Historical Commission
Regular MeetingSalem, MA · May 1, 2024
Minutes
SALEM HISTORICAL COMMISSION
MINUTES
May 1, 2024
A meeting of the Salem Historical Commission was held on Wednesday, May 1, 2024 at 6:00PM via
Zoom Virtual Meeting. Present were: Mark Meche, Kelly Tyler-Lewis, Milo Martinez, Rebecca
English, Vijay Joyce, Larry Spang (Chair), Margarida Goncalves (arrived late). Staff: Patti Kelleher
55 Summer Street
Kelly Shutoff submitted an application for a Certificate of Appropriateness for architectural roof shingles.
Ms. Kelleher reported that this project was reviewed under the minor change category. No objections
were received by April 29, 2024 and the certificate was issued. Therefore, the public hearing was
cancelled.
3 Smith Street—continuation
Megan Valentine submitted an application for a waiver of the demolition delay to demolish more than
50% of roof on house older than 100 years.
Documents & Exhibits:
▪ Application: 3/5/24
▪ Slideshow/photographs
Ms. Valentine noted that updated drawings were made available to Commission members. Ms. Valentine
noted that the roof would be raised thus creating more interior headroom and larger windows. The line of
the window would then match with side windows and be somewhat enlarged to match look of downstairs
windows. Chair Spang noted that revised scheme had taken suggestion to break cornice line so that
windows would come down and thus become more usable. Ms. Valentine affirmed that these revisions
were made and lauded the proposed alterations. Mr. Joyce suggested bringing roof slope of dormer down
a bit. Chair Spang noted that this house was not in a local historic district but is a contributing resource in
a National Register district.
Mr. Meche agreed with Mr. Joyce about the dormer. Mr. Meche was in favor of pulling the dormer away
from the exterior wall. Ms. Valentine questioned what the Commission would propose seeing on the
dormer. Chair Spang noted that Mr. Joyce’s recommendation was to lower the upper eave above the
second-floor windows. Mr. Joyce and Chair Spang marked up existing drawings to demonstrate
recommendations.
Mr. Martinez pointed out inconsistencies between placement of windows in recently submitted drawings
and current photos of the house. Mr. Joyce seconded Mr. Martinez’s point that accurate drawings would
be needed, as did Mr. Meche. Chair Spang advised re-submitting drawings for accuracy in advance of
further discussion. Mr. Martinez questioned the cornice that was remaining between the windows, which
Mr. Joyce was in favor of retaining. The applicant’s contractor asked for clarification that the goal was to
drop soffit down to top of window. Chair Spang noted that upper fascia board was situated fairly high
above windows and lowering it would still maintain head height inside.
Salem Historical Commission Meeting Minutes, May 1, 2024
Page 2 of 6
VOTE: Ms. Joyce motioned to continue the application to next meeting. Mr. Martinez seconded the
motion. Roll Call: English, Meche, Tyler-Lewis, Martinez, Joyce, Raka-Goncalves, Spang were in favor
and the motion so carried.
29 Washington Square North—continuation
Bertram Home submitted an application for a Certificate of Appropriateness to replace windows.
Documents & Exhibits:
▪ Application: 3/13/24
▪ Slideshow/photographs
John McIntire, maintenance coordinator of the Bertram House, was present. Mr. Joyce and Mr. Martinez
had visited the site in the interim. Mr. McIntire turned in a new cut sheet and detail which Ms. Kelleher
displayed. Chair Spang noted that three large windows facing the Commons would be replaced, one of
which would have a door to exit onto existing balcony. A photograph of the façade was shown. Chair
Spang questioned the structural capacity of the porch, given the stated goal of having residents occupy the
balcony. Mr. McIntire noted that the entire patio had been refurbished four years ago and was structurally
sound. Mr. McIntire also said that the rail was at least 42” tall and did not anticipate issues with building
inspector. Mr. Joyce noted that the intent of the door to be installed would be to look like existing
window, and the sill portion would be something that gets added to the kickplate of the door itself. Mr.
Meche questioned if such a custom product could be procured through Pella. Mr. McIntire noted that
minimal impact would occur on the bricks around the existing windows. Mr. Joyce noted that the outside
frame of door would be thicker than those of a window. Chair Spang questioned how deep the balcony
was in terms of its practicability to hold occupants.
Mr. Martinez noted that having a sash at the top of the middle window and a door at the bottom was not
the initial expectation. Mr. Martinez expressed preference for using a window instead of a door, though
this would still make the placement of bottom sill problematic. Ms. Kelleher noted that stacking a triple
hung window would eliminate need for a swinging door that would ultimately take up space. Mr. Meche
recommended that the applicant hire an architect. Mr. Joyce noted that different rules applied to
commercial buildings rather than residential. Chair Spang also advocated checking with insurance
provider.
Given the distinguished nature and location of house, Chair Spang expressed concern for the nature of the
windows: any replacements should be replicas. Chair Spang requested more clarity on the balcony size,
railing height, code compliance, etc. before furthering discussion.
Ms. Raka-Goncalves also expressed concern for senior residents going in and out onto this balcony space
with respect to height of the rail.
No public comment.
VOTE: Mr. Joyce motioned to continue the application to next meeting. Mr. Martinez seconded the
motion. Roll Call: English, Meche, Tyler-Lewis, Martinez, Raka-Goncalves, Joyce, Spang were in favor
and the motion so carried.
Salem Historical Commission Meeting Minutes, May 1, 2024
Page 3 of 6
8 Gifford Court—continuation
Michael Scott submitted an application for a Certificate of Appropriateness to replace wood siding with
composite siding.
The applicant was not in attendance.
VOTE: Ms. English motioned to continue the application to next meeting. Ms. Raka-Goncalves
seconded the motion. Roll Call: Meche, English, Raka-Goncalves, Tyler-Lewis, Martinez, Joyce, Spang
were in favor and the motion so carried.
29 Willson Street
Stephen Lovely and Meghan Lovely submitted an application for a waiver of the Demolition Delay
Ordinance to demolish garage older than 50 years.
Documents & Exhibits:
▪ Application: 4/4/24
▪ Slideshow/photographs
Steven Lovely was present on behalf of son and daughter-in-law. Mr. Lovely said the house was built
around 1930, as was the garage which is too narrow and small to support a vehicle being inside. The
garage was also in disrepair. Mr. Lovely said that plan was to eventually build a larger garage but the
applicants still needed to meet with the Conservation Commission as the property is in a buffer zone.
Chair Spang clarified that the plan was to remove existing garage in its entirety. Ms. Kelleher noted that
Willson Street had not been historically surveyed nor inventoried (neither the house nor garage). Ms.
Raka-Goncalves questioned the plan for replacement garage. Mr. Lovely noted that no plans existed,
citing the need to still meet with the Conservation Commission. Mr. Lovely noted that any replacement
would be built to match the existing house/property; likely a two-car garage to fit a modern vehicle.
No public comment.
VOTE: Mr. Joyce motioned that the garage was not historically significant. Ms. English seconded the
motion. Roll Call: Meche, English, Raka-Goncalves, Martinez, Joyce, Tyler-Lewis, Spang were in favor
and the motion so carried to waive the demolition delay.
23 Glendale Street
Frederick J. Atkins and Patricia Connolly-Atkins submitted an application for a waiver of the Demolition
Delay Ordinance to demolish storage building older than 50 years.
Documents & Exhibits:
▪ Application: 4/16/24
▪ Slideshow/photographs
Salem Historical Commission Meeting Minutes, May 1, 2024
Page 4 of 6
Sydney Atkins and attorney Bill Quinn were present on the call. Ms. Atkins spoke to the history of the
property and business, Dion’s Yacht Yard, the function of which is to service and provide storage for
boats. Ms. Atkins provided details on two storage sheds on south side of property: one was likely built in
the 1940s or 1950s, not part of original property, and definitely older than 50 years. Adjacent to that is
building that was probably rebuilt more recently (a steel structure building). The plan was to demolish
existing storage building and replace with larger storage building. Chair Spang clarified that the
applicants hoped to begin undertaking work in June 2024.
Interior and exterior images of existing buildings were shown. An aerial view was shown to clarify what
portions of building would be demolished and replaced with large steel shed. Ms. Atkins noted that the
new building would be insulated but not heated. Plans for new construction were shown. Ms. Atkins
noted that new storage building would have seven bays with minimal space between them. Ms. Atkins
noted that mechanical apparatuses would not feature atop the structure, in response to Chair Spang’s
question. Mr. Quinn noted nominal dimensional differences between the existing and replacement
structures.
Ms. Kelleher noted that this property was inventoried in 1989 but clarified that the building featured in
the inventory was not the one being demolished; the building being requested for demolition was not
included in the inventory form. Ms. Atkins proposed providing archival materials on the properties that
exist. Chair Spang proposed putting white cedar shingles on back of building facing the “Hocus Pocus”
house behind it, in order to keep with the fabric of the residential neighborhood as opposed to industrial
building. Ms. Raka-Goncalves agreed with Chair Spang’s suggestion. Chair Spang noted that the “Hocus
Pocus” house is a frequently visited landmark in the city, and called attention to the prominence of the
structure in question in relation to that landmark. Ms. Atkins was receptive to the Commission’s
suggestions to make the side of the building look historic. Chair Spang noted that photographs of
building should be taken prior to demolition.
No public comment.
VOTE: Mr. Joyce motioned to find the structure not historically significant. Mr. Meche seconded the
motion. Roll Call: Meche, Tyler-Lewis, English, Raka-Goncalves, Martinez, Joyce, Spang were in favor
and the motion so carried.
78 Washington Square
Estevan Martinez submitted an application for a Certificate of Appropriateness for downspouts, gutters
and in-kind repairs.
Documents & Exhibits:
▪ Application: 4/16/24
▪ Slideshow/photographs
Mr. Martinez was present. Photographs of house were shown. Mr. Martinez planned to have foundation
repointed to seal up against infiltration, as well as to carry out in-kind repairs on window jambs facing
Washington Square. Water infiltration issues along roofline would also be repaired. Mr. Martinez said
that two seams on front gutter had failed. An aerial view was shown to indicate gutter removals and
replacements. Two long runs of gutter would be replaced with aluminum seamless gutter and painted to
Salem Historical Commission Meeting Minutes, May 1, 2024
Page 5 of 6
match. Locations of downspouts to be replaced and added were also shown. Planned downspout product
was shown; aluminum round corrugated downspouts. Planned aluminum leader heads were also shown.
Neighborhood examples were shown, e.g. 12 Mall Street and 21 Washington Sq North. Mr. Martinez
noted that leader heads would be positioned between last set of brackets. A Photoshopped markup of
downspouts was shown.
No public comment.
VOTE: Mr. Meche motioned to approve application. Mr. Joyce seconded the motion. Roll Call: Meche,
English, Raka-Goncalves, Joyce, Spang were in favor and the motion so carried.
6 Monroe Street
6 Monroe Street LLC submitted an application for a Certificate of Appropriateness to relocate fire alarm
bell and strobe.
Documents & Exhibits:
▪ Application: 4/16/24
▪ Slideshow/photographs
Patrick Reddy was present. Mr. Reddy noted new fire alarm system was installed as part of renovation.
The applicant requested relocation of existing fire alarm bell and strode on building façade to side
elevation and removal of existing conduit from facade. Mr. Reddy noted that this was a relocation of
existing items, to be fed by conduit from inside home (the existing outside conduit would be removed).
Mr. Reddy identified property as a lodging house. Mr. Reddy noted that the property does have a
sprinkler system which is not being changed. Chair Spang clarified that existing devices would
essentially be moved to side cornerboard.
Public comment:
Peter J. Atkinson, 362 Essex, identified as neighbor to property, and had no objection. Mr. Atkinson
questioned where strobes would be placed. Mr. Atkinson also remarked on the floodlight in rear of
property and requested that the owner reposition light. Mr. Atkinson cast support for Mr. Reddy’s work
on the house.
Ziggy Hartfelder, 10 Monroe Street, also cast no objection and expressed enjoyment for Mr. Reddy’s
renovation and restoration of property as new landlord.
VOTE: Ms. English motioned to approve the application. Ms. Raka-Goncalves seconded the motion.
Roll Call: Meche, English, Raka-Goncalves, Tyler-Lewis, Martinez, Joyce, Spang were in favor and the
motion so carried.
Salem Historical Commission Meeting Minutes, May 1, 2024
Page 6 of 6
6 Kosciusko Street
Scott Coughlin submitted an application for a Certificate of Appropriateness to install AC condenser.
Documents & Exhibits:
▪ Application: 4/17/24
▪ Slideshow/photographs
Mr. Coughlin expressed desire to install ductless minisplit in home. Planned location of condenser unit
was shown. Chair Spang noted that rear of house faced an historic site. Fence behind house was 42” tall.
Ms. Kelleher noted that the Commission had previously reviewed this property. Mr. Meche noted that the
condenser unit would also be covered by an overhang on the property. Ms. Tyler-Lewis noted that raising
condenser units was done to prevent snow accumulation. Mr. Meche encouraged routing the line sets
inside house rather than on exterior. Mr. Martinez clarified that the line set was going on the side of
house between two houses, not facing the park, which Mr. Coughlin affirmed. Ms. Kelleher confirmed
that the lines would run horizontal from the condenser around the side of the house and then vertical.
No public comment.
VOTE: Mr. Meche motioned to approve as submitted with the additional clarification that line sets
project horizontal around the corner before going vertical; if practicable to be installed inside; painted to
match color of clapboards (added by Ms. Tyler-Lewis). Ms. Tyler-Lewis seconded the motion. Roll
Call: English, Meche, Tyler-Lewis, Martinez, Joyce, Raka-Goncalves (recused), Spang were in favor and
the motion so carried.
Other Business
Minutes
Ms. English reviewed minutes for December 20, 2023; March 20, 2024; and April 3, 2024.
VOTE: Ms. English motioned to approve the minutes for December 20, 2023; March 20, 2024; and
April 3, 2024. Mr. Joyce seconded the motion. Roll Call: Meche, English, Raka-Goncalves, Tyler-
Lewis, Martinez, Joyce, Spang were in favor and the motion so carried.
Adjournment
VOTE: Mr. Meche motioned to adjourn. Mr. Joyce seconded the motion. All were in favor and the
motion so carried.
The meeting adjourned at 8:39 PM.
Respectfully submitted,
Dan Graham, Historical Commission Clerk
Agenda
Salem Historical Commission
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)
619-5685
AGENDA*
SALEM HISTORICAL COMMISSION
WEDNESDAY, MAY 1, 2024
6:00 P.M.
*Notice is hereby given that a meeting of the Salem Historical Commission will be held on Wednesday, May 1,
2024 at 6:00 p.m. via remote participation in accordance with Chapter 2 of the Acts of 2023
Every effort will be made to ensure that the public can adequately access the proceedings in real time, via
technological means. If we are unable to do so on matters not requiring a public hearing, we will post on the
City of Salem’s website an audio or video recording, transcript, or other comprehensive record of proceedings
as soon as possible after the meeting.
Individuals may participate remotely in the meeting via a remote participation platform called Zoom.
Members of the public and/or parties with a right and/or requirement to attend this meeting may access the
remote participation meeting through any one of the following ways:
• Go to the website
https://us02web.zoom.us/j/82556613216?pwd=aEoySVFxTFY2UzViWlc2SFVtQ2JvUT09 or enter it
into your web browser to join the meeting; or
• Go to the website link https://zoom.us/join and enter Webinar ID# 825 5661 3216 and enter
Passcode 127664
▪ Dial a toll-free phone number 877-853-5257 (Toll Free). When prompted, enter Webinar ID #
825 5661 3216 , enter Passcode 127664 and follow the instructions to join the meeting. Those only
dialing in will not have access to the direct video feed of the meeting but can follow along with the
project materials that will be available for download online prior to the meeting.
▪ The link to access project materials can be found at 05-01-24 SHC Meeting folder
Members of the public attending this meeting virtually will be allowed to make comments if they wish to do
so, during the portion of the hearing designated for public comment. The meeting will be opened early at 5:45
pm to allow members of the public to test their audio. During portions of the meeting in which public
comment is permitted, members of the public who have “raised their hand” in Zoom will be called on to offer
comment. In order to raise a hand, members of the public using the Zoom computer or phone application may
click the “Raise Hand” button; members of the public dialing in may press “*9” to raise their hand to speak.
City of Salem Historical Commission
Agenda for May 1, 2024
Page 2 of 2
SALEM HISTORICAL COMMISSION
WEDNESDAY, MAY 1, 2024
6:00 P.M. (PLEASE NOTE NEW TIME)
MEETING AGENDA
1) 55 Summer Street – Kelly Shutoff – Certificate of Appropriateness – Architectural roof shingles – This
project was reviewed under the minor change category – if no objections are received by April 29, 2024, the
public hearing will be cancelled.
2) 3 Smith Street – Megan Valentine – Request to waive the demolition delay – Demolish more than 50% of
roof on house older than 100 years – continuation
3) 29 Washington Square North – Bertram Home - Certificate of Appropriateness – Replace windows -
continuation
4) 8 Gifford Court – Michael Scott – Certificate of Appropriateness – Replace wood siding with composite
siding - continuation
5) 29 Willson Street – Stephen Lovely; Meghan Lovely – Waiver of the Demolition Delay Ordinance – Demolish
garage older than 50 years
6) 23 Glendale Street – Frederick J. Atkins and Patricia Connolly-Atkins – Waiver of the Demolition Delay
Ordinance – Demolish storage building older than 50 years
7) 78 Washington Square – Estevan Martinez - Certificate of Appropriateness – Downspouts, gutters and
inkind repairs
8) 6 Monroe Street – 6 Munroe Street LLC – Certificate of Appropriateness – Relocate fire alarm bell and
strobe
9) 6 Kosciusko Street – Scott Coughlin – Certificate of Appropriateness – Install AC condenser
10) Other Business:
a. Minutes;
b. Violations;
c. Correspondence
Persons requiring auxiliary aids and services for effective communication such as sign language interpreter, an
assistive listening device, or print material in digital format or a reasonable modification in programs, services,
policies, or activities, may contact the City of Salem ADA Coordinator as soon as possible and no less than
2 business days before the meeting, program, or event. Know Your Rights Under the Open Meeting Law,