Historical Commission
Regular MeetingSalem, MA · September 1, 2021
Minutes
Historical Commission Meeting Minutes - September 1, 2021, Page 1 of 9
SALEM HISTORICAL COMMISSION
MINUTES
September 1, 2021
A meeting of the Salem Historical Commission was held on Wednesday, September 1, 2021 at 6:00 pm
via Zoom Virtual Meeting. Present were: Patti Kelleher (staff), Milo Martinez, Larry Spang (Chair),
Mark Meche, Rebecca English, Stacy Norkun, Mark Pattison. Not present: Reed Cutting, Vijay Joyce.
Presentation on Recreational Fishing Pier, Salem Willows Park
Chair Spang asked for clarification on jurisdiction, i.e. that the Commission is only being asked for
comments and review on the presentation. Comments will be delivered to MHC as part of review
process. Seth Lattrell (Salem City Planner) and Ross Kessler DMF (public access coordinator with
Division of Marine Fisheries) were present on behalf of the City to discuss the ADA fishing pier. DMF
will be seeking funding in affiliation with the City. MHC will have Section 106 review with the Army
Corps, and comments will be ongoing throughout review by multiple agencies/entities. The project is at
northeastern point of Salem Willows Park. Images were shown of existing/intended pier. Views looking
north and westerly were shown. The conditions for these piers are heavily deteriorated. Pier has been
largely closed since Winter Storm Nemo 2013 and has been inaccessible for last 8 years, causing issues
for/with harbormaster. Originally permitted in 1894 by Harbor and Land Commission. MHC has 1975
listed as construction date of current pier. Several repair projects were carried out over the years. This is
not considered a contributing structure to the Salem Willows Historic District. Entirely timber
construction, 176 existing piles, 345 feet long, 220 feet wide. Small section that necks down to 8 feet.
Elevation is about 9 or 10 feet. The proposal is a two-phase project; phase 1 is demolition of existing
pier. An analysis has been carried out with an engineer that determined the existing pier is not worth or
feasible to save at this point given age of timber. More cost-effective to reconstruct. Waterside and
shoreside work will be needed, TBD during bidding process. Phase 2 will be to reconstruct the pier
largely within existing footprint. Incorporating T-head at end and reducing width; length reduced by
about 10 feet; increase fishing access; replacing float system. On north side, historically public access
float has existed somewhat separate from DMF project. The elevation of the pier will be lifted; existing
elevation of 9-10 feet will be raised to a proposed 13 feet. Greater height was selected (1) for resiliency
purposes and (2) to balance accessibility. This is primarily a fishing pier, hence DMF’s responsibility as
primary funding source. The intent is to not limit functionality of structure.
Materiality; existing is timber. Timber and steel will be incorporated in proposed condition. Existing 176
piles will be ideally reduced to 76 steel piles, likely rock-socketed into bedrock for portions of pier.
Superstructure on top of steel piles will be timber decking, timber stringers, timber posts, and steel
railings. Image of Deer Island Fishing Pier was shown as most recent fishing/fishery project to show off
the shape, look, and feel of materials that builders are going for.
In terms of timeline, the comment period is about to close. File of notice and intent will be released to
garner public comment. Hope is to get this work permitted by fall in order to bid and construct by end of
2021. Fall 2022 and spring of 2023 for completion.
Chair Spang expressed positive reception to the project. He asked if a ramp and set of steps were
featuring on the land side from the proposed site plan and profile. He recommended looking at a gentler
ramp slope which would eliminate need for handrails and stairs. Mr. Kessler responded to note that the
preference was in fact to have a gentler ramping system rather than stairs (the drawings presented were
Historical Commission Meeting Minutes - September 1, 2021, Page 2 of 9
noted as potentially having been out of date). Mr. Kessler noted that 25% ADA compatibility is being
incorporated in the fishing area to allow for wheelchair access which will be a departure from existing
structure. Mr. Kessler noted that what is being proposed will be hurricane resistant.
Chair Spang inquired about light fixtures and whether lights were part of the planned proposal. Mr.
Kessler noted that lights are not being planned at this time and that Deer Island had required them on a
separate project. Mr. Meche asked how much rise the builders are dealing with. Mr. Kessler noted that
the structure will be ADA compatible and will come back further to an existing pagoda. Chair Spang
noted that the drawing shows a rise of 1.7 feet, give or take. David Smith was present on behalf of GZA
and explained that the desire for the ramp was to balance height increase of pier. Options of higher
elevation were looked at and held at elevation 13. Mr. Smith noted that going to a 1 and 20 ramp would
interfere with intended pathway. What is showing is half the pier width of twelve feet and the ramp will
be 6 feet as well. Mr. Meche proposed starting the ramp more offshore, get to 1 and 20, and not have to
have steps. Mr. Smith noted that a robust abutment is being proposed and indicated that the ramp must be
tied to seawalls on both sides; starting the ramp further out may create emergent issues to contend with.
Mr. Meche noted that a landing would not be needed with a 1 and 20 because the ramp would blend into
grade level. Mr. Pattison asked about the Deer Island pier model shown, specifically whether that had a
height of 13 feet. Mr. Kessler was unsure of the height but noted that many piers are high and cite sea
level rise as a factor to contend with; and also noted that the pier did not face northeast. Mr. Meche asked
where the flood elevation design would be. Mr. Smith noted that the 100-year flood at Salem is 16 per
FEMA.
No public comment.
Chair Spang expressed interest in taking care of water archaeological items. Mr. Meche asked if the pier
is being detailed the same at the rail. Mr. Smith noted that rails at Harborwalk were a combination of
metal, vertical balusters, robust railings, etc. The intended pier will have a sophisticated system of
railings. Mr. Meche also clarified that materials are galvanized. Ms. Kelleher indicated that a letter of
support would be drafted for the Commission’s approval.
VOTE: Mr. Martinez made a motion to approve support for the planned proposal. Mr. Meche seconded
the motion. Roll Call: Martinez, Norkun, English, Pattison, Meche were in favor and the motion so
carried.
18 Chestnut Street - continuation
Dorothy Kelleher requested a continuation for application to replace fence.
Documents & Exhibits
• Application: 5/3/21
• Photographs
Ms. Kelleher reported that the applicant is still working with an architect to provide a sample fence gate
as requested by the Commission.
VOTE: Ms. English made a motion to approve the request to continue the application to the next
meeting on September 15, 2021. Ms. Norkun seconded the motion. Roll Call: Martinez, Norkun,
English, Pattison, Meche, Spang were in favor and the motion so carried.
Historical Commission Meeting Minutes - September 1, 2021, Page 3 of 9
262 Lafayette Street Unit 2 - continuation
Justine Kolsky submitted an application for a Certificate of Appropriateness to replace windows.
Documents & Exhibits
• Application: 6/23/21
• Photographs
• Product specifications
Ms. Kolsky was not present on the call.
VOTE: Mr. Martinez made a motion to continue the application to the next meeting on September 15,
2021. Ms. English seconded the motion. Roll Call: Martinez, Norkun, English, Pattison, Meche, Spang
were in favor and the motion so carried.
33 Carlton Street Unit 3 -- continuation
John Osborne submitted an application for a Certificate of Appropriateness to install a HVAC mini-split
system. .
Documents & Exhibits
• Application: 7/6/21
• Photographs
• Product specifications
Mr. Osborne reported that he was having continued conversation with other condominium owners in the
building about the Commission’s recommended changes and requested a continuation to the next
meeting.
VOTE: Mr. Meche made a motion to approve the request to continue the application to the next meeting
on September 15, 2021. Mr. Martinez seconded the motion. Roll Call: Martinez, Norkun, English,
Pattison, Meche, Spang were in favor and the motion so carried.
171 Federal Street – continuation
Chris and Annie Thompson submitted an application for a Certificate of Appropriateness to replace
windows.
Documents & Exhibits
• Application: 8/2/21
• Photographs
• Product specifications
Ms. Kelleher reported that several commission members met with the owners earlier this week to view the
windows. The owners were initially proposing to replace the windows for deleading. They are now
exploring options to restore the windows and have asked for a continuation.
Historical Commission Meeting Minutes - September 1, 2021, Page 4 of 9
VOTE: Ms. Norkun made a motion to approve the request to continue the application to the next
meeting on September 15, 2021. Ms. English seconded the motion. Roll Call: Martinez, Norkun,
English, Pattison, Meche, Spang were in favor and the motion so carried.
110 Federal Street
James Daly submitted an application for a Certificate of Appropriateness to remove chain link fence and
install evergreen plantings.
Documents & Exhibits
• Application: 8/15/21
• Photographs
Ms. Kelleher reported that this application was reviewed under the minor change category and abutters
were notified. Since no objections were received, a Certificate of Appropriateness was issued on August
27, 2021.
329 Essex Street
Ian Popken submitted an application for a Certificate of Appropriateness to install fountain.
Documents & Exhibits
• Application: 8/9/21
• Photographs
Mr. Popken was present and noted that the Commission recently approved a new cast iron Victorian
fence for perimeter of his property. The applicant stated that a portion of the property between Essex and
Cambridge seems ideal for fountain. Mr. Popken located a period-appropriate 1880s cast iron fountain
from an estate in Philadelphia and is in negotiations to bring it to Salem but wanted to check in with
Commission’s reception as to its appropriateness. An image of the intended fountain was found. Chair
Spang asked if the cast iron fountain had been painted. Mr. Popken surmised that the fountain is bronze
and has likely become patina. The sellers believe the color is original, and rust is beginning to come
through. Mr. Meche asked if cast iron is usually painted to keep it from rusting. The fountain looks as
though it was white or patina green. Mr. Popken clarified that he has not yet seen the fountain in person.
Chair Spang asked if a base for the fountain would be planned or procured. Mr. Popken noted that he has
been in touch with folks at a granite restoration company to create a base that would match curbing
surrounding the property. Mr. Meche asked if the Commission has authority over this matter, to which
Ms. Kelleher noted that jurisdiction exists.
Mr. Popken suggested that a plinth with a hole in it would be placed to access the cellar reservoir in order
to provide water to the fountain. The applicant expressed interest in making this an active fountain. Ms.
Norkun was in full support and pointed out that a fountain exists on Flint Street that is somewhat similar
to the proposed fountain. Chair Spang showed an image via Google Maps of the existing fountain at 21
Flint Street. Mr. Popken noted that the fountain is self-contained, central area where water bubbles up
over top before filling basin and inside of the column; water will not spill out over the top. Mr. Meche
speculated that the Flint fountain has multiple basins and cascades. Mr. Martinez asked about the intent
regarding color: patina green or black; as well as whether the fountain would be sanded or bead blasted.
Mr. Popken noted that the fence will be matte black and asked if the fountain should be stripped and
Historical Commission Meeting Minutes - September 1, 2021, Page 5 of 9
painted black or left in its original condition. Mr. Meche and Ms. English expressed favor for patina. Mr.
Martinez was supportive of either option and recommended treating the rust. Mr. Martinez also noted that
the fountain would be handsome in black to match the fence. Mr. Meche asked if copper foil over cast
iron was ever performed. Chair Spang raised questions on final installation in terms of the plinth size.
Chair Spang expressed interest in seeing more details as to how the fountain is installed, exact location,
plinth, final deliberation on color, etc. Mr. Popken desired to have the fountain in hand before
determining final details. Mr. Pattison asked after plinth material which was said to be of a gray granite-
type material.
No public comment.
VOTE: Mr. Martinez made a motion to approve the application in concept with final details to be
determined at later meeting. Mr. Norkun seconded the motion. Roll Call: Martinez, Norkun, English,
Pattison, Meche, Spang were in favor and the motion so carried.
361 Essex Street
Darcy Birse submitted an application for a Certificate of Appropriateness to install gutters and
downspouts.
Documents & Exhibits
• Application: 8/16/21
• Photographs
• Product specifications
David Jaquith was present to represent the applicants. Mr. Jaquith requested a continuation to the
Commission’s next meeting to allow time to familiarize himself with the property and proposal.
VOTE: Ms. English made a motion to continue to October 6 meeting. Ms. Norkun seconded the motion.
Roll Call: Meche, Pattison, Norkun, English, Martinez were in favor and the motion so carried.
337 Essex Street
The Salem Athenaeum submitted an application for a Certificate of Appropriateness for accessibility
improvements.
Documents & Exhibits
• Application: 8/16/21
• Photographs
• Drawings by Spencer Preservation Group
Jean Marie Procious (executive director at Salem Athenaeum), Lynn Spencer (principal, Spencer
Preservation Group), and Doug Manley (principal, Spencer Preservation Group) were present. Ms.
Spencer noted that a preliminary consultation meeting was carried out; the goal is to achieve handicap
access through front entrance of Athenaeum. Building dates to 1904 and has strong presence on Essex
Street. The Athenaeum has a strong civic and community engagement program which served as the
impetus for the masterplan that Spencer Preservation Group has been working on. Improvements to the
building for accessibility will make it easier for all members of the public to use and enjoy the
Historical Commission Meeting Minutes - September 1, 2021, Page 6 of 9
Athenaeum. What does it mean to introduce accessibility through a vertical lift. Mr. Manley noted the
large flights of steps are impediments to accessibility. This formal architecture is not compatible with
accessibility. Ms. Spencer noted that the project team, including members of Athenaeum as well as Mark
Mazorelli, a landscape architect, explored grade issues and how to integrate the building’s walkway to the
Essex Street sidewalk in a way that is respectful to all visitors. Solution proposed is an additional
sidewalk off the main sidewalk that would lead via gentle slope to a vertical wheelchair lift that would
bring individuals to landing level by front door. An additional six-inch landing would be added to the top
of the existing staircase to provide access to the building at grade from the lift. Ms. Spencer noted that a
handsome wrought-iron fence features here; introduction of gate will be added to that fence. Repurpose
section of wrought-iron fence and maintain the existing curve in the fence. To do so, the design involves
embedding granite curb at the grade level. When the building is open, the gate will be open by personnel
rather than visitors. Mr. Manley noted that new landscaping would be in keeping with what already
exists; rhododendrons and a new section of lawn with a new brick sidewalk into the new entry. A plant
list was also shown to detail existing kinds of plants: lady ferns, pachysandra, azalea, etc. Ms. Spencer
showed a visual of rendered impact of proposed changes. A brick wall will be built in front of the
proposed vertical lift, will have a granite top to match existing granite. Proposing to paint enclosure of
lift something like burnt sienna; not to replicate brick necessarily but to establish similar/same feel.
Vertical lifts are not great outdoors, will require maintenance, but this is most sympathetic means of
introducing access to all as well as respecting historic character of building. Mr. Manley spoke to plan for
recessed lighting in ceiling of portico, adjustable lights, to support/provide access; as well as a lighted
sign, minimal LED lighting. Product specs were shown for planned recessed lights, bricks, granite, and
vertical lift. Details were also shown with dimensions, clearances, etc. Mr. Manley also noted that the
proposal has been sent to Mass Historical Commission, which holds a preservation restriction on the
building. MHC found no adverse effects to the historic character of the building.
Ms. English asked if controls will be on outside of the lift or if staff will be needed to operate. Mr.
Manley noted that operating buttons will be accessible to people who need to use it; the controls would be
on mounted piece adjacent to the lift. Ms. Spencer noted that signage will also be used to direct users to
lift. Ms. Norkun lauded the thoughtfulness of the application and design and expressed curiosity about
bricks being used for the new wall in front of the lift. Ms. Spencer noted that the desire would be to
match finish and color as closely as possible, using Stiles and Heart Brick Company. Ms. Spencer noted
that cut brick set in an asphalt bed would aim to match brick façade to the planned brick walkway. Ms.
Norkun also asked if the recessed lights would have a dimmer option. Ms. Spencer noted that the
proposal includes 3,000K LED lights and agreed that it would be sensible to allow the lights to be
controlled in terms of light temperature.
Mr. Meche asked for clarification that the existing steps have bull nosing and asked if the landing at the
top would be straight or bull-nosed. Mr. Manley answered that the plan is to replicate bull nose at the
landing. The fence to gate transition was highly commended by Mr. Meche, though he expressed interest
in seeing the red brick color become less conspicuous. Mr. Meche also expressed dislike for the color as
well as the brick wall. Mr. Meche also expressed desire to let the brick become transparent like the iron
work. Mr. Manley noted that the preferred placement was desired in order to provide better light to the
window. Mr. Pattison echoed Mr. Meche’s comments about the brick wall in front of the lift, expressing
openness to an alternative so as to not clash with existing brick of the building. Mr. Pattison asked about
the intention with existing granite curb. Mr. Manley noted that the plan would be to recess the existing
curb using same piece of stone. Mr. Pattison expressed aversion to LED lights, and asked if uplights from
the ground could be used. Ms. Spencer noted that recessed lights would be less vulnerable than uplights
which were used in the past and had been kicked over, rendered defunct in the past, etc. Mr. Manley and
Historical Commission Meeting Minutes - September 1, 2021, Page 7 of 9
Ms. Procious cited the desire to have the lights close to the sign of the building and avoid affecting
neighbors’ windows. Mr. Pattison suggested that the lights over the building sign was more of a modern
look. Mr. Martinez noted that the Commission did not have jurisdiction regarding lights when they are
attached to the building. Mr. Martinez asked if the planned burnt sienna wall will always be up, which
Mr. Manley and Ms. Spencer confirmed. Mr. Martinez proposed using the wall as a space for
announcements or to show off neighborhood artwork instead of blending the wall away.
No public comment.
Mr. Martinez asked if the board members felt that the proposal should be broken into individual pieces
given concerns raised: the landing, gate, brick wall, and mass. Mr. Pattison was open to individual pieces.
Mr. Martinez noted that the landing should be in Milford Pink, granite 6” tall, with bull nose finish. Mr.
Pattison asked if the same plinths that are in the columns now will be used. Mr. Manley affirmed that this
is the case, specifying that the granite is 6” high and plinths are 9”. Ms. Spencer clarified that the plinths
are marble, and Mr. Manley noted that one giant slab cannot be used so joints must be used to conform
around the existing plinths. Mr. Manley noted that one extra tread is being added.
VOTE: Mr. Meche made a motion to approve details of the landing in Milford Pink, with granite 6” tall,
with bull nose finish. Mr. Pattison seconded the motion. Meche, Pattison, English, Norkun, Martinez
were in favor and the motion so carried.
Mr. Martinez noted that the Commission does not have jurisdiction over the brick path which is at grade.
Mr. Martinez expressed approval for the overall materiality of the project. Mr. Meche expressed interest
in knowing what else the designers have considered, and offered suggestions such as taking the white top
off of the brick wall, decreasing transparency, or perhaps using no brick at all. Mr. Manley noted that the
vertical lift is simply steel out of the box, something of a sheet metal monolith which would be an
imposing feature, citing a desire to soften that impact. Mr. Meche asked if ironwork going from top to
bottom had been considered, which Mr. Manley and Ms. Spencer affirmed. Ms. Spencer noted that
placing ironwork from top to bottom would also be visually imposing, again citing the intent to soften the
impact. Mr. Meche asked what material is on the side of the steps, which Mr. Manley noted was a gray
concrete finish, cement parging for the side wall. Mr. Meche expressed desire for brick over parging.
Ms. Spencer noted that the Athaneum wants to apply for grant funding, and permits are needed prior to
applying. This project is not going to construction documents right away; jurisdictional permits are
needed: historic district and Mass Historical Commission.
VOTE: Ms. Norkun made a motion to approve details of the brick wall with the specification that
materials be as close a match to bricks and mortar with a white cap as shown; as well as supporting the
black fence as submitted. Ms. English seconded the motion. Roll call: Norkun, English and Martinez
were in favor with Pattison and Meche opposed. The motion did not carry.
Mr. Martinez explained that a bare quorum of 4 is always needed for any motion to pass.
Mr. Pattison expressed interest in seeing a granite wall in front of the lift instead of the proposed
extension of brick, noting that the extension as proposed looked out of place and unnatural. Mr. Meche
also expressed interest in seeing different materiality for the wall in front of the lift, as well as a granite
entrance and one less tread. Following the brick wall motion not passing, Mr. Meche expressed the desire
to provisionally change “no” vote to “yes,” if permitted to do so.
Historical Commission Meeting Minutes - September 1, 2021, Page 8 of 9
Ms. Spencer expressed openness to continuing to think about the brick wall, such as the idea of lowering
the wall so that it is not at the current landing level as well as the materiality. Ms. Spencer also clarified
the current granite at the site is quite weathered whereas new granite will be Milford Pink rather than
gray.
VOTE: Mr. Pattison made a motion to have piece of fencing removed, converted to a gate, and have the
curb sunken into grade as long as same piece of granite is used. Mr. Meche seconded the motion. Roll
Call: Norkun, English, Pattison, Meche, Martinez were in favor and the motion so carried.
Ms. Kelleher noted that guidance would be explored as to the possibility that Mr. Meche could alter vote
on the brick wall motion.
Ms. Spencer asked for clarification that the application could request another vote if the project design
was amended. She suggested that the brick wall be lowered one tread and the height of the fence
extended. Mr. Pattison asked if the applicants would also be open to altering the materiality from faux
brick to granite, though Mr. Meche noted that this would likely be a separate motion. Ms. Spencer was
open to bringing the brick wall down a tread as this was something already discussed with the client,
though more time would be needed to vet the possibility of altering materials.
VOTE: Mr. Meche made a motion to lower the wall one tread with the top of the fencing to remain as
shown in the plan. Ms. English seconded the motion. Commissioners Meche, English, Norkun and
Martinez were in favor and Pattison was opposed. The motion so carried.
Mr. Meche asked if the board supports the granite. Mr. Martinez expressed interest in seeing Milford
Pink juxtaposed with the existing granite onsite. Ms. English also was open to granite but expressed wish
to see a rendering of the material.
VOTE: Ms. English made a motion to continue application to September 15 for Athenaeum to consider
alternative material and return if they would like to propose something other than what was approved
tonight. Mr. Pattison seconded the motion. Norkun, Pattison, Meche, English, Martinez were in favor
and the motion so carried.
For clarification purposes, the Certificate of Appropriateness was approved for the wall as shown in plans
which was reduced by one tread, to be finished in brick material with granite cap.
FY22 Community Preservation Plan
Ms. Kelleher noted that the Commission is asked to provide comments on the CPP plan on a yearly basis.
Ms. Kelleher noted that any project seeking CPA funding under historic category is required to comply
with Secretary of the Interior’s standards but there are no provisions to oversee how that is done. Mr.
Martinez asked how many buildings fall into the historic category, as not all historic buildings get CPA
funding under this category. Ms. Kelleher noted that in FY20 about half awards granted went to Historic
Buildings and half to Community Resources. Given Chair Spang’s absence, Mr. Martinez proposed
continuing this discussion until next meeting. Mr. Meche noted not having seen 2021 projects in the
planned CPP and questioned whether they were known or available yet. Ms. Kelleher noted that any
project not in a district that receives CPA funding is required to have a preservation restriction attached to
the building.
Historical Commission Meeting Minutes - September 1, 2021, Page 9 of 9
VOTE: Ms. English made a motion to continue review of CPP plan to next meeting. Mr. Meche
seconded the motion. Roll Call: Norkun, Pattison, Meche, English, Martinez were in favor and the
motion so carried.
Other Business
Mr. Meche noted that he and Mr. Pattison looked at Hamilton Street slate roof house to discuss options
with the property owner. The owner is not averse to finding way to keep the slate and is in need of help
and advice. Roger of Salem Sheet Metal had done the work. Patrick Shea of professional roofing is
willing to go look at the roof. Mr. Meche requested that Ms. Kelleher connect with Mr. Shea and seek out
additional contacts.
Adjournment
VOTE: Mr. Meche made a motion to adjourn. Ms. English seconded the motion. All were in favor and
the motion so carried.
The meeting adjourned at 8:15PM.
Respectfully submitted,
Dan Graham, Historical Commission Clerk
Agenda
Salem Historical Commission
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)
619-5685
Agenda*
SALEM HISTORICAL COMMISSION
WEDNESDAY, SEPTEMBER 1, 2021
6:00 P.M.
*Notice is hereby given that a meeting of the Salem Historical Commission will be held on Wednesday,
September 1, 2021 at 6:00 p.m. via remote participation in accordance with Chapter 20 of the Acts of 2021.
Every effort will be made to ensure that the public can adequately access the proceedings in real time, via
technological means. In the event that we are unable to do so on matters not requiring a public hearing, we
will post on the City of Salem’s website an audio or video recording, transcript, or other comprehensive record
of proceedings as soon as possible after the meeting.
Individuals may participate remotely in the meeting via a remote participation platform called Zoom.
Members of the public and/or parties with a right and/or requirement to attend this meeting may access the
remote participation meeting through any one of the following ways:
• Go to the website
https://us02web.zoom.us/j/84911138416?pwd=RmhWZUVMSzc3YTUxNlJUQ0l5d0thUT09 or enter it
into your web browser to join the meeting; or
• Go to the website link https://zoom.us/join and enter Webinar ID# 849 1113 8416 and enter Passcode
102027
▪ Dial a toll-free phone number 877-853-5257 (Toll Free). When prompted, enter Webinar ID # 849 1113
8416 , enter Passcode 102027 and follow the instructions to join the meeting. Those only dialing in will
not have access to the direct video feed of the meeting but can follow along with the project materials
that will be available for download online prior to the meeting.
▪ The link to access project materials can be found at
https://cityofsalem1.sharepoint.com/:f:/s/HistoricalCommission/Eh3TpX6cmphHg9haaqqf8EsBL4wBT0
Un7xxeycZoIQj1qw?e=ZQdhmX
Members of the public attending this meeting virtually will be allowed to make comments if they wish to do
so, during the portion of the hearing designated for public comment. The meeting will be opened early at 5:45
pm to allow members of the public to test their audio. During portions of the meeting in which public
comment is permitted, members of the public who have “raised their hand” in Zoom will be called on to offer
comment. In order to raise a hand, members of the public using the Zoom computer or phone application may
click the “Raise Hand” button; members of the public dialing in may press “*9” to raise their hand to speak.
City of Salem Historical Commission
Agenda for September 1, 2021
Page 2 of 2
SALEM HISTORICAL COMMISSION
WEDNESDAY, SEPTEMBER 1, 2021
6:00 P.M. (PLEASE NOTE NEW TIME)
MEETING AGENDA
1) Presentation on Recreational Fishing Pier, Salem Willows Park – Replacement project
2) 18 Chestnut Street – Dorothy Kelleher – Certificate of Appropriateness – Replace fence - continuation
3) 262 Lafayette Street Unit 2 – Justine Kolsky – Certificate of Appropriateness – Replace windows -
continuation
4) 33 Carlton Street Unit 3 - John Osborne - Certificate of Appropriateness – HVAC mini-split system -
continuation
5) 171 Federal Street – Chris and Annie Thompson - Certificate of Appropriateness – Replace windows -
continuation
6) 110 Federal Street – James Daly – Certificate of Appropriateness – Remove chain link fence and install
evergreen plantings- Reviewed under minor change category with waiver of public hearing pending
abutter notification
7) 329 Essex Street - Ian Popken - Certificate of Appropriateness – Install fountain
8) 361 Essex Street – Darcy Birse - Certificate of Appropriateness – Install gutters and downspouts
9) 337 Essex Street – Salem Athenaeum - Certificate of Appropriateness – Accessibility improvements
10) FY22 Community Preservation Plan - Request for Comment/Input
11) Other Business
a. Minutes
b. Violations
c. Correspondence
Persons requiring auxiliary aids and services for effective communication such as sign language interpreter, an
assistive listening device, or print material in digital format or a reasonable modification in programs, services,
policies, or activities, may contact the City of Salem ADA Coordinator as soon as possible and no less than
2 business days before the meeting, program, or event.
Know Your Rights Under the Open Meeting Law, M.G.L. c. 30A §18-25, and
City Ordinance Sections 2-2028 through 2-203
Get email alerts for Salem
A daily email when new agendas and minutes are posted.