Zoning Board of Appeals
Regular MeetingSalem, MA · February 15, 2023
Minutes
City of Salem Zoning Board of Appeals
Meeting Minutes
February 15, 2023
A meeting of the Salem Zoning Board of Appeals (“Salem ZBA”) was held on
Wednesday, February 15, 2023 at 6:30 pm via remote participation in accordance with
Chapter 107 of the Act of 2022 and a Special Act extending remote participation meetings until
March 31, 2023.
Chair Peter Copelas calls the meeting to order at 6:32 pm.
Chair Copelas explains how individuals can participate in the meeting remotely via
Zoom, and that instructions to participate remotely can also be found on the Salem
website. Mr. Copelas also explains the rules regarding public comment.
ROLL CALL
Those present were: Peter Copelas (Chair), Nina Vyedin, Paul Viccica, Carly McClain,
Rosa Ordaz, and Steven Smalley. Also in attendance were Daniel Laroe – Staff
Planner, and Jonathan Pinto – Recording Clerk. Those absent were: None
CONTINUANCES
Location: 1 Purchase Street (Map 15, Lot 139) (R1 Zoning District)
Applicant: Ezekiel Holt
Project: A continuation of a public hearing for all persons interested in the petition of
EZEKIEL HOLT at 1 PURCHASE STREET (Map 15, Lot 139) (R1 Zoning
District), for a Special Permit per Section 3.3.5 Nonconforming Single- and
Two-Family Residential Structures of the Salem Zoning Ordinance to build a
new, second egress with a porch for the first-floor unit. The proposed change
will permit petitioner to restrict access to the basement from the first-floor unit
and to specifically make it a part of the second unit.
Documents and Exhibitions
· Application date-stamped November 9, 2023 and supporting documentation
Chair Copelas introduces the petition.
Ezekiel Holt introduces himself and explains that he would like to request a continuance,
as he did not obtain the updated renderings in time to submit them to the Board.
Motion and Vote: Ms. Vyedin motions to continue the petition of EZEKIEL HOLT at 1
PURCHASE STREET (Map 15, Lot 139) (R1 Zoning District), for a Special Permit per
Section 3.3.5 Nonconforming Single- and Two-Family Residential Structures of the Salem
Zoning Ordinance to build a new, second egress with a porch for the first-floor unit, to the next
regularly scheduled meeting of the Zoning Board of Appeals on March 15, 2023.
Ms. Ordaz seconds the motion. The vote is six (6) in favor (Peter Copelas, Steven Smalley,
Carly McClain, Paul Viccica, Rosa Ordaz, and Nina Vyedin) and none (0) opposed . The
motion passes.
Location: 275 Lafayette Street (Map 33, Lot 438) (R1, R3 Zoning Districts)
Applicant: MD Property Development
Project: A public hearing for all persons interested in the petition of MD PROPERTY
DEVELOPMENT at 275 LAFAYETTE STREET (Map 33, Lot 438) (R1,R3
Zoning Districts) for Special Permits per Section 3.3.2 Nonconforming
Uses to change from one nonconforming use-educational use to a multi-family
residential use. A Special Permit per Section 3.3.3 Nonconforming
Structures of the Salem Zoning Ordinance to allow for alteration of the existing
nonconforming structure. In addition, petitioner seeks Variances from Section
4.1 Dimensional Requirements for lot coverage where 30% is permitted and
32.5% is being sought/ lot area per dwelling unit where 3,500 SF is required in
the R3 Zoning District and 15,000 SF in the R1 where 2,250 SF is proposed/
Side setback where 20 feet is required and 10 feet is sought. A total of 10
residential units in the existing building and a new building to be constructed at
275 LAFAYETTE STREET.
Documents and Exhibitions
· Application date-stamped November 17, 2023 and supporting documentation
Chair Copelas introduces the petition.
Attorney Scott Grover introduces himself on behalf of the applicant, and notes he is
accompanied by MD Property Development principals as well as architect Dan
Ricciarelli. Mr. Grover explains that they presented their project December for 15 new
residential units, 10 in the existing building and five in the newly proposed building on
Lafayette Street. Based on concerns from neighbors as well as the Board, the team
revised the proposal, reducing the overall units to 10, with five units in each building. He
also notes that there will be no units in the basement of the existing building. Mr. Grover
states the hope is that the new plans address the concerns regarding density, limited
landscaped area, location of the driveway entrance, and the quality of the units that
were previously housed in the basement. The reduction in density reduces the number
of parking spaces to 15, which Mr. Grover indicates allowed for an increase in proposed
green space. The setback on Lafayette Street is increased to be more consistent with
adjacent buildings, and the driveway entrance is now proposed to be on the left side,
rather than the right on Lafayette Street. Mr. Grover states the new plans eliminate one
of the two curb cuts, as well as two of the parking spaces located on the Summit Avenue
end of the property.
Jack Dahlstedt of MD Property Development introduces himself and states they wish to
be good neighbors in the community.
Dan Ricciarelli introduces himself and walks the Board member through the plan
changes. Mr. Ricciarelli provides background information on the existing chapel
building which is currently vacant. The goal is to add needed housing, create affordable
housing, and fill in the gap on Lafayette Street, according to Mr. Ricciarelli. He presents
renderings and photographs of both existing and proposed conditions, and discusses
the plan changes in more detail. The new building will be accessed from Lafayette
Street. Mr. Ricciarelli presents floor plans showing units with two bedrooms and two
bathrooms, and states that the basements in both buildings will be used for storage. He
notes that the changes also allow for more landscaping. Renderings of the proposed
dormers for the existing building are shown, along with floor plans for the new building
on Lafayette Street. Mr. Ricciarelli also provides images of the neighborhood.
Mr. Grover reminds the Board that in addition to the Historic Commission and Design
Review Board, the project will also be subject to site plan review, and thus this will be an
iterative process with many layers of review.
Mr. Viccica asks to review the curb cut numbers, and Mr. Ricciarelli indicates the one on
Lafayette Street will be 24 feet and the one on Summit Avenue will be 20 feet. Mr.
Grover notes that 24 feet is allowed on Lafayette as it is an entrance corridor. Mr.
Viccica asks if it would be possible to reduce the length as it might be better for
pedestrians. Mr. Ricciarelli explains that the curb cuts exist today, and that they will
simply be making them cleaner and safer.
Ms. Vyedin notes that one of the drawings had a portion of a basement labeled as Unit
1. She also asks about how the previous plans for two accessible units with ramps have
changed with the revisions. Mr. Ricciarelli states that while the ramp to the basement
will be removed, the first floor ramp will remain and the accessible unit will be accessed
from that floor. Mr. Dahlstedt adds that one unit will have a room in the basement, but
that it is the only unit with a portion in the basement, and that it is a townhouse style unit.
Ms. Vyedin asks if with the revisions the two affordable units has changed to one unit,
and Mr. Dahlstedt confirms.
Chair Copelas opens the floor to public comment.
Anthony Porcello of 271 Lafayette Street introduces himself as an abutter, and states he
appreciates the applicants communications, as well as the plan revisions, which
addressed all his concerns. He notes he and his sister submitted a letter yesterday to
the Board expressing support for the current revised plans. Mr. Porcello reads the letter
he submitted into the record, which expresses support for the project.
Polly Wilbert of 7 Cedar Street introduces herself as a member of the South Salem
neighborhood association. Ms. Wilbert states she appreciates that the developers
worked with abutters to address concerns. She states she appreciates the addition of
affordable housing as well as the changes.
Ward 5 City Councilor Jeff Cohen of 12 Hancock Street introduces himself. Councilor
Cohen indicates that everyone on the development team reached out to him during this
process, and that they were engaged with the neighborhood while revising their
proposal. Mr. Cohen notes that the sidewalks and curbs currently are not great for
pedestrians with mobility issues. He states he is glad one of the ramps will be kept for
accessibility.
Mr. Copelas states his understanding is that affordable units cannot be substantially less
desirable than any other normal unit, and asks if the unit with the basement space will
thus be ineligible as the affordable unit. Mr. Dahlstedt explains that although they have
not fully designed the units, most of them will be substantially the same, and it is likely
the affordable unit will be one of the others rather than that townhouse unit.
Mr. Viccica states it is an interesting process to witness when an applicant comes before
the Board, the public provides comment, and the applicant listens, responds, and
addresses concerns, and that in the end a better project is the result.
Mr. Copelas agrees, and states it is refreshing. He asks Mr. Grover for the grounds for
the variance and special permit.
Mr. Grover states they are seeking a variance from lot area per dwelling unit to allow 10
units to be constructed, as well as a variance from the side yard setback for the building
on Lafayette. Mr. Grover also indicates a curb cut variance is required because of the
totality of the two. A special permit is sought to allow a change from one nonconforming
use to another. For the special permit, Mr. Grover explains the community is served by
eliminating a commercial use and replacing it with a less impactful residential use.
There are existing utilities on both streets to serve the project, and the proposal is more
consistent with the neighborhood character, according to Mr. Grover. He states that any
impact on the natural environment will be addressed through the Planning Board review
process. The tax impact will be positive, going from an exempt use with no tax revenue
to 10 residential units. Mr. Grover next addresses the variances, noting that special
conditions exist based on the split zoning and the existing building being a chapel. He
also notes that the lot is much larger than nearby lots and mostly consists of parking.
Mr. Grover contends that a hardship exists because the existing building is located in
the R1 zoning district, which if strictly enforced, would only allow for one unit in the
existing building.
Mr. Copelas notes there should be separate motions for the special permits and
variances.
Motion and Vote: Mr. Viccica motions to approve the petition of MD PROPERTY
DEVELOPMENT at 275 LAFAYETTE STREET (Map 33, Lot 438) (R1,R3 Zoning Districts)
for Special Permits per Section 3.3.2 Nonconforming Uses to change from one nonconforming
use-educational use to a multi-family residential use, a Special Permit per Section
3.3.3 Nonconforming Structures of the Salem Zoning Ordinance to allow for alteration of the
existing nonconforming structure, subject to the following standard conditions:
1. Petitioner shall comply with all city and state statutes, ordinances, codes, and
regulations.
2. All construction shall be done as per the plans and dimensions submitted to
and approved by the Building Commissioner.
3. All requirements of the Salem Fire Department relative to smoke and fire
safety shall be strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. Exterior finishes of the new construction shall be in harmony with the existing
structure.
6. A Certificate of Occupancy is to be obtained.
7. Petitioner shall obtain street numbering from the City of Salem Assessor’s
Office and shall display said number so as to be visible from the street.
8. Petitioner is to obtain approval from any City Board or Commission having
jurisdiction including, but not limited to, the Planning Board.
9. Unless this Decision expressly provides otherwise, any zoning relief granted
does not empower or authorize the Petitioner to demolish or reconstruct the
structure(s) located on the subject property to an extent of more than fifty
percent (50%) of its floor area or more than fifty percent (50%) of its
replacement cost at the time of destruction. If the structure is demolished by
any means to an extent of more than fifty percent (50%) of its replacement
cost or more than fifty percent (50%) of its floor area at the time of destruction,
it shall not be reconstructed except in conformity with the provisions of the
Ordinance.
10. All construction shall be done per the plans and dimension submitted to and
approved by this Board. Any modification to the plans and dimensions must
be approved by the Board of Appeals unless such changes are deemed a
minor field change by the Building Commissioner in consultation with the
Chair of the Board of Appeals.
11. Petitioner shall schedule Assessing Department inspections of the property,
at least annually, to project completion and a final inspection upon project
completion.
Ms. Ordaz seconds the motion. The vote is five (5) in favor (Peter Copelas, Carly McClain,
Paul Viccica, Steven Smalley, and Rosa Ordaz) and none (0) opposed. The motion
passes.
Motion and Vote: Mr. Viccica motions to approve the petition of MD PROPERTY
DEVELOPMENT at 275 LAFAYETTE STREET (Map 33, Lot 438) (R1,R3 Zoning Districts)
for Variances from Section 4.1 Dimensional Requirements for lot coverage where 30% is
permitted and 33.6% is being sought, lot area per dwelling unit where 3,500 SF is required in
the R3 Zoning District and 15,000 SF in the R1 where 2,250 SF is proposed, Side setback
where 20 feet is required and 10 feet is sought, and per Section 5.1.5 Curb Cuts for 44 feet of
curb cut where 20 feet is allowed, for a total of 5 residential units in the existing building and a
new building to be constructed at 275 LAFAYETTE STREET with 5 units, subject to the
following standard conditions:
1. Petitioner shall comply with all city and state statutes, ordinances, codes, and
regulations.
2. All construction shall be done as per the plans and dimensions submitted to
and approved by the Building Commissioner.
3. All requirements of the Salem Fire Department relative to smoke and fire
safety shall be strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. Exterior finishes of the new construction shall be in harmony with the existing
structure.
6. A Certificate of Occupancy is to be obtained.
7. Petitioner is to obtain approval from any City Board or Commission having
jurisdiction including, but not limited to, the Planning Board.
8. Petitioner shall obtain street numbering from the City of Salem Assessor’s
Office and shall display said number so as to be visible from the street.
9. Unless this Decision expressly provides otherwise, any zoning relief granted
does not empower or authorize the Petitioner to demolish or reconstruct the
structure(s) located on the subject property to an extent of more than fifty
percent (50%) of its floor area or more than fifty percent (50%) of its
replacement cost at the time of destruction. If the structure is demolished by
any means to an extent of more than fifty percent (50%) of its replacement
cost or more than fifty percent (50%) of its floor area at the time of destruction,
it shall not be reconstructed except in conformity with the provisions of the
Ordinance.
10. All construction shall be done per the plans and dimension submitted to and
approved by this Board. Any modification to the plans and dimensions must
be approved by the Board of Appeals unless such changes are deemed a
minor field change by the Building Commissioner in consultation with the
Chair of the Board of Appeals.
11. Petitioner shall schedule Assessing Department inspections of the property,
at least annually, to project completion and a final inspection upon project
completion.
Ms. McClain seconds the motion. The vote is five (5) in favor (Peter Copelas, Carly McClain,
Paul Viccica, Steven Smalley, and Rosa Ordaz) and none (0) opposed. The motion
passes.
REGULAR AGENDA
Location: 6 Riverbank Road (Map 31, Lot 279) (R1 Zoning District)
Applicant: Michael McKinnon
Project: A public hearing for all persons interested in the petition of MICHAEL
MCKINNON at 6 RIVERBANK ROAD (Map 31, Lot 279) (R1 Zoning District)
for a special permit per Section 3.3.5 Nonconforming Single- and Two-Family
Residential Structures of the Salem Zoning Ordinance to expand a non-
conforming structure by constructing a two (2) story addition (12’ 7” x 10’
7”). Renovations to the first and second floor, within the current footprint will
also be done.
Documents and Exhibitions
· Application date-stamped January 11, 2023 and supporting documentation
Chair Copelas introduces the petition.
Steven Livermore and Michael McKinnon introduces themselves. Mr. Livermore states he is
the project architect, and explains the proposal to create a small addition to the front of the
house. While the addition’s setbacks will comply with zoning, the existing building does not.
Mr. Livermore states the addition with the second story will help expand living space for Mr.
McKinnon’s growing family. The roof will be raised and there will be a gable roof on the
addition, with three A-dormers on the front of the house and a shed dormer proposed for the
rear. He presents plans of the existing and proposed conditions, as well as elevations and floor
plans.
Mr. Copelas asks for confirms they are seeking an addition, raising the gabled row, adding A-
dormers on the Riverbank Road side, and shed dormers in the rear. The applicant confirms.
Mr. Copelas asks if the proper relief has been sought, and Mr. St. Pierre confirms it has.
Chair Copelas opens the floor to public comment but there is none.
Motion and Vote: Ms. McClain motions to approve the petition of MICHAEL MCKINNON at 6
RIVERBANK ROAD (Map 31, Lot 279) (R1 Zoning District) for a special permit per
Section 3.3.5 Nonconforming Single- and Two-Family Residential Structures of the Salem
Zoning Ordinance to expand a non-conforming structure by constructing a two (2) story addition
(12’ 7” x 10’ 7”), along with renovations to the first and second floor within the current footprint,
subject to the following standard conditions:
1. Petitioner shall comply with all city and state statutes, ordinances, codes, and
regulations.
2. All construction shall be done as per the plans and dimensions submitted to
and approved by the Building Commissioner.
3. All requirements of the Salem Fire Department relative to smoke and fire
safety shall be strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. Exterior finishes of the new construction shall be in harmony with the existing
structure.
6. A Certificate of Occupancy is to be obtained.
7. A Certificate of Inspection is to be obtained.
8. Petitioner is to obtain approval from any City Board or Commission having
jurisdiction including, but not limited to, the Planning Board.
9. Unless this Decision expressly provides otherwise, any zoning relief granted
does not empower or authorize the Petitioner to demolish or reconstruct the
structure(s) located on the subject property to an extent of more than fifty
percent (50%) of its floor area or more than fifty percent (50%) of its
replacement cost at the time of destruction. If the structure is demolished by
any means to an extent of more than fifty percent (50%) of its replacement
cost or more than fifty percent (50%) of its floor area at the time of destruction,
it shall not be reconstructed except in conformity with the provisions of the
Ordinance.
10. All construction shall be done per the plans and dimension submitted to and
approved by this Board. Any modification to the plans and dimensions must
be approved by the Board of Appeals unless such changes are deemed a
minor field change by the Building Commissioner in consultation with the
Chair of the Board of Appeals.
11. Petitioner shall schedule Assessing Department inspections of the property,
at least annually, to project completion and a final inspection upon project
completion.
Ms. Ordaz seconds the motion. The vote is five (5) in favor (Peter Copelas, Carly McClain,
Paul Viccica, Steven Smalley, and Rosa Ordaz) and none (0) opposed. The motion
passes.
Location: 8 Mead Court (Map 27, Lot 69) (R2 Zoning District)
Applicant: Nick Nikolopoulos
Project: A public hearing for all persons interested in the petition of NICK
NIKOLOPOULOS at 8 MEAD COURT (Map 27, Lot 69) (R2 Zoning District)
for a special permit per Section 3.3.3 Nonconforming Structures of the Salem
Zoning Ordinance to add a shed dormer that will span thirty-two (32) feet from
end to end. The dormer will be five (5) feet high. Four (4) windows will be
added with the addition of the dormer. The dimensions will not raise the roof
line of the house and will not change the footprint of any rooms.
Documents and Exhibitions
· Application date-stamped January 12, 2023 and supporting documentation
Chair Copelas introduces the petition.
Chris Nikolopoulos introduces himself on behalf of the applicant and explains they are
seeking a special permit to add a shed dormer measuring 32 feet in width and five feet
in height across the from of the house. The building is an existing nonconforming
structure, but they are not looking to increase the nonconformity or create any new
ones.
Nick Nikolopoulos introduces himself and states it is a simple project looking to obtain a
bit more space and make it more livable. The existing floor plans are shown.
Chris Nikolopoulos states the current uses of the rooms are not going to be changed,
and that the dormer will go across from the living room to the hallway and one of the
bedrooms. The goal is to get more space in this smaller unit, and he maintains there will
be no disruptions during the process. He states they spoke with neighbors who do not
seem to object. Elevations are presented.
Nick Nikolopoulos states the existing gutter and soffit will remain, and notes the
neighbor across the street has a similar dormer. He presents plot plans and photos of
the property.
Mr. Viccica asks if the current use of the third floor is a residence, and the applicant
confirms. He asks if there are three units total, and the applicant again confirms.
Chair Copelas opens the floor to public comment but there is none.
Motion and Vote: Ms. Ordaz motions to approve the petition of NICK NIKOLOPOULOS at 8
MEAD COURT (Map 27, Lot 69) (R2 Zoning District) for a special permit per Section 3.3.3
Nonconforming Structures of the Salem Zoning Ordinance to add a shed dormer that will span
thirty-two (32) feet from end to end, have a height of five (5) feet, and have four (4) windows,
with no increase in the roof line of the house or the current footprint, subject to the following
standard conditions:
1. Petitioner shall comply with all city and state statutes, ordinances, codes, and
regulations.
2. All construction shall be done as per the plans and dimensions submitted to
and approved by the Building Commissioner.
3. All requirements of the Salem Fire Department relative to smoke and fire
safety shall be strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. Exterior finishes of the new construction shall be in harmony with the existing
structure.
6. A Certificate of Occupancy is to be obtained.
7. A Certificate of Inspection is to be obtained.
8. Petitioner is to obtain approval from any City Board or Commission having
jurisdiction including, but not limited to, the Planning Board.
9. Unless this Decision expressly provides otherwise, any zoning relief granted
does not empower or authorize the Petitioner to demolish or reconstruct the
structure(s) located on the subject property to an extent of more than fifty
percent (50%) of its floor area or more than fifty percent (50%) of its
replacement cost at the time of destruction. If the structure is demolished by
any means to an extent of more than fifty percent (50%) of its replacement
cost or more than fifty percent (50%) of its floor area at the time of destruction,
it shall not be reconstructed except in conformity with the provisions of the
Ordinance.
10. All construction shall be done per the plans and dimension submitted to and
approved by this Board. Any modification to the plans and dimensions must
be approved by the Board of Appeals unless such changes are deemed a
minor field change by the Building Commissioner in consultation with the
Chair of the Board of Appeals.
11. Petitioner shall schedule Assessing Department inspections of the property,
at least annually, to project completion and a final inspection upon project
completion.
Mr. Viccica seconds the motion. The vote is five (5) in favor (Peter Copelas, Carly McClain,
Paul Viccica, Steven Smalley, and Rosa Ordaz) and none (0) opposed. The motion
passes.
Location: 11 1/2 Hardy Street (Map 41, Lot 30) (R2 and B1 Zoning Districts)
Applicant: Lori A. Pattison
Project: A public hearing for all persons interested in the petition of LORI A.
PATTISON at 11 ½ HARDY STREET (Map 41, Lot 30) (R2, B1 Zoning
Districts) for a special permit per Section 3.3.3 Nonconforming Structures of
the Salem Zoning Ordinance to alter and to enlarge the residential use of a
nonconforming structure by restoring and using the third (3rd) floor
unit. Petitioner is also seeking variances from section 4.1 Dimensional
Requirements for lot area per dwelling unit where 1,423 sq. ft is
proposed/3,500 sq. ft required. In addition, a variance per section 5.1.1 –
5.1.8 Off-Street Parking.
Documents and Exhibitions
· Application date-stamped January 24, 2023 and supporting documentation
Chair Copelas introduces the petition.
Attorney Bill Quinn introduces himself on behalf of the applicant and explains the
property is on a quiet one-way street with older homes and multi-family dwellings
between Derby and Essex Streets. Mr. Quinn indicates the applicant and her then
husband purchased the property in 2001, and it was sold as a three-family dwelling.
After moving in, they attempted to renovate the third story apartment, but it was never
actually reconstructed or put in service. As such, the building has been occupied as a
two-family on the first and second floor. Mr. Quinn states currently the second floor is
occupied by the petitioner’s daughter. Mr. Quinn explains the history of the property,
noting it is a large structure with a demising wall running down the middle, creating two
row houses. Each of the two half houses are on their own separate parcels of real
estate, and the property in question is split in the B1 and R1 zoning districts. Mr. Quinn
presents the plot plan. He states the zoning division is important because a three-family
use is allowed in a B1 zone, and that they are seeking to reinstate the legal use on the
third floor. He notes the circumstances are odd and that the building and property are
divided with an odd shaped lot twice as deep as it is wide. Mr. Quinn states that he met
with Mr. St. Pierre and initially filed a different petition seeking different relief, but that
the current petition is the result of their discussions. Mr. Quinn explains they are
seeking a special permit to enlarge the use of the existing nonconforming structure to
allow residential use to be expanded into the third floor. He next presents a parking
plan, noting the open space of the lot but also its narrowness. If the four car parking
plan is not approved, a five car plan is also provided, but would require removal of an
old large cedar tree in the back. Two spaces have always existed for the first and
second floor units, and the proposal would add two spaces. Photos are presented,
along with a petition signed by all four immediate abutters agreeing to support the
proposal. Mr. Quinn presents a map of the neighborhood, and notes relief is also being
sought for lot area per dwelling unit. He states the grounds for the variance and special
permit have been submitted.
Lori Pattison introduces herself and thanks the Board. She explains the parking a bit
more, noting the adequate space. Ms. Pattison states she loves her house and the
neighborhood, and that she would love to create an opportunity for someone else to live
here too. She also presents photos of the tree, showing its age and beauty.
Mr. Copelas states that if the previous three-unit use is still valid, then some of the relief
seems to be superfluous or unnecessary.
Mr. Quinn states they are taking a current two-unit dwelling to a three-unit, where three
is a legal conforming use. Mr. St. Pierre and the Board discuss the relief being sought
and the nature of the existing three-family home. Mr. Copelas states that if it is a three
family dwelling, a variance would not be needed. Mr. St. Pierre suggests the use was
not utilized for some time, and this is an attempt to reinstate the use of the third unit. Mr.
Copelas asks if the property is currently recognized as a legal three-unit dwelling or not.
Mr. Copelas states that if it is already a legal unit, there may also be no need to talk
about the parking configuration.
Mr. Quinn contends it is a complicated issue, and that the existing regulations could be
clearer on the matter of reinstating a legal but non-existing present use. He states that
he was attempting to be thorough through a “belt and suspenders” approach to make
sure all grounds were covered. Mr. Quinn states that if it is recognized as a legal three-
family and can be restored without addressing the issues of parking volume or lot
square footage per dwelling unit, then only the requested special permit would be
needed,
Mr. Copelas suggests it is not up to the Board to decide what relief is required, but
rather acts on what is presented and requested. If the relief is not necessary or
required, Mr. Copelas states it should not be requested. He indicates he is unsure
whether to revisit the application, and is open to hearing from other Board members.
Mr. Quinn states he was conflicted on what relief to petition for, but that if the Board is
satisfied and Mr. St. Pierre agrees it is an existing three-family, then the petition could
be withdrawn because relief aside from a building permit may not be needed.
Mr. St. Pierre suggests asking for a continuance so that the issue can be looked into
further, and the petitioner can decide prior to the next meeting whether to withdraw or
finish the application.
Mr. Quinn asks to continue.
Motion and Vote: Mr. Viccica motions to continue the petition of LORI A. PATTISON at 11 ½
HARDY STREET (Map 41, Lot 30) (R2, B1 Zoning Districts) for a special permit per
Section 3.3.3 Nonconforming Structures of the Salem Zoning Ordinance to alter and to enlarge
the residential use of a nonconforming structure by restoring and using the third (3rd) floor unit,
as well as variances from section 4.1 Dimensional Requirements for lot area per dwelling unit
where 1,423 sq. ft is proposed but 3,500 sq. ft is required, and a variance per section 5.1.1 –
5.1.8 Off-Street Parking, to the next regularly scheduled meeting of the Zoning Board of
Appeals on March 15, 2023.
Ms. Ordaz seconds the motion. The vote is five (5) in favor (Peter Copelas, Carly McClain,
Paul Viccica, Steven Smalley, and Rosa Ordaz) and none (0) opposed. The motion
passes.
Location: 31 Bertuccio Avenue (Map 24, Lot 104) (R1 Zoning District)
Applicant: Dean Boucher
Project: A public hearing for all persons interested in the petition of DEAN BOUCHER
at 31 BERTUCCIO AVENUE (Map 24, Lot 104) (R1 Zoning District) for a
variance per Section 4.1.1 Dimensional Requirements of the Salem Zoning
Ordinance to build a sixteen by forty sq. foot (16”x40”) two story single family
residence .The relief will be from minimum lot area. Petitioner is seeking to
construct on a lot size of two thousand nine hundred thirteen (2,913) sq.
feet/Where fifteen thousand sq. feet (15,000) is required. In addition, relief
requested is to build into the left side setback at four (4) feet and into the right-
side setback at nine (9) feet/ Where ten (10) feet is required. The rear yard
setback would be five (5) feet/ Where thirty (30) feet is required.
Documents and Exhibitions
· Application date-stamped January 26, 2023 and supporting documentation
Chair Copelas introduces the petition.
Dean Boucher introduces himself and explains this is a piece of land that he has owned
for 12 to 15 years and paid taxes on. Mr. Boucher explains that in the 1950’s they were
dividing the land into lots, and this was the last one left. He contends there once was a
building on the plot, and that there is currently a driveway that goes to nothing. He adds
that he has been to the registry of deeds trying to find the building but cannot. Mr.
Boucher states there is no residence to the right of his lot and in back are some woods
and Salem Hospital. He suggests his proposal is the best use of the property, and that
he would like to move back to Salem by building the proposed small two bedroom
home. He presents a plot plan.
Mr. Copelas states that the application made note of sheds being used when homes
were built in the area, but that tonight the applicant is claiming there was a building on
the location. Mr. Boucher indicates he does not know if someone lived in the building,
but was told that there was a structure there.
Mr. Boucher explains that he approached his abutters to purchase extra land but they
refused. He notes that his wife works at Salem Hospital and has for many years, and
that he would like to move back to Salem but has had difficulty finding any residences
he can afford. Mr. Boucher states the proposal is set back enough to not be a detriment
to anyone in the neighborhood.
Mr. Copelas suggests it is not a matter of whether neighbors are in favor of the proposal
or not, and states that the hardship presented does not meet the legal requirement of a
hardship. He adds that having financial difficulty finding housing in Salem does not
qualify one for zoning and variances. Mr. Copelas notes that paying real estate taxes on
the land is irrelevant if the lot is not buildable due to easements. Mr. Copelas explains
that paying taxes does not obligate the Board to provide a variance for a house to be
build.
Mr. Viccica asks about the lot width and fronting, noting that he does not think it
complies in regard to either of those, which would mean the advertisement would be
wrong.
Mr. Copelas states he is struggling to find a reason why a house should be located here.
Ms. Vyedin asks about parking, and Mr. Boucher explains there would be two-car
tandem parking in front. Mr. Viccica states a variance would also be required for that as
tandem parking is not allowed. Mr. Boucher states he realizes he is asking a lot, but
that he hopes the Board will grant his relief.
Mr. Copelas suggests seeking the help of an attorney who has knowledge of land use
that might be able to point Mr. Boucher in a different direction, noting that this petition is
problematic on many levels.
Mr. Boucher asks for a continuance.
Mr. St. Pierre notes that he told the petitioner the proposal was not feasible, but that he
wanted to go ahead and present. The lot is taxed as unbuildable land, and Mr. St.
Pierre suggests the property is ripe for a title search to see how it even came into
existence.
Motion and Vote: Mr. Viccica motions to continue the petition of DEAN BOUCHER at 31
BERTUCCIO AVENUE (Map 24, Lot 104) (R1 Zoning District) for a variance per Section 4.1.1
Dimensional Requirements of the Salem Zoning Ordinance to build a sixteen by forty sq. foot
(16”x40”) two story single family residence with relief from minimum lot area, on a two thousand
nine hundred thirteen (2,913) sq. feet lot where fifteen thousand sq. feet (15,000) is required, as
well as relief to build into the left side setback at four (4) feet and into the right-side setback at
nine (9) feet where ten (10) feet is required, and a rear yard setback that would be five (5) feet
where thirty (30) feet is required, to the next regularly scheduled meeting of the Zoning Board of
Appeals on March 15, 2023.
Mr. Smalley seconds the motion. The vote is five (5) in favor (Peter Copelas, Carly McClain,
Paul Viccica, Steven Smalley, and Rosa Ordaz) and none (0) opposed. The motion
passes.
MEETING MINUTES
December 14, 2022
Mr. Copelas states he went through the minutes and did not have any edits. Ms. Ordaz
confirms.
Mr. Smalley notes he found a small typo on the Purchase Street item, where his name is
missing an “E”.
Ms. Vyedin states that on page 5 “low firm” should be changed to “law firm”.
Motion and Vote: Ms. Vyedin motions to approve the minutes from the December 14,
2022 meeting of the Zoning Board of Appeals as amended. Mr. Smalley seconds the
motion. The vote is five (5) in favor, and none (0) opposed. The motion passes
January 18, 2023
Mr. Copelas note
Motion and Vote: Mr. Viccica motions to approve the minutes from the January 18,
2023 meeting of the Zoning Board of Appeals as drafted. Ms. Rodaz seconds the
motion. The vote is five (5) in favor, one (1) abstained, and none (0) opposed. The
motion passes
OLD/NEW BUSINESS
Vice Chair Discussion
Mr. Copelas confirms that this was discussed at the last meeting and that Carly McClain
is Vice Chair.
The Board discusses hybrid versus in person versus fully remote meetings and what
may come after the order in March ends.
ADJOURNMENT
Motion and Vote: Ms. McClain motions to adjourn the meeting. No one seconds the
motion. The vote is all in favor. The motion passes.
The meeting ends at 9:20 PM on February 15, 2023.
For actions where the decisions have not been fully written into these minutes,
copies of the
Decisions have been posted separately by address or project at:
https://www.salem.com/zoning-board-appeals/pages/zoning-board-appeals-decisions-
2023
Respectfully submitted,
Daniel Laroe, Staff Planner
Agenda
CITY OF SALEM, MASSACHUSETTS
BOARD OF APPEALS
98 WASHINGTON STREET SALEM, MASSACHUSETTS 01970
TEL: 978-619-5685
ROBERT K. MCCARTHY
ACTING MAYOR
NOTICE OF MEETING
Notice is hereby given that a meeting of the Salem Zoning Board of Appeals’ will be held
on FEBRUARY 15, 2023, at 6:30 p.m.
**Via remote participation**
This is in accordance with Chapter 107 of the Act of 2022.
Peter Copelas, Acting Chair
Important Announcement:
Every effort will be made to ensure that the public can adequately access the
proceedings in real time, via technological means. In the event that we are unable to do
so on matters not requiring a public hearing, we will post on the City of Salem’s website
an audio or video recording, transcript, or other comprehensive record of proceedings
as soon as possible after the meeting.
Individuals may participate remotely in the meeting via a remote participation platform
called Zoom. Members of the public and/or parties with a right and/or requirement to
attend this meeting may access the remote participation meeting through any one of
the following ways:
Attending the Virtual Public Meeting:
• Go to Website link:
https://us02web.zoom.us/j/83964128644?pwd=cTNlTlFic2pKNWlOZnV3dW9yb1l
oUT09 Or, go to the website link https://zoom.us/join and enter meeting ID
#839 6412 8644 followed by meeting password 011324 if directed to do so
on screen.
• Dial toll-free phone number 877-853-5257. When prompted enter meeting ID
#839 6412 8644 followed by meeting password 011324 if directed. Those
calling in will not have access to the direct video feed of the meeting, but can
follow along with the project materials available for
download at Salem.com/ZBA
• Watch the meeting live on Salem Access Television Chanel 22.
• Project materials are available for download at (https://tinyurl.com/SalemZBA)
1
City of Salem Zoning Board of Appeals
Agenda for February 15, 2023
Page 2 of 5
Providing Public Comment During the Meeting:
Members of the public attending this meeting virtually will be allowed to make
comments during the portion of the hearing designated for each agenda item. Members
of the public will be asked to use the virtual “Raise Hand” function in Zoom to indicate
that they would like to provide comment.
• Dial *9 on your phone’s dial pad to raise your hand if you are using the toll-free
number.
• Click the “Raise Hand” button if you are using the Zoom application on your
computer or phone.
For each agenda item, the moderator will identify attendees with raised hands by their
screenname or the last 3 digits of their telephone number and will then unmute them.
The moderator will then request that the attendee unmute their device to provide their
full name, address, and comment for the record.
The moderator will go down the list of attendees in the order presented by the Zoom
application. The attendee list is ordered so that phone numbers are first, followed by an
alphabetical list of the screen names of attendees accessing Zoom through a computer,
tablet, or smartphone. Anyone that speaks about an issue unrelated to the agenda
items will be immediately muted.
Providing Public Comment Before the Meeting:
Members of the public can alternatively email their comment before the start of the
meeting to zoningboardcomments@salem.com.
Familiarizing Yourself with Zoom:
We encourage members of the public to install and familiarize themselves with Zoom in
advance of the meeting.
If you plan on providing public comments and are logging into this meeting via the
Zoom application, please test your speakers and microphone ahead of time. If we have
trouble hearing you when you speak, we will move on to the next person and try to
return to you later in the list. If this happens, we recommend that you call the toll-free
number to access the meeting and provide your comment.
The Zoom meeting will open 15 minutes before the start of the meeting to allow
participants to connect and practice with the audio and raise hand functions.
Thank you for your patience and understanding as we navigate these challenging
circumstances.
Know your rights under the Open Meeting Law M.G.L. c. 30A § 18-25 and City
Ordinance § 2-2028 through § 2-2033.
2
City of Salem Zoning Board of Appeals
Agenda for February 15, 2023
Page 3 of 5
MEETING AGENDA
I. ROLL CALL
II. CONTINUANCES
1) Location: 1 Purchase Street (R1 Zoning District)
Applicant: Ezekiel Holt
Description: The petition of EZEKIEL HOLT at 1 PURCHASE STREET (Map 15,
Lot 139) (R1 Zoning District), for a Special Permit per
Section 3.3.5 Nonconforming Single- and Two-Family Residential Structures of
the Salem Zoning Ordinance to build a new, second egress with a porch for the
first-floor unit. The proposed change will permit petitioner to restrict access to
the basement from the first-floor unit and to specifically make it a part of the
second unit.
2) Location: 275 Lafayette Street (R1,R3 Zoning Districts)
Applicant: MD Property Development
Description: The petition of MD PROPERTY DEVELOPMENT at 275 LAFAYETTE
STREET (Map 33, Lot 438) (R1,R3 Zoning Districts) for Special Permits per
Section 3.3.2 Nonconforming Uses to change from one nonconforming use-
educational use to a multi-family residential use. A Special Permit per Section
3.3.3 Nonconforming Structures of the Salem Zoning Ordinance to allow for
alteration of the existing nonconforming structure. In addition, petitioner seeks
Variances from Section 4.1 Dimensional Requirements for lot coverage where
30% is permitted and 32.5% is being sought/ lot area per dwelling unit where
3,500 SF is required in the R3 Zoning District and 15,000 SF in the R1 where
1,500 SF is proposed/ Side setback where 20 feet is required and 10 feet is
sought. And per Section 5.1.5 Curb Cuts for 30 feet of curb cut where 20 feet is
allowed. A total of 15 residential units in the existing building and a new building
to be constructed at 275 LAFAYETTE STREET.
Know your rights under the Open Meeting Law M.G.L. c. 30A § 18-25 and City
Ordinance § 2-2028 through § 2-2033.
3
City of Salem Zoning Board of Appeals
Agenda for February 15, 2023
Page 4 of 5
III. REGULAR AGENDA
1) Location: 6 Riverbank Road (R1 Zoning District)
Applicant: Michael McKinnon
Description: The petition of MICHAEL MCKINNON at 6 RIVERBANK ROAD (Map
31, Lot 279) (R1 Zoning District) for a special permit per Section 3.3.5
Nonconforming Single- and Two-Family Residential Structures of the Salem
Zoning Ordinance to expand a non-conforming structure by constructing a two
(2) story addition (12’ 7” x 10’ 7”). Renovations to the first and second floor,
within the current footprint will also be done.
2) Location: 8 Mead Court (R2 Zoning District)
Applicant: Nick Nikolopoulos
Description: The petition of NICK NIKOLOPOULOS at 8 MEAD COURT (Map 27,
Lot 69) (R2 Zoning District) for a special permit per Section 3.3.3 Nonconforming
Structures of the Salem Zoning Ordinance to add a shed dormer that will span
thirty-two (32) feet from end to end. The dormer will be five (5) feet high. Four
(4) windows will be added with the addition of the dormer. The dimensions will
not raise the roof line of the house and will not change the footprint of any
rooms.
3) Location: 11 ½ Hardy Street (R2, B1 Zoning Districts)
Applicant: Lori A. Pattison
Description: The petition of LORI A. PATTISON at 11 ½ HARDY STREET (Map
41, Lot 30) (R2, B1 Zoning Districts) for a special permit per Section 3.3.3
Nonconforming Structures of the Salem Zoning Ordinance to alter and to enlarge
the residential use of a nonconforming structure by restoring and using the third
(3rd) floor unit. Petitioner is also seeking variances from section 4.1 Dimensional
Requirements for lot area per dwelling unit where 1,423 sq. ft is proposed/3,500
sq. ft required. In addition, a variance per section 5.1.1 – 5.1.8 Off-Street
Parking.
4) Location: 31 Bertuccio Avenue (R1 Zoning District)
Applicant: Dean Boucher
Know your rights under the Open Meeting Law M.G.L. c. 30A § 18-25 and City
Ordinance § 2-2028 through § 2-2033.
4
City of Salem Zoning Board of Appeals
Agenda for February 15, 2023
Page 5 of 5
Description: The petition of DEAN BOUCHER at 31 BERTUCCIO AVENUE (Map
24, Lot 104) (R1 Zoning District) for a variance per Section 4.1.1 Dimensional
Requirements of the Salem Zoning Ordinance to build a sixteen by forty sq. foot
(16”x40”) two story single family residence .The relief will be from minimum lot
area. Petitioner is seeking to construct on a lot size of two thousand nine
hundred thirteen (2,913) sq. feet/Where fifteen thousand sq. feet (15,000) is
required. In addition, relief requested is to build into the left side setback at four
(4) feet and into the right-side setback at nine (9) feet/ Where ten (10) feet is
required. The rear yard setback would be five (5) feet/ Where thirty (30) feet is
required.
IV. APPROVAL OF MINUTES
12.14.22
1.18.23
V. OLD/NEW BUSINESS
Vice-Chair discussion
VI. ADJOURNMENT
Persons requiring auxiliary aids and services for effective communication such as sign
language interpreter, an assistive listening device, or print material in digital format or a
reasonable modification in programs, services, policies, or activities, may contact the
City of Salem ADA Coordinator as soon as possible and no less than two (2) business
days before the meeting, program, or event.
This agenda is subject to change.
Know your rights under the Open Meeting Law M.G.L. c. 30A § 18-25 and City
Ordinance § 2-2028 through § 2-2033.
5
Get email alerts for Salem
A daily email when new agendas and minutes are posted.