for the purpose of transferring
electric energy to a battery or other energy storage device in an electric vehicle.
Electric-Vehicle-Ready: Electric-Vehicle-Ready shall mean providing raceway to every
parking space, adequate space in the electrical panel and space for additional
transformer capacity to accommodate the future installation of the transformer, if
necessary.
Long-term Bicycle Parking: Long-term Bicycle Parking must be located in an enclosed,
limited-access area designed to protect bicycles from precipitation and from theft, such
as bicycle lockers, covered bicycle sheds, or bicycle rooms within a building.
Net-zero energy site: a site that is optimally efficient, and over the course of a year,
generates energy onsite, using clean renewable resources, in a quantity equal to or
greater than the total amount of energy consumed onsite.
Net-zero-energy plan: A document outlining a development’s energy sources, locations
(on or off-site), and consumption. The Plan outlines how the development can become
a net-zero energy site, as defined above; or, why achieving net-zero energy site is not
possible through renewable resources on-site, given site or other constraints.
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
Photovoltaic System (also referred to as Photovoltaic Installation): An active solar
energy system that converts solar energy directly into electricity.
Rated Nameplate Capacity: The maximum rated output of electric power production of
the photovoltaic system in watts of Direct Current (DC).
Short-term Bicycle Parking: Short-term bicycle parking must be located in a publicly
accessible space within 50 feet of pedestrian entrances. Short-term bicycle parking is
intended primarily to serve visitors, such as retail patrons making trips of up to a few
hours; however, it may serve other bicycle users as needed.
Solar Access: The access of a solar energy system to direct sunlight.
Solar Collector: A device, structure or a part of a device or structure for which the
primary purpose is to transform solar radiant energy into thermal, mechanical, chemical,
or electrical energy.
Solar Energy: Radiant energy received from the sun that can be collected in the form of
heat or light by a solar collector.
Solar Energy System: A device or structural design feature, a substantial purpose of
which is to provide daylight for interior lighting or provide for the collection, storage and
distribution of solar energy for space heating or cooling, electricity generation, or water
heating.
Solar Energy System, Active: A solar energy system whose primary purpose is
to harvest energy by transforming solar energy into another form of energy or
transferring heat from a collector to another medium using mechanical,
electrical, or chemical means.
Solar Energy System, Grid-Intertie: A photovoltaic system that is connected to
an electric circuit served by an electric utility.
Solar Energy System, Ground-Mounted: An Active Solar Energy System that
is structurally mounted to the ground and is not roof-mounted; may be of any
size (small-, medium- or large-scale).
Solar Energy System, Large-Scale: An Active Solar Energy System that
occupies more than 40,000 square feet of surface area (equivalent to a rated
nameplate capacity of about 250kW DC or greater).
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022
Solar Energy System, Medium-Scale: An Active Solar Energy System that
occupies more than 1,750 but less than 40,000 square feet of surface area
(equivalent to a rated nameplate capacity of about 10 - 250 kW DC).
Solar Energy System, Off-Grid: A photovoltaic solar energy system in which
the circuits energized by the solar energy system are not electrically
connected in any way to electric circuits that are served by an electric utility.
Solar Energy System, Passive: A solar energy system that captures solar light
or heat without transforming it to another form of energy or transferring the
energy via a heat exchanger.
Solar Energy System, Roof-Mounted: An Active Solar Energy System that is
structurally mounted to the roof of a building or structure; may be of any size
(small-, medium- or large-scale).
Solar Energy System, Small-Scale: An Active Solar Energy System that
occupies 1,750 square feet of surface area or less (equivalent to a rated
nameplate capacity of about 10 kW DC or less).
Solar Thermal System: An Active Solar Energy System that uses collectors to convert
the sun’s rays into useful forms of energy for water heating, space heating, or space
cooling.”
Section 13. This Ordinance shall take effect as provided by City Charter.
Agenda
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
The Salem City Council will hold a Joint Public Meeting with the Planning Board on Monday, March
7, 2022 at 6:30 P.M. for the purpose of discussing two (2) Zoning Ordinance Amendments relative
to Buffer Zones for Marijuana Establishments and Green Infrastructure via remote participation in
accordance with Chapter 40A, SS 5, of the Massachusetts General Laws and in accordance with
Chapter 20 of the Acts of 2021.
Individuals may participate remotely in the meeting via a remote participation platform called Zoom.
Members of the public and/or parties with a right and/or requirement to attend this meeting may
access the remote participation meeting through any one of the following ways:
If wishing to make comment, please use the raise my hand feature.
• Enter this link below into your web browser to join the meeting:
https://us02web.zoom.us/j/81495105275?pwd=Yk1LcGxvYzRHRko0NEZwSUQxaUJIZz09
Password: 063213
• Go to the website link https://zoom.us/join. Enter Webinar ID: 814 9510 5275 followed by the
meeting password noted above if necessary.
• By Telephone: Participants can dial a toll-free phone number at 888-475-4499 or 877-853-5257
(Toll Free) to join the meeting. When prompted, enter Webinar ID#: 814 9510 5275 and follow the
instructions to join the meeting. Those dialing in may press *9 to raise your hand to speak.
SATV will still be airing this meeting live on Channel 22.
Very truly yours,
ATTEST: ILENE SIMONS
“Persons requiring auxiliary aids and services for effective communication such as sign language
interpreter, an assistive listening device, or print material in digital format or a reasonable
modification in programs, services, policies, or activities, may contact the City of Salem ADA
Coordinator at (978-619-5630) as soon as possible and no less than 2 business days before the
meeting, program, or event.”
“Know Your Rights Under the Open Meeting Law, M.G.L. c. 30A ss. 18-25, and City
Ordinance Sections 2-2028 through 2-2033.”
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
A Joint Public Hearing of the City Council and Planning Board was held remotely on Monday,
March 7, 2022 at 6:30 P.M. for the purpose of discussing two (2) Zoning Ordinance Amendment
relative to Buffer Zones for Marijuana Establishments and Green Infrastructure via remote
participation in accordance with Chapter 40A, SS 5, of the Massachusetts General Laws and in
accordance with Chapter 20 of the Acts of 2021. The complete text of the proposed amendments
to the Zoning Ordinance is noted below and on file and available for inspection by calling or
emailing the City Clerk’s Office, 93 Washington Street, Salem, MA at 978-619-5610 or
isimons@salem.com or the Department of Planning & Community Development, 2nd floor, City
Hall Annex, 98 Washington Street, Salem, MA. 978-619-5685.
Notice of this meeting was posted on February 24, 2022, at 1:19 P.M. and advertised in the Salem
News on February 21, 2022 & February 28, 2022.
Absent were:
Councillor Patricia Morsillo Presiding
Councillor Morsillo introduced the Planning Board
Also in attendance were the following:
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
ZONING ORDINANCE AMENDMENT RELATIVE TO BUFFER ZONES FOR MARIJUANA
ESTABLISHEMENTS (SEE COMPLETE TEXT BELOW)
Appearing in Favor:
Appearing Opposed:
Councillor Riccardi Moved that the Public Hearing be Closed by RCV Yeas Nays Abs
Councillor Riccardi Moved that the matter be referred to the Planning
Board for their recommendation by RCV Yeas Nays Abs
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
ZONING ORDINANCE AMENDMENT RELATIVE TO GREEN INFRASTRUCTURE (SEE
COMPLETE TEXT BELOW)
Appearing in Favor:
Appearing Opposed:
Councillor Riccardi Moved that the Public Hearing be Closed by RCV Yeas Nays Abs
Councillor Riccardi Moved that the matter be referred to the Planning
Board for their recommendation by RCV Yeas Nays Abs
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
ZONING ORDINANCE AMENDMENT RELATIVE TO BUFFER ZONES FOR MARIJUANA
ESTABLISHEMENTS
An Ordinance to amend the zoning ordinance regarding buffer zones relative to marijuana
establishments.
Section 1. Section 6.10.6 of the Code of Zoning Ordinances is amended by replacing (5) in
its entirety with the following:
“5. Pursuant to M.G.L.A. c. 94G, § 5(b)(3), a marijuana establishment shall not be located
within five hundred (500) feet of a pre-existing public or private school providing education
in kindergarten or any of grades 1 through 12.”
Section 2. This Ordinance shall take effect as provided by City Charter.
ZONING ORDINANCE AMENDMENT RELATIVE TO GREEN INFRASTRUCTURE
An Ordinance to amend an ordinance relative to zoning.
Section 1. Amend Section 3.1 Table of Principal and Accessory Use Regulations by
inserting the following uses within C. Commercial Uses and E. Accessory Uses:
C. Commercial Uses RC R1 R2 R3 B1 B2 B4 B5 BPD NRCC I
Medium-Scale Ground Y Y Y Y Y Y Y Y Y Y Y
Mounted Solar Energy
System
Large-Scale Ground PB PB N Y Y Y Y Y Y Y Y
Mounted Solar Energy
System
E. Accessory Uses
Roof-Mounted Solar Energy Y Y Y Y Y Y Y Y Y Y Y
System
Small-Scale Ground Y Y Y Y Y Y Y Y Y Y Y
Mounted Energy System
Medium-Scale Ground Y Y Y Y Y Y Y Y Y Y Y
Mounted Solar Energy
System
Section 2. Amend Section 4.1.2 Notes to Table of Dimensional Requirements by inserting
the phrase “roof-mounted solar energy systems” immediately following the word
“ventilators” as it appears in paragraph 7 and further amend this Section by inserting the
following new paragraphs:
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
“8. Small- and medium-scale ground mounted solar energy systems accessory to principal
use may be located no closer than ten (10) feet from the front, side, or rear lot line.
9. Lot Coverage-Ground mounted solar energy systems shall not count towards building
coverage as defined in Section 10.0 definitions.”
Section 3. Amend Section 5 General Regulations by adding the following new sections:
“5.4. BICYCLE PARKING
5.4.1 Purposes. Bicycling infrastructure in Salem is a basic necessity to residents, visitors, and
employers and can provide a key “last mile” connection to destinations throughout the city. The
purpose of this section is to provide specific guidelines to project proponents to determine the type,
location, and amount of bicycle parking required for each development project. The intended result
is to require development projects to include bicycle parking that enhances the project’s value and
helps to make Salem a more desirable place to live, work, and visit.
5.4.2. Requirements.
The required minimum quantity of bicycle parking spaces is as outlined below. Additional bicycle
spaces are encouraged but are not required beyond the minimum stated.
Single-family and two-family residential: none
Residential with three or more units: 1 long-term bicycle space per unit, 1 short-term space
per 4 units
Commercial/Industrial/Exempt or Institutional: 1 long-term space per 4 employees. Number
of short-term spaces to be determined by the Planning Board, but shall not be less than 2.
5.4.3 Additional Notes. Fractions of spaces shall be rounded up to a whole number. Minimum
bicycle storage consists of one double-sided rack. Total employees for this purpose is the
maximum number of employees present on premises at one time.
Section 5.5 ELECTRIC VEHICLE CHARGING STATIONS
5.5.1 Purposes. In line with the Massachusetts Decarbonization Roadmap to reduce carbon
emissions by at least 85% by 2050 and the City of Salem’s Resilient Together Mobility Goals, the
City will encourage use of electric vehicles by further enabling electric vehicle charging. As of
2017, the transportation sector accounted for 42% of greenhouse gas emissions in the
Commonwealth and 43% of greenhouse gas emissions in the City of Salem. Electric Vehicles offer
the most promising option for replacing internal combustion engine vehicles.
5.5.2 Requirements. New developments of 5,000-square-feet or larger shall have 25% of parking
spaces be installed with Electric Vehicle Supply Equipment; and the remaining 75% of
parking spaces shall be Electric Vehicle-Ready for future installation.”
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
Section 4. Amend Section 6 Special Regulations by adding the following new section:
“Section 6.12-Solar Energy Facilities
6.12.1 Purpose. The purpose of this section is to accommodate solar energy facilities in
appropriate locations, while minimizing any adverse visual, safety, and environmental impacts of
the facilities.
6.12.2 Applicability. This section applies to all uses identified as requiring a site plan review per
Section 9.5.2 or a special permit for ground mounted solar energy facilities per Section 3.1, Table
of Uses.
6.12.3 Siting Preferences. Where a solar facility is sited, as well as placement on the site once
selected, is an important consideration. The City strongly discourages locations that result in
significant loss of land and natural resources, including farm and forest land, and encourages
rooftop siting, as well as locations in industrial and commercial districts, or on vacant, disturbed
land. Significant tree cutting is problematic because of the important water management, cooling,
and climate benefits trees provide.
6.12.4 Dimensional Regulations
1. Height- For primary uses see Section 4, Table 4.1.1. For accessory uses see Section
4.1.2.7
2. Setbacks- For primary uses see Section 4, Table 4.1.1. For small- and medium-scale
ground mounted solar energy systems accessory to principal use may be located no closer
than ten (10) feet from the front, side, or rear lot line. All ground-mounted solar energy
systems in residential districts shall be installed either in the side yard or rear yard to the
extent practicable.
3. Lot Coverage-Ground mounted solar energy systems shall not count towards building
coverage as defined in Section 10.0 definitions.
6.12.5 Special Permit.
1. The Planning Board is hereby designated the Special Permit Granting Authority (SPGA)
for solar energy systems. The SPGA shall adopt rules relative to the application for
special permits for ground mounted solar plan approval and file a copy with the City
Clerk. After notice and public hearing and after due consideration of the reports and
recommendations of other city boards, commissions and or departments, the SPGA may
grant such a permit. The SPGA shall also impose, in addition to any applicable conditions
specified in this section, such applicable conditions as the SPGA finds reasonably
appropriate to improve the site design to serve the purposes of this section.
2. The Planning Board shall include as part of its special permit review and proceedings all
the provisions and requirements of the Site Plan Review standards applicable to large-
scale ground-mounted solar energy systems. See Section 9.4 for additional Special
Permit Requirements.
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
6.12.6 Large and Medium Scale Ground Mounted Solar Energy System Site Plan Review
1. Site Plan Documentation Required. In addition to the requirements of Section 9.5, the
following items shall be included:
(a) Blueprints or drawings of the solar energy system showing the proposed layout of the
system, any potential shading from nearby structures, the distance between the proposed
solar collector and all property lines and existing on-site buildings and structures, and the
tallest finished height of the solar collector;
(b) Documentation of the major system components to be used, including the panels,
mounting system, and inverter(s);
(c) Additional requirements for large scale ground mounted solar energy systems
(i) One or three line electrical diagram detailing the solar photovoltaic installation,
associated components, and electrical interconnection methods, with all
Massachusetts Electric Code (527 CMR 12.00) compliant disconnects and overcurrent
devices;
(ii) Documentation of actual or prospective access and control of the project site (see
also Solar Design Guideline Document);
(iii) An operation and maintenance plan (see Solar Design Guideline Document);
(iv) Proof of liability insurance; and
6.12.7 Large and Medium Scale Ground Mounted Solar Energy System Maintenance,
Removal, and Abandonment
1. Monitoring and Maintenance.
(a) Solar Energy System Installation Conditions - The ground-mounted solar energy
system owner or operator shall maintain the facility in good condition. Maintenance shall
include, but not be limited to, painting, structural repairs, and integrity of security
measures. Site access shall be maintained to a level acceptable to the Building
Commissioner. The owner or operator shall be responsible for the cost of maintaining the
solar energy system and any access road(s), unless accepted as a public way.
(b) Modifications - All material modifications to a ground-mounted solar energy system
made after issuance of the required building permit shall require approval by the Site Plan
Review Authority.
2. Abandonment or Decommissioning
(a) Removal Requirements-Any ground-mounted solar energy system which has
reached the end of its useful life or has been abandoned consistent with Subsection (b),
below of this ordinance shall be removed. The owner or operator shall physically remove
the installation no more than 150 days after the date of discontinued operations. The
owner or operator shall notify the Site Plan Review Authority by certified mail of the
proposed date of discontinued operations and plans for removal.
Decommissioning shall consist of:
(i) Physical removal of all solar energy systems, structures, equipment, security
barriers and transmission lines from the site.
(ii) Disposal of all solid and hazardous waste in accordance with local, state, and
federal waste disposal regulations.
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
(iii) Stabilization or re-vegetation of the site as necessary to minimize erosion. The
Site Plan Review Authority may allow the owner or operator to leave landscaping or
designated below-grade foundations in order to minimize erosion and disruption to
vegetation.
(b) Abandonment-Absent notice of a proposed date of decommissioning or written
notice of extenuating circumstances, the large-scale ground-mounted solar energy
system shall be considered abandoned when it fails to operate for more than one year
without the written consent of the Site Plan Review Authority. If the owner or operator of
the solar energy system fails to remove the installation in accordance with the
requirements of this section within 150 days of abandonment or the proposed date of
decommissioning, the town retains the right, after the receipt of an appropriate court
order, to enter and remove an abandoned, hazardous, or decommissioned large-scale
ground-mounted solar energy system. As a condition of Site Plan approval, the
applicant and landowner shall agree to allow entry to remove an abandoned or
decommissioned installation.
6.12.8 Site Plan Review-Roof-mounted and Small-scale Ground-Mounted Solar Energy
Systems
1. Applicability-Where these solar energy systems may be accessory to a use allowed through
Site Plan Review, the Site Plan Review shall include review of their adequacy, location,
arrangement, size, design, and general site compatibility.
6.12.9 Pre-Existing Non-Conforming Uses and Structures
Improvements that do not change the use or the basic exterior characteristics of the
building or structure are allowed. Such improvements include but are not limited to the
installation or replacement of solar energy systems.”
Section 5. Amend Section 8.4.15 Site Plan Review of Section 8.4 North River Canal Corridor
Neighborhood Mixed Use District by inserting the following additional site plan requirement as the
fourth requirement and renumbering the requirements to a total of five:
“4. Adequate net-zero-energy plan;”
Section 6. Amend Section 9.4.2 Criteria of Section 9.4 Special Permits within Section 9
Administration and Procedures by deleting the following:
“5.Impacts on the natural environment including view; and”
and replacing it with the following:
“5.Impacts on the natural environment including greenhouse gas emissions and view; and”
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
Section 7. Amend Section 9.5.2 Applicability of Section 9.5 Site Plan Review within Section 9
Administration and Procedures by adding the following at the end of paragraph number 2:
“; or
3. Large scale ground mounted solar energy system in the R3, B2, B4, B5, BPD, NRCC,
or I district; or
4. Medium scale ground mounted solar energy system in the RC, R1, R2, or R3 district.”
Section 8. Amend Section 9.5.3 Application of Section 9.5 Site Plan Review within Section 9
Administration and Procedures by deleting the phrases “fifteen (15) copies of” and “include fifteen
(15) copies of” as they appear in the first paragraph and further amend this Section by adding the
following to the end of this Section:
“11. Plans depicting the property lines and physical features, including roads, for the project
site;
12. Proposed changes to the landscape of the site, grading, vegetation clearing and planting,
exterior lighting, screening vegetation or structures;
13. Locations of active farmland, wetlands, permanently protected open space, Priority Habitat
Areas and BioMap 2 Critical Natural Landscape Core Habitat mapped by the Natural Heritage
& Endangered Species Program (NHESP) and “Important Wildlife Habitat” mapped by the DEP.
14. Locations of floodplains or inundation areas for moderate or high hazard dams; and
15. Locations of local or National Historic Districts.
16. Location, arrangement, size, and design of roof mounted and small-scale ground mounted
solar energy systems.”
Section 9. Amend Section 9.5.4 Narrative of Section 9.5 Site Plan Review within Section 9
Administration and Procedures by inserting the Phrase “, including parking with electric vehicle
charging stations and parking for bicycles;” at the end of paragraph number 2 and further
amending this Section by inserting the following after paragraph number 8 and renumbering the
requirements to a total of 10:
“9. Sustainability and resiliency, including energy planning and alignment with local climate
mitigation goals;”
Section 10. Amend Section 9.5.5 Distribution of Section 9.5 Site Plan Review within Section 9
Administration and Procedures by replacing the words “his” with “their” as they appear in the first
paragraph and further amending the first paragraph of this Section by inserting the phrase “Head
of the Sustainability Department or their designee,” immediately preceding the phrases “Board of
Health”.
Section 11. Amend Section 9.5.6 Review Criteria of Section 9.5 Site Plan Review within Section 9
Administration and Procedures by adding the following to the end of this Section:
“14. Adequacy of bicycle parking facilities and number of bicycle parking spaces proposed for
each development;
15. Adequacy of electric vehicle charging station;
16. Adequacy and general site compatibility of roof mounted and small-scale ground mounted
solar energy systems; and
17. Adequacy of a net-zero-energy plan to outline site energy uptake, creation, and
consumption.”
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
Section 12. Amend Section 10 Definitions by adding the following new definitions:
“Electric Vehicle (EV): Any vehicle that is licensed and registered for operation on public and
private highways, roads, and streets and that operates exclusively on electrical energy from an off-
board source that is stored in the vehicle’s batteries, producing zero tailpipe emissions or pollution
when stationary or operating.
Electric Vehicle Supply Equipment (EVSE): Equipment for the purpose of transferring
electric energy to a battery or other energy storage device in an electric vehicle.
Electric-Vehicle-Ready: Electric-Vehicle-Ready shall mean providing raceway to every parking
space, adequate space in the electrical panel and space for additional transformer capacity to
accommodate the future installation of the transformer, if necessary.
Long-term Bicycle Parking: Long-term Bicycle Parking must be located in an enclosed, limited-
access area designed to protect bicycles from precipitation and from theft, such as bicycle lockers,
covered bicycle sheds, or bicycle rooms within a building.
Net-zero energy site: a site that is optimally efficient, and over the course of a year, generates
energy onsite, using clean renewable resources, in a quantity equal to or greater than the total
amount of energy consumed onsite.
Net-zero-energy plan: A document outlining a development’s energy sources, locations (on or off-
site), and consumption. The Plan outlines how the development can become a net-zero energy
site, as defined above; or, why achieving net-zero energy site is not possible through renewable
resources on-site, given site or other constraints.
Photovoltaic System (also referred to as Photovoltaic Installation): An active solar energy system
that converts solar energy directly into electricity.
Rated Nameplate Capacity: The maximum rated output of electric power production of the
photovoltaic system in watts of Direct Current (DC).
Short-term Bicycle Parking: Short-term bicycle parking must be located in a publicly accessible
space within 50 feet of pedestrian entrances. Short-term bicycle parking is intended primarily to
serve visitors, such as retail patrons making trips of up to a few hours; however, it may serve other
bicycle users as needed.
Solar Access: The access of a solar energy system to direct sunlight.
Solar Collector: A device, structure or a part of a device or structure for which the primary purpose
is to transform solar radiant energy into thermal, mechanical, chemical, or electrical energy.
Solar Energy: Radiant energy received from the sun that can be collected in the form of heat or
light by a solar collector.
Solar Energy System: A device or structural design feature, a substantial purpose of which is to
provide daylight for interior lighting or provide for the collection, storage and distribution of solar
energy for space heating or cooling, electricity generation, or water heating.
CITY OF SALEM
JOINT PUBLIC HEARING
OF THE CITY COUNCIL AND PLANNING BOARD
MARCH 7, 2022, AT 6:30 P.M.
Solar Energy System, Active: A solar energy system whose primary purpose is to harvest
energy by transforming solar energy into another form of energy or transferring heat from
a collector to another medium using mechanical, electrical, or chemical means.
Solar Energy System, Grid-Intertie: A photovoltaic system that is connected to an electric
circuit served by an electric utility.
Solar Energy System, Ground-Mounted: An Active Solar Energy System that is
structurally mounted to the ground and is not roof-mounted; may be of any size (small-,
medium- or large-scale).
Solar Energy System, Large-Scale: An Active Solar Energy System that occupies more
than 40,000 square feet of surface area (equivalent to a rated nameplate capacity of
about 250kW DC or greater).
Solar Energy System, Medium-Scale: An Active Solar Energy System that occupies more
than 1,750 but less than 40,000 square feet of surface area (equivalent to a rated
nameplate capacity of about 10 - 250 kW DC).
Solar Energy System, Off-Grid: A photovoltaic solar energy system in which the circuits
energized by the solar energy system are not electrically connected in any way to electric
circuits that are served by an electric utility.
Solar Energy System, Passive: A solar energy system that captures solar light or heat
without transforming it to another form of energy or transferring the energy via a heat
exchanger.
Solar Energy System, Roof-Mounted: An Active Solar Energy System that is structurally
mounted to the roof of a building or structure; may be of any size (small-, medium- or
large-scale).
Solar Energy System, Small-Scale: An Active Solar Energy System that occupies 1,750
square feet of surface area or less (equivalent to a rated nameplate capacity of about 10
kW DC or less).
Solar Thermal System: An Active Solar Energy System that uses collectors to convert the sun’s
rays into useful forms of energy for water heating, space heating, or space cooling.”
Section 13. This Ordinance shall take effect as provided by City Charter.
Get email alerts for Salem
A daily email when new agendas and minutes are posted.