Historical Commission
Regular MeetingSalem, MA · June 5, 2019
Minutes
DRAFT
SALEM HISTORICAL COMMISSION
MINUTES
WEDNESDAY, JUNE 5, 2019
A meeting of the Salem Historical Commission was held on Wednesday, June 5, 2019 at 7:00 pm at 98
Washington Street, Salem, MA. Present were: Reed Cutting, David Hart (Acting Chair), Rebecca English
(participating remotely), Vijay Joyce, Mark Pattison and Erin Schaeffer. Not present: Milo Martinez, Stacey
Norkun and Larry Spang.
Mr. Hart reported that the Historical Commission was awarded an appreciation plaque from Historic
Salem, Inc. during HSI’s 75th Anniversary celebration.
Mr. Hart noted that Commission member Rebecca English was participating remotely through speaker
phone.
4 River Street
Lindsey and Brendan Wakeham submitted an application for a Certificate of Appropriateness for new paint
colors
Documents & Exhibits
▪ Application:
▪ Photographs
Lindsey and Brendan Wakeham were present.
Ms. Wakeham presented the application to repair the house and paint the house in a different color
scheme. The scheme is similar to a color scheme shown on a house in Newport. The color would be a
lighter shade of pink and all trim color would “Jewett White” The green door would remain the same
color.
Mr. Cutting stated that he was in support of the proposed color scheme.
There was no public comment.
VOTE: Mr. Cutting made a motion to approve the application as presented. Ms. Schaeffer seconded the
motion. All were in favor and the motion so carried.
21 Washington Square North - continuation
Renewal Ventures LLC submitted an application for a Certificate of Hardship to remove snow fence on roof.
Documents & Exhibits
▪ Application:
▪ Photographs
David Pabich of Renewal Ventures was present.
Mr. Pabich presented the history of the project. He replaced the roof and discovered the snow roof was in
severely deteriorated condition with broken brackets. He received a quote of $9,000 from Cassidy
Brothers to replicate the fence. He was seeking permission from the Commission to not replace the fence.
June 5, 2019, Page 2 of 11
Mr. Hart asked if he had considered a simpler pipe rail. Mr. Pabich replied that he could consider a
simpler rail but it would be different than the original and the roof no longer has slate shingles.
Mr. Pattison asked if he had consulted other companies. Mr. Pabich replied that he has reached out to
other companies but they were not interested in the project. He expressed his concern with liability of the
fence in its previous condition.
Mr. Cutting noted that the snow fence was original and highly significant for the building.
Mr. Pabich noted that he has restored the exterior of the building including the ornate downspouts, the
original flushboard siding and the windows.
Ms. English expressed her struggle with losing such an important architectural element of the building,
even though it no longer serves a function since the slate shingles were removed. She noted that the
original snow fence was beautiful and functional and while expensive to replicate, she wondered if there
might be a compromise.
Mr. Hart recommended approving the certificate of hardship with the condition that if snow falls occur
than the Commission could require a new simple rail be installed. He did note that the existing snow fence
was very elaborate.
Mr. Cutting noted that there are other similar buildings with no snow fence.
Mr. Pattison recommended reaching out to Lundy’s in Lynn. Ms. Schaeffer suggested DeAngelis Iron
Works.
Mr. Cutting recommended that the application be continued so the applicant can continue to research
other companies for estimates to replicate.
Jeremy Peterson, Washington Square, expressed concern about losing the historic snow fence and the
danger of snow falling off the roof.
Ms. Kelleher reported that she did a quick search of other buildings in Salem and did not find a similar
elaborate style snow fence.
Ms. Schaeffer noted that while the estimate of $9,000 may seem like a lot, she expressed her opinion that
it was worth the investment. She recommended reaching out to DeAngelis Iron Works who is recasting
the Salem Common fence. She also suggested the possibility of recasting in aluminum.
Mr. Pabich stated that the cast is the most expensive component of the project, costing $1,000. He had not
considered recasting in another metal.
VOTE: Mr. Cutting made a motion to continue to July 3rd meeting. Mr. Pattison seconded the motion.
All were in favor (excluding E. Schaeffer) and the motion so carried.
Mr. Pabich asked if the Commission approves chimney caps for gas fireplace vents. Mr. Pattison asked if
the vent would be round or square and if it would extend above chimney. Mr. Pabich stated that the
company said that it had to extend and could only be round, although he would prefer square. Mr.
Pattison suggested that there may be other options to consider. The Commission agreed that the
preference would be for a square cap.
June 5, 2019, Page 3 of 11
266 Lafayette Street - continuation
Tyna L. Hull and Paul F. de Napoli submitted an application for a Certificate of Appropriateness to rebuild
front porch.
Documents & Exhibits
▪ Application:
▪ Photographs
Tyna Hull was present.
Ms. Kelleher presented the history of the project and the owners’ previous approval for fiberglass gutters.
She also noted that the owner of the other half of the building was already approved for a redesign of their
porch. Ms. Kelleher reported that she spoke with neighbor about their design.
Ms. Hull noted that she would like to change the design to include wider boards below the porch post to
frame the lattice but did not think the neighbor would be interested. Ms. Hull presented the application to
rebuild their section of the front porch. She stated that they would like to install square lattice under both
the porch and the staircase to be painted gray to match body of house. Ms. Kelleher noted that the other
owner received approval to install either vertical slats or square lattice. Ms. Hull explained the history of
property and the porch. She noted that she will not be changing porch balustrade this year.
Ms. Hull presented a mockup drawing showing square lattice with wider framing boards. Mr. Cutting
expressed his opinion that the square lattice would be an improvement. Ms. Kelleher noted that this
design would be different than what was approved at #268.
Mr. Cutting asked the Commission if there was concerns about matching the porch design to the design at
#268.
Ms. Kelleher noted that previously the Commission’s concerns were particularly focused on the
balustrade and balusters. The other owners received approval to raise the height of the railing to meet
code. Ms. Hull is not proposing to replace the railings at this time but when they will be replaced, they
will match #268.
There was no public comment.
VOTE: Mr. Cutting made a motion to approve the application as designed and presented in the
application. Mr. Pattison seconded the motion. All were in favor and the motion so carried.
23 Chestnut Street - continuation
Otis and Susan Edwards-Mistler submitted an application for a Certificate of Appropriateness to alter rear
addition.
Documents & Exhibits
▪ Application:
▪ Photographs
Otis Edwards and Lee Dearborn, Derby Square Architects, were present.
Mr. Dearborn presented the plans to alter windows, remove a chimney, and enlarge a skylight on the rear
ell. He stated that there was evidence that the first half of the ell was original and known as a garden
June 5, 2019, Page 4 of 11
house and it was later extended. He presented a second design option based on comments received at the
last meeting. This option includes a different window configuration that would keep view from a public
way the same. He also presented a new rendering that provided more context – indicating that the window
configuration on this building was different than the window configuration on the other half of the
rowhouse at 21 Chestnut Street.
Ms. Schaeffer asked if it was possible to support chimney from roof up. Mr. Dearborn responded that it
could be done if supported by steel, but it would be more costly.
Ms. Schaeffer expressed her opinion that it was important to focus on what is visible from public way –
top of windows, skylight and chimney only. She stated that she was not supportive of the chimney
removal and the extension of the skylight but not the window changes. However, she is unable to vote
since she was not present at the previous meeting.
Mr. Pattison noted that the chimney matches others on building. He asked how high the skylight extends
above the roofline. Mr. Dearborn replied that it was going to match the existing height – 6” to 10” tall.
The Commission debated whether it would be visible from a public way.
Ms. Schaeffer asked if the finish was going to be the same. Mr. Dearborn replied yes, it would be copper.
She expressed her support of the skylight since it would have very limited visibility.
Mr. Hart expressed concern that the Federal style house is brick with wood windows. He expressed
concern with removing the wood windows to install metal windows. He also expressed concern with the
introduction of metal doors.
Mr. Hart asked for public comment.
Mr Hart summarized a 6-page comment letter from Stanley Smith, 4 Pickering Street expressing his
concern about the proposed design changes.
Vijay Joyce, asked if the view of building showed 2/2 or 2/6 configuration. He said that he would prefer
to match the existing configuration so it would appear the same.
Rich Jagolta, 41 Chestnut Street, stated that he believed it was a stretch to say that the changes are visible
from a public way. He expressed his opinion that someone would really have to look for the changes from
the street view.
Mr. Rafael Crespo, 25 Chestnut Street, stated that the rear ell is visible from his rear yard and the
proposed changes would be drastic. He noted that the changes would be visible from a public way if the
boundary fence came down in the future. He stated his opinion that the commercial look of the black
metal doors does not match the historic Federal houses on Chestnut Street. He expressed concern about
the changes to the building’s historic integrity.
Joe Pyfrin, 21 Chestnut Street, stated that he would like the proposed windows to be reduced in size,
constructed of wood and painted white – more like a French door system. He stated that he would not like
to see them constructed in metal as proposed.
Ms. Kelleher noted that only four members were available to vote – Mr. Hart, Mr. Cutting, Ms. English
and Mr. Pattison.
June 5, 2019, Page 5 of 11
VOTE: Mr. Cutting made a motion to approve Option #2 with the enlargement of the skylight, changes to
the doors and windows but denial of the chimney removal. Mr. Pattison seconded the motion. Three were
in support and one (Mr. Hart) was in opposition. The motion does not carry.
The Commission discussed the process for voting with a bare quorum.
VOTE: Ms. Schaeffer made a motion to reopen the public hearing to continue discussing and
reconsideration. Mr. Cutting seconded the motion. All were in favor and the motion so carried.
Phil Gillespie, 35 and 37 Chestnut Street, asked if the concern was about color only.
Mr. Hart expressed his opposition to the use of black metal with the changes to window configuration. He
stated that the renovation of an existing historic building. If it was a new addition, he would feel
differently.
Ms. Schaeffer asked if the applicant was amenable to a wood window.
Mr. Dearborn stated that all profiles would be the same as viewable from the street.
Mr. Hart stated that his objection was the use of metal and not wood.
Mr. Joyce asked if the addition is more than 40’ away from the street, would it be possible to determine
the material from this distance if the color was the same.
Ms. Kelleher reported that she spoke with the MHC on the question about whether the presence of a fence
can restrict public view. MHC stated that because the fence is considered a structure subject to
Commission review, any elements screened by the fence would not be considered visible from a public
way. Vegetation is not considered a barrier.
Mr. Cutting expressed his opinion that the change in material would be imperceptible from public view.
Mr. Hart stated that if the window would be painted white, then visibility would be indistinguishable.
Mr. Dearborn noted that brick mold will be in white to match existing profile. But the owner prefers the
windows to be in black.
Mr. Cutting expressed his preference for black windows.
The Commission debated the visibility of the doors from the public way. All agreed that doors were
screened from view.
VOTE: Mr. Pattison made a motion to accept Option #2 to extend skylight and to modify windows with
the condition that metal doors and windows be white. The request to remove chimney was not approved.
Mr. Cutting second the motion. All were in favor and the motion so carried.
June 5, 2019, Page 6 of 11
39-41 Washington Square – continuation
Jeremy & Leah Peterson, Barbara Pervier, David & Lacy Coviello, Jane May, Nikolaus Sucher, Maria
Carles submitted an application for a Certificate of Hardship to replace slate roof with asphalt shingles
Documents & Exhibits
▪ Application: 4/16/19
▪ Photographs
▪ Roof condition assessment
Jeremy Peterson, Barbara Pervier and David Coviello were present.
Mr. Peterson stated that the condition of the roof has become a safety hazard. Two estimates for slate
replacement were provided.
Mr. Hart noted that the Commission does not consider cost in its decisions. However, the assessment
notes that slate is “squishy” with a majority needing replacement.
Ms. Schaeffer asked for specifics on slate removal elsewhere in the Washington Square district. Ms.
Kelleher noted that the Commission previously approved slate removal at 21 Washington Square in 2018.
Ms. Schaeffer asked if the slate will be retained on the sides of the dormers. Mrs. Pervier replied no, they
were proposing to use clapboard on side. The Commission agreed that retention of slate on the side walls
was preferred.
Mr. Peterson explained the request to replace a skylight. Ms. Pervier noted that they will be replacing
soffit as well in-kind repair. Will retain slate on gabled addition.
Mr. Joyce asked if there was a snow guard. Mr. Peterson replied yes, but they will be replacing.
VOTE: Mr. Cutting made a motion to approve the replacement of slate shingles with GAF Slateline
architectural shingles to match gray color of existing slate, replace skylights and repair soffits in-kind. Mr.
Pattison seconded the motion. All four members were in favor and the motion so passed.
39-41 Washington Square
Jeremy & Leah Peterson, Barbara Pervier, David & Lacy Coviello, Jane May, Nikolaus Sucher, Maria
Carles submitted an application for a Certificate of Appropriateness for new paint color for front door.
Documents & Exhibits
▪ Application: 5/16/19
▪ Photographs
Jeremy Peterson, Barbara Pervier and David Coviello were present.
The Commission discussed the proposal to change the color of two front doors. The applicants presented
several color options.
Ms. Pervier noted that the doorway is dark and so would prefer the more intense color. The color is
similar to the door at 13 Chestnut Street. The stairs are currently pale gray with inside walls to be painted
to match original color. The trim will be “Mainsail” to match rest of trim.
June 5, 2019, Page 7 of 11
Mr. Cutting expressed his opinion that a black or dark green would be preferred.
Mr. Pattison noted that 13 Chestnut Street was more blue and the proposed color for this house is more
teal. Ms. Pervier stated that she thought teal would be preferable with the brick.
The Commission agreed that paint Benjamin Moore #754 with Mainsail was the preferred combination.
Finish to be in satin.
VOTE: Mr. Cutting made a motion to approve paint colors as discussed - #754 and Mainsail in semi-
gloss or satin. Mr. Pattison seconded the motion. All were in favor and the motion so carried.
89 Federal Street - continuation
T. Jane Graham-Dwyer submitted an application for a Certificate of Appropriateness to install HVAC unit
Documents & Exhibits
▪ Application:
▪ Photographs
Jane Graham-Dwyer was present.
Ms. Dwyer reported that units are set on a platform 11” off ground. Pipe will touch chimney all way up.
Unit to be 35 7/16 wide x 32 11/16 high.
Mr. Hart asked if the unit would be screened by a fence or vegetation. Ms. Graham-Dwyer responded that
she could do either a fence or landscaping to screen the unit. She stated that she could consult with
neighbors to see which option they preferred.
The Commission discussed screening, with arborvitae preferred. Ms. Schaeffer expressed concern with
putting in fencing so close to property line. She recommended that landscaping would be a better option
for screening.
There was no public comment.
VOTE: Ms. Schaeffer made a motion to approve as presented with location and description as provided
by contractor. Mr. Cutting seconded the motion. All were in favor and the motion so carried.
254 Lafayette Street Unit 3R – continuation
Barbara Bowker submitted an application for a Certificate of Appropriateness to replace windows.
Documents & Exhibits
▪ Application:
▪ Photographs
The applicant was unable to attend the meeting.
Mr. Pattison reported on the site visit noting that the applicant was to provide more information on the
windows to be installed.
The Commission asked for more information on the request
June 5, 2019, Page 8 of 11
Ms. Kelleher noted that the 60-day deadline for acting on the application was approaching.
VOTE: Ms. Schaeffer made a motion to deny the application without prejudice due to the fact that the
application’s 60-day expiration. Mr. Cutting seconded the motion. All were in favor and the motion so
carried.
144 Federal Street – continuation
Robert Ouellette submitted an application for a Certificate of Appropriateness to install an exterior HVAC
unit
Documents & Exhibits
▪ Application:
▪ Photographs
Bob Ouellette was present.
Mr. Ouellette presented a photo showing a mockup of mini-split unit and pipes placed on the rear wall of
the rear ell in the approximate location where they will be installed. He noted that the system was not
installed yet.
The Commission discussed whether it would be better to place the duct pipe as close to the window trim
as possible. Mr. Ouellette replied that it would be better to install a little distance from trim to allow
painting of the trim.
There was no public comment.
VOTE: Mr. Cutting made a motion to approve the application as presented. Mr. Pattison seconded the
motion. All were in favor and the motion so carried.
21 Flint Street
David Kaytes submitted an application for a Certificate of Appropriateness to replace rear fence.
Documents & Exhibits
▪ Application: 5/15/19
▪ Photographs
David Kaytes was present.
Mr. Kaytes presented his proposal to relocate the fence to tie into the existing fencing. He presented the
site plan indicating where fence will be located. The fence height will stay the same but the design will be
different with fence boards installed on the front to hide the fence posts.
There was no public comment.
VOTE: Mr. Cutting made a motion to approve the application as presented. Mr. Pattison seconded the
motion. All were in favor and the motion so carried.
June 5, 2019, Page 9 of 11
15 Chestnut Street
Peter Gordon and Karen Hayes submitted an application for a Certificate of Appropriateness for architectural
roof shingles and chimney repairs.
Documents & Exhibits
▪ Application: 5/13/19
▪ Photographs
Peter Gordon was present.
Mr. Gordon reported that he is withdrawing the request to change the chimney as they are reevaluating the
condition of the chimney which may need rebuilding. He is only seeking to change the 3-tab shingle roof
to GAF Slateline architectural shingles. The flat roofed sections of the roof would remain as existing.
There was no public comment.
VOTE: Mr. Pattison made a motion to approve the GAF Slateline architectural roof shingles as
proposed. Ms. Schaeffer seconded the motion. All were in favor and the motion so carried.
159 Federal Street
Peter Abbruzzese submitted an application for a Certificate of Appropriateness to install new AC
condensers.
Documents & Exhibits
▪ Application: 5/20/19
▪ Photographs
Peter Abbruzzese was present.
Mr. Abbruzzese presented his proposal to install three units next to a Kelleher Way, public way. The units
will be screened by yews. Ms. Kelleher noted that units will be AC condensers only; it is not a mini-split
system that requires placement on raised platform.
The Commission discussed whether the landscaping would be installed in place of the existing asphalt or
will be installed in planters.
Ms. Schaeffer expressed concern about how three units will fit into this small, and highly visible space.
Mr. Abbruzzese noted that units are 2x2 and would not be impacted by opening doors. Mr. Cutting
suggested scheduling a site visit. Mr. Abbruzzese stated that they would be installed with 2 in back and 1
in front.
Ms. Schaeffer expressed concerns about the type of landscaping to be added to ensure that screening was
adequate. Will units still be visible from Kelleher Way from the rear. The Commission suggested that
screening be closer to Kelleher Way.
The Commission discussed the temporary nature of planters and the benefits of landscaping versus a
permanent screening fence. Mr. Abbruzzese suggested a wood lattice screen in a square pattern with
potted plants in front. To be 4’ tall with 2 square posts and 4 lengths. Applicant to send in plan/sketch
showing design and dimensions to staff for review. Ms. Schaeffer suggested applicant complete a mockup
installation to show design and site.
June 5, 2019, Page 10 of 11
There was no public comment.
VOTE: Ms. Schaeffer made a motion to approve as discussed with three condensers, lattice screening and
potted plants with the condition that applicant submit scaled site plans or drawing. Mr. Cutting seconded
the motion. All were in favor and the motion so carried.
1 Jefferson Avenue
Todd Waller submitted an application for a Waiver of the Demolition Delay Ordinance to demolish rear
single-story addition.
Documents & Exhibits
▪ Application
▪ Photographs
Todd Waller was present.
Mr. Waller presented the request to Waive the Demolition Delay Ordinance to demolish a rear addition on
an historic freight house, which was built in 1902. The addition was constructed around 1955. The
building was used as a chicken processing plant for a while. There were once railroad lines on both sides
of the building. The rear addition was originally a loading platform before it was enclosed.
Mr. Cutting asked if the granite block will be retained. Mr. Waller replied that it will be reused on site or
reused elsewhere. There is approximately 8,000 SF of block. Will be rebuilding a new industrial building
on the site of the addition. He presented plans of the new building.
Ms. Schaeffer asked for the intended use. Mr. Waller replied incubator space for small business including
8 spaces for start-up businesses. Ms. Schaeffer asked if he could reuse existing building. Mr. Waller
replied no due to its present construction which is not ground level.
Mr. Pattison suggested new structure not mimic the original building. Mr. Waller replied no, the new
structure will be more modern to highlight the industrial history of the site.
There was no public comment.
VOTE: Mr. Cutting made a motion to approve the request to demolish the rear addition, noting that it
was not original, with the condition that the applicant submit the dimensions of the addition along with
photographs, including ¾ view images. Mr. Pattison seconded the motion. All were in favor and the
motion so carried.
396½ Essex Street (Friends Cemetery)
The City of Salem submitted an application for a Certificate of Hardship to install a new interpretive sign in
the Friends Cemetery.
Documents & Exhibits
▪ Application:
▪ Photographs
Patti Kelleher presented the application on behalf of the City.
June 5, 2019, Page 11 of 11
Ms. Schaeffer asked if the proposed design was consistent with the design of other signage in the City’s
cemeteries.
Ms. Kelleher noted that the proposed design was typically used for the City’s parks and not cemeteries.
The Commission discussed changing the sign design to a simpler, smaller sign. They discussed moving
the “established by” date further up on the sign and changing the font size of “Salem”.
The Commission agreed to continue the application to the next meeting to allow time to research other
sign designs.
VOTE: Mr. Cutting made a motion to continue the application to the next meeting. Ms. Schaeffer
seconded the motion. All were in favor and the motion so carried.
Respectfully submitted,
Patti Kelleher
Preservation Planner
Agenda
Salem Historical Commission
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970
(978) 619-5685
Agenda - REVISED
SALEM HISTORICAL COMMISSION
WEDNESDAY, JUNE 5, 2019
7:00 P.M.
98 WASHINGTON STREET, 1st FLOOR CONFERENCE ROOM
1. 4 River Street – Lindsey and Brendan Wakeham - Certificate of Appropriateness – Paint colors
2. 21 Washington Square North – Renewal Ventures LLC – Certificate of Hardship – Remove snow fence on roof-
continuation
3. 266 Lafayette Street – Tyna L. Hull and Paul F. de Napoli – Certificate of Appropriateness – Rebuild front porch -
continuation
4. 23 Chestnut Street – Otis and Susan Edwards-Mistler – Certificate of Appropriateness – Alter rear addition - continuation
5. 39-41 Washington Square – Jeremy & Leah Peterson, Barbara Pervier, David & Lacy Coviello, Jane May, Nikolaus
Sucher, Maria Carles - Certificate of Appropriateness – Paint color for front door
6. 39-41 Washington Square – Jeremy & Leah Peterson, Barbara Pervier, David & Lacy Coviello, Jane May, Nikolaus
Sucher, Maria Carles - Certificate of Hardship – Replace slate roof with asphalt shingles – continuation
7. 89 Federal Street – T. Jane Graham-Dwyer - Certificate of Appropriateness – Install HVAC unit - continuation
8. 254 Lafayette Street Unit 3R – Barbara Bowker– Certificate of Appropriateness – Replace windows - continuation
9. 144 Federal Street – Robert Ouellette – Certificate of Appropriateness – Install HVAC unit – continuation
10. 21 Flint Street – David Kaytes – Certificate of Appropriateness – Replace rear fence
11. 15 Chestnut Street – Peter Gordon and Karen Hayes – Certificate of Appropriateness – Architectural roof shingles and
repair chimney
12. 159 Federal Street – Peter Abbruzzese - Certificate of Appropriateness – Install AC units
13. 396½ Essex Street (Friends Cemetery) – City of Salem – Install new interpretive sign
14. 1 Jefferson Avenue – Todd Waller – Waiver of the Demolition Delay Ordinance – demolish rear single-story addition
15. Other Business
a. Minutes
b. Violations
c. Correspondence