Sustainability, Energy, & Resiliency Committee
Regular MeetingSalem, MA · March 23, 2022
Minutes
Sustainability Energy and Resiliency Committee (SERC)
Meeting Minutes
March 23, 2022, 6:30 P.M.
Remote Participation
Attendance
Chair John Hayes
Vice Chair Gail Kubik
Chris Cantone
Doug Bowker
Rick Nye
City Staff:
Jenna Ide, Director, Sustainability and Resiliency Department & Capital Projects
Esmeralda Bisono, Manager, Sustainability and Resiliency Department
Vanessa Pineda, Energy Manager
Stacy Kilb, Sustainability Engagement Coordinator (recorder)
Chris Malstrom, Lead Outreach Coordinator
Public:
SATV (recording)
Stephanie Ericson
Robert Rogers
Erin Casey
John DiModica
Not Present
Phil Koch
Jeff Cohen, City Council liaison
Introduction
Robert Rogers, resident. Concerned about sustainability and environment, wants to get
involved at the local level.
Public Comment
None
Review & Approve Meeting Minutes – December 15, 2021 and February 23, 2022
• Rick Nye notes that February minutes should say at the top that there was no
quorum
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404
♦ WWW.SALEM.COM
A motion to approve both sets of minutes, pending edits to be sent to Stacy by Monday
the 28th close of business, is made by Gail Kubik, seconded by Rick Nye and passes 5-0.
• Jenna Ide suggests that when items related to the Green Building Ordinance
come up and SERC will play a role, members should review minutes before the
meeting so that they can be discussed in depth during the meeting so that edits
can be agreed to by all Board members.
• Board members will be sure to come to future meetings with comments on the
minutes.
Guest Speaker: Breathe Clean North Shore – Peabody Peaker Plant (Mireille Bejjani, Energy
Justice Director, Community Action Works)
• 60-megawatt natural gas and oil peaking power plant
• Funding and permits obtained
• Expands natural gas infrastructure
• Located within one Environmental Justice (EJ) community and less than a mile
from 8 others
• Impact has not been evaluated
• Site locus
• EJ communities outlined
• 14 municipal utilities signed 30-year contracts, but some have withdrawn b/c it
would be cheaper to withdraw from contract and buy energy on the open
market
▪ Chicopee and Holyoke are out
▪ Wakefield, South Hadley, and Hull are reconsidering
▪ Many communities purchasing power are not close to the source of their
power in this case
• Made some adjustments to project: no oil tank, replace ammonia with urea
• Agreed to retire one Peaker in Peabody but no plans for this were shared
• Proposed to integrate hydrogen fuel but uncertain if this is a feasible alternative
• MMWEC moving forward
• BCNS wants:
▪ Re open the Mass Environmental Policy Act (MEPA) process and conduct
an Environmental Impact Report (EIR) as this has not been done; the
2015 threshold was higher (see https://www.mass.gov/regulations/301-
CMR-1100-mepa-regulations#11-03-review-thresholds )
“Energy.
1. ENF and Mandatory EIR.
a. Construction of a New electric generating facility with a Capacity of 100 or more MW.
b. Expansion of an existing electric generating facility by 100 or more MW.
c. Construction of a New fuel pipeline ten or more miles in length.
d. Construction of electric transmission lines with a Capacity of 230 or more kv, provided the
transmission lines are five or more miles in length along New, unused or abandoned right of way.
2. ENF and Other MEPA Review if the Secretary So Requires.
a. Construction of a New electric generating facility with a Capacity of 25 or more MW.
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404
♦ WWW.SALEM.COM
b. Expansion of an existing electric generating facility by 25 or more MW.
c. Construction of a New fuel pipeline five or more miles in length.
d. Construction of electric transmission lines with a Capacity of 69 or more kv, provided the
transmission lines are one or more miles in length along New, unused or abandoned right of
way.”
▪ Conduct a CHIA (Community Health Impact Assessment)
• Recent actions are outlined: Day of Action, petition, Board of Health appeals to
Baker Administration
▪ A group of 6 affiliated w/350 Massachusetts went on a hunger strike
▪ “Fix the Grid” rally on the Boston Common. Delays of wind and solar
entering market until 2028. Also went to some locations that would buy
power from this plant
• John Hayes comments: Original ENF in 2015? It was 2017, then got an air permit
in Sept. 2020. SERC signed the petition after the Committee voted on it; activism
pushing Gov. Baker re battery storage? Yes, battery storage is a viable alternative
and should be considered
• Stratagen Consulting Report: Energy Storage Alternatives for Project 2015A
• John notes that we are discussing this in a Salem board even though it’s in
Peabody b/c it affects all of us. Peaker plants running coincide with the worst air
quality days of the summer, if they are natural gas
• If in winter a Peaker plant is needed, it would have to run on oil b/c gas might
not be available due to higher demand for home heating
• Jenna Ide: They usually have to do an analysis of where air pollution goes; can
we see this as it may affect Salem on certain days? A visual would be helpful but
is not currently available; all data is in table form
▪ Don’t need Peaker plants if energy is managed correctly through demand
response, which saves customers money and costs nothing
▪ Not sure if Peaker will be water-cooled or air-cooled. If the former, they
would need a water permit which could be difficult to get as it is on the
river directly upstream from Salem and Beverly. Thermal pollution of a
water body could be an issue
• Gail Kubik: 51,000 tons of CO2 annually would be emitted and there is no offset
plan, though MMWEC claims less will be emitted. May be called to run more
than older Peakers, so it is permitted up to 51,000 tons and could reach that.
Gail is surprised that a plan for offsets is not mandated
• Timing of project permitting is described
• Chris Cantone: Agrees that battery storage is cost competitive to a point but asks
why Peabody has decided they need to increase the size of the plant they are
replacing? The existing plant is a 20-25 megawatt. Do they anticipate a larger gap
in what they are regulated to cover? Demand response/programmatic solutions
should be lowering that gap
▪ Mireille Bejjani: Outwardly this was not billed as a replacement, it started
as an addition and three Peaker plants would exist in Peabody, two
owned by PMLP and this by MMWEC, only as a result of organizing did
they decide to retire an existing plant. Was that the plan or only after
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404
♦ WWW.SALEM.COM
they were pushed? They have not moved to retire the smaller plant that
belongs to PMLP, 30% of that power goes to Peabody, the rest to other
MMWEC communities. The math does not quite add up
▪ Not just about Peabody, more about MMWEC, which covers many
municipalities and has a large area where they could promote demand
response
▪ Mireille also notes there are additional opportunities for battery storage.
They do not need to put 60 megawatts of battery power in Peabody, can
put it in another town of MMWEC
• Mireille to send article and actions individuals can take on this issue
▪ https://www.cleanegroup.org/ceg-resources/resource/energy-storage-
alternatives-peabody-ma/
▪ https://www.massclimateaction.org/clean_the_peak
• Lori Ehrlich and Paul Tucker have decided not to run again, new candidates
should be informed of this. Manny Cruz is running to replace Paul Tucker
City Updates
Report from Ordinance, Licenses & Legal Affairs (OLLA) Committee 1/6/22 (Jenna Ide)
• Municipal Green Building Ordinance passed, is now law
• Applies to Municipal Buildings, Operations and Transportation owned by the City
• 12.251 Green Municipal Buildings
▪ Net zero energy. Projects over a certain size must meet Passive House or
LEED gold standards. Or can propose another rating system to be
presented to SERC
▪ Smaller projects must also include sustainable elements
▪ Design teams must be qualified
▪ Green infrastructure and permeable materials required
▪ Maintenance and training
• 12.252 Green Municipal Operations
▪ Environmentally Preferable Purchasing program to be developed and
submitted to SERC for comment
▪ Waste reduction
• 12.253 Green Municipal Transportation
▪ EPPP: shift fleet to hybrid or electric
▪ EVCS (charging stations)
▪ Bicycle parking
• 12.254 Approvals and Waivers
▪ Waiver process is described; must come to SERC for
input/recommendations. Will help us understand what is hard to do and
help revise GBO moving forward
• John Hayes: 3 areas where SERC input is required. This meets the goal to play an
advisory role
• SERC may need to form a subcommittee for review. Gail Kubik agrees, must do
like Conservation Commission– materials provided a week in advance, members
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404
♦ WWW.SALEM.COM
review prior to the full meeting. Will need to devise a system. Jenna agrees. An
agenda item should be added for April to discuss rules about submission and
Applicant timing for participation in SERC/being on the Agenda/SERC returning
comments to Applicant
• Can we ask an Applicant to present to SERC? Yes. Gail approves of Applicants
appearing before SERC so they can get real time answers. Doug Bowker also
concurs.
▪ Chris Cantone asks if SERC is allowed to meet outside of the standard
meeting to discuss projects. You can meet but not have a quorum (up to
3 members can meet). John Hayes explains that a subcommittee of 3
members could be formed for this purpose. Chris suggests they could
meet 1 hour before the SERC meeting
▪ Doug Bowker notes the subcommittee members could rotate
▪ Developers will need to figure out how to submit plans. Must also submit
to Sustainability Dept. for review
▪ City Council joint meetings are outlined. Planning Board wanted clarity
around “EV-ready” in one Ordinance; subcommittee will need to work
through
▪ Questions around cost must be addressed
Update: “Resilient Together: The Point” (Esmeralda Bisono/Chris Malstrom)
• Point Project is described
▪ Modeling done, entering solutions phase and getting community input
▪ Next community forum end of April, date TBD
▪ Working with NSCDC, Latino Leadership, Shetland Park, Palmer Cove
(Phase 2 of design)
• Outreach
▪ Full recording of first community forum is on website and broken down
by topic
▪ Outreach: hourlong survey/$50 gift card and an in-person event to gather
resident input (discussion and walk-through Point neighborhood)
▪ Engagement Partners: Salem Pantry, NorthShore CDC
▪ Majority of residents in Point are renters; lots of affordable housing.
NSCDC owns hundreds of units in the Point
▪ How to communicate to property owners that green can save them
money over the long run
• How to engage owners who can help renters with flooding issue
Update: Building Electrification Alliance (BEA) (Esmeralda Bisono)
Not provided at this time.
City Council Liaison Report (Jeff Cohen not present – presented by John Hayes)
John Hayes reads Jeff’s report. He is grateful for having the opportunity to work with SERC
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404
♦ WWW.SALEM.COM
• GBO: best ordinance statewide for municipal properties, SERC is part of the process
• Working on a version for private properties that will address needs
• Other Ordinances:
o Councilor Varela: Polystyrene ban in process
o Urban Agriculture Ordinance had favorable endorsement from BOH & Building
and positive public hearings
o Revised/improved Wetlands Ordinance is on track for quick passage. Gail
represented SERC
o Ground Mounted Solar Ordinance: Joint meeting was held, thinks it will move
forward but language for bicycle and EV charging must be expanded
o DOER Straw Proposal re stretch code: Many environmentalists believe it is not
strong enough and does not adhere to what was mandated by State Climate
Roadmap Bill. Letter was signed by Chair, Mayor and 8 Councilors
• This Council can act more than any before to address climate issues
New Business
o Discussion and vote on remote meeting through July 15, 2022
Board name: Sustainability, Energy and Resiliency Committee (SERC)
Number of board members, as well as any clerks, staff, alternates, etc. (please include any vacancies on
your board; we are looking for the total number of potential persons who could attend, not including
the public): 13, including Board Members, City Council Liaison, Sustainability Dept. Staff, and SATV
recorder
The recurring day and time of your board’s meeting (i.e. 2nd Wednesdays at 6:00 p.m.): 4th Wednesdays
6:30-8:00PM
Please indicate the date when your board will resume in-person meetings (this should be the first date
on which your board will meet in-person): July 27, 2022
Bold and underline your board’s first choice for a meeting location when in-person meetings resume:
Annex, 1st floor large
Annex, 1st floor medium
CLC, great room
CLC, board room
Bold and underline your board’s second/back-up choice for a meeting location when in-person
meetings resume: Board did not want a 2nd choice . They strongly feel that the medium room is the
best place to meet for SERC.
Annex, 1st floor large
Annex, 1st floor medium
CLC, great room
CLC, board room
• Do we HAVE to go back in person? Hybrid? Hybrid can be complicated but access is
expanded when others can attend virtually. Board members agree that meetings should
be remote up through June, then hybrid starting with the July meeting
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404
♦ WWW.SALEM.COM
• Stacy to send Doug Bowker an invite to zoom room trainings
• Remote April, May, June. Hybrid in July moving forward
• Jenna describes the rooms. Medium conference can do 20, large 50 in Annex. Great
room in CLC can do 100 but is very open. Board room is max of 10-15 in CLC
• Not supposed to meet on 3rd floor of Annex b/c they have to open staff areas to public
• SERC will meet in medium room 1st floor Annex
A motion to meet remotely in April, May and June with a hybrid format starting in July if
possible, is made by Rick Nye, seconded by Doug Bowker, and passes 5-0.
City Departments to Invite
• Gail’s idea was to have SERC meet w/individual City depts, one per month, that would
present to us how they are currently incorporating sustainability/resiliency measures
into their Dept.
• Would allow SERC and the public to ask questions and SERC to notice trends (I.e.
opportunities for Dept. Collaboration, SERC can compile a list of recommendations)
• Would increase access to community and City’s social resilience
• Is this a good idea?
• Rick Nye notes we should narrow the scope of discussions to avoid long conversations
about nonrelated activities
• SERC now has more clout; this is the right time to get to know other City aspects and let
them know who we are
• To be vetted for next month, Stacy to reach out, start in May
• List of potential Departments sent to Gail & John
• John: Day 28 of Putin’s war, our heart goes out to those in the Ukraine.
• School Facilities Master Plan: Still gathering information. Schools have more capacity
than students and there is no projected growth, buildings are highest investment in
Cityhave the highest impact on sustainability, resiliency, and transportation. For more
information, or to participate in public forums and surveys:
o https://www.salemma.gov/home/news/school-facilities-master-plan-survey
o https://www.cannondesign.com/salem-public-schools-facility-master-plan/
Goal Setting
Postponed to April meeting
• Upcoming City Committee Meetings
o Recycling Committee: First Tuesday of the month, 4/5/22, 6:30-7:30PM
o Tree Commission: Third Monday of the month, 4/18/22, 6:00PM
o Conservation Commission: Third Tuesday of the month, 4/19/22, 6:30PM
• Next SERC Meeting - Wednesday, April 27, 2022, at 6:30PM on zoom
• Adjournment
A motion to adjourn is made by Rick Nye, seconded by Chris Cantone, and passes 5-0.
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404
♦ WWW.SALEM.COM
The meeting ends at 8:06PM
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404
♦ WWW.SALEM.COM
Agenda
NOTICE OF MEETING
You are hereby notified that the Salem Sustainability, Energy, and Resiliency Committee will be holding a
public meeting on Wednesday, March 23, 2022 at 6:30 PM via remote participation with instructions posted
to www.salem.com in accordance with Chapter 40A of the Massachusetts General Laws and Governor Baker’s
Emergency Order dated March 12, 2020.
Important Announcement:
Pursuant to Governor Baker’s March 12, 2020 Order Suspending Certain Provisions of the Open Meeting Law,
G.L. c. 30A, §18, and the Governor’s March 15, 2020, and as amended by Chapter 22 of the Acts of 2022 Order
imposing strict limitation on the number of people that may gather in one place, this public meeting of the
City of Salem Sustainability, Energy, and Resiliency Committee is being conducted via remote participation to
the greatest extent possible. Commented [SK1]: Need to edit as per Dominick
Specific information and the general guidelines for remote participation by members of the public and/or
parties with a right and/or requirement to attend this meeting can be found on the city’s website, at
www.salem.com, and on the committee web page, at www.salem.com/sustainability-energy-and-resiliency-
committee-serc.
For this meeting, members of the public who wish to watch, listen or provide comment during the meeting
may do so in the following manner:
Remote Participation Instructions:
• Go to the website link SERC 4th Monday Zoom Link and enter password: 251052 or
• Go to the website link www.zoom.us/join and enter meeting ID # 859-3957-6528 or
• Dial toll-free phone number 877-853-5257. When prompted enter meeting ID # 859-3957-6528. Those
only dialing in will not have access to the direct video feed of the meeting.
The meeting will be opened at 6:15 P.M. to allow members of the public to test their audio. During portions of
the meeting in which public comment is permitted, members of the public who have “raised their hand” in
Zoom will be called on to offer comments. In order to raise a hand, members of the public using the Zoom
computer of phone application may click the “Raise Hand” button; members of the public dialing in may press
“*9” to raise their hand to speak.
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404 ♦
WWW.SALEM.COM
No in-person attendance of members of the public will be permitted, but every effort will be made to ensure
that the public can adequately access the proceedings in real time, via technological means. In the event that
we are unable to do so, despite best efforts, we will post on the city’s website an audio or video recording,
transcript, or other comprehensive record of proceedings as soon as possible after the meeting.
Thank you for your patience and understanding as we navigate this challenging situation for our community
and the world.
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404 ♦
WWW.SALEM.COM
Meeting Agenda
March 23, 2022, 6:30 P.M.
Remote Participation
• Introduction
• Public Comment
• Review & Approve Meeting Minutes – December 15, 2021 and February 23, 2022
• City Updates
o Update: Municipal Green Building Ordinance, Licenses & Legal Affairs (OLLA) Committee 1/6/22
(Jenna Ide)
o Update: Zoning Ordinance Changes Relative to Salem Sustainability (Jenna Ide/Jeff Cohen)
o Update: “Resilient Together: The Point” (Esmeralda Bisono/Chris Malstrom)
• City Council Liaison Report (Jeff Cohen) Commented [SK2]: Jeff asked to add this as a permanent
agenda item.
o Update on DOER Building Energy Code Straw Proposal
• Guest Speaker: Mireille Bejjani (she/they), Energy Justice Director and Community Organizer,
Community Action Works - Peabody Peaker Plant update
• New Business
o Discussion and vote on remote meeting through July 15, 2022
o Update on Peabody Peaker Plant (John Hayes)
o SERC and Department website updates (Stacy Kilb)
o Discuss SERC short-, medium-, and long-term objectives
▪ Related: Discuss inviting City Department and Board members to future meetings to
develop a relationship
• Upcoming City Committee Meetings
o Recycling Committee: First Tuesday of the month, 4/5/22, 6:30-7:30PM
o Tree Commission: Third Monday of the month, 4/18/22, 6:00PM
o Conservation Commission: Third Tuesday of the month, 4/19/22, 6:30PM
• Next SERC Meeting - Wednesday, April 27, 2022, at 6:30PM on zoom
• Adjournment
Persons requiring auxiliary aids and services for effective communication such as sign language interpreter, an assistive listening device, or print
material in digital format or a reasonable modification in programs, services, policies, or activities, may contact the City of Salem ADA Coordinator
as soon as possible and no less than 2 business days before the meeting, program, or event.
Know Your Rights Under the Open Meeting Law, M.G.L. c. 39 §23B, and City Ordinance Sections 2-2028 through 2-2033. Please contact Jenna Ide at
jide@salem.com or 978-619-5699 for more information.
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 ♦ TEL: 978.745.9595 FAX: 978.740.0404 ♦
WWW.SALEM.COM
Get email alerts for Salem
A daily email when new agendas and minutes are posted.