Historical Commission
Regular MeetingSalem, MA · December 15, 2021
Minutes
SALEM HISTORICAL COMMISSION
SPECIAL MEETING MINUTES
December 15, 2021
A special meeting of the Salem Historical Commission was held on Wednesday, December 15, 2021, at 6:00 pm.
VIRTUAL ZOOM MEETING. Present were: Rebecca English, Vijay Joyce (Acting Chair), Milo Martinez,
Mark Meche and Mark Pattison. Not present: Reed Cutting, Stacey Norkun, and Larry Spang. Staff: Patti Kelleher
127 Derby Street - continuation
Louise Spohr submitted a Certificate of Appropriateness to replace windows - continuation
Documents & Exhibits
• Application: 11/1/21
• Photographs
Ms. Kelleher stated that the applicant is exploring other options and requested a continuation.
VOTE: Ms. English made a motion to continue the application to the next meeting. Mr. Pattison seconded the
motion. Roll Call: Martinez, Meche, English, Pattison, Joyce were in favor and the motion so carried.
284 Lafayette Street - continuation
Coach House Inn, LLC submitted a Certificate of Appropriateness to replace gutters
Documents & Exhibits
• Application: 11/4/21
• Photographs
Nick Giallousis was present to discuss the project.
Ms. Kelleher stated that the Commission requested additional information for the applicant. Mr. Giallousis noted
that the Commission suggested Duragutter to maintain the integrity of the building. Duragutter is the closest match
they could find, and the existing details would remain, unless they were replaced in kind. The fasteners would be
hidden, and the gutters would be continuous. It would sit out 3/8” of an inch more making the difference minimal.
Mr. Joyce asked if it could be installed at the high pediment at the roof, above the entry door. Mr. Giallousis
replied yes and it would involve a simple mitered gutter.
Ms. Kelleher stated that the Commission previously approved this product. Mr. Giallousis noted that the aluminum
is ¼” thick, and costs $17 per linear foot for the material only, while a fiberglass gutter is $35. The joints are sealed
from the inside and will be painted the trim color to match the house, Thornwood White by Benjamin Moore. A
paint appropriate for metal would be used for the gutter.
Public Comment: No one else in the assembly wished to speak.
Mr. Martinez – this gutter will be minimally invasive.
VOTE: Martinez made a motion to approve the Duragutter, painted to match the trim color of the house. Pattison
seconded the motion. Roll Call: Martinez, Meche, English, Pattison, Joyce and the motion so carried.
159 Derby Street - continuation
James Bostick/Paul Nathan Art submitted a Certificate of Appropriateness for new gutters and downspouts
Historical Commission meeting minutes, December 15, 2021
Page 2 of 7
Documents & Exhibits
• Application: 11/1/21
• Photographs
Jim Bostick, Director of Salem Arts, on behalf of Paul Nathan, Owner, and Robert Bouve (Chairperson) were
present to speak.
Mr. Bouve stated that they will use the half-round gutter applied to the two different types of corners. The
downspouts will be installed at the outside of the rear bumpout, and at the rear of the bumpout. Mr. Bostick noted
that the rear downspout is like the Kosciusko Street side of the building.
Mr. Meche asked if the gutter will have an elbow or vacuum break that extends from the high side of the building to
the low at the rear bump-out. Mr. Bouve replied that there will be two separate gutters, but all joints would be
soldered. The gutters will be attached to the roof with clips and the downspouts will also be round. Mr. Joyce
asked if the cornice be removed to install the gutter. Mr. Bouve replied no, the gutter will sit under the cornice.
Mr. Meche noted his concern with the angled gutter at the jog in the wall although there is no alternative. Mr.
Bouve replied that they are trying to eliminate a slipping hazard by keeping water away from the door. He noted
that the ramp is on hold because they’ve used their budget to focus on the gutter, downspout, and masonry repairs.
Mr. Meche suggested rerouting the downspout along the side of the main body of the building with a downspout
below the ramp as well as leaving the gutter and downspout copper so they can patina to green rather than painting
it while to match the trim color. Mr. Joyce noted his concern with historic methods which would be to paint them
white to so blend. Mr. Bostick suggested copper gutters and white downspouts. Mr. Joyce replied that keeping
them copper would be the most historic approach and would add to the charm of the building. Ms. English did not
have a preference. Ms. Kelleher stated that the Design Guidelines recommend that gutters be painted to match the
underlying material and the painting of copper guidelines should be determined on a case-by-case basis. Mr.
Martinez noted that painted gutters were wood and very few were half round, so this would be a good example of
letting the half round be painted white. Mr. Bouve noted that any material to be painted would be aluminum, they
don’t want an anodize look and he’s unknown of a factory finish might appear. Mr. Pattison replied that a brush
painted finish would be most appropriate.
Public Comment: No one in the assembly wished to speak.
VOTE: Mr. Martinez made a motion to approve the application and allow the half-round gutters and round
downspouts to be painted white to match the building trim. Mr. Meche seconded the motion.
Mr. Martinez amended his motion to include that the downspouts would be round. Meche seconded the
amendment.
Roll Call: Martinez, Meche, English, Pattison were in favor, Joyce was opposed due to preference for maintaining
the copper, and the motion so carried (4-1).
361 Essex Street - continuation
Darcy Birse submitted an application for a Certificate of Appropriateness to add new gutters
Documents & Exhibits
• Application: 8/21/21
• Photographs
Ms. Kelleher stated that she has requested additional information about the request but has not received the
information. The owner has requested numerous continuations and is again not present.
VOTE: Ms. English made a motion to deny the application for new gutters without prejudice. Mr. Pattison
seconded the motion. Roll Call: Martinez, Meche, English, Pattison, Joyce and the motion so carried.
Historical Commission meeting minutes, December 15, 2021
Page 3 of 7
361 Essex Street- continuation
Darcy Birse submitted an application for a Certificate of Appropriateness for fencing and curbing
Documents & Exhibits
• Application: 11/1/21
• Photographs
Ms. Kelleher stated that she requested additional information, however; the applicant has not responded.
VOTE: Ms. English made a motion to deny application for fencing and curbing without prejudice. Mr. Pattison
seconded the motion. Roll Call: Martinez, Meche, English, Pattison, Joyce and the motion so carried.
78 Washington Square
Milo Martinez submitted an application for a Certificate of Appropriateness to add new vent
Documents & Exhibits
• Application: 11/30/21
• Photographs
Mr. Martinez recused himself as the applicant.
Mr. Martinez stated that the 5-unit building has 2 heaters and one broke over the summer. Two heaters are tanked,
and they want to switch the broken one with a tankless. They are currently vented through the chimney, which
require an intake and outtake, but chimney is not up to code for that type of installation. The low-profile vent
would be installed close to the interior corner on the water table. This side of the house has multiple utilities and it
partially obscured by a brick wall and only 5-6-feet along the sidewalk where this area of visible. A conduit would
need to be moved to accommodate this location. Mr. Joyce asked if the vent cover would overtake the width of the
water table. Mr. Martinez replied no.
Mr. Meche asked if the Plumbing Inspector would approve of it. Mr. Martinez replied that he believes his installer
would only propose products that would be approved by the inspector. Mr. Meche asked what would occur when
the second take is installed. Mr. Martinez replied that they may be able to share an intake but not an outtake.
Public Comment: No one in the assembly wished to speak.
Mr. Joyce asked if it could be placed elsewhere. Mr. Martinez replied, either on the other side of the chimney or as
a long run across the entire basement to the foundation at Unit 1 by the driveway, which is even more visible. Mr.
Meche suggested installing it inside. Mr. Martinez replied that it could have gone through the furnace room and
then to the exterior. He suggested an approval that allowed not installing it above a certain height.
VOTE: Mr. Meche made a motion to approve as presented, to be painted the trim color, with the outtake location to
be confirmed by Commissioner Meche. Ms. English seconded the motion. Roll Call: Meche, English, Pattison,
Joyce in favor and the motion so carried.
7 Cambridge Street
Hamilton Hall submitted a Certificate of Appropriateness for gutters, downspouts, site work and repairs
Documents & Exhibits
• Application: 11/24/21
• Photographs
• Drawings by Spencer Preservation Group dated 10/26/21
Historical Commission meeting minutes, December 15, 2021
Page 4 of 7
Lynn Spencer and Doug Manley of Spencer Preservation Group were present to discuss the project.
Ms. Spencer stated that 1-year ago they were tasked with creating a conditions assessment and master plan
renovation recommendation for Hamilton Hall. The project is now partially funded by a grant from the
Massachusetts Preservation Projects Fund and is a high priority project. Mr. Manley stated that at the Cambridge
Street side of the building, the sidewalk is uneven and pitched towards the building, the portico roof needs to be re-
roofed and its gutter has two outlets but no downspouts allowing the water to spill onto the sidewalk and ice up in
winter months. The entry roof would be replaced with flat seam copper, with a new copper gutter and new copper
downspouts directed underground into a catch basin or into a cast iron boot leading to a drywell. All replacements
would be in-kind, and at the rear, a 4-inch downspout would also be replaced in kind. They would relay the brick
and curb so the paving pitches away from the building and would reset the curb and curb tilt for handicapped
accessibility. At the north elevation, staining and organic growth would be cleaned off all surfaces with a low-
pressure bio-wash. Repairs at the eave will wait for a later date.
Mr. Meche noted his concern with the gutter detail indicating that the drip edge was soldered into the roof, since it
is usually proud of the drip height, otherwise it would be submerged in water. Ms. Kelleher asked for the existing
gutter material. Mr. Manley replied copper painted white, they will drain the downspouts underground and they
will install a small granite curb around window wells to keep water on the sidewalk from entering them. The
downspout will have a cast iron boot at grade. A catch basin is in place, but they require the help of the City
Engineer to determine if it can be routed there or to a drywell below the new brick paving, and only the rain from
this roof will be directed there. Ms. Kelleher noted that the City Engineer had concerns with the condition of the
catch basin which may require improvements, so a dry well may be the preferred option.
Mr. Manely noted that they would install an asphalt below the paving to direct water to the street. Ms. English
requested additional information about the extent of the brick work. Mr. Manely replied that very little of the brick
sidewalk is on city land, but they need to meet the city sidewalk so they will do the work all along Cambridge
Street themselves. Mr. Meche suggested the existing paving, which is more than likely already sitting on stone
dust, be installed on well compacted stone dust again with a fabric liner, rather than on an impervious material such
as asphalt. He asked their civil engineer or landscape architects to consider alternatives. Mr. Pattison agreed.
Mr. Manley stated that the Massachusetts Historic Commission holds the preservation restriction to the property,
they submitted their proposed plans for review, and they were approved.
Mr. Joyce suggested the pervious vs. impervious nature of the paving base be addressed. Mr. Meche suggested the
applicant propose a more appropriate detail and suggested the use of pervious paving. Mr. Pattison agreed. Ms.
Kelleher noted that paving is not within the Commission’s jurisdiction and should only be a recommendation. The
city is also hoping to redo the sidewalk on Cambridge Street and perhaps could be folded into the Hamilton Hall
project and the City Engineer should weigh-in on the sidewalk reinstallation. Mr. Manley agreed that their
proposed paving should align with the city engineers proposed work. Mr. Meche asked if the applicants disagreed
with their paving suggestion. Mr. Manley replied that at the Athenaeum they wanted to create a stable surface that
would not move for future accessibility and that’s why asphalt base was proposed below that brick sidewalk too.
Future master plan work includes a front accessible entry. Mr. Meche replied that the surface could be stabilized.
Mr. Pattison added that it should be voiced as a concern, and this could be the catalyst that sets a precedent for the
engineering department. Ms. Spenser stated that she appreciates the concerns with ground water recharge and
drainage, and since the current base is sand and not stone dust, she suggested pervious asphalt as a compromise.
This has been an issue with brick sidewalks throughout Salem and asphalt was used as a base at the Salem Library.
Public Comment:
Peter Pitman, Architect at Pitman & Wardley, Associates. Ms. Spencer’s recommendation can resolve the concerns
since tamped surfaces don’t always remain level, although the proposed plan should tie-into the city standards for
sidewalks and stabilization.
No one else in the assembly wished to speak.
VOTE: Mr. Martinez made a motion to approve replacing the gutters, add downspouts tied to the pilasters
terminated into the ground and painted to match the trim.
Historical Commission meeting minutes, December 15, 2021
Page 5 of 7
Mr. Meche amended the motion to include a recommendation to integrate pervious paving into the brick paving.
Mr. Martinez accepted the amendment and Mr. Meche seconded the amended motion.
Roll Call: Martinez, Meche, English, Pattison, Joyce in favor and the motion so carried.
VOTE: Mr. Martinez made a motion to approve the roof replacement and repointing of the brick. Mr. Meche
seconded the motion. Roll Call: Martinez, Meche, English, Pattison, Joyce in favor and the motion so carried.
186 Federal Street
James Carria submitted an application for a Certificate of Appropriateness for a rear fence
Documents & Exhibits
• Application: 12/1/21
• Photographs
Mr. Carria stated that the rear fence is in a state of disrepair, and they want to conceal the lot behind them at the
corner of Boston and Bridge Streets. The fence will be over 100 yards away from the street and they are proposing
a 6-foot-high vinyl fence from Lowe’s. He’s had pressure treated fences previously and they rot and have
formaldehyde in them which raises health concerns for their family. He noted that several houses in the district
have similar vinyl fences. Mr. Meche asked if the grade drops at the rear of the site drops. Ms. Carria replied yes
and noted that the fence would be U-shaped and not visible from either side of the house. Mr. Martinez stated that
vinyl fences aren’t approved by the Commission, suggested that any others may be violation, noted that he would
not approve it, and recommended a site visit. Mr. Joyce agreed.
Mr. Carria noted that they plan to plant arborvitaes in front of the new fence and there is little to no historic detail
on the home to retain. He does not want a fence that they must pay to maintain since many surrounding fences are
falling. Mr. Meche noted the various historic details, such as the entrance door, and stated that the Commission has
fence guidelines to follow. Despite the aluminum siding, the home is still on Federal Street and within the
Commission’s jurisdiction. Mr. Martinez noted the details and elements of this home that are historic details and a
fence that is right of the property is a better solution. Mr. Joyce agreed, noted the Greek Revival details of the
home, and that the condition of the rear site won’t exist forever, so they must consider the longevity when making
decision. Mr. Carria suggested planting arborvitaes only.
Mr. Carria noted the existing vinyl fence that has been installed behind their home at the CLC building property.
Ms. Kelleher replied that the Commission’s jurisdiction does not include things visible from Bridge Street. She
also suggested a site visit. Mr. Joyce noted his concern with the longevity of vinyl fences and their tendency to
warp over time. Mr. Pattison suggested a painted Cedar fence. Mr. Meche noted that PVC also has hazardous
materials. Ms. Kelleher suggested the applicant explore white cedar options.
Public Comment: No one in the assembly wished to speak.
VOTE: Mr. Pattison made a motion to continue the application to the next meeting. Ms. English seconded the
motion. Roll Call: Martinez, Meche, English, Pattison, Joyce were in favor and the motion so carried.
Comments on draft Memorandum of Agreement for Salem State University South Campus Disposition
Ms. Kelleher stated that the State is looking to sell the historic property and wants to enter into a MOA with MHC.
She had some suggested edits to the MOA language for the Commission to consider as did HSI but MHC has
already approved the MOA as drafted. She noted that the MOA is between MHC and DCAMM and the SHC and
HSI are interested parties. MHC approved the MOA and moving it forward is important for the vacant buildings.
There would be an RFP for interested developers that will preserve the building in the future and MHC found an
adverse effect since the sale would occur without a preservation restriction on the historic buildings. There was a
similar MOA process with the transfer of the Courthouse projects to the SRA, but in that case there was an
established set of criteria that gave preference to developers proposing to restore the historic buildings.
Historical Commission meeting minutes, December 15, 2021
Page 6 of 7
Public Comment:
Emily Udy, Historic Salem, Inc. HSI submitted comments the same day as DCAMM’s finalized MOA, so their
comments weren’t included. HSI has similar concerns with the weak wording used and agreed that the
Commission could ask for changes, although only 14-days were given to respond and then 7-days to respond after
that. They hope the RFP is more substantial.
Barbara Cleary, HSI. Concerned with the letter being sent before their comments were included and very
concerned about the short turn-around periods that were given.
Ms. Kelleher suggested a comment letter from the Commission to DCAMM, sharing HSI’s concerns that a longer
opportunity was not given to provide input, that stronger language should have been included, and an initial
recommendation for the RFP to include language that preservation proposals for the buildings are ranked as highly
advantageous.
Mr. Meche noted that adaptive reuse tends to change the interiors, but that rehabilitation standards are crafted for
flexibility. He suggested including rooms with character defining features which constitute minimal changes and
recommend preservation rather than only encouraging preservation. Ms. Kelleher stated that she will draft a letter
for the Commission to approve.
Other Business:
Meeting Minutes
VOTE: Mr. Martinez motion to approve September 15, 2021 regular meeting minutes. Ms. English seconded.
Roll Call: Martinez, Meche, English, Pattison, Joyce were in favor and the motion so carried.
VOTE: Mr. Martinez motion to approve October 6, 2021 regular meeting minutes. Ms. English seconded.
Roll Call: Martinez, Meche, English, Pattison, Joyce were in favor and the motion so carried.
VOTE: Mr. Martinez motion to approve October 20, 2021 regular meeting minutes. Ms. English seconded.
Roll Call: Martinez, Meche, English, Pattison, Joyce were in favor and the motion so carried.
VOTE: Mr. Martinez motion to approve November 3, 2021 regular meeting minutes. Ms. English seconded.
Roll Call: Martinez, Meche, English, Pattison, Joyce were in favor and the motion so carried.
VOTE: Mr. Martinez motion to approve December 1, 2021 regular meeting minutes with Meche’s edits. Ms.
English seconded. Roll Call: Martinez, Meche, English, Pattison, Joyce were in favor and the motion so carried.
93 Washington Square
Mr. Martinez stated that at the last meeting K-style bronze gutters were approved, and both he and Chair Spang
were to determine the final details. The gutters installed across the street may have been custom made and he
believes the best option is to have them painted to match the trim so the butt ends are less visible. Ms. Kelleher
suggested that if the applicant proposed a paint color change they return to the Commission for another review,
since a color change wasn’t included in the responsibilities of those deputized to review the project on site. Mr.
Martinez noted that the applicant also suggested Azek for the fascia. Ms. Kelleher noted that the Commission has
approved Azek elsewhere in the district and the applicant said it was already approved at the front of the building.
Mr. Meche noted that no matter the material it should be painted. Mr. Joyce stated that it would be mostly covered
by the new gutter. Mr. Pattison noted that long runs of Azek tend to look wavy. If it’s a cap under 2x’s and built
Historical Commission meeting minutes, December 15, 2021
Page 7 of 7
out to attach the gutter, the bottom 3-4-inches would be visible below the gutter. He’d prefer a cap at the underside
of the three boards to conceal the build-up of materials and if the applicant wants it for the fascia, it should be
hardwood. Mr. Meche noted that Azek secured to a solid surface would look more supported. The Commission
agreed to authorize a color change, but a material change should be wood rather than Azek. Mr. Meche stated that
the applicant should submit all associated drawings and details.
Design Guidelines
Ms. Kelleher requested a review by the Commission to determine if anything is missing, if it’s not reflective of how
the Commission would normally review it, tightening the language, etc. January 10th is the new due date.
Public Meetings
Ms. Kelleher stated that public meetings are still scheduled to return to in-person in April 2022.
Adjournment
VOTE: Mr. Pattison made a motion to adjourn. Mr. Meche seconded the motion. Roll Call: Martinez, Meche,
English, Pattison, Joyce in favor and the motion so carried.
The meeting adjourned at 8:30PM
Respectfully submitted,
Patti Kelleher
Preservation Planner
Agenda
Salem Historical Commission
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)
619-5685
Agenda* - REVISED
SALEM HISTORICAL COMMISSION
WEDNESDAY, DECEMBER 15, 2021
6:00 P.M.
*Notice is hereby given that a meeting of the Salem Historical Commission will be held on Wednesday,
December 15, 2021 at 6:00 p.m. via remote participation in accordance with Chapter 20 of the Acts of 2021.
Every effort will be made to ensure that the public can adequately access the proceedings in real time, via
technological means. In the event that we are unable to do so on matters not requiring a public hearing, we
will post on the City of Salem’s website an audio or video recording, transcript, or other comprehensive record
of proceedings as soon as possible after the meeting.
Individuals may participate remotely in the meeting via a remote participation platform called Zoom.
Members of the public and/or parties with a right and/or requirement to attend this meeting may access the
remote participation meeting through any one of the following ways:
• Go to the website
https://us02web.zoom.us/j/89357132924?pwd=ZFkwM1A4a1MxRnhWOFZGbitTckNxUT09 or enter it
into your web browser to join the meeting; or
• Go to the website link https://zoom.us/join and enter Webinar ID# 893 5713 2924 and enter Passcode
133255
▪ Dial a toll-free phone number 877-853-5257 (Toll Free). When prompted, enter Webinar ID # 893 5713
2924, enter Passcode 133255 and follow the instructions to join the meeting. Those only dialing in will
not have access to the direct video feed of the meeting but can follow along with the project materials
that will be available for download online prior to the meeting.
▪ The link to access project materials can be found at
https://cityofsalem1.sharepoint.com/:f:/s/HistoricalCommission/Eh3TpX6cmphHg9haaqqf8EsBL4wBT0
Un7xxeycZoIQj1qw?e=ZQdhmX
Members of the public attending this meeting virtually will be allowed to make comments if they wish to do
so, during the portion of the hearing designated for public comment. The meeting will be opened early at 5:45
pm to allow members of the public to test their audio. During portions of the meeting in which public
comment is permitted, members of the public who have “raised their hand” in Zoom will be called on to offer
comment. In order to raise a hand, members of the public using the Zoom computer or phone application may
click the “Raise Hand” button; members of the public dialing in may press “*9” to raise their hand to speak.
City of Salem Historical Commission
Agenda for December 15, 2021
Page 2 of 2
SALEM HISTORICAL COMMISSION
WEDNESDAY, DECEMBER 15, 2021
6:00 P.M. (PLEASE NOTE NEW TIME)
MEETING AGENDA - REVISED
1) 127 Derby Street – Louise Spohr – Certificate of Appropriateness – Replace windows – continuation
2) 284 Lafayette Street – Coach House Inn LLC – Certificate of Appropriateness – Replace gutters – continuation
3) 159 Derby Street – James Bostick/Paul Nathan Art – Certificate of Appropriateness – New gutters and
downspouts - continuation
4) 361 Essex Street – Darcy Birse – Certificate of Appropriateness – New gutters – continuation
5) 361 Essex Street – Darcy Birse – Certificate of Appropriateness – Fencing and curbing – continuation
6) 78 Washington Square – Milo Martinez – Certificate of Appropriateness – New vent
7) 7 Cambridge Street – Hamilton Hall – Certificate of Appropriateness – Gutters, downspouts, site work and
repairs
8) 186 Federal Street – James Carria – Certificate of Appropriateness – Rear fence
9) Comments on draft Memorandum of Agreement for Salem State University South Campus Disposition
10) Other Business
a. Minutes
b. Violations
c. Correspondence
Persons requiring auxiliary aids and services for effective communication such as sign language interpreter, an
assistive listening device, or print material in digital format or a reasonable modification in programs, services,
policies, or activities, may contact the City of Salem ADA Coordinator as soon as possible and no less than
2 business days before the meeting, program, or event.
Know Your Rights Under the Open Meeting Law, M.G.L. c. 30A §18-25, and
City Ordinance Sections 2-2028 through 2-203
Get email alerts for Salem
A daily email when new agendas and minutes are posted.