Transportation Commission
Regular MeetingSalem, MA · May 2, 2019
Minutes
City of Salem
Traffic and Parking Commission
DRAFT Meeting Minutes
Thursday, May 2nd, 2019
A meeting of the Salem Traffic and Parking Commission was held on Thursday, May 2nd,
2019 at 6:30pm at 98 Washington Street, Salem. Present: Commission Chair Tanya
Stepasiuk, Commission Vice-Chair Eric Papetti, Commissioner Robin Seidel, Commissioner
Todd Waller and Director David Kucharsky. Absent: Commissioner Lt. David Tucker.
CALL OF MEETING
The meeting was called to order at 6:32pm.
PUBLIC COMMENTS
Linda Werbner, Salem Family Health Center, 47 Congress Street stated that the Health Center
is located at Shetland Park and crossing Congress Street has become very dangerous due to
speeding vehicles. She and her staff are very worried about elderly and disabled patients
being struck. Ms. Werbner produced a petition with approximately 120 signatures
expressing their concern. She asked that a temporary calming device be installed to slow
vehicles down, whilst a more permanent solution be determined. Director Kucharsky said
he appreciated the hard work of gathering the signatures and indicated that staff are aware
of this location as a highly utilized crosswalk with high volumes of traffic.
Michael Caggiano, 14 Patton Road indicated he works at a business at 14 Front Street, he
said he was confused by the different parking meter rates throughout the City. He said the
meters on Front Street are $1.50 per hour and on Lafayette they are $1.00. He maintains
that the parking issues have been the same for over a decade and nothing has been done to
alleviate the situation and yet parking fees have increased dramatically. He said he will
speak to the City Councilors about this as he believes it is getting out of hand. Chair
Stepasiuk advised him to speak with the Director further to learn more about the recent
rate increases and why they vary depending on the location.
TRAFFIC AND PARKING DIRECTOR UPDATE
Local Transportation Improvement Plan (LTIP)
Chair Stepasiuk asked Director Kucharsky to give an update on all current projects.
Bates Elementary School Safe Routes to School Program (SRTS): Director Kucharsky
informed the Commission that a public hearing took place on April 25th to discuss project,
he said the DPS Director, David Knowlton, Lt. Tucker, MassDOT and their consultants from
Toole Design were present. The State ran the hearing through their normal procedures. H
e explained that transcripts were being developed, and the State is responding to some of
the comments made by the public. Overall, he said the people were pleased with the plans,
Approved at Commission Meeting on June 6, 2019
although there was some trepidation about potential loss of parking near the intersection
of Appleton St and Liberty Hill Ave. MassDOT is looking for additional public feedback as it
is currently at 75% design.
Commissioner Papetti said he lives close to the area and thought it is a very good project,
especially preserving some of the mature trees. He said he would like to see some
consideration given to extending the scope of the project further down Liberty Hill Ave to
North St. He also suggested the City should consider funding some of the costs if it cannot
be addressed by the State funding. He went on to say that there is no connection to the
northeast corner of the intersection to the cemetery entrance which is heavily used by the
neighbored residents. Chair Stepasiuk agreed and asked it be considered as part of the
overall scope of the project. Director Kucharsky mentioned that the public had 3 more
days to submit comments/suggestions.
MOTION: Commissioner Papetti made a motion instructing Director Kucharsky to draft
and submit a letter to MassDOT and their designers requesting that they consider the
additional improvements and extending the project’s scope based on the Commission’s
discussion as well as offer assistance with continuing to work with abutters on parking
concerns. Separately, to recommend the City examine all options to supplement the project
budget to make these scope adjustments happen, if the MassDOT budget is not sufficient.
Commissioner Seidel seconded the motion. All were in favor, and so the motion passed.
Downtown Bike Upgrades: Director Kucharsky informed the Commission that the City
Engineering Department met with MassDOT on April 16th to discuss the schedule, he said
there are talks to push this project out to July or August due to ongoing development
projects, including the demolition of the Old District Court, the roundabout pilot at
Norman-Chestnut-Summer, the Essex Street reconstruction project and the ongoing
construction of the Hampton Inn Hotel. Due to the courthouse demo delay, there was a
discussion about whether to stop the striping on Washington St at Church St. Director
Kucharsky also indicated that Hiway Safety Systems, has been awarded the MassDOT
project, which is the same firm the City is working with to install the pilot roundabout.
Boston Street Design: Director Kucharsky said there was a Road Safety Audit (RSA)
conducted on April 8th and a draft RSA has been developed and distributed. In addition,
MassDOT’s Project Review Committee, recently approved the project, which is another step
in getting the project programmed for funding on the MPO’s Transportation Improvement
Program (TIP). Vice Chair Papetti asked if the DPS Director would meet with the
Commission to discuss the timeline, as this project may not happen until 2025, he said the
public would be better served if they were aware that this project was not going to happen
in the near future. Chair Stepasiuk agreed, she said this was a topic that came up with
Councilor Flynn when she and the Vice Chair met with him, who thought it would happen
soon and this is inaccurate.
Bridge Street Reconstruction (Flint to Washington): Director Kucharsky informed the
Commission that the DPS Director attended the MPO meeting on May 2nd and requested
they work with the City to develop new design plans which includes Complete Streets
features reducing the number of lanes. The current concept, which was developed back in
Approved at Commission Meeting on June 6, 2019
1992 as part of the Bridge St bypass road to Beverly, has 4 lanes of traffic which is not what
the City intends to construct.
Once the new concept is developed the plan is to then bring it back to the Historical
Commission for their review. He said the City is moving forward and hoping to share the
design plans as things proceed.
Bridge Street Complete Streets (Boston to Flint): The Director informed the
Commission that on April 25th the Mayor and the DPS Director had met with the
Department of Environmental Protection (DEP) to discuss compensatory storage needs
and the design of the project. He said he believes there is a way to move forward with this
project. He explained the shared use path along the canal, the idea is to make that path as
the same level as the roadway separated by a curb and a green strip which would address
some of the compensatory storage requirements. Vice Chair Papetti asked if this would
commence in 2020, the Director said yes, that is the plan at the moment.
Essex Street Reconstruction: Director Kucharsky informed the Commission that no bids
were submitted, and the RFP was re-released with a deadline of May 13th. Vice Chair
Papetti expressed disappointment that the Engineering Department had not taken the
Traffic and Parking Commission’s suggestions on this project as the City needs to rethink
how roads are designed. He said he would like to have a discussion as to what the
Commission’s role is. Chair Stepasuik said she agreed 100% and she would like to have the
DPS Director meet with the Commission to discuss this and other items.
Museum Place Garage Elevators: Director Kucharsky said the work is on schedule and
the first elevator is to be completed by mid-May. Once the State inspector signs off we will
proceed work on the second elevator.
Norman/Chestnut/Summer/Roundabout Pilot Program: Director Kucharsky said the
procurement is complete and the City is working with the contractor to set a schedule for
installation.
North Street Bridge (MAssDOT): Director Kucharsky informed the Commission that work
is underway. He said there are still issues with the railing and whether some lights can be
replaced, he said there is a difference of opinion that the Engineering Department is
working out with the State. He also said there was some discussion about enhancing the
path under the overpass which provides access to the T station. He said these items are
ongoing with no specifics at this time. Vice Chair Papetti welcomed this idea, he
acknowledged it would not be an easy thing and a more viable maintenance plan is needed.
Paving Program: The Director told the Commission that a new city engineer was hired on
April 16th and would be meeting with the BETA Group on May 3rd to discuss the status of
their roadway and sidewalk pavement inspections work and maintenance plan. He
indicated he is working with him and the DPS Director to identify where traffic calming and
complete streets features can be incorporated into the overall paving work.
Swampscott Road and 1st Street Roundabout: The Director said that construction
began April 16th and approximately 80% is scheduled to be completed by mid-July.
Approved at Commission Meeting on June 6, 2019
Szetela Lane Multiuse Path Extensions: The Bike Committee submitted comments to
VHB and are under review. Plans to mitigate contaminated soils are being developed
which will help determine where the extension occurs.
General Departmental Updates
Vice Chair Papetti asked that the Director look into re-striping the Church Street parking
Lot. The Director said he would look in to this.
NEW/OLD BUSINESS.
Traffic Calming Program
Congress St @ Harbor St – The Director addressed the request and petition submitted by
Ms. Werbner. He said he is aware of the issues along this stretch of Congress Street, due to
curbside parking and visibility issues, he said he planned on speaking with the Engineering
and Police Departments to discuss improving signage and sight lines. A site visit with the
engineering staff and Lt. Tucker will also be conducted. Traffic counts conducted in 2017
as part of a development project will also be reviewed.
Vice Chair Papetti suggested coming up with some temporary solutions if there is a true
public safety issue, he said we should be able to go out tomorrow morning and put up signs
restricting parking within 20 feet of that crosswalk. He said if there’s anything that the
Police can do immediately, it should be done the go to City Council for any formal
approvals. Chair Stepasiuk asked that we give ourselves a better timeline for review and
implementation of these types of traffic calming projects. The Director said he can work
with Lt. Tucker to get this taken care of in the interim. Director Kucharsky also noted that
he plans on discussing this topic with the North Shore Community Development Coalition
(NSDC) as they have recently approached the city about reconfiguring the intersection of
Congress/Peabody/Ward. The Director and Lt. Tucker will visit the site and implement a
temporary measure for safety purposes, he said he would keep the Commission updated.
Traffic Ordinance Recommendations
Discussion and Recommendation: Beaver Street One-Way – The Director and Lt.
Tucker recently met with Councilor Flynn and a resident, on site, to discuss the on-street
parking issues related to the ongoing residential developments being built in this area. In
addition, there was a discussion regarding trucks traveling up Beaver Street only to learn
that it becomes one-way near the Ancient Order of Hibernian’s (AOH) parking lot. This has
created some safety issues with trucks trying to back up and maneuver in what is a
constrained residential area. Director Kucharsky informed the Commission that he drafted
an ordinance amendment which seeks to restore Beaver Street to a one-way street from
Silver to Grove Street as well as permit some on-street parking along a southern portion of
Approved at Commission Meeting on June 6, 2019
Beaver St. He said Councilor Flynn was supportive of this. Chair Stepasuik said she was
very much on board with this idea.
MOTION: Commissioner Seidel made a motion to approve rescinding the current ordinance
and reinstating the original ordinance which makes Beaver Street one way from Silver St to
Grove St. Commissioner Waller seconded the motion. All were in favor and so the motion
passed.
Discussion: Hawthorne Boulevard Parking – Director Kucharsky said he would like to
discuss with the Commission the existing traffic regulations along Hawthorne Boulevard as
it relates to resident and visitor parking. He said Councilor McCarthy requested that the
Commission evaluate existing ordinances and how they are enforced. Director Kucharsky
said he had looked back at the various regulations on this stretch of road from the 70’s and
there have been several ordinances adopted which in some cases conflict with earlier
ordinances that were never rescinded. Chair Stepasiuk asked about enforcement in the
area. The Director said that when a 2-hour limit from 9AM-5PM was implemented along
the easterly side of Hawthorne, there was push back from some residents due to ticketing.
Chair Stepasiuk said the Commission should attempt to clean up this issue and submit a
recommendation to the City Council. Vice Chair Papetti asked if the residents on the street
assumed it was their parking space. Director Kucharsky said he believed this to be the case.
He pointed out there are three residential buildings along this side of the road. One idea is
to have parking in front of the residences designated as resident only parking and the rest
of the street could be signed for 2-hour parking for the general public which could assist
with some of the enforcement. However, this would be establishing a precedent that may
create issues elsewhere.
Commissioner Seidel suggested determining the number of houses and people living on the
street to identify the magnitude of residences being affected. Vice Chair Papetti agreed and
said implementing ad hoc regulations are not helpful He also asked how urgent this issue
was, as he thought Assistant Director Downing could look into this further. Chair Stepasiuk
agreed.
OTHER BUSINESS
Valet Parking: The Director informed the Commission that the service is two weeks in.
This past weekend there were 27 cars served, he said they are still working with the
Chamber of Commerce to get the word out. Chair Stepasiuk asked if the vendor had a
target number, he said based on insurance and other costs, they are looking at 70 to 80 cars
per weekend.
Scooter Update: The Director informed the Commission that there will be a scooter
stakeholder meeting on May 9th in the Annex, four councilmembers are attending. Lt.
Tucker, DPS representation and Vice Chair Papetti will attend as well as the Chamber of
Commerce, Salem Main Streets and NIAC representatives.
Approved at Commission Meeting on June 6, 2019
Traffic Calming Projects: Chair Stepasiuk asked the Director to give an update on the
overall Traffic Calming Program, in terms of funds etc. Director Kucharsky said the Police
Department recently purchased a device that will capture two- way speed and volume data
and it has been deployed to First Street. Vice Chair Papetti asked if Mass in Motion could be
assigned to collect pedestrian data with the devices they have, as it would be interesting to
see what the activity is. The Director said he would work with Russell Findley (Mass in
Motion) on this. Director Kucharsky went on to say that they currently plan on using the
device on Valley Street, Fort Avenue/ Columbus St and Congress Street.
Chair Stepasiuk asked if there were enough funds in the budget to address all of these
locations. The Director said that FY 19 funds are for the Norman/Chestnut/Summer Street
roundabout project which is scheduled to be implemented on May 19th as well as the
Pickering/Chestnut crosswalk. He said there should be some additional funds that can be
used elsewhere. He also indicated that he has requested additional funds in the FY20
budget, however, he will not know whether the requests are approved until the Mayor and
City Council have their budget meetings.
Ms. Werbner asked for a description of the device being used at First street. The Director
explained that it was a small device intended to capture actual speed and volume data. Ms.
Werbner suggested taking a look at the device used on Humphrey Street in Swampscott. It
is a crosswalk sign which has LED lights around the perimeter that light up to remind
drivers to slow down.
MEETING MINUTES APPROVAL
Chair Stepasiuk noted that only two people were present from the January meeting
minutes and could not be approved until Lt. Tucker was present.
On a motion duly made by Commissioner Seidel and seconded by Vice Chair Papetti, the
Commission voted to approve the minutes from the April 11th, 2018 Traffic and Parking
Commission meeting.
UPCOMING MEETINGS SCHEDULE
The next Traffic and Parking Commission meeting will take place May 30th, 2019.
ADJOURNMENT
On a motion duly made by Commissioner Seidel and seconded by Vice Chair Papetti, the
Traffic and Parking Commission meeting was adjourned at 8:23PM.
The following documents were used at the meeting and can be viewed by making a request
to the Traffic & Parking Department
Local Transportation Improvement Plan Spreadsheet
Approved at Commission Meeting on June 6, 2019
Agenda
City of Salem
Traffic and Parking Commission
Meeting Agenda
Thursday , May 2, 2019, 6:30 p.m.
City Hall Annex, 98 Washington Street
2nd Floor, Large Conference Room
Salem, Massachusetts
I. ROLL CALL
II. PUBLIC COMMENTS
III. TRAFFIC AND PARKING DIRECTOR UPDATE
a. Local Transportation Improvement Plan (LTIP) Project Update – The LTIP is a list of
transportation projects in Salem at various stages of planning and implementation. The goal
of providing this information to the Commission is to identify opportunities for comment and
input as early as possible in the development timeline of a project. Will include updates on
Boston St design and Essex St reconstruction.
b. General Departmental Updates
IV. NEW/OLD BUSINESS .
a. Traffic Calming Program
i. Congress St @ Harbor St – A preliminary discussion will take place to discuss the
application submitted by Linda Werbner who works at the North Shore Community
Health Center.
b. Traffic Ordinance Recommendations
i. Discussion and Recommendation: Beaver Street One-Way – Director has drafted an
ordinance amendment which seeks to restore Beaver St to a one-way street from Silver
St to Grove St as well as permit on-street parking along a southern portion of Beaver
St. Staff will review with the Commission in order to submit a recommendation to the
City Council.
ii. Discussion : Hawthorne Boulevard Parking – Director would like to discuss with the
Commission existing traffic regulations along Hawthorne Boulevard as it relates to
resident and visitor parking. Councilor McCarthy requested that the Commission
evaluate existing ordinances and how they are enforced.
V. OTHER BUSINESS THAT MAY LEGALLY COME BEFORE THE COMMISSION
VI. MEETING MINUTES
VII. UPCOMING MEETING S SCHEDULE
VIII. ADJOURNMENT
Know your rights under the Open Meeting Law M.G.L. c. 30A §§18-25 &
City Ordinance Sections 2-2028 through 2-2033