Historical Commission
Regular MeetingSalem, MA · February 16, 2022
Minutes
SALEM HISTORICAL COMMISSION
REGULAR MEETING MINUTES
February 16, 2022
A regular meeting of the Salem Historical Commission was held on Wednesday, February 16, 2022, at 6:00 pm.
VIRTUAL ZOOM MEETING. Present were: Reed Cutting, Rebecca English, Vijay Joyce (Acting Chair), Milo
Martinez, Mark Meche, Mark Pattison. Not present: Larry Spang.
20 Chestnut Street
Shawn Smith submitted an application for a Certificate of Appropriateness for roof vents
Documents & Exhibits
• Application: 1/27/22
• Photographs
Shawn Smith was present to discuss the project.
Ms. Smith stated that they are planning a light remodel of a couple second floor bathrooms that don’t currently
have exhaust vents. They will be vented through the attic with 4-inch ductwork with an 8-inch x 8-inch black roof
vent. Their double-house neighbors at 22 Chestnut placed a vent directly in front of their front chimneys so they
would do the same. Their second proposed vent is at the rear two-story addition and the vent would be placed in
front of the vent stack. Mr. Joyce suggested the roof vents be installed behind the chimney where they will be less
visible. Ms. Smith replied yes, which would also reduce the run of ductwork. Mr. Martinez asked if the same vent
would go in the opposite side. Ms. Smith replied yes, the vent is a standard size roof vent manufactured by
Grainger.
Commissioner Pattison left at this time.
Public Comment: No one in the assembly wished to speak.
VOTE: Mr. Martinez made a motion to approve as submitted. Mr. Cutting seconded the motion. Roll Call:
Cutting, Martinez, Meche, Joyce were in favor and the motion so carried.
5 Broad Street
Charing Cross Realty submitted an application for a Certificate of Appropriateness to renovate the building –
Documents & Exhibits
• Application: 1/17/22
• Photographs
• Drawings by Pitman & Wardley dated 1/17/22
Peter Pitman of Pitman & Wardley Associates was present to discuss the project.
Mr. Pitman stated that the building is the old senior center and a former Salem high school from the 1850’s. The
existing dormers are not original, and the balustrade is no longer present. The building backs up to Broad Street
Cemetery where a public easement exits onto Broad Street. The finished building will include a restored cupola
and bell tower and a recreated balustrade will be used as screening for new HVAC equipment since there is no
ground footprint to use. The existing windows will be restored, a new fence will be added to screen the parking lot,
and the side entry doorway will be lowered to create an accessible entrance with a transom above. The brownstone
and granite plinths will remain, new brick will be added at grade to create a new walkway, landscaping and simple
iron fences will be added to conceal the window wells. The current a non-compliant HC ramp to the basement will
be removed and a stair will be added to provide access to 2 basement units. The new landscape plan was completed
by Jim Emmanuel and will be reviewed by the Planning Board (PB). The fence will have granite newel posts at the
ends and cast-iron finials on top of the posts. The rooftop dormers are in line with the exterior brick wall and the
Salem Historical Commission meeting minutes, February 16, 2022
Page 2 of 8
balustrade will have paneled posts. The building was constructed in the 1850’s and the dormers may have been
added in the 1870’s or 80’s. The proposal is to have loft style attic units and proposed dormers will provide light
and make the space usable. The new details will be recessed and more modest, so the dormers have a smaller
profile from the street. The internal 3-foot-deep balcony will have sliding doors and is needed for ventilation and
emergency egress. The bell tower will be restored, and the slate roof will be preserved. The new dormer work will
use salvaged slate from the existing dormers.
Mr. Joyce asked about the proposed door material and surrounds. Mr. Pitman replied that there will be custom
fabricated doors painted black to fit the openings with trim painted to match the existing trim. There was concern
about including a vision panel because of a tight landing so they’d rather not include a solid panel door. Mr.
Martinez suggested the use of a 4-panel door with the 2 upper glass panes and lower 2 panes.
Mr. Meche asked how far the front door is set back. Mr. Pitman replied approximately 3-feet and the replacement
door will be put back in the same location. Mr. Meche asked if the transom above to be new door is existing or
new. Mr. Pitman replied new, and it will have mullions.
Mr. Pitman stated that at the parking lot façade they will remove the brick in-fill, preserve the rusticated surround
and granite plinths, remove the granite treads and lower the entrance, similar to the PEM former Phillips Library
building on Essex Street with a transom with a mullion. Cast iron fences will be installed around the window wells
and basement stairwell and the front window wells will have planting and greenspace for screening.
Mr. Pitman stated that at the rear cemetery side the existing ramp is not near any HC parking spaces and there is a
travel easement along the rear façade. The rear dormer windows will not be at an egress height so they will have
minimal size lites. The center dormer window will remain and the two on either end will comply with current light
and ventilation requirements, and ice and snow cleats will be added to the roof. They will remove the rear HC
ramp to reveal and restore the granite steps below and repurpose the granite steps from the driveway entrance if
necessary.
Mr. Pitman stated that at the left elevation, new walkways will be set on granite curbs, the gas meters will be
screened, and they will work with MEP engineers to elevate the equipment to the roof rather than at grade. If
anything is unavoidable a copper or matte black sleeve will be used to conceal it.
Mr. Pitman noted that the building section shows the modest new dormers pushed away from the front face of the
wall and the 42-inch railing height. The floor will be raised two risers and a structural engineer didn’t see any need
to remove framing, so they will build on top of the existing framing. Mr. Meche questioned if the balconies met the
IBC egress requirements. Mr. Pitman replied that they will use a sliding door rather than an egress window at the
bedrooms, but it will act as a functional Juliette balcony. There are two means of egress, and he needs to meet the
bedroom window requirement.
Mr. Joyce asked for the material proposed for the sidewalls of the dormer. Mr. Pitman replied that they will
repurpose the slate and the casing will be weaved around the corner and into the slate on the sidewalls. There is no
room for clapboards and the dormer will have minimal dimensions with a relatively small wall area.
Mr. Meche asked about the plumbing vent locations. Mr. Pitman replied that if anything can’t be vented behind the
balustrade, he will return to the SHC, but they will not vent anything through the front of the building. There will
be many penetrations, but the details need to be determined. Mr. Meche asked if all existing flues will be reused.
Mr. Pitman replied that they will be capped in place if they aren’t reused.
Mr. Joyce asked if the existing windows are true divided lite. Mr. Pitman replied yes, and they will be replicated,
and field painted. They will add a storm assembly but haven’t spoken to any companies yet due. He requested an
approval as is and if they find a large window storm manufacturer he could return to the Commission for their
review. Mr. Meche replied that interior and exterior storms aren’t within their purview.
Mr. Meche suggested adding structure above the cornice to reinforce the horizontal plane since there is a still a bit
of roof plane below the window and suggested a handrail at the balconies. Mr. Pitman suggested a sloped railing or
sheet metal. Mr. Joyce asked how far up the roof it would extend. Mr. Pitman replied that it would resemble a
snow fence detail rather than a pitched roof which will block light, ventilation, and the view which is already a
challenge.
Salem Historical Commission meeting minutes, February 16, 2022
Page 3 of 8
Mr. Joyce asked if the snow fence would be at the front and rear. Mr. Pitman replied that they would only be at the
rear since the front sliding doors are protected by large gables, and the window wells would be a simple black tube
or snow cleats. Mr. Joyce agreed that the profile remain low and continue the roof line across the windows.
Mr. Meche suggested the existing vent penetrations in the front pilasters flanking the entry door be removed. Mr.
Pitman replied that all existing front façade penetration will be removed.
Mr. Martinez noted that the window configuration at the dormer windows is changing from 8 over 8 for two sets of
windows and they will be changed to door size windows with a transom configuration above the door. Mr. Pitman
replied that there is a wall between the dormer transoms, the doors will be tall since the hip roofed dormers are the
main light source. The arched window in the front is common space and side elevations will be unit windows. The
existing dormer windows have approximately 8-12 inches between the jambs and the wall that divides them,
widening them insignificantly to allow for egress. The door head height is 8-feet above the finished floor. Mr.
Martinez suggested adjusting the mullion locations, so they resemble the windows on the first and second floors.
Mr. Pitman replied that they will be a closer match and will be modest.
Mr. Martinez asked why the roof pitch at the dormer has changed. Mr. Pitman replied that the new dormer will
match the pitch of the existing roof and the current dormers have a different pitch.
Mr. Martinez asked if the side entrance door transom be reduced by making the door taller since the proportions are
strange with a small looking door and two large transoms above. Mr. Pitman replied that the door is 3-6’W x 8-feet
H and the mullions were added between the two transoms to break up the pattern and make the pane pattern vertical
not horizontal.
Mr. Martinez asked why a fence is proposed at the parking lot. Mr. Pitman replied that the PB is concerned with
headlights, view corridors, traffic flow, etc.
Mr. Meche asked about the large circles shown on rear façade. Mr. Pitman replied that they are existing kitchen
vents that will be removed.
Public Comment:
Karen Murray Cady spoke in favor of seeing this building being restored. Concerned about when the neighborhood
should weigh in on the traffic, parking, and the impact construction will have on the neighbors. Mr. Pitman replied
that those questions are legal issues that get resolved at the PB meetings, but they will have a neighborhood
meeting prior to the PB meeting to address the concerns of the neighbors.
Michael Steinitz, President of Friends of Broad Street Cemetery. Happy to see the building be rehabilitated.
Regarding the west parking lot door, the PEM example lowered the entire surround and in-filled the area above
with brick, so the entrance was the same proportion. This seems to be an awkward solution, with a lot of glass,
that’s highly visible when traveling down Broad Street, although the original photo doesn’t show any further detail.
Mr. Joyce replied that moving it down takes it out of level with the main Broad Street door, so moving it down and
adding a transom above keeps them level.
Sarah Staats asked if the cupola would be restored. Mr. Pitman replied yes, the details will be restored, and any
missing elements will be replicated using paint grade mahogany.
Emily Udy, 8 Buffum Street. Noted that all other windows and dormers have a heavy stone lintel and asked if there
an opportunity to create an upper lintel with stone trim to tie it to the other windows. Mr. Pitman replied that they
could add a wood trim that touches the wood cornice, but it wouldn’t be appropriate to include a brownstone lintel
since they are framed in wood. Mr. Meche suggested enlarging the trim at the head of the transom. Mr. Pitman
replied that the doors will be 3-feet wide and 6-feet wide overall. Mr. Martinez suggested the doors mimic the
window and making a large mullion between the transom in the dormer. Mr. Meche suggested using French doors.
Mr. Pitman agreed and don’t that they don’t want a single course of slate above so that’s why they selected wood
and a wood corner board could also be used.
Salem Historical Commission meeting minutes, February 16, 2022
Page 4 of 8
Ms. Kelleher stated that she received an e-mail from Lisa Lyons, with questions and concerns that related more to
the PB review.
No one in the assembly wished to speak.
Ms. Kelleher stated that regarding the discussion on recreating the balustrade, another project used mahogany and
composite for repairs in hard-to-reach areas and suggested it be considered for this project. Mr. Joyce added that
once painted the difference in material wouldn’t be very visible.
Ms. Kelleher stated that the complexity of the new iron railing at the window wells hasn’t been called out. It’s
unknown if they would be similar to the cemetery and she suggested a conditional approval for their design.
Mr. Meche suggested other conditional approval items such as the west entrance, balcony on third floor, and infill
items like doors and windows. Mr. Joyce added the dormer trim detailing, fencing, changing all doors to 4 panels,
and balustrade.
VOTE: Mr. Meche made a motion to grant conditional approval with additional review of all entry doors,
balustrade, balcony, fencing with the submission of floor plans, and mechanical plans. Mr. Cutting seconded the
motion. Roll Call: Cutting, Martinez, Meche, Joyce were in favor and the motion so carried.
Ms. English joined the meeting at this time.
38 Norman Street
38 Norman Street LLC submitted a request to Waive Demolition Delay to demolish 1956 garage building
Documents & Exhibits
• Application: 1/5/22
• Photographs
Ryan Wittig and Matthew Moore of Camerra Capital and Philip Sima, Balance Architects, were present.
Mr. Witting stated that a 20-unit residential building is proposed with a ground floor commercial space, which is an
upgrade over the current existing use as a former gas station and a Christmas tree lot. Ms. Kelleher noted that
traditionally the Commission has asked for development plans, but this project is also going through PB, SRA,
DRB review as well.
Mr. Sima noted that the building is a 2,000 square-foot former Texaco service station built in 1956 located in the
downtown district. It has stucco siding, one window and 2 service doors on Norman Street, and CMU on the rear
wall. No original Texaco signage remains. The new development proposes to eliminate the Normal Street curb
cut. A 20-unit development with a first-floor commercial space with outdoor seating on Norman Street and
vegetative screening. There will be an enclosed trash and recycling room, and pavers at the residential entry and
seating. There will be 3 floors of residential units that step back alongside the abutters and at the roof decks. The
rental units are primarily 1 and 2 bedrooms, there will be an architectural CMU masonry base, with ACM panels,
and brick and clapboard siding above. The parking entry is partially exposed and partially over the building with
an opaque garage door. Iterations resulted in a 4-story development, rather than the 5-stories originally proposed.
They want to create a vertical prominence to differentiate between the base with a different pattern of brick at the
4th floor and the use of banding.
Mr. Joyce stated that the application is to discuss the Demolition Delay request so they can’t talk about the design.
According to the Demolition Delay the existing building should be well documented with plans and photographs if
it cannot be saved, because this is representative of the style used at the time.
Public Comment:
Mark Ricklefs, 24 Norman Street. Concerned with the 3-story building’s impact on adjoining house and residential
neighborhood. He stated that the request to waive the demolition delay was the first time he had received notice of
the project, which was concerning since the project is far into the process. He asked what will happen to people
Salem Historical Commission meeting minutes, February 16, 2022
Page 5 of 8
using that parking area or the Christmas tree lot that people in the neighborhood get their tree from. The dumpster
would be less than 20-feet from the closest Salem neighbor. While the developers state that neighbors are aware of
the demolition, he is the only one that showed up at this meeting and he’s concerned this will be like other new
developments. Ms. Kelleher noted that language was added to the recently revised Demolition Delay ordinance
requiring for a 2-week notice to abutters and abutters to abutters. Other review boards would have done the same
and included newspaper ads too. The Commission only sends notices to abutters and abutters to abutters.
Emily Udy, Historic Salem Inc. HSI has no comments on the historical significance of the existing building and is
in agreement with the Historical Commission. The previous demolition in this area of the downtown in the 1940s
and 50’s divided Crombie and Summer Streets from the McIntire District and anything proposed should connect
the neighborhoods in a pedestrian friendly way that’s beneficial to the neighborhood. She thanked the developer
for working with HSI and hopes they continue that outreach with others.
Ms. Kelleher stated that she received no additional written public comments and there are other opportunities to
participate in the PB, SRA, and DRB review on other concerns.
Mr. Joyce noted that parking, etc. will be reviewed by the Planning Board.
No one else in the assembly wished to speak.
VOTE: Mr. Cutting made a motion to approve the request to waive the Demolition Delay with the condition that
photographs and dimensional plans of the existing building be provided prior to demolition. Ms. English seconded
the motion. Roll Call: Cutting, Martinez, Meche, English, Joyce were in favor and the motion so carried.
6 Lathrop Street
Michael Buonfiglio submitted a Request to Waive Demolition Delay to demolish more than 50% of the building
Documents & Exhibits
• Application: 1/31/22
• Photographs
• Plans by MAC Design
Attorney Kristin Kolick of Correnti & Darling, Michael Buonfiglio, and Matt Carlson, Project Designer at MAC
Design were present to discuss the project.
Atty. Kolick stated that the building is in the Bridge Street Neck National Registered District, the original building
was constructed around 1800, but the structure has been substantially altered with oddly configured bump-outs on
multiple sides. The applicant purchased the home 1-year ago and intended to complete a renovation and repairs.
He intends to square off and modernize the building with the intent to keep it within the character and style of the
neighborhood, although the renovation triggers the Demolition Delay Ordinance, and they are requesting a waiver.
Mr. Carlson stated that the front of the house fits in with the Georgian style within the district with its 3-bay facade
and 2-bay side elevation, although there have been substantial modifications to the front and rear façades. The
houses at 12 Conant Street and 5 Barton Street area similar and have been modified. The modification made to 6
Lathrop include a side porch that created a new entrance, the continuation of the upper level of the gambrel roof to
provide additional square footage, at the rear a single story and partial two-story addition and a second means of
egress, at the left side a small bump-out to add a half bath to each unit that has structural posts and no foundation.
The intent of the proposed design is to preserve some of the street facing elements while improving the living
spaces on each floor through exterior balconies and porches. A full height bump-out was also added to preserve the
overall new massing of the building. They are pulling from both new and old designs to include covered side
porches, gable roofs with gabled dormers that maintain the flat street façade. All the existing windows and siding
has been replaced and the brick foundation walls painted. The proposal is intended to restore the aligned rhythm of
the façade to a more traditional design and to do away with the windows of various sizes that don’t align.
Ms. Kelleher stated that the building is from the mid 1800’s Georgian style with the gambrel roof. It is located
within a National Registered district and was found to be a contributing resource in the district, which is one of the
Salem Historical Commission meeting minutes, February 16, 2022
Page 6 of 8
criteria for determining whether a building is historically significant. She is not sure when the additions were added,
and the structure has most likely been modified since the inventory form was completed. Mr. Cutting noted that the
brick foundation extends across the extended left-side. Ms. Kelleher replied that the foundation is high and
consistent and could have been moved. Mr. Joyce agreed that the new foundation aligns well with the existing.
Mr. Joyce noted that they are taking off the existing gambrel and proposing a gable roof and asked if the roof will
be raised to provide additional height. Mr. Carlson replied yes, the roof would be lifted to provide more third floor
living space. The space on that level is only within the gambrel and doesn’t extend into the extended roof. Mr.
Meche asked how much will be demolished. Mr. Carlson replied that pending a structural review, the structure will
be removed down to the ceiling of the second floor, since much of the framing appears to be deteriorating, but what
is salvageable will remain, although the window openings would change. Mr. Meche asked if the waiver is being
requested to potentially demolish the structure down to the found walls. Ms. Kelleher replied that the removal of
50% or more of the roofline triggered the new Demolition Delay Ordinance. Much of the building will be removed
even if the exterior walls remain in place. If there are any hesitations or concerns the Commission can schedule site
visits, review condition reports, and work with property owner to search for opportunities to salvage what is left of
the historic character.
Mr. Joyce expressed concern that the proposed style doesn’t fit within the neighborhood and there is no formal
language left that speaks to the historic layout of the proposed structure. The basic shape remains, but the
symmetry of a Georgian style, the additions have been lost, and the proposed roof pitch is steeper than the
surrounding buildings. Although no additional floor is being added, but the gambrel hides a third floor well and
dormer can be added. The house also won’t be wider; the left side addition is being removed to restore the 1-room
depth. He asked if they considered keeping the left side addition. Mr. Carlson replied that they considered
reconfiguring the roof to maximize the living space for the third-floor unit to make each unit equal.
Mr. Meche noted that the shed dormer, where the face of the dormer is in line with the façade of the building, but
there is no window over the entry door. The partial demolition has erased the historic aspects, but if those aspects
are not so far gone then perhaps there is a better way to reuse them. Mr. Martinez believed that the details are not
too far gone, the house is clearly a Georgian style. Its details make it easy to see what it used to be, how it was
configured, and its relationship to the lot and the neighborhood. The Commission sees many Georgian style houses
turned sideways throughout Salem. The new design is a new house, but the current house is preferably preserved,
the discussion regarding the design is to find common ground to complete the work sooner than 18-months. The
roof line is entirely characteristic and should be preserved and the gable end is inappropriate for this house. He
asked if the footprint is changing or only being modified at the upper level. Mr. Carlson replied that the width
would remain, and the depth would increase to match 8 Lathrop Street, but the footprint will remain.
Mr. Meche asked if Zoning relief was required. Atty. Kolick replied that they applied to ZBA because the house is
in a B4 zoning district. The received ZBA approval for changing use from a 2-family to a 3 unit building. Mr.
Buonfiglio added that the structure would not be taken down to the foundation, only to the second-floor deck and
dormered as depicted in the renderings.
Public Comment:
Emily Udy, HSI. A letter was submitted that spoke to the significance of the house because of its age, form, and
location. HSI believes it should be found preferably preserved. 7 Curtis Street went through a similar process and
received feedback from the Commission and HSI on ways to utilize more of the building without changing the
roofline. HSI is extending that invitation to the applicant as they would with any project and are happy to
participate in any conversation that will help the developer reach their goal while maintaining as much of the
historic house as possible. They appreciate the Demolition Delay process which allows that addition time to meet
the goals of the community and the developer.
Barbara Cleary, HSI. The new Demolition Delay Ordinance was designed to allow time for design input to
determine what details and important features can be reused. Once the finding of significance is determined and the
structure is found preferably preserved, design discussed that results in a satisfactory conclusion the delay period
can be reduced. One of the contributing elements of the definition of historic significance is a contributing building
in a National Register District, which this property does.
No one else in the assembly wished to speak.
Salem Historical Commission meeting minutes, February 16, 2022
Page 7 of 8
Ms. Kelleher stated that if the Commission were to invoke the delay, it would start with the closure of the public
hearing, and during the delay the Commission can work with the property owner to find a solution and when the
Commission is satisfied the delay can be released.
Mr. Meche stated that the structure is contributing according to the language of the ordinance. Ms. Kelleher replied
that the Commission must also determine if the structure is preferably preserved.
The Commission agreed to conduct a site visit. Atty. Kolick suggested a continuation to allow for revisions to the
gambrel roof and overall proposed design.
Mr. Joyce noted that there are stipulations for historically significant buildings to maintain their features and bypass
the building code if there is no health code or safety violation.
Mr. Meche added that the International Building Code (IBC) provides some flexibility but not for historically
significant structures unless it’s a museum. His opinion would be for a continuance to modify the design, but if
details are replicated to match, they will not look original so saving what you can is better, but it’s a good start.
He’s looking forward to the revised design. Mr. Joyce stated that a walkthrough of the structure during a redesign
could occur simultaneously. Window scale and dimensions are also important to keep in mind, so the new
windows aren’t too small or too big.
VOTE: Ms. English made a motion to continue to the next regular meeting on March 2, 2022. Mr. Martinez
seconded the motion. Roll Call: Cutting, Martinez, Meche, English, Joyce, were in favor and the motion so carried.
Other Business:
Old Town Hall – Request for letter of support for grant application
Ms. Kelleher presented a request for a letter of support for the City of Salem’s application for a grant under the
Economic Development Administration (EDA) to renovate and make sustainable and add HVAC, and accessibility
improvements to Old Town Hall. This work would render all three floors of the building useable as a year-round
center for arts and culture. Many factors will be considered as part of this review including making it a net zero
building, adding fire suppression, restoring interior features, and window operating on the second-floor windows
which makes holding summer events challenging. The Commission will have a role in overseeing this future of
this historic city resource.
Ms. Kelleher stated that she could draft and circulate a support letter that includes the statement that the Historical
Commission looks forward to working with City Planners and Designers to ensure that the character is preserved
while making the building more useful for the future.
VOTE: Ms. English made a motion to approve providing a letter of support. Mr. Cutting seconded the motion.
Roll Call: Cutting, Martinez, Meche, English, Joyce were in favor and the motion so carried.
Conflicts of Interest Certification: Ms. Kelleher noted that an e-mail want sent to all Commission members
regarding the annual conflict of interest statement. Both the letter and certification form must be signed and
returned to her.
35 Chestnut Street: Ms. Kelleher stated that the landing details were sent to her and Mr. Joyce and she will let the
applicant know that they are authorized to proceed.
Commission Appointments: Ms. Kelleher stated that there are a regular and alternate position available for the
Salem Historical Commission. They are looking for a resident of one of the local historic districts, however Ms.
Salem Historical Commission meeting minutes, February 16, 2022
Page 8 of 8
English is the only woman and full representation on the Commission would be great. Please send any suggestions
to her.
In-Person Meetings: Ms. Kelleher reported that she had just received an e-mail regarding resuming in-person
meeting. The open meeting law has been extended to allow remote meetings through July. She will request a vote
at the next meeting regarding whether to end remote meetings in March or to extend them to July. Mr. Martinez
asked whether the majority of the Commission members must be in person to vote if meetings converted to in-
person. Ms. Kelleher will request clarification since there have been some question as to what that means for the
Board/Commissions vs. the public. Her personal preference would be for in-person meetings although virtual has
been very helpful to allow everyone to see all the documentation under review.
Violations: Ms. Kelleher stated that there are outstanding violations that need to be addressed. Including 186
Federal Street which significant violation from the installation of a new driveway. Currently, the owner is working
with the Engineering Department and once that review is completed, will return to the Commission to review the
as-constructed driveway. The contractor did not pull permits before beginning the work.
Mr. Martinez requested that some of the violations be brought back into the agenda.
Adjournment
VOTE: Mr. Cutting made a motion to adjourn. Mr. Martinez seconded the motion. Roll Call: Cutting, Martinez,
Meche, English, Joyce were in favor and the motion so carried.
The meeting adjourned at 9:00PM
Respectfully submitted,
Patti Kelleher
Preservation Planner
Agenda
Salem Historical Commission
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)
619-5685
Agenda*
SALEM HISTORICAL COMMISSION
WEDNESDAY, FEBRUARY 16, 2022
6:00 P.M.
*Notice is hereby given that a meeting of the Salem Historical Commission will be held on Wednesday, January
5, 2022 at 6:00 p.m. via remote participation in accordance with Chapter 20 of the Acts of 2021.
Every effort will be made to ensure that the public can adequately access the proceedings in real time, via
technological means. In the event that we are unable to do so on matters not requiring a public hearing, we
will post on the City of Salem’s website an audio or video recording, transcript, or other comprehensive record
of proceedings as soon as possible after the meeting.
Individuals may participate remotely in the meeting via a remote participation platform called Zoom.
Members of the public and/or parties with a right and/or requirement to attend this meeting may access the
remote participation meeting through any one of the following ways:
• Go to the website
https://us02web.zoom.us/j/87649483527?pwd=dHhYbW5tQW5KNzNFSUUwZElIMU9sZz09 or enter it
into your web browser to join the meeting; or
• Go to the website link https://zoom.us/join and enter Webinar ID# 876 4948 3527 and enter Passcode
548470
▪ Dial a toll-free phone number 877-853-5257 (Toll Free). When prompted, enter Webinar ID # 876 4948
3527, enter Passcode 548470 and follow the instructions to join the meeting. Those only dialing in will
not have access to the direct video feed of the meeting but can follow along with the project materials
that will be available for download online prior to the meeting.
▪ The link to access project materials can be found at
https://cityofsalem1.sharepoint.com/:f:/s/HistoricalCommission/Eh3TpX6cmphHg9haaqqf8EsBL4wBT0
Un7xxeycZoIQj1qw?e=ZQdhmX
Members of the public attending this meeting virtually will be allowed to make comments if they wish to do
so, during the portion of the hearing designated for public comment. The meeting will be opened early at 5:45
pm to allow members of the public to test their audio. During portions of the meeting in which public
comment is permitted, members of the public who have “raised their hand” in Zoom will be called on to offer
comment. In order to raise a hand, members of the public using the Zoom computer or phone application may
click the “Raise Hand” button; members of the public dialing in may press “*9” to raise their hand to speak.
City of Salem Historical Commission
Agenda for February 16, 2022
Page 2 of 2
SALEM HISTORICAL COMMISSION
WEDNESDAY, FEBRUARY 16, 2022
6:00 P.M. (PLEASE NOTE NEW TIME)
MEETING AGENDA
1) 20 Chestnut Street – Shawn Smith – Certificate of Appropriateness – Roof vents
2) 5 Broad Street – Charing Cross Realty – Certificate of Appropriateness – Renovate building – NOTICE: The
public hearing for this application was continued from the February 2, 2022 meeting due to an error in the
abutter notification.
3) 38 Norman Street – 38 Norman Street LLC – Request to Waive Demolition Delay – Demolish 1956 garage
building
4) 6 Lathrop Street – Michael Buonfiglio – Request to Waive Demolition Delay – Demolish more than 50% of
building
5) Other Business
a. Minutes
b. Violations
c. Correspondence
Persons requiring auxiliary aids and services for effective communication such as sign language interpreter, an
assistive listening device, or print material in digital format or a reasonable modification in programs, services,
policies, or activities, may contact the City of Salem ADA Coordinator as soon as possible and no less than
2 business days before the meeting, program, or event. Know Your Rights Under the Open Meeting Law,
M.G.L. c. 30A §18-25, and City Ordinance Sections 2-2028 through 2-203
Get email alerts for Salem
A daily email when new agendas and minutes are posted.