City Council
Regular MeetingSan Bruno, CA · January 28, 2025
Agenda
UPDATE ON SOUTH LINDEN AVE
AND SCOTT STREET GRADE
SEPARATION PROJECT
JANUARY 28, 2025
HAE WON RITCHIE CITY COUNCIL
CITY ENGINEER/DEP PW DIRECTOR
AGENDA
I. Objective
II. Introductions
III. Background
IV. Caltrain Presentation
V. Tonight’s Recommended Action
VI. Next Steps
VII. Questions
2
OBJECTIVE
Provide City Council with an Update on the South Linden
Avenue and Scott Street Grade Separation Project and Seek
Direction on the Optimized Alternative
3
Introductions
• Caltrain
Robert Barnard
Navdeep Dhaliwal
John Valsecchi (Jacobs)
Liliam Perez
• Darrell Maxey (RSE)
• Jessica Manzi (SMCTA)
4
BACKGROUND
Planning Phase (Project Study Report) Completed 2021
Preferred Alternative 1 selected
Raise railroad tracks slightly
Close Scott Street to vehicular traffic across tracks
Construct pedestrian/bicycle undercrossing
Current Conditions Alternative 1 – Looking North Alternative 1 – Looking South 5
DISCUSSION
Preliminary Engineering / Environmental phase started 2022
Grant funding from SMCTA
Caltrain retained designer (RSE) in 2023
Caltrain and RSE performed value engineering
Caltrain to present results of this effort
6
CALTRAIN
PRESENTATION
7
South Linden Avenue Item #6.e.
6/2/2022
and Scott Street
Grade Separation (LSGS)
Project
San Bruno City Council
Special Meeting
Presentation Outline
Introduction
Background
Original Preferred Alternative
Optimization Effort
Comparison
Summary
Questions – Next Steps
2
Background: Project Location/Key Features
South San Francisco Station
N
Colma Creek
UPRR/
Granite Rock San Bruno Station
City Limit SSF and SB
South Linden Ave Scott St I-380
to San Francisco to San Jose
Southline 1,850 feet
Development
Stakeholders Logo and Roles
Implementing Agency
Project Sponsors
Funding Partner
4
Scott Street South Linden Ave
Granite
Rock
N
N
Central
AT&T Concrete
Parking
Lot
Scott St
Southline
Development Airgas
Storage
5
Pedestrian/Bicycle Undercrossing Only
PSR Alternative 1 - with Scott Street Crossing Closed
6
PSR Alt 1 – Key Features at Scott Street
Temporary Construction Easement (TCE) for
Shoofly and signal house.
Reduce Herman Street to one lane and no parking
Pedestrian/bike
Undercrossing
AT&T Parking Lot
ROW required for
access ramp to
pedestrian/bike
Undercrossing
Scott St
Tracks raised 2.5 ft.
Scott Street - closed when
shoofly is constructed.
7
No-Build Alternative
The No-Build Alternative will fail to address:
Growth in Future Auto Traffic on Scott
56% increase in Annual Average Daily Traffic (AADT)
Level of Service lowered to F (Delay > 80 sec)
Extensive queues with spillovers, blocked driveways,
and intersections
Growth in gate down time ranging from 100% to
250%
Growth in future train crossings ranging from 100%
to 400%
8
PSR 1 Alternative Challenges
Original Project Study Report (PSR) from 2020 focus: Conc e ptua l Engine e ring De s ign Only
Recent re-evaluation effort focus: Cons truc ta bility
2024 effort found new issues and challenges with PSR 1:
Building the PSR Alt 1 - up to s e ve n ye a rs to construct – will take much longer than assumed
Building the PSR Alt 1 has multiple im plica tions especially c os t a nd s c he dule due to:
Ve ry lim ite d a c c e s s for construction work near operating trains and site access
La rge footprint due to shoofly and elevated tracks
Sa fe ty re quire m e nts related to construction near tracks
Funda bility
9
Construction Methodology Re-evaluation
In 2023, a new design consultant was tasked with performing a review of the
PSR Alternative 1 design, the constructability and other issues. The consultant
took a deeper dive into:
Cons truc ta bility – Staging, sequencing, and duration
Environmental
Utility Relocations
Traffic impacts
Compatibility with re duc e d work windows
10
Box Jacking
– Keep Existing Surface Improvements
– Eliminate Shoofly and Elevated Tracks
Push or Jack a precast concrete box beneath existing railroad tracks
PSR 1 vs Optimized Alternative
Scott Street Undercrossing
Key Characteristics
• Rail - Raised 2.5 ft
• Scott Street - Closed when shoofly is
constructed.
• Pedestrian / bicycle undercrossing
• Rail - Remains at-grade
• Scott Street – Remains at-grade during
OA
construction. May possibly remain open
during portions of construction.
• Undercrossing will need to be lowered
No material changes to Scott
Street’s fundamental
undercrossing configuration.
12
Comparison - Scott Street Undercrossing
PSR Alternative 1 Optimized Alternative
13
Rendering - Scott Street Undercrossing
10PM
24 AM
Facing West
14
Rendering - Scott Street Undercrossing
10PM
4
2 AM
Facing East
15
Project Comparisons
(for both Scott Street and South Linden Avenue)
Project Aspect PSR Alternative 1 Optimized Alternative
Construction Schedule 84 months 36 months
Risk (schedule / cost / High Low
environmental)
Cost High 25% less
Environmental Impacts High Low
Road Closures / Traffic Long duration Moderate duration
Impacts
Operational Impacts (RR) Extensive Minimal
Project Footprint Impacts Extensive Moderate
(No change in San Bruno)
16
Project Development Timeline
Caltrain & RSE continue development and
minor refinements of OA while conducting
Caltrain & RSE shared decision
Project Study Report outreach to gather feedback from Caltrain,
to Evaluate Preferred
(PSR) Phase city managers, and other stakeholders
Alternative
2016 – 2021 July – August 2023 December 2023 – November 2024
June 2023 September – November 2023
RSE begins work on Preliminary
Studies and Preliminary Caltrain & the Cities of San Bruno and
Engineering South San Francisco further developed
the Optimized Alternative (OA)
17
Caltrain Lessons Learned
Caltrain wants to share and inform stakeholders about the c ha nging la nds ca pe
of c os t e s tim a te s . These lessons learned include:
Exploring different construction methods and techniques that are le s s
im pa c tful, s upport c os t s a ving s olutions , m itiga te s ris k, a nd re duc e the
proje c t c ons truc tion s c he dule. Examples include:
Elimination of Shoofly (detour) tracks
Addressing the reduced work windows impacts caused by electrification
Use of new technology - Box Jacking
Collaboration with all technical project stakeholders on va lue -
e ngine e ring s olutions , s e tting c le a r tim e line s for the proje c t, next s te ps ,
a nd ide ntifying de c is ion points
18
Summary
With new analysis of the design, constructability, and risks, Caltrain endorses the
Optim ize d Alte rna tive as a m ore e ffe c tive and re a lis tic option to advance forward
with design.
By contrast, the PSR Alternative is a le s s pra c tica l alternative due to:
7-year construction dura tion
the large im pa c ts (ROW, the environment, the footprint, traffic)
the higher c os t, higher risk, and fundability
the impacts of s a fe ty clearances
the construction ine ffic ie nc ie s (constrained site access, electrified operating
railroad environment)
19
Next Steps
• Ongoing engagement with property/business owners
• South San Francisco City Council
• February 12, 2025
• Upon council approval: preliminary engineering & environmental
phase (15%-35%)
20
Questions
21
TONIGHT’S RECOMMENDED ACTION
• Receive update on the South Linden Avenue and Scott Street
Grade Separation Project and provide direction on the
Optimized Alternative
• Staff recommendation is to proceed with the Optimized
Alternative
8
NEXT STEPS
South San Francisco City Council on February 12, 2025
Preliminary engineering
Environmental review phase
9
QUESTIONS?
10
January 28, 2025
Update for the San Bruno City Council
San Mateo County Flood and Sea Level Rise Resiliency District
Len Materman, CEO
info@OneShoreline.org
Agenda Introduction to OneShoreline and flooding in San Bruno
Short-term and long-term actions to reduce flooding
Outreach and what we heard from Belle Air residents
Roles for key agencies, including the City of San Bruno
7th Avenue looking north at Hwy. 380
2 2
Ba c k g ro u n d Climate change is a
transformative challenge that
requires regional collaboration.
With the support of the County
and all 20 cities, State legislation
established OneShoreline as a
special district on January 1, 2020.
It is the first independent
government agency to plan and
build regional resilience to the
water-related impacts of climate
change: flooding, sea level rise,
groundwater rise, coastal erosion,
and drought.
3
O n g o in g P rio rit ie s
Plan land use, private development, and public infrastructure for
climate-driven conditions and with regional resilience projects
Advance aligned resilience projects
Alert people to, and reduce the impacts of, extreme storms
Secure funding to sustain these efforts and leverage outside
funding
4
Flooding around the county – more extreme storms and higher tides
San Mateo San Carlos Redwood City
San Carlos Half Moon Bay Half Moon Bay
5
Most San Bruno
properties pay taxes Colma Creek
into a flood zone Flood Zone
established decades ago
by San Mateo County,
now administered by
OneShoreline.
City of
San Bruno
San Bruno Creek
Flood Zone
6
Complex flooding issues
in and around the
Belle Air neighborhood
• Belle Air is located along
the last mile of San Bruno
Creek before it crosses
Hwy. 101 and drains into
the Bay.
• The Creek winds through
major infrastructure owned
by, or in the jurisdiction of,
multiple agencies, which
has made solving the
chronic flooding difficult.
7
Recent actions to reduce flooding
• Completed the San Bruno
Creek Emergency Tide Gate
Repair Project in 2022
• Replaced three out of the
four pumps in the Walnut
Pump Station over multiple
winters
• Hand-cleared Creek
vegetation to maintain
flow capacity (with SFO).
8
San Bruno Creek Flood Zone funds have historically
been used to maintain the existing infrastructure.
Given the age of the infrastructure, and the fact
that it was designed for historic and not future
climate change conditions, OneShoreline looks to
replace its infrastructure.
OneShoreline Regional Infrastructure Project
builds upon past studies, current studies, and
local expertise to develop a regional project from
the Caltrain tracks to SSF Water Treatment Plant
that overcomes jurisdictional complexities.
9
OneShoreline Regional Infrastructure Project Anticipated Project Schedule
Timeframe Activities
Spring 2025 Convene multi-agency
Technical Advisory Committee
Summer Issue Consultant RFPs and
2025 Execute Consultant Contracts
2026 – 2028 Community Engagement
Project Alternatives and
Conceptual Designs
2028 Apply for Project Final Design
and Implementation Funding
10
Private partner citizen
feedback platform
ISeeChange
Flood Early
Warning System
11
FEMA National Flood Insurance Program’s
Community Rating System
Reduces flood insurance premiums in communities with
floodplain management practices and communications
beyond minimum NFIP requirements
Activities Required for City Participation
• Pass a Community Assistance Visit
• Designate CRS Coordinator
• Implement activities
• Maintain records
• Recertify each year
• Participate in verification cycle visits
Through June 2025, a OneShoreline consultant can support city exploration
and potential application to join CRS
12
Outreach and what we heard
OneShoreline convened an outreach
team that worked to better understand
experiences and information gaps
related to flooding in Belle Air.
oneshoreline.org/projects/san-bruno-creek
13
Laying Sandbags
What residents are
doing to protect Sharing
themselves information
ACTIONS Moving vehicles &
belongings
TAKEN
Installing
sump pumps
Joining Resilient
San Bruno
14
Roles for the Key Agencies
Project OneShoreline City CRC * C/CAG
Convene Resilient San Bruno ● ●
OneWatershed Project ● ●
Regional Infrastructure Project ●
Stormdrain capacity improvements ●
Stormwater detention project(s) ● ●
● Lead role Most agencies have a supporting role in most efforts
* CRC = Climate Resilient Communities, a CBO based in San Mateo County
15
City of San Bruno potential investments and participation
Update the City’s storm drain plan and implement storm drain improvements
Participate in community engagement
Participate in OneShoreline’s regional project: staffing, funding, and land use
FEMA CRS to reduce flood insurance premiums
16
Thank you
info@OneShoreline.org
D r a ft O n e W a t e r s h e d Fr a m e w o r k Re p o r t
Reid Bogert, C/CAG Stormwater Program Director – rbogert@smcgov.org
City of San Bruno Council Meeting, January 28, 2025
Image Source: http://astanehelaw.com/2020/09/02/san-mateo-county-passes-emergency-ordinance-establishing-paid-sick-leave-for-the-coronavirus-covid-19-pandemic/
St o rm w a t e r – W h a t ’s t h e Big D e a l?
• Urbanization = hard surfaces and pollutants
• Rain washes pollutants away
• Flows into inlets and underground pipes (as quickly as
possible under traditional engineering designs)
• Discharge directly to creeks, the Bay, or ocean
• No treatment to remove any pollutants
• Impacts water quality and aquatic life
Stormwater 101
Pre-Urban Development
Stormwater 101
Urban Development
Local Impacts
Gre e n In fra s t ru c t u re
• Using natural systems to capture, treat, and infiltrate
stormwater
• Restores “natural” stormwater management
• Distributed, small-scale systems or large-scale regional projects
• Multi-benefit, including for key water issues
–Adaptation for climate change impacts
–Flooding
–Groundwater recharge
• Includes public and private projects
• Integrated with “grey infrastructure” i.e., storm drain pipes and
other drainage infrastructure
• City of San Bruno adopted its Green Infrastructure Plan in
2019
Stormwater 101
Balanced Development
Orange Memorial Park
Regional Stormwater Project
Orange Memorial Park
Regional SW Capture
Project
(South San Francisco)
• $15.5M from Caltrans
• 7 agencies in the
watershed (including San
Bruno)
• First in Bay Area
• Innovate climate
resilience focused project
• Part of the overall
OneWatershed strategy
W h a t is t h e
O n e W a t e rs h e d
Fra m e w o rk ?
An equity-focused, integrated approach to climate
resilience in San Mateo County
• Effort led by C/CAG in partnership with other
regional stakeholders (including OneShoreline)
• Watershed scale vs. agency specific approach
• Climate Hazards evaluated:
• Sea level Rise/Groundwater Rise
• Extreme Precipitation
• Extreme Heat/Drought/Wildfire
• Watershed Assets evaluated for risk exposure:
• Water Supply
• Storm Drainage
• Waste Water Services
• Groundwater Basins
W h a t is t h e
O n e W a t e rs h e d
Fra m e w o rk ?
Potential OneWatershed Projects:
• Focus on green stormwater infrastructure
(benefits to flood/stormwater/water
supply/wastewater systems)
• Sustainable Streets
• Regional stormwater capture projects
• School/park retrofits
• May also include:
• Grey infrastructure improvements
• Shoreline resilience projects
• Diversion to WWTPs
• Creek Restoration
W h a t is t h e
O n e W a t e rs h e d
Fra m e w o rk ?
Overall Goals:
• Stormwater permit compliance related to green infrastructure + local planning efforts
• Holistically address climate impacts:
• Geographically connected water sector utilities and resources (opportunities to
enhance overall system resilience and leverage projects to benefit multiple sectors)
• E.g., increase stormwater capture, reduce need for upsizing pipes, reduce impacts
of I/I on sewer system, increase opportunity to recharge groundwater
• Compound effects of climate (sea level rise/storm flooding)
• Form partnerships for funding
• Include communities in planning and address priority communities first
• Collaborative approach to climate resilience with other regional efforts, including
OneShoreline and other partners
O n e W a t e rs h e d
P ro je c t P a rt n e rs
• C/CAG Stormwater Program – project lead
• Climate Resilient Communities – CBO lead
• City of San Bruno – San Bruno Creek Watershed lead
• County of San Mateo Sustainability Department
• South San Francisco-San Bruno Regional Water Quality
Control Plant
• Bay Area Water Supply and Conservation Agency
• San Mateo County Flood and Sea Level Rise Resiliency
District (OneShoreline)
7
Primary Tasks
Workplan and Initial Engagement Community-Led San Bruno Creek
1 4 OneWatershed Climate Resilience Plan
OneWatershed Data Inventory NOAA Grant Application
2 5.1
OneWatershed Framework Project Administration
5
3 Report and OneWatershed
Dashboard
8
Project Groups/Committees
Group Membership Oversight
Project Management Team Partners and Consultant team Entire Project
Technical Advisory Committee Agency Representatives OneWatershed Framework
Development
Non-profits/CBOs and other
Equity Priority Community Group stakeholders Community Engagement Plan and
OneWatershed Framework
Climate Change Community Team San Bruno Community Members San Bruno Creek OneWatershed
Plan
San Bruno Community Members
San Bruno Creek Community San Bruno Creek OneWatershed
and other stakeholders
Member Workshops Plan
Photo Credit: OneShoreline
Photo Credit: OneShoreline
Draft OneWatershed Framework Report
• Provides context and background on climate
hazards in the county and the OneWatershed
approach
• Summarizes the Climate Hazard Exposure
Assessment methods and outputs
• Defines the process for developing
OneWatershed Climate Resilience Plans, i.e.,
San Bruno Creek OneWatershed Plan
OneWatershed Framework follows CalOES Adaptation Planning Process
• Climate hazard exposure for each asset category and each climate hazard are
available through the OneWatershed Dashboard
• Visual representation, averaging exposure scores across all climate hazard
categories and OneWatershed infrastructure network categories:
Pilot Application to San Bruno Creek Watershed
• In 2025, the Project will pilot the OneWatershed Framework in the San
Bruno Creek watershed
• Step 1: Identify multi-agency, multi-stakeholder collaborative
partnerships – the collaborative partnerships established through this
project and the Resilient San Bruno team
• Step 2: Assess watershed-scale vulnerability of OneWatershed
infrastructure and assets to climate hazards – will use the Exposure
Assessment and San Bruno Creek Community Vulnerability
Assessment led by CRC
P ilo t Ap p lic a t io n t o Sa n Bru n o Cre e k
• Step 3: Identify and prioritize climate resilience projects - In close
coordination with the Resilient San Bruno Team, the PMT and the
Consultant Team will identify potential climate resilience projects that
could address prioritized vulnerabilities within the watershed.
• Watershed-based plans will be referenced to compile previously
identified project opportunities. Projects identified through the
Community Vulnerability Assessment will also be considered.
• These projects will be prioritized to maximize the climate hazard resilience
benefits provided, in alignment with community priorities.
P ro je c t Ne xt St e p s
• Draft OneWatershed Framework Report for review - January
• Final OneWatershed Framework Report – February/March
• The San Bruno Creek Pilot will be initiated in early 2025
–Public Workshops through spring 2025
• Coordinated with City of San Bruno, OneShoreline and Climate Resilient Communities
–Draft/Final San Bruno Creek OneWatershed Plan fall/winter 2025
Q UESTIO NS?
Reid Bogert, C/CAG Stormwater Program Director – rbogert@smcgov.org
Image Source: http://astanehelaw.com/2020/09/02/san-mateo-county-passes-emergency-ordinance-establishing-paid-sick-leave-for-the-coronavirus-covid-19-pandemic/
ASSET PURCHASE
AGREEMENT WITH COMCAST FOR
THE SALE OF CITYNET SERVICES
JANUARY 28, 2025
CITY COUNCIL
AGENDA
I. Objective
II. Background
III. Sale Terms and Price
IV. Evaluation and Financial Implications
V. Recommendation
2
OBJECTIVE
Approve an Asset Purchase Agreement with Comcast for the
Sale of the San Bruno CityNet Services, Authorizing the City
Manager to Take Certain Actions in Connection therewith and
Finding the Action Exempt from the California Environmental
Quality Act
3
Background
CityNet established 1971
As of 2023, CityNet has negative equity of $21.5 million
Council affirms FY25 initiative to stabilize CityNet fiscal situation
April 2024, request for interest issued
June 2024, authorized to executive letter of intent from Comcast
4
SALE TERMS AND PRICE
• CityNet will continue to operate as it does today, and the City will
continue to bear all costs and receive all customer revenues until
the closing of the sale
• Agreement requires several conditions be met prior to closing:
Comcast must establish a physical interconnection of Comcast’s
cable system with the CityNet cable system
System must have at least 5,000 internet subscribers at close
Closing must occur within 180 days following execution
5
SALE TERMS AND PRICE, continued
Maximum purchase price Comcast will pay for CityNet assets at
the closing is $8 million:
• Purchase price could be reduced if total customers drop
below 5,400 prior to the closing
• Comcast will withhold 10% of the purchase price for one
year from the date of closing to secure the City’s indemnity
obligations
6
SALE TERMS AND PRICE, continued
• Following the closing, the Agreement provides for a transition period of up to 6
months
• During the transition period, the City must continue to operate CityNet while
Comcast performs upgrades and physically transitions customers, area by
area, to Comcast’s service platform
• City must transmit all customer revenues to Comcast, less a management fee
retained by the City in the amount of $75 per customer per month to cover the
City’s costs of operating and maintaining the system
• Sale does not include any real estate assets occupied by CityNet, the CityNet
vehicle fleet, or CityNet employees. Nor will any CityNet vendor or other
contracts be assigned to Comcast, with a few exceptions
• CityNet employees will be governed by the existing memoranda of
understanding 7
EVALUATION AND FINANCIAL
IMPLICATIONS
Net loss
Scenario Upsides Downsides
(millions of $)
• CityNet customers
CityNet • Disposition of lose continuity of
shuts $1.8 - 2.5M CityNet remains on service
down schedule • No sale value to offset
losses
• Remainder of $8
• Sale time tied to
CityNet million sale price
Comcast’s
sold to $1.7 - 1.9M • Continuity of
interconnection and
Comcast service for CityNet
upgrade completion
customers
8
ANALYSIS
• Fiscal Impact – If the sale proceeds and closes, the City would
receive $8 million - less any reduction for loss of customers as
provided in the APA, costs associated with the negotiation,
communications and transition of the CityNet service, and any
actual indemnification claims
• Environmental Impact – Exempt
9
RECOMMENDATION
• Public comment
• Questions and comments from City Council
• Adopt a Resolution Approving an Asset Purchase Agreement with
Comcast of California IX, Inc. for the Sale of the San Bruno
CityNet Services, Authorizing the City Manager to Take Certain
Actions in Connection therewith and Finding the Action Exempt
from the California Environmental Quality Act
10
CityNet to Comcast Transition:
Ensuring a Seamless Experience
1
For Headlines Use Comcast New Vision Semibold 24pts
• For optional sub-heading use Comcast New Vision Light
• For bullet copy use Comcast New Vision Regular
2
3
Customer Impact and Support
• Ensuring a Seamless Experience for Residents
CityNet
Customers
Continue with
Minimal Pop up Stores Multichannel
Network
Disruption and Community Marketing Device Upgrades
Upgrades
During outreach Campaign
Transition to
Comcast
Network
4
5
MUNICIPAL CODE AMENDMENTS
TO CHAPTER 10.24 AND 10.28
JANUARY 28, 2025
CITY COUNCIL
OBJECTIVE
Consideration of introduction of an ordinance to amend the
Municipal Code to Repealing Chapter 10.24 Municipal Cable
Television And Communications System and Amending Chapter
10.28 State Video Franchises
2
BACKGROUND
• Digital Infrastructure and Video Competition Act of 2006
(DIVCA), codified in California Public Utilities Code Section
5800, et seq.and the proposed sale of CityNet to Comcast
require changes to Title 10 of the San Bruno Municipal Code
• DIVCA does not apply to municipal cable systems such as
CityNet but does apply to private companies like Comcast
3
PROPOSED CODE AMENDMENTS
• Repeals provisions in Chapter 10.24 governing CityNet as it will
no longer be relevant upon the sale of CityNet assets to
Comcast
• Amends Chapter 10.28 to fully exercise the regulatory authority
that the city retains over holders of state video franchises such
as Comcast under DIVCA, including to collect franchise fees and
public, educational and governmental access (PEG) fees
4
ANALYSIS
• Fiscal Impact – None
• Environmental Impact – Not subject to CEQA
5
RECOMMENDATION
• Public comment
• Questions and comments from City Council
• Recommended Action:
Introduce, read by title only and waive further reading of an
Ordinance of the City Council of the City of San Bruno
Repealing Chapter 10.24 (Municipal Cable Television And
Communications System) and Amending Chapter 10.28
(State Video Franchises) and Finding Such Action Exempt
from the California Environmental Quality Act
6