SALEM HISTORICAL COMMISSION
MINUTES
April 3rd, 2019
A meeting of the Salem Historical Commission was held on Wednesday, April 3 rd, 2019
at 7:05 pm at 98 Washington Street, Salem, MA.
Present were Jessica Herbert (Chair), Laurie Bellin, Rebecca English, David Hart, Larry
Spang, Jane Turiel and Patti Kelleher. Absent: Reed Cutting and Mark Pattison.
266 Lafayette Street
Tyna Hull and Paul De Napoli submitted an application for a Certificate of
Appropriateness to install fiberglass gutters, replace fascia and soffits, and rebuild front
porch.
Documents & Exhibits:
▪ Application:3/18/19
▪ Photographs
Tyna Hull and David Reardon, contractor, were present.
Ms. Hull explained that her contractor would start at the corner of the building and
replace only the gutters on her portion of the building. She would not change the gutters
on the projecting front bay since this includes #268. In the future, if the aluminum
gutters were to be replaced at 268 Lafayette, Ms. Hull would replace the front bay
section of gutter with fiberglass. Ms. Herbert said she would prefer if fiberglass were
extended across the full bay and asked if contractors could work together. Ms. Bellin
asked if they could get approval from the other owner for all fiberglass. If not, the
Commission could approve fiberglass for all the gutters on the #266 portion of the
building even though half of the bay won’t be replaced. Ms. Kelleher asked fi the first
story gutter on the bay will be replaced in copper. Ms. Herbert asked for the material of
the downspout and whether capacity of the existing copper gutter is adequate. Mr.
Reardon replied that the gutter capacity is fine if there are enough downspouts. Mr.
Spang said the Commission will want to see the detail match of what is shown in the
drawing or submit for approval if different. The contractor said he can come back with
sample with different trim if needed.
Ms. Hull and Mr. Reardon presented plans to reconstruct the porch at #266. The
materials will match the materials used on the front steps and will match details
proposed at #268.
Ms. Herbert noted that lattice is now large gauge on the diagonal and typically
Commission prefers square small-scale lattice. Mr. Spang recommended using vertical
boards which is a traditional design detail. Mr. Reardon suggested carrying lattice to
newel posts and splitting lattice into 3 sections. Ms. Kelleher noted that a design was
already approved for #268, which did include specific lattice details. Mr. Spang
SHC Meeting Minutes – April 3, 2019, Page 2 of 4
recommended owner continue to work with #268 on final design, including possibility of
using 3 lattice panels on the base. Mr. Reardon stated that he would work on a simple
sketch.
VOTE: Mr. Sprang made a motion to approve the following: 1) install fiberglass gutters
on #266 with final details to be submitted to Commission; 2) replace fascia with PVC
and soffits with wood to match details and continue fiberglass gutter on bay in the
future; 3) install new downspouts in either 3” or 4” painted to match trim and 4) rebuild
roof and gutter detail on first story of front bay using copper; and 5) continuation of
discussion for porch reconstruction to allow coordination with owner of #268. Mr. Hart
seconded the motion. All were in favor. And so, the motion carried.
Ms. Herbert said she would reach out to the owner at 268 Lafayette Street.
65 Federal Street - continuation
65 Federal Street LLC- Waiver of Demolition Delay Ordinance- Demolish rear and side
ells
Documents & Exhibits:
▪ Application:2/19/19
▪ Photographs
▪ Drawings by Thomas Mayo Associates
The applicant Michael Becker was present.
Mr. Becker presented revised drawings, including a shallower gable on the west
elevation. Mr. Spang said he was concerned about the gable returns and the shallower
gable. He also pointed out the odd dogleg to the left of the dormer on the north
elevation and expressed concern with the downer on the side of the main building. The
Commission agreed that the design was much improved. Ms. Kelleher said this could
be included in the letter to the SRA and DRB. The letter could also include the following:
further improvements to west elevation, proportion is not consistent with guidelines
outlined in the historic districts. The Commission also noted that the drawings as
presented showed mystery squares on the sides of the dormers, which was repeated on
the north side.
VOTE: Ms. Turiel made a motion to approve the waiver of the demolition delay. Mr. Hart
seconded the motion. All were in favor. And so, the motion carried.
25 Lynde Street- continuation
Evergreen Realty Trust- Waiver of Demolition Delay Ordinance- Demolish rear ell
Documents & Exhibits:
▪ Application:2/19/19
SHC Meeting Minutes – April 3, 2019, Page 3 of 4
▪ Photographs
▪ Drawings by Thomas Mayo Associates
The applicant Michael Becker was present
Mr. Becker presented revised drawings noting that the arbor could be extended across
the garage bays. He also noted introduction of fascia boards on the new addition and
the use of carriage house doors instead of windows
The Commission discussed language for the comment letter to the SRA and DRB. All
agreed that letter should include language about complying with Secretary of the Interior
Standards used in letter for 53 Summer Street. Ms. Kelleher expressed her continued
concern about the massing of the addition. The Commission discussed whether to offer
comments about the massing. The existing building has one single plane, west. Mr.
Sprang proposed a slight setback. Support less parking. Ms. English thought that
parking was instrumental to marketability. Overall the Commission was pleased with
the progress and improvement of the design as it preserved two sides of the original
house.
VOTE: Mr. Spang made a motion to approve the demolition, Ms. Turiel seconded the
motion. All were in favor. And so, the motion carried.
23 Summer Street
23 Summer Street LLC submitted an Waiver of the Demolition Delay to demolish rear
additions.
Documents & Exhibits:
▪ Application:2/19/19
▪ Photographs
▪ Drawings by Thomas Mayo Associates
The applicant Michael Becker was present.
The Commission agreed that the project design was moving in a good direction, noting
that the lowered height of the addition was better, but the details still need work. Mr.
Sprang stated that he would like to see the design again and Mr. Hart agreed. Mr.
Spang said if the goal was to hide the addition behind the building, it still allows views
through to the vacant lot. He suggested that an “L” shape addition would provide a
visual buffer to adjacent lot with parking lot and commercial building.
VOTE: Mr. Hart made a motion to continue the discussion to the next meeting. Ms.
Turiel seconded the motion. All were in favor. And so, the motion carried.
SHC Meeting Minutes – April 3, 2019, Page 4 of 4
Chimney caps
Ms. Kelleher discussed her proposal to establish an administrative policy to allow
chimney caps as a “minor change” if they meet specific guidelines. Mr. Hart said he was
reluctant to allow and asked Ms. Kelleher to send proposed language and visuals to
Commission for consideration at next meeting.
Other Business
There was no other business.
Respectfully submitted,
Patti Kelleher
Preservation Planner
Agenda
Salem Historical Commission
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970
(978) 619-5685
Agenda
SALEM HISTORICAL COMMISSION
WEDNESDAY, APRIL 3, 2019
7:00 P.M.
98 WASHINGTON STREET, 1st FLOOR CONFERENCE ROOM
1. 266 Lafayette Street – Tyna L. Hull and Paul F. de Napoli – Certificate of Appropriateness – Install fiberglass gutters,
replace fascia and soffits, rebuild front porch.
2. 65 Federal Street – 65 Federal Street LLC – Waiver of the Demolition Delay Ordinance – Demolish rear and side ells -
continuation
3. 25 Lynde Street – Evergreen Realty Trust – Waiver of the Demolition Delay Ordinance – Demolish rear ell -
continuation
4. Other Business
a. Minutes
b. Violations
c. Correspondence